36E77618R0092-006.pdf
PDF 11 MB Posted
- Solicitation number
- 36E77618R0092
About this file
36E77618R0092 ATTACHMENT 5 - Construct CLC Cottage Final Drawings Part 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618C0031-000.docx | DOCX document | |
| 36E77618R0092-0005003.pdf | ||
| 36E77618R0092-0005002.docx | DOCX document | |
| 36E77618R0092-0004001.pdf | ||
| 36E77618R0092-0004003.pdf | ||
| 36E77618R0092-0004000.docx | DOCX document | |
| 36E77618R0092-0004002.pdf | ||
| 36E77618R0092-0003001.pdf | ||
| 36E77618R0092-0003002.pdf | ||
| 36E77618R0092-0003000.docx | DOCX document | |
| 36E77618R0092-0002001.pdf | ||
| 36E77618R0092-0002000.docx | DOCX document | |
| 36E77618R0092-0002002.pdf | ||
| 36E77618R0092-001.docx | DOCX document | |
| 36E77618R0092-002.pdf | ||
| 36E77618R0092-004.pdf | ||
| 36E77618R0092-009.docx | DOCX document | |
| 36E77618R0092-010.pdf | ||
| 36E77618R0092-008.docx | DOCX document | |
| 36E77618R0092-003.pdf | ||
| 36E77618R0092-005.pdf | ||
| 36E77618R0092-007.pdf | ||
| 36E77618R0092-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE
OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW
ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN. FULL-TONE LINES INDICATED NEW OR RELOCATED
CONSTRUCTION.
E. IN VIEWING THESE DRAWINGS, THE CONTRACTOR SHALL PAY CLOSE
ATTENTION TO THE MATCH LINES. SOME WORK AND NOTE REFERENCES
MAY BE REPEATED, BUT DO NOT ALWAYS SHOW ON BOTH SIDES OF THE
MATCH LINE
F. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL PIPING WITH
STRUCTURE, CEILING, LIGHTING, AND DUCTWORK.
G. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY
OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED
HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE
AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT
THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE
OWNER AND CONTRACTOR.
K. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONTRACTOR.
A. THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL
DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.
DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR
SHALL FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED
TO BE REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS SOLID, FULL-
TONE LINES. ALL OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND
ARE SHOWN AS HALF-TONE.
B. DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED
BELOW OR HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL
REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING
BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE DEMOLITION REQUIRED
AND AS LISTED BELOW.
C. THE REMOVAL OF HVAC AND PLUMBING EQUIPMENT FROM FINISHED AREAS
AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED WITH
ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE
MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS
MADE TO THE BUILDING.
D. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND
REMOVAL OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND
APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR
ACCOMMODATE ALL NEW CONSTRUCTION WITH THE OWNER HAVING FIRST
RIGHT OF REFUSAL ON ALL ITEMS.
E. ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE
CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND
STORED OR REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR
SALVAGED ITEMS SHALL REMAIN THE PROPERTY OF THE OWNER.
F. COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND
CONTROLS WITH ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL
REMOVALS.
G. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY
OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED
HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE
AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT
THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE
OWNER AND ARCHITECT.
H. ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION
SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
MECHANICAL INFO SHEET
TMJ AJP
BGJ
M000
58 97
06054.032
TRUE
NORTH
PLAN
NORTH
NORTH
NORTH
ARROW
SYMBOL LEGEND ABBREVIATIONS
MATCHLINE
AREA A
AREA B
EXISTING
COLUMN
NEW
COLUMN
X
X
X
SIM
X
XX-XX
XXXX
DX
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM NAME
150 SF
ROOM / SPACE
NUMBER
LETTER INDICATES
NEW COLUMN LINE
LETTER INDICATES
EXISTING COLUMN LINE
SECTION/DETAIL NUMBER
SHEET NUMBER
INDICATES DIRECTION OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION
ROOM AREA DESIGNATION
REFERENCE LEGEND
NAME
ELEVATION
LEVEL
TITLE
MARKER
VIEW NAME
