36E77618R0104-0002004.pdf

PDF 4 MB Posted

Attached to
Modernize Existing Chillers - Iowa City
Solicitation number
36E77618R0104
Issued by

About this file

36E77618R0104 0002 Approved Epoxy Floor Coating Substitution Request.pdf

View the file

Other files

File Type Posted
36E77619C0008-000.docx DOCX document
36E77618R0104-0005003.pdf PDF
36E77618R0104-0005001.pdf PDF
36E77618R0104-0005000.docx DOCX document
36E77618R0104-0005002.pdf PDF
36E77618R0104-0005004.pdf PDF
36E77618R0104-0004000.docx DOCX document
36E77618R0104-0003000.docx DOCX document
36E77618R0104-0003001.pdf PDF
36E77618R0104-0002001.pdf PDF
36E77618R0104-0002005.zip ZIP file
36E77618R0104-0002003.pdf PDF
36E77618R0104-0002002.pdf PDF
36E77618R0104-0002000.docx DOCX document
36E77618R0104-0001001.pdf PDF
36E77618R0104-0001000.docx DOCX document
36E77618R0104-0001002.pdf PDF
36E77618R0104-001.docx DOCX document
36E77618R0104-007.docx DOCX document
36E77618R0104-004.pdf PDF
36E77618R0104-003.pdf PDF
36E77618R0104-006.pdf PDF
36E77618R0104-008.docx DOCX document
36E77618R0104-005.pdf PDF
36E77618R0104-002.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eco-Crete™ HF

System - A three-part, cementitious-polyurethane troweled system for resurfacing interior concrete floors in areas that require thermal shock resistance.

ADVANCE YOUR SUSTAINABILITY GOALS – Utilizes renewable bean oils and environmentally friendly packaging.

LEED® CREDIT – LEED Green Building Certification Program credits may be available:

- Indoor Environmental Quality

- 4.2 Low-Emitting Materials, Paint & Coatings

- Material and Resource

- 6 Rapidly Renewable Materials

EXTREME THERMAL STABILITY – Steam cleanable. Formulated to withstand temperature variations up to 250°F (121°C)

SEAMLESS – Hygienic finish; no grout joints

PRIMARY APPLICATIONS

Food & beverage processing facilities Chemical process facilities

Pharmaceutical facilities Pulp and paper mills

Wet processing & packaging areas Commercial kitchens

Freezers and coolers Battery charging areas

Truck unloading areas

BENEFITS

Resistant to fungi growth per ASTM G-21 Low odor, fast installation, fast cure

Impact & abrasion resistant surface suitable for heavy traffic and fork lift operation

Excellent corrosion & chemical resistance

High temperature resistant to 250ºF (121ºC) Anti-slip surface, meets ADA recommendations

Resistant to moisture vapor transmission (MVT) Apply to concrete as new as 7 days

SYSTEM PROPERTIES

Property Test Method Results

Compressive Strength ASTM C579 7800 psi (53.78 MPa)

Tensile Strength ASTM C307 975 psi (6.72 MPa)

Flexural Strength ASTM C580 1,900 psi (10.34 MPa)

Bond Strength ASTM D-4541 100% Concrete Failure

Impact Strength ASTM D-4226 >160 in-lb

Volatile Organic Compound, VOC ASTM D3960 Mixed A+B+C = 0.04 lb/gal (5 g/L)

Resistance to Fungi Growth ASTM G-21 Passes, Rating of 1

Flammability ASTM D635 Self-extinguishing

Testing performed at 70ºF. The data shown above reflects typical results based on laboratory testing under controlled conditions.

Variations from the data shown may result. Test methods are modified where applicable.

INSTALLATION DATA

Coverage rate @ ¼” (6.35 mm) 23 ft2 (2.1 m2) per unit

Application Temperature, ambient 40-85ºF (4.4-29.4ºC)

Application Temperature, material 50-80ºF (10-26.6ºC)

Pot Life, @ 77ºF (25ºC) 15 minutes

Traffic, @77ºF (25ºC) Light: 12 hours / Full: 24 hours

Fully Cured, @ 77ºF (25ºC) 7 days

CHEMICAL RESISTANCE PROPERTIES

1 / 7 Day(s) Eco-Crete

HF

1 / 7 Day(s)

Eco- Crete HF

Acids, Inorganic Solvents (Ketones & Esters)

10% Hydrochloric Acid G / G Methyl Ethyl Ketone (MEK) G / P

30% Hydrochloric Acid (Muriatic) G / G Propylene Glycol Methyl Ether Acetate (PMA)

G* / G

Tennant Company, 701 North Lilac Drive, P.O. Box 1452, Minneapolis, MN 55440-1452 800-553-8033 / www.tennantfloorcoatings.com / © Tennant Company 02/16/16

10% Nitric Acid G / G Miscellaneous Chemicals

50% Phosphoric Acid G / G 20% Ammonium Nitrate G / G

10% Sulfuric Acid G* / G* Brake Fluid E / G

37% Sulfuric Acid (Battery Acid) G* / G* Bleach G* / G*

Acids, Organic Motor Oil (SAE 30) E / E

10% Acetic Acid G / G Skydrol 500B E / E

10% Citric Acid G* / G* Skydrol LD4 E / G*

50% Citric Acid G / G 20% Sodium Chloride E / E

Glacial Acetic Acid G / P 1% Tide Laundry Soap E / E

Lactic Acid 88% G* / G 10% Trisodium Phosphate E / E

Oleic Acid E / G* Castor Oil E / E

Alkalies Vegetable Shortening E / E

10% Ammonium Hydroxide E / E Water E / E

50% Sodium Hydroxide E / E High Fructose Corn Syrup E / E

Solvents (Alcohols) Hydrogen Peroxide G* / G*

30% Ammonium Hydroxide E / G* White Wine G / G

Ethylene Glycol (Antifreeze) E / E Red Wine G* / G*

Isopropyl Alcohol G* / G* Vodka E / E

Methanol G* / G Ketchup G / G*

Solvents (Aliphatic) Mustard G* / G* d-Limonene E / E Coffee G* / G*

Jet Fuel - JP-4 E / E Coke® E / G*

Gasoline E / E Fish Oil E / E

Mineral Spirits E / E Dish Liquid Hand Soap (Full Strength)

G* / G*

Solvents (Aromatic) Octave™ FS Sanitizer G / G

Xylene E / E Registered trademarks: Tide® of Procter and Gamble, Skydrol® of

Solutia, Inc., Octave™ of Ecolab® and Coke of Coca-Cola Co. Solvents (Chlorinated)

Methylene Chloride P / P Results are based on 1-day and 7-day spot testing. Coating cured 2 weeks prior to testing.

ASTM D1308 Test Method 3.1.1 spot test, covered. Results are based on 1-day and 7-day. Coating cured 2 weeks prior to testing.

Legend: E - Excellent (No Adverse Effect) - Recommended. F - Fair (Moderate Adverse Effect) - Not recommended.

G - Good (Limited Adverse Effect) - Use for short-term exposure only. P - Poor (Unsatisfactory) - Little or no resistance to chemical.

*Only adverse effect was staining. NOTE: Reduced chemical resistance and staining is possible in pigmented versions of the system.

GENERAL PRODUCT INFORMATION

STORAGE: Materials should be stored indoors between 65ºF (18ºC) and 80ºF (26.6ºC).

