36E77618R0104-002.pdf
PDF 27 KB Posted
- Attached to
- Modernize Existing Chillers - Iowa City
- Solicitation number
- 36E77618R0104
About this file
36E77618R0104 ATTACHMENT 1 - SOW - Modernize Existing Chillers.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0008-000.docx | DOCX document | |
| 36E77618R0104-0005003.pdf | ||
| 36E77618R0104-0005001.pdf | ||
| 36E77618R0104-0005000.docx | DOCX document | |
| 36E77618R0104-0005002.pdf | ||
| 36E77618R0104-0005004.pdf | ||
| 36E77618R0104-0004000.docx | DOCX document | |
| 36E77618R0104-0003000.docx | DOCX document | |
| 36E77618R0104-0003001.pdf | ||
| 36E77618R0104-0002001.pdf | ||
| 36E77618R0104-0002005.zip | ZIP file | |
| 36E77618R0104-0002004.pdf | ||
| 36E77618R0104-0002003.pdf | ||
| 36E77618R0104-0002002.pdf | ||
| 36E77618R0104-0002000.docx | DOCX document | |
| 36E77618R0104-0001001.pdf | ||
| 36E77618R0104-0001000.docx | DOCX document | |
| 36E77618R0104-0001002.pdf | ||
| 36E77618R0104-001.docx | DOCX document | |
| 36E77618R0104-007.docx | DOCX document | |
| 36E77618R0104-004.pdf | ||
| 36E77618R0104-003.pdf | ||
| 36E77618R0104-006.pdf | ||
| 36E77618R0104-008.docx | DOCX document | |
| 36E77618R0104-005.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Scope of Work
Modernize Existing Chillers
636A8-16-008
The Modernize Existing Chillers project will replace 1000 ton Chillers 4 and 5 with two high-pressure chillers, along with its associated pumps and piping. The new chillers will be brought on-site and rigged in a disassembled state sufficient to be brought in through the overhead door and through the areas of the demolished pumps and piping. The manufacturer will be responsible for assembly and testing on-site. The base will include installing Magnetic bearing oil-less chillers with variable frequency drives with an alternate deduct for the standard model. This project will also replace the transformer and switchgear that serves the chillers.
The existing control system will be updated with the removal of the DX9100 control modules and replaced with the latest versions. The winter install for both chillers must be performed and finished between the dates of October 1st and April 15th, with expected plant to be fully operational by May 1st.