SCALE: 1/8" = 1'-0"
DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION DESIGNATION
GRAPHIC AREA FOR DRAWING
TITLE
SCALE OF THE DRAWING
18 Ø
18x10
18/10
PIPE GUIDE
HOSE BIBB
THERMOMETER
PIPE ANCHOR
HB
STEAM TRAP
PH
WH
YH
SIGHT GLASS-REFRIGERANT
POST HYDRANT
YARD HYDRANT
WALL HYDRANT
PRESSURE GAUGE
ROUND DUCT
CA
PN
VD
FLAT OVAL DUCT-1ST FIG IS SIDE SHOWN
FLEXIBLE DUCTWORK CONNECTION
RECT DUCT-1ST FIG IS SIDE SHOWN
ACOUSTICAL DUCT LINER
VOLUME DAMPER
CONTROL AIR SUPPLY
NEW TO EXISTING CONNECTION
PNEUMATIC TUBE
FIRE WATER (BURIED)
SPRINKLER DRAIN
FIRE SPRINKLER MAIN
BALL VALVE
TAMPER SWITCH
BUTTERFLY VALVE
MANUAL BALANCING VALVE
FLOW SWITCH
FIRE DEPARTMENT CONNECTION
GAS COCK OR VALVE
CONTROL VALVE (3 WAY)
CONTROL VALVE (2 WAY)
PLUG VALVE
GLOBE VALVE
HOSE END DRAIN VALVE
ANGLE VALVE
PRESSURE REDUCING VALVE
AUTO FLOW CONTROL VALVE
GATE VALVE OR GEN SHUT-OFF VALVE
CHECK VALVE
HVAC DUCTWORK AND SPECIALTIES
PIPING SPECIALTIES AND FITTINGS (CONT)
MISCELLANEOUS SYMBOLS
EXTRACTOR
SIZE/TYPE
RETURN OR EXHAUST DUCT DOWN
RETURN OR EXHAUST REGISTER OR
GRILLE (VERTICAL MOUNTING)
SUPPLY REGISTER OR GRILLE
ROUND DUCT UP / DOUBLE LINE PIPE
ROUND DUCT DOWN / DOUBLE LINE PIPE
RETURN OR EXHAUST DUCT UP
(R OR G) (VERTICAL MOUNTING)
TURNING VANES
SUPPLY AND FRESH AIR DUCT DOWN
SUPPLY AND FRESH AIR DUCT
SIZE/TYPE
SIZE/TYPE
FLOW
FLOW
SIZE/TYPE
FLOW
FLOW
S
S
SMOKE DAMPER-HORIZ FIRE SEPARATION
SMOKE DAMPER-VERT FIRE SEPARATION
FIRE DAMPER-VERT FIRE SEPARATION
FIRE DAMPER-HORIZ FIRE SEPARATION
MOTORIZED DAMPER-OPPOSED BLADE
MOTORIZED DAMPER-PARALLEL BLADE
ROUND CEILING SUPPLY DIFFUSER
(HORIZONTAL MOUNTING)
GRAVITY DAMPER
(OR) SAFETY VALVE-STEAM
TEMP & PRESS RELIEF
FLOOR SINK
AREA DRAIN
FLOOR DRAIN
GRADE CLEANOUT
THERMO EXPANSION VALVE-REFRIGERANT
PLUMBING VENT THRU ROOF
CLEANOUT / WALL CLEANOUT
THERMOSTATIC MIXING VALVE
VALVE IN VERTICAL PIPE-TYPE SHOWN
M
M
MANHOLE
TRENCH DRAIN
OVERFLOW ROOF DRAIN
RUNNING TRAP
OXYGEN OUTLET
PIPE CAP
ELBOW UP
AIR OUTLET
TEE
ELBOW DOWN
VACUUM OUTLET
RUNNING TRAP WITH CLEANOUTS
ROOF DRAIN
SIZE/TYPE
FLOW
HUMIDISTAT
THERMOSTAT
FLEXIBLE DUCT
S
H
T
FS
FS
TEMPERATURE SENSOR
UNION
TEE DOWN
STRAINER
DIELECTRIC UNION
THERMOMETER WELL
CONCENTRIC REDUCER
EXPANSION JOINT
FLEXIBLE PIPE CONNECTION
ECCENTRIC REDUCER
AIR VENT (MANUAL UNLESS NOTED)
PITCH PIPE DOWN IN DIR OF ARROW
TEE UP
FIRE/SMOKE DAMPER-HORIZ FIRE SEPARATION
FIRE/SMOKE DAMPER-VERT FIRE SEPARATION
RECTANGULAR RETURN REG OR GRILLE
(HORIZONTAL MOUNTING)
RECTANGULAR SUPPLY DIFF, REG OR GRILLE
(HORIZONTAL MOUNTING)
SOLENOID VALVE
SM
FW
D
TS
VALVES
FS
M
M
S
LPC
HPS
MPC
MPS
LPS
HVAC PIPING
GHWR
GHWS
HWR
HWS
PC
HPC
ES
BBD BOILER BLOW DOWN
EXHAUST STEAM
PUMPED CONDENSATE
HIGH PRESSURE CONDENSATE
HIGH PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
LOW PRESSURE CONDENSATE
LOW PRESSURE STEAM
GLYCOL HOT WATER RETURN
GLYCOL HOT WATER SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
_"FS-_
_"AD-_
_"FD-_
CO
VTR
GCO
_"OD-_
MH
X
A
V
_"RD-_
PIPING SPECIALTIES AND FITTINGS
WCO
FIRE PROTECTION
XXX
PLUMBING
FIXTURES
PLUMBING FIXTURE
DESIGNATION
X"
PIPE
SIZE PIPE SIZE (DIAMETER)
X"/X"
DUCT
SIZE
WIDTH / HEIGHT
SIZE/TYPE
FLOW
RECTANGULAR EXHAUST REG OR GRILLE
(HORIZONTAL MOUNTING)
REF. DEMO NOTES ( )GENERAL NOTES MXMDXGENERAL DEMOLITION NOTES
CWS
GCWS
CWR
GCS
CR
CS
RL
RD
RS
GCWR
GLYCOL CONDENSER WATER SUPPLY
GLYCOL CHILLED WATER RETURN
GLYCOL CHILLED WATER SUPPLY
REFRIGERANT LIQUID LINE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION LINE
GHCS
GHCR
CD
HCS
HCR
GCR
HOT/CHILLED WATER SUPPLY
HOT/CHILLED WATER RETURN
GLYCOL CONDENSER WATER RETURN
GLYCOL HOT/CHILLED WATER RETURN
GLYCOL HOT/CHILLED WATER SUPPLY
CONDENSATE DRAIN
REF. NOTES ( )
RECIRCULATING DOMESTIC HOT WATER (RDHW)
DOMESTIC COLD WATER (DCW)
DOMESTIC HOT WATER (DHW)
RD
SAN
SAN
PLUMBING PIPING
ACID VENT
TW
AV
AW
W
DS
LS
SCW
RTW
SHW
V SANITARY VENT
BURIED EXTERIOR WATER
RECIRCULATING TEMPERED WATER
TEMPERED WATER
DISTILLED WATER
LAWN SPRINKLER
SOFTENED HOT WATER
SOFTENED COLD WATER
ACID WASTE
SUBSOIL OR FOUNDATION DRAIN
STORM DRAIN (BELOW FLOOR)
STORM DRAIN (ABOVE FLOOR)
SANITARY DRAIN (BELOW FLOOR)
SANITARY DRAIN (ABOVE FLOOR)
OXYGEN
GASOLINE
VACUUM
OX
GS
G
VAC
RO
A
FOF
FOG
LPG
FOV
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL GAGE
FUEL OIL FILL
FUEL OIL VENT
REVERSE OSMOSIS PROCESSED WATER
COMPRESSED AIR
NATURAL GAS
LIQUEFIED PETROLEUM GAS
DEIONIZED WATERDI
XX-XX
MECHANICAL SHEET LIST
SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES. SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES.