SHELF LIFE: 6 months

PACKAGING

OPTIONS / PART

NUMBERS:

Eco-Crete™ HF

1 gallon / 9014428 (½ gallon Part A, ½ gallon Part B, 1 bag C + 1 powder pigment) 10 gallons / 9014432 (5 gallons Part A, 5 gallons Part B, 10 bags C + 10 powder pigments) 500 gallons / 9014435 (250 gallons Part A, 250 gallons Part B, 500 bags C + 500 powder pigments) Eco-Crete™ CB

9014446 (0.25 gallon Part A, 0.25 gallon Part B, 1 bag C + 1 powder pigment)

OPTIONS: Colors: Available in Red, Gray, Dark Gray, Tan, Green, Blue, Safety Yellow and Black Cove: A seamless, smooth transition can be created between the flooring and wall using Eco-Crete

CB.

LIMITATIONS: Contamination (Fisheyes): Product may not adhere if oil, silicones, mold release agents or other contaminants are present.

Movement: Moving joints and cracks will reflect through the installed system. 7 day old concrete may be coated, but any shrinkage cracks that form may show in the Eco-Crete.

UV/Light Stability: This product is not light stable and will yellow/amber over time unless topcoated with optional UV resistant topcoat.

Product Stability: Part A and Part B resins must not be allowed to freeze. If you suspect product has frozen, please call Tennant technical support.

IMPORTANT: READ AND FOLLOW ALL PRECAUTIONS AND INSTRUCTIONS BEFORE PROCEEDING.

PLEASE SEE MATERIAL SAFETY DATA SHEET (MSDS) FOR HANDLING PROCEDURES.

USE PRODUCT AS DIRECTED.

KEEP OUT OF THE REACH OF CHILDREN.

PRELIMINARY FLOOR INSPECTIONS

http://www.tennantfloorcoatings.com/

CHECK THE TEMPERATURE AND HUMIDITY: Floor temperature should be between 40°F (4.4°C) and 85°F (29.4°C) and material temperature should be between 50°F (10°C) and 80°F (26.6°C) for Eco-Crete HF. Humidity must be less than 80%.

DO NOT coat unless floor temperature is more than five degrees over the current, local dew point.

BARE CONCRETE

CHECK THE CONCRETE: Concrete must be structurally sound and free of curing membrane, paint and/or other sealer with no standing water. If you suspect that the concrete has been previously sealed, call Tennant Company Tech Support for further instructions.

APPLICATION EQUIPMENT

Protective clothing For optional cove Eco-Crete CB:

Spiked shoes Chalk line

Screed Box Duct tape

Mortar mixer – (Baugh, Imer or Kol mixer) Cove strips

Mohair / Adhesive Roller Paint brushes

Roller Assembly 4” (106.6 mm) Roller Frame with covers

Trowel (stainless steel), 4”x12” (101.6 x 304.8 mm) Pool Trowel, Notch Trowel and Margin Trowel

Trowel (stainless steel), 3/8” (9.5 mm) or ½” (12.7 mm) radius cove trowel

Putty Knife

ASSEMBLE EQUIPMENT: Due to the limited pot life of the material, all application equipment, etc. should be ready for immediate use. (Clean roller with tape to remove any residual lint.)

PREPARATION

Detergent scrub and rinse with clean water to remove surface dirt, grease, oil and contaminants.

Steel shot blast (minimum shot size of 330) to a minimum surface profile of CSP-5 meeting ICRI (International Concrete Repair Institute) standard guideline #310.2R. Use magnetic broom to remove excess shot, sweep to remove large debris and vacuum to remove fine dust.

Scarify: Sweep to remove large debris and vacuum to remove fine dust.

Key-in all termination points, drains and joints that may move with a 1/4" (6.35 mm) by 1/4" (6.35 mm) cut.

Patch all depressions, divots and stress cracks in concrete with Eco-Crete HF.

JOINTS: Fill all static (non-moving) cracks or control joints with Eco-Crete HF. Cracking of the resurfacer will occur over joints that are overlayed and later move. Because resurfacers are not flexible, joints that might move should be honored (cut) after the installation and filled with Eco-PJF or Eco-EJF. Isolation joints must be honored and filled with a flexible material designed for this purpose.

APPLICATION - OVERLAY - ECO-CRETE™ HF

COVERAGE RATE: Coverage rate will depend upon application thickness. A one bag mix will nominally cover (finished floor):

23 ft2 (2.1 m2) @ 1/4" (6.35 mm)

To achieve a 1/4" (6.35 mm) finished floor, set the screed box at 5/16" (7.94 mm). For a 3/8" (9.53 mm) floor, set the screed box at 7/16” (11.11 mm). If material is too thick, it will be more difficult to level.

Pour out 0.50 gallons (1.89 litres) Eco-Crete Part A into a measuring container. Then, POUR THE MEASURED PART A INTO THE MORTAR MIXER. Begin mixing.

ADD ONE POWDER PIGMENT BAG TO PART A and mix for about 15 seconds.

Pour out 0.50 gallons (1.89 litres) Eco-Crete Part B into a measuring container that is separate from the one used with the Part A. Then, ADD THE MEASURED PART B TO THE PART A already in the mortar mixer.

MIX FOR APPROXIMATELY 30 SECONDS or until thoroughly blended using the mortar mixer.

GRADUALLY ADD ALL CONTENTS OF A BAG OF ECO-CRETE HF FILLER into the liquid mixture in the mortar mixer. Blend thoroughly until all particles are wetted out, normally about two minutes. NOTE: It is critical to use the same mixing sequence to ensure color consistency throughout the entire application.

POTLIFE AT 75°F: Mix only enough material, which can be screeded, troweled and backrolled in a 15-minute period.

POUR THE MIXED MATERIAL INTO THE SCREED BOX AND SPREAD MATERIAL within 3 minutes of mixing.

TROWEL THE SURFACE LIGHTLY, USING A STEEL FINISH TROWEL to smooth the surface. Finish trowel strokes should all be in the same direction. Do not overwork the mortar. The material should be troweled to a finished thickness of at least ¼” to 3/8”. For thicknesses greater than 1”, add 25 lbs. of clean, dry 3/8” pea gravel to the mixture to help reduce the heat generated during cure. NOTE: If pea gravel is used, it is not a usable surface. It must be overlayed with another layer of the standard mix.

IMMEDIATELY ROLL THE SURACE LIGHTLY IN NO MORE THAN TWO PASSES with a mohair roller. Excessive rolling or use of loop roller will reduce slip resistance. NOTE: Late or heavy rolling may induce pinholes.

LAY ABUTTING EDES WITHIN 10 MINUTES to ensure a clean edge. A “wet edge” installation is imperative during large placements to avoid lines and ridges in the finished floor.

ALLOW COATING TO DRY 24 HOURS at 75°F (24°C), 50% relative humidity before opening to light traffic. Allow more time at low temperatures, low humidity or for heavier traffic. Full coating properties take 14 days to develop.

APPLICATION – OPTIONAL COVE – ECO-CRETE™ CB

NOTE: Cove installation may be done before placement of the floor; however, a smoother transition is achieved by installing the cove after the floor has been placed.

COVERAGE RATE:

The cove mix below typically covers 35 lineal feet (10.7 meters) at a height of 4 inches (101.6 mm). The coverage of the Eco-Crete CB could vary depending on its thickness (cove shape). The primer mix will cover 120 ft2 (11.1 m2).

