36E77618R0104-0005004.pdf
PDF 77 KB Posted
- Attached to
- Modernize Existing Chillers - Iowa City
- Solicitation number
- 36E77618R0104
About this file
36E77618R0104 0005 Pricing Schedule - Modernize Existing Chillers - UPDATED - 10-12-2018.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0008-000.docx | DOCX document | |
| 36E77618R0104-0005003.pdf | ||
| 36E77618R0104-0005001.pdf | ||
| 36E77618R0104-0005000.docx | DOCX document | |
| 36E77618R0104-0005002.pdf | ||
| 36E77618R0104-0004000.docx | DOCX document | |
| 36E77618R0104-0003000.docx | DOCX document | |
| 36E77618R0104-0003001.pdf | ||
| 36E77618R0104-0002001.pdf | ||
| 36E77618R0104-0002005.zip | ZIP file | |
| 36E77618R0104-0002004.pdf | ||
| 36E77618R0104-0002003.pdf | ||
| 36E77618R0104-0002002.pdf | ||
| 36E77618R0104-0002000.docx | DOCX document | |
| 36E77618R0104-0001001.pdf | ||
| 36E77618R0104-0001000.docx | DOCX document | |
| 36E77618R0104-0001002.pdf | ||
| 36E77618R0104-001.docx | DOCX document | |
| 36E77618R0104-007.docx | DOCX document | |
| 36E77618R0104-004.pdf | ||
| 36E77618R0104-003.pdf | ||
| 36E77618R0104-006.pdf | ||
| 36E77618R0104-008.docx | DOCX document | |
| 36E77618R0104-005.pdf | ||
| 36E77618R0104-002.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule CLIN 0001, ITEM I: Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Modernization of the existing Central Chilled Water Plant as required by drawings and specifications.
The period of performance is 547 calendar days after date of receipt of Notice to Proceed.
CLIN 0001: $__________________________________
NOTICE
1. The Department of Veterans Affairs intends to award a single contract to the Offeror whose proposal is in conformance with this solicitation and is determined to be the best value to the Government utilizing the lowest price that is technically acceptable method of evaluation.
2. CLIN 0001, Item I, identifies all of the work necessary to complete this project.
3. Offeror shall provide total pricing in the CLIN 0001 Line Item above.
Price Schedule
File details come from the government source that posted it.