L LAVATORY
LAT LEAVING AIR TEMPERATURE
LH LAB HOOD
LPC LOW PRESSURE CONDENSATE
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM
LRA LOCKED ROTOR AMPS
LS LAUNDRY SINK
LSS LAWN SPRINKLER DESIGN
LV LOUVER
LWT LEAVING WATER TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MACHINE BOLT
MBH 1000 BTUH
MCA MINIMUM CIRCUIT AMPS
MD MOTORIZED DAMPER
MG GAS: MEDIUM-PRESSURE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT
PROTECTION
MPC MEDIUM PRESSURE
CONDENSATE
MPS MEDIUM PRESSURE STEAM
MS MOP SINK
N NITROGEN
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
NPCW NONPOTABLE COLD WATER
NPHW NONPOTABLE HOT WATER
NPHWR NONPOTABLE HOT WATER
RETURN
OA OUTSIDE AIR
OD OVERFLOW ROOF DRAIN
OX OXYGEN
P PUMP
PC POINT OF CURVATURE
PHC PREHEAT COIL
PIV POST INDICATING VALVE
PRV PRESSURE REGULATING VALVE
PS PLASTER SINKS
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH,
ABSOLUTE
PSIG POUNDS PER SQUARE INCH,
GAUGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RA RETURN AIR
RCP RADIANT CEILING PANELS
RD ROOF AREA DRAINS
RDL REFRIGERANT DISCHARGE LINE
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RELIEF AIR
RLF RELIEF FAN
RO REVERSE OSMOSIS WATER
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
RTU ROOF TOP UNIT
RV RELIEF VALVE
S SINKS
SA SUPPLY AIR
SAN SANITARY SEWER
SB SITZ BATH
SD SMOKE DAMPER
SF SUPPLY FAN
SFU SANITARY FIXTURE UNITS
SH SHOWERS
SHB SHAMPOO BOWLS
SP STATIC PRESSURE
SS SERVICE SINK
SSCU DUSTLESS SPLIT SYSTEM
CONDENSING UNIT
SSFC DUCTLESS SPLIT SYSTEM
SSS SURGEON SCRUB SINKS
ST STORAGE TANK
SUP SUMP PUMP
SW STORM WATER
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVES
TONS TONS OF REFRIGERATION
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TWU TROUGH WALL AIR CONDITIONER
UH UNIT HEATER
UR URINAL
US UTILITY SINK
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
WB WET BULB
WC WATER CLOSETS
WCO WALL CLEANOUT
WF WASH FOUNTAINS
WFU WATER FIXTURE UNITS
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WS WATER SOFTENER
WSHP WATER SOURCE HEAT PUMP
WWHP WATER TO WATER HEAT PUMP
YH YARD HYDRANT
A COMPRESSED AIR
AC AIR COMPRESSOR
AD AIR DOOR
AFCV AUTO FLOW CONTROL VALVE
AHU AIR HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
ARD AIR PRESSURE DROP
AS AIR SEPARATOR
AV ACID VENT
AW ACID WASTE
AW AREA DRAIN
B BOILER
BC BLOWER COIL
BD BIDET
BF BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BHP BREAK HORSEPOWER
BLKG BLOCKING
BLV BALANCING VALVE
BT BATHTUBS
BV BALL VALVE
BW BEDPAN WASHERS
C CHILLER
CC COOLING COIL
CD CONDENSATE DRAIN
CF CEILING FANS
CFM CUBIC FEET PER MINUTE
CHIU CABINET HEATER
CHV CHECK VALVE
CI CAST IRON
CMU COMBINATION UNITS
CR CONDENSER WATER RETURN
CRAC COMPUTER ROOM AIR
CONDITIONER
CS CONDENSER WATER SUPPLY
CSS CLINICAL SERVICE SINKS
CT COOLING TOWER
CU AIR COOLED CONDENSING UNIT
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
D DIFFUSER
DB DRY-BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DEG DEGREE
DF DRINKING FOUNTAIN
DGCO DOUBLE GRADE CLEANOUT
DH EMERGENCY DRENCH HOSES
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RECIRC
DI DEIONIZED WATER
DOA DEDICATED OUTDOOR AIR UNIT
DP DOMESTIC PUMP
DS DISTILLED WATER
DSA DUCT SOUND ATTENUATORS
DSCW DOMESTIC SOF COLD WATER
DSHW DOMESTIC SOFT HOT WATER
DSHWRDOMESTIC SOFT HOT WATER
RETURN
DST DOMESTIC STORAGE TANK
DTW DOMESTIC TEMPERED WATER
DTWR DOMESTIC TEMPERED WATER
RETURN
DXT DOMESTIC EXPANSION TANK
EA EACH
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EEW EMERGENCY EYE WASH
EEWS EMERGENCY EYE
WASH/SHOWERS
EF EXHAUST FAN
EFF EFFICIENCY
EFW EMERGENCY FACE WASH
EH EXHAUST HOOD
ERV ENERGY RECOVERY
VENTILATOR
ES EMERGENCY SHOWER
ESP EXTERNAL STATIC PRESSURE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER
TEMPERATURE
EX EXPANSION TANK
F FIRE PROTECTION WATER
SUPPLY
F FURNACE
FCO FOOT CANDLE
FCT FLUID COOLER TOWERS
FCU FAN COIL UNIT
FD FIRE DAMPER
FLA FULL LOAD AMPS
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR SINKS
FSD FIRE/SMOKE DAMPER
FTR FINNED TUBE RADIATION
G GAS: LOW-PRESSURE
GCR GLYCOL CONDENSER
WATER RETURN
GCS GLYCOL CONDENSER
WATER SUPPLY
GCWR GLYCOL CHILLED
WATER RETURN
GCWS GLYCOL CHILLED
WATER SUPPLY
GD GARBAGE DISPOSAL
GD GRAVITY DAMPER
GDH GAS DUCT HEATER
GHCR GLYCOL HOT/COLD
WATER RETURN
GHCS GLYCOL HOT/COLD
WATER SUPPLY
GHWR GLYCOL HOT WATER RETURN
GHWS GLYCOL HOT WATER SUPPLY
GI GREASE INTERCEPTOR
GIV GRAVITY INTAKE VENTILATOR
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRV GRAVITY RELIEF VENTILATOR
GV GAS VENT
GWH GAS WATER HEATER
H HYDRANTS
HB HOSE BIBB
HC HEATING COIL
HCR HOT/COLD WATER RETURN
HCS HOT/COLD WATER SUPPLY
HG GAS: HIGH-PRESSURE
HP HEAT PUMP (AIR SOURCE)
IH INTAKE HOOD
IRH INFRARED RADIANT HEATER
KDH KITCHEN DISHWASHING HOOD
KH KITCHEN HOOD
KW KILOWATT
KWH KILOWATT HOURS
HP HORSEPOWER
HPC HIGH PRESSURE CONDENSTATE
HPS HIGH PRESURE STEAM
HRC HEAT RECOVERY COIL
HU HUMIDIFIER
HWR HOT WATER RETURN (HEATING)
HWS HOT WATER SUPPLY (HEATING)
HX HEAT EXCHANGER
M000 MECHANICAL INFO SHEET
MH101 FIRST FLOOR PLAN-HVAC
MH102 ATTIC FLOOR PLAN - HVAC
MP100 MECHANICAL SITE PLAN
MP101 FIRST FLOOR HVAC PIPING PLAN
MP102 ATTIC FLOOR PLAN - HVAC PIPING
M301 MECHANICAL CONTROL SEQUENCE
M302 MECHANICAL FLOW DIAGRAMS
M401 MECHANICAL DETAILS
M402 MECHANICAL DETAILS
M403 MECHANICAL DETAILS
M501 MECHANICAL SCHEDULES
M502 MECHANICAL SCHEDULES
T
T
T
T
T
T T T T
T
T
T
T
T
T T
T
T
T
T
T T
FS
T
T T
MEN
WOMEN
NURSE ADMIN.