APPLICATION – PRIMER – ECO-CRETE TC

Pour out 0.50 gallons (1.89 litres) Eco-Crete Part A into a measuring container. Then, POUR THE MEASURED PART A INTO

THE MIXING CONTAINER.

Pour out 0.50 gallons (1.89 litres) Eco-Crete Part B into a measuring container that is separate from the one used with the Part A. Then, ADD THE MEASURED PART B TO THE PART A already in the mixing pail, and mix for 15 seconds. POTLIFE:

Mix only enough material that can be applied within a 15-minute period.

GRADUALLY ADD ALL CONTENTS OF A BAG OF ECO-CRETE TC FILLER into the liquid mixture and blend thoroughly until all particles are wetted out, normally about 2 minutes.

APPLY PRIMER TO WALL BASE OR EQUIPMENT PADS using a paint brush or roller that will receive cove. Allow primer to dry.

APPLICATION – COVE – ECO- CRETE CB

Pour out 0.25 gallons (0.95 litres) Eco-Crete Part A into a measuring container. Then, POUR THE MEASURED PART A INTO THE MORTAR MIXER. Begin mixing.

ADD ONE POWDER PIGMENT BAG TO PART A and mix for about 15 seconds.

Pour out 0.25 gallons (0.95 litres) Eco-Crete Part B into a measuring container that is separate from the one used with the Part A. Then, ADD THE MEASURED PART B TO THE PART A already in the mortar mixer. POTLIFE: Mix only enough material that can be applied within a 15-minute period.

POUR ONE BAG PART C into the mortar mixer. Mix until uniform (approximately one minute). The resin needs to completely wet out the sand.

POUR THE MIXED MATERIAL along wall or at the base of equipment pads.

USE COVE TROWELS to apply, compact and finish material.

ALLOW COATING TO DRY 24 HOURS at 75°F (24°C), 50% relative humidity before opening to light traffic. Allow more time at low temperatures, low humidity or for heavier traffic. Full coating properties take 14 days to develop.

TECHNICAL SUPPORT

For any preparation or application questions, please call Tennant technical support at 800-228-4943, option 4 (US & Canada), 800-832-8935 (International).

DISPOSAL

Dispose of all excess material, packaging and other waste in accordance with federal, state and local regulations.

MAINTENANCE GUIDELINES

Allow floor coating to cure at least one week before cleaning by mechanical means (e.g., sweeper, scrubber, disc machine).

Care: Proper maintenance will increase the life and help maintain the appearance of your new Tennant floor coating. Sweep and scrub your new coating regularly, as dirt and dust are abrasive and can quickly dull the finish, decreasing the life of your coating. Remove spills quickly as certain chemicals may stain and could possibly permanently damage the finish.

Use soft nylon brushes or white pads on your new floor coating. Any brush more abrasive than a soft nylon or white pad can cause premature loss of gloss.

Detergent: Tennant has a full range of detergents--general purpose to heavy duty--for your cleaning needs. For assistance in determining which detergent is right for your facility or for additional technical information call: 800-228-4943, option 4 (US & Canada), 800-832-8935 (International).

Caution: Avoid scratching or gouging the surface. All floor coatings will scratch if heavy objects are dragged across the surface.

Do not drop heavy or pointed items on the floor as this may causing chipping or concrete popouts in the case of a weak cap.

Rubber tires can permanently stain the floor coating from plasticizer migration. Plexiglass® between the tire and the floor coating can prevent discoloration.

Rubber burns from quick stops and starts can heat the coating to its softening temperature, causing permanent marking.

Repair: Repair gouges or scratches or chip outs as soon as possible to prevent moisture or chemical contamination.

CONDITIONS OF SALE AND LIMITATION OF WARRANTY AND LIABILITY

This warranty applies to all Specialty Surface Coatings, with the following exceptions: Eco-Hard-N-Seal™, Eco-EDP™ (Electrostatic Dissipative Primer), Eco-EDE™ (Electrostatic Dissipative Epoxy), and SDS™ (Static Dissipative System). These products have a separate warranty policy.

Tennant Company warrants its Specialty Surface Coatings to be free from defective manufacture, improper formulation, and defective ingredients. Warranty covers replacement of materials only.

THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.

In no event shall Tennant or Seller be liable for any incidental, consequential, or special damages arising out of the use of Tennant Specialty Surface Coatings. THE ONLY REMEDY OF THE USER OR BUYER, AND THE ONLY LIABILITY OF TENNANT AND SELLER FOR ANY AND ALL CLAIMS, LOSSES, INJURIES, OR DAMAGES (INCLUDING CLAIMS BASED ON BREACH OF WARRANTY, CONTRACT, NEGLIGENCE, STRICT LIABILITY, OR OTHERWISE) SHALL BE REPLACEMENT OF THE PRODUCT OR, AT THE ELECTION OF TENNANT OR SELLER, RETURN OF THE PURCHASE

PRICE.

No representative of Tennant has authority to give any other warranty or assume other liability. The presence of a Tennant employee during the application of Tennant’s Specialty Surface Coatings does not extend or alter the warranty or limitations in any manner whatsoever.

P R O D U C T B U L L E T I N EEccoo--HHTTSS™™ 110000

SSaattiinn UUrreetthhaannee TTooppccooaatt

Tennant Company (Headquarters) 701 North Lilac Drive, P.O. Box 1452

Minneapolis, MN 55440-1452 800-553-8033 / www.tennantco.com

Tennant Company (Australia) Head Office: Unit 2 Block Y, 391 Park Road, P.O. Box 116

Regents Park NSW 2143 Sales: 1800 226 843 / www.tennantco.com

© Tennant Company 12/19/13 Page 1 of 4

DESCRIPTION:

High solids, three-component, aliphatic, moisture-cure urethane applied over an epoxy primer or used to recoat an existing epoxy or urethane floor.

USES:

Designed for loading docks, main traffic aisles and areas that call for light stability with a satin appearance.

ADVANTAGES:

Lasts twice as long as standard urethanes; up to four times as long as standard epoxies

Light stable, satin-finish maintains fresh look in traffic aisles

Resists Skydrol®, jet fuels and other industrial chemicals

Low VOC (5 g/L). (Complies with SCAQMD VOC regulations. LEED credits available.)

STORAGE: Materials should be stored indoors between

65ºF (18ºC) and 90ºF (32ºC).

SHELF LIFE: Two years from date of manufacture.

PACKAGING OPTIONS / PART NUMBERS:

Eco-HTS 100:

1.09 gallons (4.13 litres) / 9002617

5.5 gallons (20.82 litres) / 9002621

OPTIONS:

Colors: All 100 Series Colorants may be added to Eco-HTS 100. 100 Series colorants must be used if VOC of the mix needs to be <100 g/L. Standard colorants can also be used in Eco-HTS 100.

It is important to have a consistent base coat in a similar color before application or multiple coats may be needed.

Use colorants at the rate of 1 unit per gallon (3.78 litres) of Eco-HTS 100.

Traction: To improve traction in slip hazard areas, use

Tennant 291 Grit. See 291 Grit Product Bulletin.

LIMITATIONS:

Contamination (Fisheyes): Products may fisheye if oil, silicones, mold release agents or other contaminants are present.

