36E77618R0104-0005003.pdf
PDF 11 KB Posted
- Attached to
- Modernize Existing Chillers - Iowa City
- Solicitation number
- 36E77618R0104
About this file
36E77618R0104 0005 ATTACHMENT 1 - UPDATED - SOW - Modernize Existing Chillers 10-12-2018.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0008-000.docx | DOCX document | |
| 36E77618R0104-0005001.pdf | ||
| 36E77618R0104-0005000.docx | DOCX document | |
| 36E77618R0104-0005002.pdf | ||
| 36E77618R0104-0005004.pdf | ||
| 36E77618R0104-0004000.docx | DOCX document | |
| 36E77618R0104-0003000.docx | DOCX document | |
| 36E77618R0104-0003001.pdf | ||
| 36E77618R0104-0002001.pdf | ||
| 36E77618R0104-0002005.zip | ZIP file | |
| 36E77618R0104-0002004.pdf | ||
| 36E77618R0104-0002003.pdf | ||
| 36E77618R0104-0002002.pdf | ||
| 36E77618R0104-0002000.docx | DOCX document | |
| 36E77618R0104-0001001.pdf | ||
| 36E77618R0104-0001000.docx | DOCX document | |
| 36E77618R0104-0001002.pdf | ||
| 36E77618R0104-001.docx | DOCX document | |
| 36E77618R0104-007.docx | DOCX document | |
| 36E77618R0104-004.pdf | ||
| 36E77618R0104-003.pdf | ||
| 36E77618R0104-006.pdf | ||
| 36E77618R0104-008.docx | DOCX document | |
| 36E77618R0104-005.pdf | ||
| 36E77618R0104-002.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Scope of Work
UPDATED 10-12-2018
Modernize Existing Chillers
636A8-16-008
The Modernize Existing Chillers project will replace 1000 ton Chillers 4 and 5 with two Magnetic Bearing chillers, along with its associated pumps and piping. The new chillers will be brought on-site and rigged in a disassembled state sufficient to be brought in through the overhead door and through the areas of the demolished pumps and piping. The manufacturer will be responsible for assembly and testing on-site. The base will include installing Magnetic bearing chillers with variable frequency drives. This project will also replace the transformer and switchgear that serves the chillers. The existing control system will be updated with the removal of the DX9100 control modules and replaced with the latest versions. Phase 1 will take place after the issuance of the notice to proceed, which includes the submittal process and procurement of all equipment. Equipment and submittals must be fully ready for the fall 2019 shutdown to replace the two chillers. Phase 2 will include construction with the understanding that the existing chillers will not be shut down until fall/winter 2019. The winter install for both chillers must be performed between the dates of October 1st and April 15th, with expected plant to be fully operational by May 1st, 2020.
File details come from the government source that posted it.