LOUNGE
CORRIDOR
CORRIDOR
SOILED UTILITY
STORAGE
RESIDENT
LAUNDRY
SPA
ELECT.
HSKPG
GROUP ROOM
CLEAN LINEN
DEN
SERVERY
BATHROOM
2525A
BATHROOM
2527A
BATHROOM
2529A
BATHROOM
2523A
BATHROOM
2521A
BATHROOM
2519A
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
(BARIATRIC)
MED. STO.
BATHROOM
2505A RESIDENT
RESIDENT
BATHROOM
2507A
BATHROOM
2509A
RESIDENT
RESIDENT
BATHROOM
2513A
RESIDENT
BATHROOM
2515A
RESIDENT
(BARIATRIC)
CORRIDOR
SRVC CORR.
FAMILY
FOYER
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STAIR 1
FIRE/WATER
SRVC
CLEAN EQUIP.
CLEAN UTILITY
CORRIDOR
HOME OFFICE
2508A
PRODUCTION
KITCHEN
LIVING ROOM
VAV-2545
VAV-2528
VAV-2507
VAV-2505
VAV-2511
VAV-2509
VAV-2519
VAV-2521
VAV-2529
VAV-2527
VAV-2525
VAV-2523
IT
STAFF REPORT
ROOM
9" Ø LS-1
250 CFM
9" Ø LS-1
250 CFM
(TYP. 12)
(TYP. 12)
12x12 E-2
110 CFM
12x12 R-2
390 CFM
12x12 E-2
110 CFM
(TYP. 4)
8" Ø S-1
350 CFM
22x22 R-1
350 CFM
12x12 E-2
110 CFM
12x12 E-2
110 CFM
22x22 R-1
720 CFM
8" Ø S-1
280 CFM
12x12 R-1
380 CFM
6" Ø S-1
100 CFM
12x12 E-1
200 CFM
12x12 E-1
290 CFM
8" Ø S-1
260 CFM
6" Ø S-1
200 CFM
6" Ø S-1
50 CFM
6" Ø S-1
200 CFM
12x12 R-1
400 CFM
6" Ø S-1
200 CFM
12x12 R-1
130 CFM
6" Ø S-1
200 CFM
12x12 E-1
100 CFM
8" Ø S-1
180 CFM
8" Ø S-1
180 CFM
6" Ø S-1
180 CFM
12x12 R-1
175 CFM
12x12 R-1
225 CFM
6" Ø S-1
230 CFM
6x6 R-1
100 CFM
6" Ø S-1
150 CFM
12x12 R-2
390 CFM
22x22 R-1
630 CFM
10x6 S-2
180 CFM
8" Ø S-1
225 CFM
12x12 R-1
330 CFM
6" Ø S-1
140 CFM
6" Ø S-1
140 CFM
8" Ø S-1
350 CFM
8" Ø S-1
350 CFM
8" Ø S-1
350 CFM
8" Ø S-1
295 CFM
22x22 R-1
1890 CFM
22x22 R-1
300 CFM
8" Ø S-1
250 CFM
6" Ø S-1
180 CFM
12x12 R-2
125 CFM
6" Ø S-1
180 CFM
22x22 R-1
880 CFM
6" Ø S-1
95 CFM
8" Ø S-1
250 CFM
8" Ø S-1
160 CFM
22x22 R-1
160 CFM
12x12 R-1
1710 CFM
8" Ø S-1
275 CFM
12x12 E-1
200 CFM
6" Ø S-1
225 CFM 12x12 E-1
110 CFM
12x12 R-2
390 CFM
16x12 RA x
R
A x
R
A
R
Q
P
L
M
K
J
H
G
F
E
D
B
A
1 2 3 5 6 7 9 12 13 14 158
C
N
N.1
D.4
S
VAV-2539
VAV-2531
12x10 SA
10x10 SA
12x10 SA (TYP. 6)
(TYP. 6)
(TYP. 6)
(TYP. 6)
(TYP. 6)
6x6 EA
8x8 EA
8x8 RA 6x6 RA 6x6 RA
10x10 RA
10x8 SA
6" Ø SA
VAV-2510
14x14 SA
12x10 SA
14x12 EA
8" Ø SA
16x16 SA
VAV-2506
8x6 EA
8x8 EA 6" Ø SA
12x8 SA
8x8 RA
VAV-2526
4" Ø EA
SS-1
DBF-1
16x14 SA
22x12 RA
10x10 RA10x10 RA
14x12 RA 16x16 RA
12x8 SA
10x10 SA
9" Ø LS-1
250 CFM
10x8 SA
8x6 RA
10x8 RA
12x6 RA
12x12 RA
(TYP. 5)
10x8 SA
6" Ø SA
12x10 SA
14x14 SA
16x12 RA20x20 RA24x20 RA x
S
A
30x20 RA
12" Ø SA
20x12 RA16x10 RA
10x6 SA
30x22 RA
10" Ø SA
14x12 SA
10x8 SA x
R
A
8x10 SA
(TYP. 3)
(TYP. 4)
8" Ø S-1
180 CFM
22x12 SA
26x18 RA
12" Ø SA
7" Ø SA
12x12 RA
7" Ø SA 7" Ø SA
7" Ø SA7" Ø SA
6" Ø SA
VAV-2517
VAV-2504
VAV-2515
VAV-2513
VAV-2501
1 (TYP.)6x6 EA6x6 EA
8x8 EA
(TYP. 8)
20x12
TRANSFER
DUCT
12x12 E-2
110 CFM
(TYP. 6)
6" Ø EA
6"Ø UP TO EF-2
KH-1
KH-2
VAV-2562
14x14 SA
6" Ø SA
8" Ø S-1
290 CFM
(TYP. 4)
16x16 RA
VAV-2512
8" Ø S-1
225 CFM
8" Ø S-1
225 CFM
8" Ø S-1
225 CFM
16x8 SA
12x8 SA
8" Ø SA
FCU-2
16x8 SA
12x8 SA
8" Ø S-1
225 CFM
AREA A
AREA B
FCU-3
8" Ø S-1
225 CFM
20x20 R-1
20x8 RA
20x8 RA
20x20 R-1
8" Ø S-1
225 CFM
8" Ø S-1
225 CFM
8" Ø SA
6" Ø LS-2
180 CFM
6" Ø LS-3
110 CFM
VAV-2514
CLEAN LINEN
DEN
SERVERY
DINING
RESIDENT
BATHROOM
2507A
BATHROOM
2509A
RESIDENT
RESIDENT
BATHROOM
2511A
BATHROOM
2513A
RESIDENT
FAMILY
FOYER
CORRIDOR
LIVING ROOM
(TYP. 4)
8" Ø S-1
295 CFM
x
R
A
(TYP. 3)
(TYP. 4)
12x12 RA
(TYP.)