MATERIAL PROPERTIES (LIQUID):

Flash Point F/C

Seta Closed Cup

ASTM D3278 A - >200 / 93

B - >200 / 93

Percent Solids, by wt

ASTM D2369 A - 99.35

B - 59.23 C- 100.00 A+B+C = 94.00

Density lb/gal / kg/L

ASTM D1475

(A/B)

A - 9.56 / 1.15 B - 9.54 / 1.15 C- 33.00/3.96 A+B+C=11.93 / 1.43

Viscosity, cps Brookfield

ASTM D2196 A+B+C=700-800

Volatile Organic Compound - VOC lb/gal (g/L)

ASTM D3960 Mixed A+B+C

0.05 (6)

CURED COATING PROPERTIES (DRY FILM):

Abrasion Resistance, mg loss Taber Abraser

ASTM D4060* 18

Coefficient of Friction -

COF

James Friction Tester

ASTM D2047 0.63

Dry Film Thickness mils (microns)

3.0 (1 coat) (76.2)

Tensile Strength, psi (MPa) (resin only)

ASTM D2370 6,250 (43.092)

Percent Elongation

(resin only)

ASTM D2370 6

König Hardness (3 mil / 76.2 micron film) (resin only)

ASTM D4366 171.3

*CS-17 Taber Abrasion Wheel, 1,000 gram load, 1,000 revolutions Based on independent lab testing of Eco-HTS™.

Results are based on conditions at 77F (25°C), 50% relative humidity.

APPLICATION CHARACTERISTICS:

A gallon (litre) of Eco-HTS 100 will cover:

Coverage Rate, ft /gal (m

/L) 500 (12.3)

Application Thickness, wet mils (microns)

3.2 (81) 1 coat

Results are based on conditions at 77°F (25°C), 50% relative http://www.tennantco.com/

Eco-HTS™100 © Tennant Company 03/17/10 Page 2 of 4

CHEMICAL RESISTANCE

UNPIGMENTED - ECO-HTS 100 1 Day 7 Days

Acids, Inorganic

10% Hydrochloric Acid E E

30% Hydrochloric Acid (Muriatic) E E

10% Nitric Acid E E

50% Phosphoric Acid E G

37% Sulfuric Acid (Battery Acid) E E

Acids, Organic

10% Acetic Acid E E

10% Citric Acid E E

Oleic Acid E E

Alkalies

10% Ammonium Hydroxide E E

50% Sodium Hydroxide E E

Solvents (Alcohols)

Ethylene Glycol (Antifreeze) E E

Isopropyl Alcohol E E

Methanol E E

Solvents (Aliphatic) d-Limonene E E

Jet Fuel - JP-4 E E

Gasoline E E

Mineral Spirits E E

Solvents (Aromatic)

Xylene E E

Solvents (Chlorinated)

Methylene Chloride P P

Solvents (Ketones & Esters)

Methyl Ethyl Ketone (MEK) E E

Propylene Glycol Methyl Ether Acetate

(PMA)

E E

Miscellaneous Chemicals

20% Ammonium Nitrate E E

Brake Fluid E E

Bleach E E

Motor Oil (SAE 30) E E

Skydrol 500B E E

Skydrol LD4 E E

20% Sodium Chloride E E

1% Tide Laundry Soap E E

10% Trisodium Phosphate E E

Based on 1-day and 7-day spot testing on concrete.

Coating cured 2 weeks prior to testing.

Legend:

E - Excellent (No Adverse Effect) - Recommended.

G - Good (Limited Adverse Effect) - Use for short-term exposure only.

F - Fair (Moderate Adverse Effect) - Not recommended.

P - Poor (Unsatisfactory) - Little or no resistance to chemical.

Note: Reduced chemical resistance and increased staining is possible in pigmented versions of this system.

Tide is a registered trademark of Proctor and Gamble.

Skydrol is a registered trademark of Monsanto.

IMPORTANT:

READ AND FOLLOW ALL PRECAUTIONS AND

INSTRUCTIONS BEFORE PROCEEDING.

CHECK THE CONCRETE: Concrete must be structurally sound and free of curing membrane, paint or other sealer. If you suspect that the concrete has been previously sealed, call Tennant Company, technical support for further

CHECK FOR MOISTURE: Concrete must be dry before application of this floor coating material. Concrete moisture testing must occur. Calcium chloride testing or in-situ relative humidity testing is recommended. Readings must be below 3 pounds per 1,000 square feet (1.5 kg per 150m

) over a

24-hour period on the calcium chloride test or below 75% relative internal concrete humidity. Test methods can be purchased at www.astm.org, see ASTM F1869 or F2170, respectively or follow manufacturer's instructions.

NOTE: Although testing is critical, it is not a guarantee against future problems. This is especially true if there is no vapor barrier or the vapor barrier is not functioning properly and/or you suspect you may have concrete contamination from oils, chemical spills or excessive salts.

CHECK THE TEMPERATURE AND HUMIDITY: Floor temperature and materials should be between 65°F (18°C) and 90°F (32°C). Humidity must be less than 80%. DO NOT coat unless floor temperature is more than five degrees over the dew point.

Protective clothing

Jiffy Mixer Blade

[Tennant Part No. 08643-1 (small unit) or 08643-5 (large unit)]

Slow speed drill (500 rpm or less)

Roller Assembly

Shed Resistant, 3/8" (10mm) Nap Rollers

Application Tray

Disc machine

60 grit sandpaper [Tennant Part No. 65449]

80 grit sandpaper [Tennant Part No. 65450]

ASSEMBLE EQUIPMENT: Clean roller with tape to remove any residual lint.

Detergent scrub and rinse with clean water to remove surface dirt, grease, oil and contaminants.

JOINTS: Depending on the preference of the facility owner, joints may or may not be filled. If the joints are filled, non-moving joints, i.e. contraction or control joints, can be hard filled with thickened, 100% solids epoxy or with a semi-rigid joint filler such as Eco-PJS™ or Eco-EJF™. Construction joints less than one inch wide may also be filled with Eco-PJS. Isolation or expansion joints must be filled with a flexible material designed for this purpose. Coating applied over filled joints will crack if there is concrete movement.

Eco-HTS™100 © Tennant Company 03/17/10 Page 3 of 4

RECOAT

Eco-HTS 100 may be used to coat over an existing epoxy or urethane in sound condition. Floor must be sanded thoroughly with 80 grit paper/60 grit screen prior to recoating.

If sanding a high wear urethane, use 60 grit paper as the filler in high wear urethanes will wear down the paper very quickly.

Change the paper every 200 sq. ft. (18.6 m

) so abrasive stays sharp.

We recommend thorough sanding with a swing-type buffer so that multiple scratch marks cause an obvious gloss loss on all areas (depressions will remain shiny), and the floor is uniformly dulled. The ability to see individual scratch marks is an indication that sanding is not adequate. Scrub with detergent and rinse with clean water before coating.

BARE CONCRETE APPLICATION - PRIMER

ECO-HTS 100 MUST BE APPLIED OVER A TENNANT

100% SOLIDS EPOXY PRIMER. (See appropriate epoxy product bulletin for application instructions.)

EPOXY MUST BE THOROUGHLY SANDED AND

CLEANED PRIOR TO APPLICATION OF ECO-HTS 100

unless Eco-HTS 100 can be applied within the recoat window. The window is 24 hours for floor temperatures 65°F-90°F (18°C-32°C).

APPLICATION – COATING

PREMIX PART A FOR 3 MINUTES USING A JIFFY®

MIXER BLADE with slow speed drill. POTLIFE: Mix only enough material which can be used in a two-hour period.