(TYP. 8)
12x12 EA
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE
OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW
ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. IN VIEWING THESE DRAWINGS, THE CONTRACTOR SHALL PAY CLOSE
ATTENTION TO THE MATCH LINES. SOME WORK AND NOTE REFERENCES
MAY BE REPEATED, BUT DO NOT ALWAYS SHOW ON BOTH SIDES OF THE
MATCH LINE
E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL DUCTWORK WITH
STRUCTURE, CEILING, LIGHTING, AND PIPING.
F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
G. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
H. ANY UTILITY OR SYSTEM DISRUPTION OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONNTRACTOR
I. SEE PHASING PLANS ON SHEET G102. COORDINATE WORK WITH PHASING
PLANS.
9 121110
T
U
V
W
8.6 11.3
Y
12.3
CORRIDOR
FCU-1
UH-1
STAIR 4
S4
PASSAGE
C1-3E
8" Ø S-1
225 CFM
8" Ø S-1
225 CFM
8" Ø S-1
225 CFM
VESTIBULE
CORRIDOR
AREA A
AREA B
12x8 SA
16x8 SA
8" Ø SA
10x6 S-2
250 CFM
20x20 R-1
670 CFM
20x8 RA
8" Ø SA
16x16 R-1
500 CFM
16x8 RA 10x6 SA
8" Ø SA
10x10 SA
8" Ø S-1
250 CFM
RESIDENT
ROOM
C119
13 14
T
U
V
12.3
RESIDENT
ROOM
C119
TOILET
C119A
STAIR 4
S4
PASSAGE
C1-3E
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
FIRST FLOOR PLAN-HVAC
TMJ AJP
BGJ
MH101
59 97
06054.032
1 ALL RESIDENT ROOM TEMPERATURE CONTROLS TO BE VIA
PROGRAMMABLE WALL THERMOSTAT.
2 DUCTWORK OFFSET DUE TO STRUCTURE.
3 SUPPLY, RETURN, AND EXHAUST MAINS RUN IN TRUSSES ABOVE
BOTTOM CHORD OF TRUSSES.
4 VAV/CAV BOXES AND TERMINAL AIR DISTRIBUTION DUCTWORK IN
INTERSTITIAL CEILING SPACE.
5 FIRE DAMPERS AT FLOOR PENETRATION TO MECHANICAL ROOM ABOVE.
6 THREE-SLOT LINEAR DIFFUSER AT 9'-6" A.F.F.
7 PAINT DRYER VENT CAP TO MATCH WALL.
8 SEE KITCHEN HOOD SCHEDULE FOR FIRE SUPPRESSION SYSTEMS
PROVIDED WITH HOODS.
9 MEASURE POSITIVE PRESSURE RELATIVE TO CORRIDOR DURING TAB
WITH CFM SHOWN ON THIS PLAN.
10 SEAL DUCT AT ALL VERTICAL SMOKE SEPARATION PENETRATIONS. SEE
CODE SUMMARY PLAN FOR ADDITIONAL INFORMATION.
11 FIRE/SMOKE DAMPER IN CORRIDOR WALL IN TRANSFER DUCT. (DAMPER
I.D. 25.FS.R.1.2510.4)
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - HVAC
GENERAL HVAC NOTES:
REF. NOTES ( ):X
NORTHKEY PLAN
E X
IS
S
E
A M
U N
N E
L
EXIS
T C
HIL
LER T
UNNEL
1W
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - HVAC AREA B
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - DEMO HVAC
REF. DEMO NOTES ( ):X
1 EXISTING FAN COIL UNITS TO BE REMOVED FROM BUILDING 12 STAIR AND
PASSAGE.
MECHANICAL
ELEC.
STAIR 1
F
E
D
B
2 3 5 6 7 98
C
D.4
SSU-1
SSU-2
SS-2
34x22 L-2 34x22 L-2 34x22 L-2
34x22 L-1 34x22 L-1 34x22 L-1 34x22 L-1
RF-1 36x24 RA36x24 RA
EF-2
EF-1
VFD
TEMPERATURE
CONTROL PANEL
VFD
10x6 G-4
200 CFM
x
R
A
18x16 EA x
E
A
EF-3
AHU-12
MH102
PLATFORM FOR SERVICING
GREASE FAN AT KITCHEN HOOD -
SEE ARCH. PLANS AND DETAILS
36x24 RA
36x24 EA
60x22 OA
34x22 OA
VFD
36x24 EA
PLENUM
VAV-2552
10x8 E-1
400 CFM
10x6 S-2
250 CFM
10x6 S-2
300 CFM
10x10 SA10x6 SA
6 7 8
F F
F
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE
OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW
ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. IN VIEWING THESE DRAWINGS, THE CONTRACTOR SHALL PAY CLOSE
ATTENTION TO THE MATCH LINES. SOME WORK AND NOTE REFERENCES
MAY BE REPEATED, BUT DO NOT ALWAYS SHOW ON BOTH SIDES OF THE
MATCH LINE
E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL DUCTWORK WITH
STRUCTURE, CEILING, LIGHTING, AND PIPING.
F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
G. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
H. ANY UTILITY OR SYSTEM DISRUPTION OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONNTRACTOR
I. SEE PHASING PLANS ON SHEET G102. COORDINATE WORK WITH PHASING
PLANS.
35679 810
CLERESTORY ROOF BEARING
128' - 4"
M
32x100 OA
22x60 OA 22x34 OA
32x98 RA x
R
A
AHU-1
x
R
A
18x16 EA
EF-3
10" Ø EA
10" Ø EA
x
S
A
7" Ø SA
10x6 S-2
300 CFM
6x10 SA10x10 SA
VAV-2552
10x6 S-2
250 CFM
x
E
A
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
ATTIC FLOOR PLAN - HVAC
TMJ AJP
BGJ
MH102
60 97
06054.032
SCALE: 1/4" = 1'-0"
SECOND FLOOR PLAN - HVAC
GENERAL MECHANICAL NOTES:
REF. NOTES ( ):X
1 4" CONCRETE HOUSEKEEPING PAD. EXTEND 6" BEYOND EQUIPMENT EACH
DIRECTION (TYPICAL).
2 TWO TRANSFER GRILLES, ONE EACH SIDE OF WALL CONNECTED BY
EQUAL SIZE TRANSFER DUCT THROUGH WALL.
3 WALL MOUNTED VFD'S FOR EF-1 AND RF-1.
4 WALL CAP EXHAUST PROVIDED WITH EF-3 SYSTEM.
5 PROVIDE DUCT DETECTOR IN SUPPLY AIR. COORDINATE WITH FIRE
ALARM COORDINATOR.
6 EXHAUST AIR FIRE DAMPER AT FLOOR. (DAMPER I.D. 25.FD.E.2.2552.3)
7 RETURN AIR FIRE DAMPER AT FLOOR. (DAMPER I.D. 25.FD.R.2.2552.2)
8 SUPPLY AIR FIRE DAMPER AT FLOOR. (DAMPER I.D. 25.FD.S.2.2552.1)
SCALE: 1/4" = 1'-0"
HVAC SECTION - MECH 2552
NORTHKEY PLAN
E X
E
N
N E
L
EXIS
T C
HIL
LER T
UNNEL
1W
DN
UP
DNDN
UP
SEE 2/MP100 FOR CONTINUATION.
MP102
CWP-2
CRV-3
5 6
SP-1 8
MP102
MP102
SEE 1/MP100 FOR
CONTINUATION.
4" CWS/R TO
EXISTING CHILLER
TUNNEL
3" PC & 3" HPS
IN EXISTING
STEAM TUNNEL
5 6
MP102
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE
OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW
ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO
REMAIN. FULL-TONE LINES INDICATED NEW OR RELOCATED
CONSTRUCTION.
E. IN VIEWING THESE DRAWINGS, THE CONTRACTOR SHALL PAY CLOSE
ATTENTION TO THE MATCH LINES. SOME WORK AND NOTE REFERENCES
MAY BE REPEATED, BUT DO NOT ALWAYS SHOW ON BOTH SIDES OF THE
MATCH LINE
F. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL PIPING WITH
STRUCTURE, CEILING, LIGHTING, AND DUCTWORK.
G. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
H. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
J. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY
OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED
HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE
AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT
THEREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE
OWNER AND CONTRACTOR.
K. ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONTRACTOR.
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
MECHANICAL SITE PLAN
TMJ AJP
BGJ
MP100
61 97
06054.032
SCALE: 1/16" = 1'-0"
SUB GRADE BUILDING & TUNNEL
SCALE: 1/16" = 1'-0"
SUB-GRADE TUNNEL
NORTHKEY PLAN
E X
E
N
N E
L
EXIS
T C
HIL
LER T
UNNEL
1W
GENERAL HVAC PIPING NOTES:
REF. NOTES ( ):X
1 4" CWS, 4" CWR, 3" HPS, AND 3" LPR FROM THIS POINT. PROVIDE STEAM
TRAP AND BEGIN 2" HPR DRIP LEG FROM THIS POINT SOUTH TO
CONNECTION AT EXISTING TUNNEL EXPANSION LOOP.
2 LOCATE GUIDES NO CLOSER THAN 20'-0" FROM EXPANSION LOOP.
LOCATE SLIDES NEAR EXPANSION LOOP.
3 NEW PIPE RACK CONNECTED TO EXISTING CHILLED WATER PIPE RACK
TOP SUPPORT STRUT (TYPICAL AT EXISTING RACK LOCATIONS).
4 PROVIDE KEFLEX F040KFCSUWE40 EXPANSION LOOP ON CHILLED WATER
SUPPLY AND RETURN.
5 SEE SHEET CS102 FOR PROFILE VIEW OF UTILITY TRENCH.
6 SEE 2/MP102 FOR INFORMATION ON PRECAST UTILITY TRENCH BASIS OF
DESIGN.
7 ANCHOR POINT.
8 SUMP PUMP DISCHARGE TO BE PIPED TO STORM DRAIN. 2" PIPED STORM
FROM BELOW GRADE STRUCTURE TO STORM SEWER STRUCTURE
CALLED OUT IN REFERENCE NOTE 6 ON SHEET CG101.
9 PRECAST UTILITY TRENCH, ALSO REFERRED TO AS A DUCT BANK TO BE
COORDINATED WITH MECHANICAL PIPING, ELECTRICAL, AND EXCAVATION
SUB CONTRACTORS.
SCALE: 1/16" = 1'-0"
SUB-GRADE PLAN - DEMO HVAC PIPING
REF. DEMO NOTES ( ):X
1 INACTIVE ABANDONED STEAM AND CONDENSATE IN THIS LOCATION TO
BE DEMOLISHED.