NOTE: Once opened, this material cannot be resealed for later use.

COLORS: Premix Tennant Colorants (100 series colorants must be used to achieve 100 g/L VOC) before adding to Eco-HTS 100 to ensure uniform color. Add colorant to Eco-HTS 100 A.

POUR PART C INTO PART A while mixing. NOTE: The materials in this container are not blended. The entire amount MUST be added.

CONTINUE TO MIX AND ADD PART B.

MIX FOR 3 MINUTES using a Jiffy® mixer blade and slow speed drill. Pour into application tray.

APPLY ECO-HTS 100 at the rate of 500 sq. ft. per gallon

(12.3 m /L) with a 3/8" (10 mm) nap roller. For proper appearance and development of physical properties, it is crucial that material is not applied above or below this rate.

Dip the roller in the coating and lightly roll out excess in the application tray. Apply two 8-10 foot (2.4-3.0 meter) long paths on the concrete, making one stroke left to right and one right to left. Rewet the roller and apply two more paths adjacent to the first pair. Rewet roller and apply a third pair adjacent to the second.

SPREAD THE MATERIAL evenly with V-shaped cross passes.

MAKE SURE THE FLOOR HAS JUST ENOUGH COATING

TO COVER EVENLY. Excess material could cause the floor to blister, especially in high humidity. Insufficient material will cause the floor to look non-uniform.

LEVEL THE AREA with straight passes that cross the initial material paths. These final strokes will reduce roller marks.

If the appearance is not satisfactory, reroll the area.

REMIX THE MATERIAL in the tray occasionally (with the roller) to prevent settling of the Part C (filler).

NOTE: When multiple applicators are used to apply material, inconsistencies between areas may result. To ensure a more uniform finish, an individual outfitted with spike shoes may finish by pushing or pulling a roller across all applicator areas.

ALLOW COATING TO DRY 24 HOURS at 75°F (24°C), 50% relative humidity before opening to light traffic. Allow more time at low temperatures, low humidity or for heavier traffic.

Full coating properties take 14 days to develop.

For any preparation or application questions, please call Tennant technical support at 800-228-4943 ext. 6075 (1800 226 843 Aust).

DISPOSAL

Dispose in accordance with federal, state and local regulations.

PLEASE SEE MATERIAL SAFETY DATA

SHEET (MSDS) FOR SAFETY AND

PRECAUTIONS.

USE PRODUCT AS DIRECTED.

KEEP OUT OF THE REACH OF

CHILDREN.

Eco-HTS™100 © Tennant Company 03/17/10 Page 4 of 4

MAINTENANCE GUIDELINES

Allow floor coating to cure at least one week before cleaning by mechanical means (e.g., sweeper, scrubber, disc machine).

Care: Proper maintenance will increase the life and help maintain the appearance of your new Tennant floor coating.

Sweep and scrub your new coating regularly, as dirt and dust are abrasive and can quickly dull the finish, decreasing the life of your coating. Remove spills quickly as certain chemicals may stain and could possibly permanently damage the finish.

Use soft nylon brushes or white pads on your new floor coating. Polypropylene or abrasive bristle (Tynex) brushes can cause premature loss of gloss.

Detergent: Tennant has a full range of detergents--general purpose to heavy duty--for your cleaning needs. For assistance in determining which detergent is right for your facility or for additional technical information call: 800-553- 8033 US (1800 226 843 Aust).

Caution: Avoid scratching or gouging the surface. All floor coatings will scratch if heavy objects are dragged across the surface.

Do not drop heavy or pointed items on the floor as this may causing chipping or concrete popouts in the case of a weak cap.

Rubber tires can permanently stain the floor coating from plasticizer migration. Plexiglass® between the tire and the floor coating can prevent discoloration.

Rubber burns from quick stops and starts can heat the coating to its softening temperature, causing permanent marking.

Repair: Repair gouges or scratches or chip outs as soon as possible to prevent moisture or chemical contamination.

CONDITIONS OF SALE AND LIMITATION OF

WARRANTY AND LIABILITY

This warranty applies to all Specialty Surface Coatings, with the following exceptions: Eco-Hard-N-Seal™, Eco-EDP™ (Electrostatic Dissipative Primer), Eco-EDE™ (Electrostatic Dissipative Epoxy), and SDS™ (Static Dissipative System). These products have a separate warranty policy.

Tennant Company warrants its Specialty Surface Coatings to be free from defective manufacture, improper formulation, and defective ingredients. Warranty covers replacement of materials only.

THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER

WARRANTIES EXPRESSED OR IMPLIED, INCLUDING,

BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF

MERCHANTABILITY AND FITNESS FOR A PARTICULAR

PURPOSE.

In no event shall Tennant or Seller be liable for any incidental, consequential, or special damages arising out of the use of Tennant Specialty Surface Coatings. THE ONLY

REMEDY OF THE USER OR BUYER, AND THE ONLY

LIABILITY OF TENNANT AND SELLER FOR ANY AND

ALL CLAIMS, LOSSES, INJURIES, OR DAMAGES

(INCLUDING CLAIMS BASED ON BREACH OF

WARRANTY, CONTRACT, NEGLIGENCE, STRICT

LIABILITY, OR OTHERWISE) SHALL BE REPLACEMENT

OF THE PRODUCT OR, AT THE ELECTION OF TENNANT

OR SELLER, RETURN OF THE PURCHASE PRICE.

No representative of Tennant has authority to give any other warranty or assume other liability.

The presence of a Tennant employee during the application of Tennant’s Specialty Surface Coatings does not extend or alter the warranty or limitations in any manner whatsoever.

EEccoo--MMPPEE™™ MMuullttii--PPuurrppoossee EEppooxxyy

Minneapolis, MN 55440-1452 800-553-8033 / www.tennantco.com

Tennant Company (Australia) Head Office: Unit 2 Block Y, 391 Park Road, P.O. Box 116

Regents Park NSW 2143 Sales: 1800 226 843 / www.tennantco.com

© Tennant Company 02/09/09 Page 1 of 4

DESCRIPTION:

Clear, two-component, 100% solids epoxy. Applied at 3 mils (76.2 microns) for priming or up to 30 mils (762 microns) (1/32 inch) as a build coat. Colors are optional.

• To level floor after mechanical prep

• Use as a concrete primer before applying another epoxy or urethane.

• Use over other 100% solids epoxies.

• Use as random crack filler when combined with thickening agents.

• Use as a stand-alone coating. (A finish coat of urethane is recommended.)

• Seals concrete, protecting against dirt and spills

• Cleans easily, saving detergent, labor and water

• Low VOC (4 g/L). (Complies with SCAQMD VOC

SHELF LIFE: Minimum 2 years from date of manufacture.

Eco-MPE:

0.75 gallons (2.84 litres) / 370501=A, 370502=B

3.0 gallons (11.34 litres) / 370503 15 gallons (56.78 litres) / 370650

- BULK - Contractor Only - 165 gallons (624.59 litres) / 9004758

Colors: Tennant Colorants may be added to Eco-MPE. Use colorants at a rate of one unit per 3-gallon (11.34 litres) mix of Eco-MPE. Standard Colorants--White, Light Gray, Yellow and Rotunda Red will not impart total hide. Use these colorants at a rate of two units per 3-gallon (11.34 litres) mix of Eco-MPE. (White and Light Gray are only recommended if topcoating with a non-yellowing urethane. Due to possible color inconsistencies, standard colorants Battleship Gray and Medium Gray are only recommended if topcoated.)

Traction: To improve traction in slip hazard areas, use 292 Grit for applications less than 8 mils (203.2 microns). See 292 Grit Product Bulletin.

LIMITATIONS:

Colors: Multiple coats may be needed to achieve complete hide in lighter systems.

UV/Light Stability: This product is not light stable and will yellow/amber over time.

Contamination (Fisheyes): Product may fisheye if oil, silicones, mold release agents or other contaminants are present.

Flash Point °F/C Seta Closed Cup

ASTM D3278 A - >200 / 93

B - >200 / 93

Percent Solids, by wt

ASTM D2369 A - 99.4

B - 99.8

Density lb/gal / kg/L

ASTM D1475 A - 9.22 / 1.11

B - 8.39 / 1.00 A/B - 8.94 / 1.07

Viscosity, cps Brookfield

ASTM D2196 A - 700-1000

B - 350-550 A/B - 500-700

Volatile Organic Compound - VOC lb/gal (g/L)

ASTM D3960 Mixed A + B

0.04 (4)

Abrasion Resistance, mg loss Taber Abraser

ASTM D4060 83.1*

Coefficient of Friction -

COF

James Friction Tester

ASTM D2047 0.59-0.62

Compressive Strength, psi (MPa)

ASTM D695 13,500 (93.079)

Tensile Strength, psi (MPa)

ASTM D2370 8,000 (55.158)

Percent Elongation ASTM D2370 5

Shore D Hardness ASTM D2240 80-85 @ 0 sec 75-80 @ 15 sec

*Independent Lab Test Result CS-17 Taber Abrasion Wheel, 1,000 gram load, 1,000 revolutions

Results are based on conditions at 77°F (25°C), 50% relative

Coverage rate will depend upon application coating thickness as well as the texture and porosity of the concrete. A gallon (litre) of Eco-MPE will cover:

Coverage Rate, ft2/gal (m2/L) 53-535 (1.3-13.1)

Application Thickness, wet/dry mils (microns) 3-30 (76.2-762)

Eco-MPE © Tennant Company 02/09/09 Page 2 of 4

CHEMICAL RESISTANCE

CLEAR - ECO-MPE 1 Day 7 Days

Acids, Inorganic

10% Hydrochloric Acid E E

30% Hydrochloric Acid (Muriatic) E G

10% Nitric Acid E G

50% Phosphoric Acid F F

37% Sulfuric Acid (Battery Acid) G G

Acids, Organic

10% Acetic Acid G F

10% Citric Acid G G

Oleic Acid G F

Alkalies

10% Ammonium Hydroxide E E

50% Sodium Hydroxide E E

Solvents (Alcohols)

Ethylene Glycol (Antifreeze) E G

Isopropyl Alcohol F P

Methanol F F

Solvents (Aliphatic) d-Limonene G G

Jet Fuel - JP-4 E E

Gasoline G G

Mineral Spirits E E

Solvents (Aromatic)

Xylene F F

Solvents (Chlorinated)

Methylene Chloride P P

Solvents (Ketones & Esters)

Methyl Ethyl Ketone (MEK) P P

Propylene Glycol Methyl Ether Acetate

(PMA)

F F

Miscellaneous Chemicals

20% Ammonium Nitrate E E

Brake Fluid F F

Bleach E E

Motor Oil (SAE 30) E E

Skydrol® 500B F F

Skydrol® LD4 F F

20% Sodium Chloride E E

1% Tide® Laundry Soap E E

10% Trisodium Phosphate E E

Legend:

E - Excellent (No Adverse Effect) - Recommended.

G - Good (Limited Adverse Effect--such as softening or staining) -

Use for short-term exposure only.

F - Fair (Moderate Adverse Effect) - Not recommended.

P - Poor (Unsatisfactory) - Little or no resistance to chemical.

Note: Reduced chemical resistance and increased staining is possible in pigmented versions of this system.

Tide is a registered trademark of Proctor and Gamble.

Skydrol sound and free of curing membrane, paint or other sealer. If you suspect that the concrete has been previously sealed, testing must occur. Calcium chloride testing or in-situ relative humidity testing is recommended. Readings must be below 3 pounds per 1,000 square feet (1.5 kg per 150m

) over a

24-hour period on the calcium chloride test or below 75% relative internal concrete humidity. Test methods can be purchased at www.astm.org, see ASTM F1869 or F2170, respectively or follow instructions from the suppliers of these tests.

vapor barrier or the vapor barrier is not functioning properly and 90°F (32°C). Humidity must be less than 80%. DO NOT coat unless floor temperature is more than five degrees over the dew point.

• Protective clothing

• Jiffy Mixer Blade

[Tennant Part No. 08643-1 (small unit) or 08643-5 (large unit)]

• Slow speed drill (500 rpm or less)

• 18-24" (46-61 cm) Flat rubber squeegee

• 18-24" (46-61 cm) Notched rubber squeegee

• Roller Assembly

• Shed Resistant, 3/8" (10 mm) Nap Rollers

• Spiked shoes

• 60 grit sandpaper [Tennant Part No. 65449]

• 80 grit sandpaper [Tennant Part No. 65450]

• 100 grit sandpaper [Tennant Part No. 65451]

ASSEMBLE EQUIPMENT: Due to the limited pot life of the material, all application equipment, etc. should be ready for immediate use. (Clean roller with tape to remove any residual lint.)

THIN FILM APPLICATIONS (3-10 mils / 76.2-254 microns):

Acid Etch (bare concrete): Detergent scrub and rinse with clean water.

Tennant Eco-Prep™ or Diamond Grind: Scrub with Tennant Acid Wash and rinse with clean water (results of diamond grinding may vary depending on technique and the hardness of the concrete. Additional mils may be required).

Eco-MPE © Tennant Company 02/09/09 Page 3 of 4

Light Blast: Use magnetic broom to remove excess shot, sweep to remove large debris and vacuum to remove fine dust.

THICK FILM APPLICATIONS (11-30 mils / 279.4-762 microns):

Steel Shot Blast: Use magnetic broom to remove excess shot, sweep to remove large debris and vacuum to remove fine dust.

Scarify: Sweep to remove large debris and vacuum to remove fine dust.

JOINTS: Depending on the preference of the facility owner, joints may or may not be filled. If the joints are filled, non-moving joints, i.e. contraction or control joints, can be hard filled with thickened, 100% solids epoxy or with a semi-rigid joint filler such as Eco-PJS™ or Eco-EJF™. Construction joints less than one inch wide may also be filled with Eco-PJS. Isolation or expansion joints must be filled with a flexible material designed for this purpose. Coating applied over filled joints will crack if there is concrete movement.

APPLICATION - PRIMER COAT

A thin coat of primer will wet out concrete, help seal off concrete pores and minimize outgassing bubbles. Apply a tight coat of primer with a clean, flexible squeegee.

Backrolling is not recommended. There should be no mil build over the high spots of the concrete.

COVERAGE RATE will depend upon coating thickness.