T
T T
R
Q
P
L
M
K
J
H
G
F
E
D
B
A
1 2 3 5 6 7 9 12 13 14 158
C
N
N.1
D.4
SERVERY
2508PRODUCTION
KITCHEN
SPA
HOME OFFICE
2508A
FIRE/WATER
SRVC
CLEAN EQUIP.
CLEAN UTILITY
RESIDENT
(BARIATRIC)
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
2519 MED. STO.
BATHROOM
2519A
BATHROOM
2521A
BATHROOM
2523A
BATHROOM
2525A
BATHROOM
2527A
BATHROOM
2529A
STAIR 1
IT
NURSE ADMIN.
LOUNGE
MEN
WOMEN
CORRIDOR
CORRIDOR
SOILED UTILITY
RESIDENT
LAUNDRY
ELECT.
HSKPG
CLEAN LINEN
2528GROUP ROOM
STAFF REPORT
ROOM
CORRIDOR
CORRIDOR
BATHROOM
2515A
BATHROOM
2513A
BATHROOM
2511A
BATHROOM
2509A
BATHROOM
2507A
BATHROOM
2505A
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
(BARIATRIC)
FAMILY
SRVC CORR.
CORRIDOR
FOYER
LIVING ROOM
CORRIDOR
CORRIDOR
DEN
DINING
CORRIDOR
S
3/4"3/4"
3/4"3/4"
1/2"1/2"
3/4"3/4"
3/4"3/4" 3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
1/2"1/2"
1/2"1/2"
1/2"1/2" 1/2"1/2"
1/2"1/2"
1/2"1/2"
3/4"3/4"
3/4"3/4"3/4"3/4"
1/2"1/2"
1/2"1/2"
2"
RCP-2527A RCP-2525A RCP-2523A RCP-2521ARCP-2529A
VAV-2545
RCP-2543A
RCP-2541A
VAV-2528
VAV-2510
VAV-2512
VAV-2527
VAV-2523
VAV-2521 VAV-2519
RCP-2515A
RCP-2513A
VAV-2511
RCP-2511A
VAV-2509
RCP-2509A
VAV-2507
RCP-2507A
VAV-2505
RCP-2505A
RCP-2519A
VAV-2506
VAV-2539
VAV-2526
VAV-2531
VAV-2529
VAV-2525
1/2"1/2"
1/2"1/2" 1/2"1/2"
1/2"1/2"
1/2"1/2"
1/2"1/2"
3/4"3/4"
1/2"1/2"
1 1/2"
1 1/4"
1/2"1/2"
3/4"3/4"
1 1/2"
1/2" 2"
1" 2"
H W
R H W
S C W
R C W
S
2"
3/4"
3/4"3/4"
3/4"3/4"
1 1/2"
1"
SS-1
AREA A
AREA B
FCU-2
FCU-3
VAV-2517
VAV-2513
VAV-2515
VAV-2504
1/2"1/2"
3/4"3/4"
2" 1 1/4" 1/2"1/2"
1/2"
VAV-2501
RL
RS
3/4"3/4"
3/4"3/4"
VAV-2562
1"1"
1"1"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"
3/4" 3/4"
3/4"
RCP-2512
3/4"
1 1/2"
RCP-S1
3/4"3/4"
1"1/2"
1/2"1/2"
3/4"3/4"
9 121110
T
U
V
W
8.6 11.3
Y
12.3
CORRIDOR
AREA A
AREA B
FCU-1
UH-1
STAIR 4
S4
PASSAGE
C1-3E
3/4"3/4"
HWR
HWS
RESIDENT
ROOM
C119
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE
OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW
ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. IN VIEWING THESE DRAWINGS, THE CONTRACTOR SHALL PAY CLOSE
ATTENTION TO THE MATCH LINES. SOME WORK AND NOTE REFERENCES
MAY BE REPEATED, BUT DO NOT ALWAYS SHOW ON BOTH SIDES OF THE
MATCH LINE
E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL PIPING WITH
STRUCTURE, CEILING, LIGHTING, AND DUCTWORK.
F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
G. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
H. IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLE BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY
OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED
HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE
AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE WORK IN THE AFFECTED AREA SHALL NOT
THREAFTER BE RESUMED EXCEPT BY WRITTEN AGREEMENT OF THE
OWNER AND CONTRACTOR.
I. ANY UTILITY OR SYSTEM DISRUPTION OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONNTRACTOR
J. SEE PHASING PLANS ON SHEET G102. COORDINATE WORK WITH PHASING
PLANS.
13 14
T
U
V
W
12.3
HWR
HWS
RESIDENT
ROOM
C119
PASSAGE
C1-3E
STAIR 4
S41
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
FIRST FLOOR HVAC PIPING PLAN
TMJ AJP
BGJ
MP101
62 97
06054.032
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - HVAC PIPING AREA A
GENERAL HVAC PIPING NOTES:
REF. NOTES ( ):X
NORTHKEY PLAN
E X
E
N
N E
L
EXIS
T C
HIL
LER T
UNNEL
1W
1 2" HWS AND HWR FROM ABOVE. SEE MP102 FOR CONTINUATION.
2 1" CWS AND CWR FROM ABOVE. SEE MP102 FOR CONTINUATION.
3 DIFFERENTIAL PRESSURE SENSOR LOCATION. SEE 3/M302.
4 RADIANT HEATING PANEL MOUNTED ON BOTTOM OF STAIR LANDING.
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - HVAC PIPING AREA B
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - DEMO HVAC PIPING
REF. DEMO NOTES ( ):X
1 EXISTING FAN COIL UNITS TO BE REMOVED INCLUDING ASSOCIATED
PIPING BACK TO MAIN AND ALL CONTROLS.
D.4
EX. STEAM P2 TOP
90' - 0"
EX. STEAM P3 FLOOR
87' - 8"
EX. STEAM P3 TOP
94' - 0"
CWP-2
CWP-1
CRV-3
3/4" LPC3/4" LPC
4" CWS
3" LPC
3" HPS
4" CWR
F
E
D
B
2 3 5 6 7 9 128
C
D.4
SSU-1
SSU-2
SS-2
RS
RL
RL
HX-2
CRV-1
HWP-1
HX-1
RS
HWP-2
ET-1
3" LPC
4" CWR
4" CWS
STEAM PRV
3" MPS
2" HWR
2" HWS
CRV-2
AHU-1
AS-1
3" HPS
6'-3 7/64"
G
R O
U N
D C
O V
E R
M
IN
WATER
TIGHT
GROUTE
REMOVABLE
COVER
TYPE 39 SADDLE
PROVIDE CENTER
BOLT FOR SPANS
GREATER THAN 24"
4" 5.4#
SECTION THRU TRENCH
1. PRECAST COVER WEIGHT:2255 LBS
2. PRECAST TRENCH WEIGHT: 2950 LBS
FOR ONE 10'-0" SECTION
3. FORTERRA PRECAST UTILITY TRENCH
BASIS OF DESIGN.