Much of this will soak into porous concrete. A gallon (litre) of Eco-MPE will cover:

535 ft

(13.1 m

) @ 3 mils (76.2 microns) wet/dry film

400 ft (9.8 m

) @ 4 mils (101.6 microns) wet/dry film

321 ft (7.9 m

) @ 5 mils (127 microns) wet/dry film

PREMIX PART A using a Jiffy® mixer blade and slow speed drill. (This is required for both 3-gallon (11.34 litres) and full-fill 5-gallon (18.9 litres) units.) For full-fill 5’s (18.9 litres), pour out 2 gal (7.56 litres) into a measuring container. Then, pour the measured Part A into a mixing pail.

COLORS: Premix Tennant Colorants to ensure uniform color. Colorant is added to the Part A and mixed using a Jiffy® mixer blade and slow speed drill. NOTE: When using colorant in the bulk units, add the colorant to the Part A that has been measured into the "mixing pail".

ADD ECO-MPE PART B TO PART A (3 GALLONS / 11.34

LITRES TOTAL MIX). For full-fill 5’s (18.9 litres), pour out 1 gal (3.78 litres) Part B into a measuring container that is separate from the one used with the Part A. Then, add the measured Part B to the Part A already in the mixing pail.

POTLIFE: Mix only enough material which can be applied within the work time (time between the addition of Part B to Part A and the completion of all application actions). Check the following chart for work times at various temperatures.

For smaller quantities, use 2 parts PART A to 1 part PART B by volume.

APPROXIMATE WORK TIME (minutes) - °F (°C) 65 (18.3) 70 (21.1) 75 (23.9) 80 (26.7) 90 (32.2)

40 30 25 20 15

MIX FOR 2 MINUTES using a Jiffy® mixer blade and slow speed drill. (Failure to do so could result in lower/diminished coating properties.)

IMMEDIATELY POUR ALL OF THE MIXED MATERIAL

onto the floor in a single bead.

PUSH THE FLAT SQUEEGEE at an even speed with sufficient down pressure to apply the thinnest coat.

START THE SECOND AND REMAINING PASSES by pushing material parallel to the first stroke. Hold the bead of material near the center of the bar. NOTE: Eco-MPE applied thin may "bridge" holes and cracks momentarily before soaking in--make sure the previously squeegeed area is overlapped (halfway). NOTE: The use of spiked shoes will allow freedom of movement on the wet floor.

TO REDUCE OUTGASSING BUBBLES, it is best to wait until the primer has set up enough to walk on before applying a build coat of Eco-MPE. The primer does not need to be sanded if coated within 24 hours at floor temperatures 65°F-90°F (18°C-32°C).

If primer is not coated within 24 hours, it must be sanded with 60 grit paper. We recommend thorough sanding with a swing-type buffer so that multiple scratch marks cause an obvious gloss loss on all areas (depressions will remain shiny), and the floor is uniformly dulled. The ability to see individual scratch marks is an indication that sanding is not adequate. Scrub with detergent and rinse with clean water before coating.

APPLICATION - BUILD COAT - (IF REQUIRED)

COVERAGE RATE will depend upon required thickness. A gallon (litre) of Eco-MPE will cover:

160 ft

(3.9 m

) @ 10 mils (254 microns) wet/dry film

107 ft (2.6 m

) @ 15 mils (381 microns) wet/dry film

80 ft (1.9 m

) @ 20 mils (508 microns) wet/dry film

NOTE: Total Eco-MPE (prime and build coat) should not exceed 35 mils (889 microns).

REPEAT STEPS used for mixing and spreading of the primer coat. A notched squeegee can be used to increase the thickness applied.

*1/16" (1.59 mm) notched squeegee to apply 10-15 mils (254-381 microns) *1/8" (3.18 mm) notched squeegee to apply 15-20 mils (254-508 microns) *1/4" (6.35 mm) notched squeegee to apply more than 20 mils (508 microns) *These guidelines were arrived at by using new squeegees on smooth concrete with little applied pressure. The application rate is affected by worn squeegees, applied pressure and texture of the concrete.

Immediately after the Eco-MPE is applied and there is room to roll, a second person will BACKROLL THE MATERIAL with a 3/8” (10 mm) roller to a smooth and uniform appearance. NOTE: Get off the Eco-MPE as soon as possible.

ALLOW COATING TO CURE 24 hours at 75°F (24°C) before opening to light traffic. Allow more time at low temperatures or for heavier traffic. Full coating properties take 14 days to develop.

APPLICATION OF ADDITIONAL COATINGS

If Eco-MPE is being topcoated with a Tennant urethane except Eco-HPS™ and Eco-HPS™ 100 at floor temperatures of 65-90°F (18-32°C), it does not need to be sanded if applied within 24 hours. NOTE: This is a Tennant solution only, DO NOT try this with competitive epoxies.

SANDING REQUIRED

Eco-MPE must be thoroughly sanded if applying Eco-HPS or Eco-HPS 100 (see chart below).

APPROXIMATE SAND TIME (hours) - °F (°C)

24 20 16 12 8

Eco-MPE © Tennant Company 02/09/09 Page 4 of 4

Eco-MPE must also be sanded if applying other Tennant urethanes after 24 hours. Use 80 grit paper except for Eco-HPS, Eco-HPS 100, WearGuard™-CRU and WearGuard™-CRU 250–use 100. The use of more aggressive paper will introduce deep grooves that will not be covered by a single, thin coat of urethane; swirl marks will be particularly evident if the topcoat is glossy. We recommend thorough sanding with a swing-type buffer so that multiple scratch marks cause an obvious gloss loss on all areas (depressions will remain shiny), and the floor is uniformly dulled. The ability to see individual scratch marks is an indication that sanding is not adequate. Scrub with detergent and rinse with clean water before coating and tack rag to

Tennant technical support at 800-228-4943 ext. 6075 (1800 226 843 Aust).

PRECAUTIONS.

USE PRODUCT AS DIRECTED.

Allow floor coating to cure at least one week before cleaning by mechanical means (e.g., sweeper, scrubber, disc machine).

Sweep and scrub your new coating regularly, as dirt and dust are abrasive and can quickly dull the finish, decreasing the life of your coating. Remove spills quickly as certain coating. Polypropylene or abrasive bristle (Tynex®) assistance in determining which detergent is right for your facility or for additional technical information call: 800-553- 8033 US (1800 226 843 Aust).

Caution: Avoid scratching or gouging the surface. All floor floor coating can prevent discoloration.

Rubber burns from quick stops and starts can heat the

This warranty applies to all Specialty Surface Coatings, with the following exceptions: Eco-Hard-N-Seal™, Eco-EDP™ (Electrostatic Dissipative Primer), Eco-EDE™ (Electrostatic Dissipative Epoxy), and SDS™ (Static Dissipative System). These products have a separate warranty policy.

Tennant Company warrants its Specialty Surface Coatings to be free from defective manufacture, improper formulation, and defective ingredients. Warranty covers replacement of materials only.

THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER

WARRANTIES EXPRESSED OR IMPLIED, INCLUDING,

BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF

MERCHANTABILITY AND FITNESS FOR A PARTICULAR

PURPOSE.

In no event shall Tennant or Seller be liable for any incidental, consequential, or special damages arising out of the use of Tennant Specialty Surface Coatings. THE ONLY

REMEDY OF THE USER OR BUYER, AND THE ONLY

LIABILITY OF TENNANT AND SELLER FOR ANY AND

ALL CLAIMS, LOSSES, INJURIES, OR DAMAGES

(INCLUDING CLAIMS BASED ON BREACH OF

WARRANTY, CONTRACT, NEGLIGENCE, STRICT

LIABILITY, OR OTHERWISE) SHALL BE REPLACEMENT

OF THE PRODUCT OR, AT THE ELECTION OF TENNANT

OR SELLER, RETURN OF THE PURCHASE PRICE.

No representative of Tennant has authority to give any other warranty or assume other liability.

The presence of a Tennant employee during the application

EEccoo--PPTT™™ 225500 PPoowweerr--TTrroowweell EEppooxxyy

OOvveerrllaayy RReessuurrffaacceerr

EEccoo--PPTT™™ TTooppccooaatt//

EEccoo--HHTT™™ TTooppccooaatt TTooppccooaatt ffoorr EEccoo--PPTT™™ 225500

Minneapolis, MN 55440-1452 800-553-8033 / www.tennantco.com

Tennant Company (Australia) Head Office: Unit 2 Block Y, 391 Park Road, P.O. Box 116

Regents Park NSW 2143 Sales: 1800 226 843 / www.tennantco.com

© Tennant Company 05/21/09 Page 1 of 4

DESCRIPTION:

Overlay is a three-component filled, 100% solids epoxy system for resurfacing eroded interior concrete floors.

Topcoats are two-component, 100% solids epoxies for sealing the overlay.

• Ideal for repairing large eroded areas such as main traffic aisles, loading docks and other spaces subjected to heavy traffic and abuse.

• Safe to use around solvent sensitive products such as food, beverages, pharmaceuticals and cosmetic products

• Less costly than concrete replacement or capping

• Cleans easily, saving detergent, labor and water

• No VOC (0 g/L). (Complies with SCAQMD VOC

SHELF LIFE: Two years from date of manufacture.

Eco-PT 250:

900 sq. ft. (83.61 m

) kit / 60690

11,700 sq. ft. (1,086.97 m

) kit / 60690BLK (Contractor Only)

Eco-PT Topcoat:

3 gallons (11.34 litres) / 370516

Eco-HT Topcoat

2.5 gallons (9.45 litres) / 370248

Colors: Tennant Colorants may be added to Eco-PT 250, Eco-PT Topcoat and Eco-HT Topcoat. Use colorants at a rate of one unit per 3-bag mix of Eco-PT 250, 3-gallon (11.34 litres) unit of Eco-PT Topcoat and 2.5-gallon (9.45 litres) unit of Eco-HT Topcoat. Standard Colorants-- White, Light Gray, Yellow and Rotunda Red will not impart total hide. Use these colorants at a rate of two units per 3-bag mix of Eco-PT 250, 3-gallon (11.34 litres) unit of Eco-PT Topcoat and 2.5-gallon (9.45 litres) unit of Eco-HT Topcoat. (White and Light Gray are only recommended if topcoating with a non-yellowing urethane.)

Traction: To improve traction in slip hazard areas, use 292 Grit for applications less than 8 mils (203.2 microns). See 292 Grit Product Bulletin.

LIMITATIONS:

UV/Light Stability: This product is not light stable and will yellow/amber over time.

Property/ Test Method

Eco-PT 250 Results

Eco-PT Topcoat Results

Eco-HT Topcoat Results

Flash Point

°F/C Seta Closed Cup

ASTM D3278

A - >200 / 93 B - >200 / 93

A - >200 / 93 B - >200 / 93

A - >200 / 93 B - >200 / 93

Percent Solids, by wt

ASTM D2369

A - 100 B - 99.62 C - 100

A - 100 B - 99.62

A - 100 B - 99.62

Density lb/gal / kg/L

ASTM D1475

A - 9.23 (1.11) B - 8.39 (1.01) C - 21.64 (2.60) A/B/C 18.81 (2.26)

A - 9.41 (1.13) B - 8.44 (1.01) A/B - 9.09 (1.09)

A - 9.41 (1.13) B - 8.44 (1.01) A/B - 9.09 (1.09)

Viscosity, cps Brookfield

ASTM D2196

A - 800-1100 B - 170-220

A - N/A (Paste) B - 350-550 A/B - 4000-

A - N/A (Paste) B - 350-550 A/B - 4000-

Volatile Organic Compound -

VOC

lb/gal (g/L)

ASTM D3960

A/B/C 0 (0)

A/B 0 (0)

A/B 0 (0)

CURED COATING PROPERTIES (DRY FILM): Eco-PT 250

Coefficient of Friction -

COF

James Friction Tester

ASTM D2047 0.60-0.63

(with 2 coats Eco-PT Topcoat)

Coefficient of Thermal Linear Expansion, mm/mm/°C

ASTM D696 1.97x10 -5

Compressive Strength, psi (MPa)

ASTM C579 10,000 (68.95)

Flexural Strength, psi (MPa)

ASTM D790 3,700 (25.51)

Flexural Modulas of Elasticity, psi (MPa)

ASTM D790 1.8x10 (0.01x10

Heat Deflection Temperature

ASTM D648 140°F (60°C) @ 264 psi (1.82 MPa) load 151°F (66°C) @ 66 psi (0.46 MPa) load

Izod Impact Strength, lb/in (N/m)

ASTM D256 0.26 (45.53)

Tensile Strength, psi (MPa)

ASTM C307 1,690 (11.65)

Shore D Hardness ASTM D2240 80-85 @ 0 sec 75-80 @ 15 sec

Property/Test Method Eco-PT Topcoat Eco-HT Topcoat

Abrasion Resistance, mg loss Taber Abraser*

ASTM D4060*

83 100

Tensile Strength, psi (MPA)

ASTM D2370

8,000 (55.16) 8,000 (55.16)

Percent Elongation

ASTM D2370

5 5

Shore D Hardness

ASTM D2240

75-80 @ 0 sec 65-70 @ 15 sec

75-80 @ 0 sec 70-75 @ 15 sec

*CS-17 Taber Abrasion Wheel, 1,000 gram load, 1,000 revolutions

Results are based on conditions at 77°F (25°C), 50% RH.

Eco-PT™ 250 © Tennant Company 05/21/09 Page 2 of 4

Coverage rate will depend upon application thickness as well as the texture and porosity of the concrete.

Eco-PT 250

Coverage Rate, ft2 (m2) /3 bag mix)

56-70 (5.2-6.5)

Application Thickness, inches (mm)

1/4-3/16 (6.35-4.76)

Eco-PT Topcoat

Eco-HT Topcoat

Coverage Rate, ft2/gal (m2/L) 200-320 (4.92-7.87)

200-320 (4.92-7.87)

Application Thickness, wet/dry mils (microns)

5-8 per coat (127-203)

5-8 per coat (127-203)

CHEMICAL RESISTANCE - UNPIGMENTED

Eco-PT Topcoat

Eco-HT Topcoat

1 / 7 Day(s) 1 / 7 Day(s)

Acids, Inorganic

10% Hydrochloric Acid E / E E / E

30% Hydrochloric Acid (Muriatic) E / E E / E

10% Nitric Acid E / G E / E

50% Phosphoric Acid F / P G / G

37% Sulfuric Acid (Battery Acid) G / G G / G

Acids, Organic

10% Acetic Acid F / P G / F

10% Citric Acid E / G E / E

Oleic Acid G / F E / E

Alkalies

10% Ammonium Hydroxide E / E E / E

50% Sodium Hydroxide E / E E / E

Solvents (Alcohols)

Ethylene Glycol (Antifreeze) E / E E / E

Isopropyl Alcohol F / F E / G

Methanol F / F P / P

Solvents…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.