4" CWS
4" CWR
3" HPS
3" LPR
ELECTRICAL CONDUIT
(SEE ELECTRICAL PLANS)
PRECAST COVER
HS-20 DESIGN
TONGUE AND
GROOVE TYPE JOINTS
3" HAUNCH EACH
SIDE CONTINUOUS
PRECAST
TRENCH
SECTION
GROUTE
A. EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE
OWNER AND LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM
THOSE SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL ADJUST TO
ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
B. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR
SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW
ENTIRE SET OF DOCUMENTS.
C. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE
RESPONSIBLE FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD
CONDITIONS AT NO ADDITIONAL EXPENSE TO OWNER. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED.
D. IN VIEWING THESE DRAWINGS, THE CONTRACTOR SHALL PAY CLOSE
ATTENTION TO THE MATCH LINES. SOME WORK AND NOTE REFERENCES
MAY BE REPEATED, BUT DO NOT ALWAYS SHOW ON BOTH SIDES OF THE
MATCH LINE
E. CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL DUCTWORK WITH
STRUCTURE, CEILING, LIGHTING, AND PIPING.
F. MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL
EQUIPMENT TO ALLOW FOR MAINTENANCE ACCESS.
G. DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
H. ANY UTILITY OR SYSTEM DISRUPTION OR OUTAGES DURING
CONSTRUCTION SHALL BE COORDINATED WITH THE OWNER AND GENERAL
CONNTRACTOR
I. SEE PHASING PLANS ON SHEET G102. COORDINATE WORK WITH PHASING
PLANS.
6'-3 7/64"
G
R O
U N
D C
O V
E R
M
IN
WATER
TIGHT
GROUTE
REMOVABLE
COVER
TYPE 39 SADDLE
PROVIDE CENTER
BOLT FOR SPANS
GREATER THAN 24"
4" 5.4#
SECTION THRU TRENCH
4" CWS
4" CWR
ELECTRICAL CONDUIT
(SEE ELECTRICAL PLANS)
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
ATTIC FLOOR PLAN - HVAC PIPING
TMJ AJP
BGJ
MP102
63 97
06054.032
SCALE: 3/8" = 1'-0"
TUNNEL DETAIL 3
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN - HVAC PIPING
SCALE: 1/2" = 1'-0"
PRECAST UTILITY TRENCH DETAIL
1 SEE STEAM AND CHILLED WATER PIPING CONTINUATION ON SHEET
MP100.
2 HIGH PRESSURE CONDENSATE RETURN FROM DRIP LEGS TO
CONDENSATE PUMP RECEIVER.
3 4" CONCRETE HOUSEKEEPING PAD. EXTEND 6" BEYOND EQUIPMENT EACH
DIRECTION (TYPICAL).
4 PROVIDE FITTINGS AND VALVES IN THE MECHANICAL ROOM TO
FACILITATE HYPER CHLORINATION OF THE BUILDING DOMESTIC WATER
SYSTEM BY VA STAFF IN THE FUTURE.
GENERAL HVAC NOTES:
REF. NOTES ( ):X
NORTHKEY PLAN
E X
E
N
N E
L
EXIS
T C
HIL
LER T
UNNEL
1W
SCALE: 1/2" = 1'-0"
PRECAST UTILITY TRENCH DETAIL
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.
VARIABLE VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
TU
RHCHWS
HWR
V-1
REHEAT
COIL
AIR TERMINAL
UNIT
AIR
FLOW
TE
ATU
CONTROLLER
PC
TE
A
IR
F L O
W (C
F M
ROOM TEMPERATURE (°F)
HEATING
MINIMUM
SP
VAV BOX CONTROL SEQUENCE
W/DEADBAND
100%
V A V A
IR
F
LO
WR
E H
E A T F
LO
W
A. SET POINTS SHALL BE SET AS FOLLOWS:
COOLING 75°F (ADJ)
HEATING 70°F(ADJ)
DEADBAND OF 5° F BETWEEN HEATING AND
COOLING SET POINTS WILL BE MAINTAINED.
B. UPON FALL IN SPACE TEMPERATURE THE
VAV DAMPER WILL MODULATE TO MINIMUM
POSITION.
C. UPON FURTHER DROP IN SPACE
TEMPERATURE VALVE V-1 WILL MODULATE
TO MAINTAIN SET POINT + .5° F. THE
ADJUSTABLE TOLERANCE OF + .5° F HAS
BEEN SELECTED TO PREVENT VALVE
HUNTING
D. THE REVERSE SHALL OCCUR ON THE RISE
IN SPACE TEMPERATURE.
FE
ALARM
PROCESSING
D U
T Y
C Y C
L E
F U
N C
T
IO
N
S C
H E
D U
LE
S
T A
R T /S
T O
P
HUMIDITY HIGH LIMIT
RETURN FAN VSMC ALARM
SUPPLY FAN VSMC ALARM
RETURN FAN STATUS
STATIC PRESSURE HIGH LIMIT
SUPPLY AIR FLOW (CFM)
RETURN LOW PRESSURE
S T A
T U
S
SYSTEM
A
LA
R M
P R
IO
R
IT
Y
/A D
D -A
LT
E
R N
A T E
N O
E
LE
C T R
IC
D
E V
IC
E
S P
E E
D C
O M
M A
N D
P O
IN
T
ID
DISCHARGE STATIC PRESSURE
DISCHARGE AIR HUMIDITY
DISCHARGE AIR TEMPERATURE
PRE-HEAT TEMPERATURE
MIXED AIR TEMPERATURE
COOLING COIL TEMPERATURE
SYSTEM COMPONENT:
RETURN AIR FLOW (CFM)
RETURN AIR TEMPERATURE
-- O P
E N
/C
LO
S E
S T A
R T /S
T O
P -- V
A
LV
E P
O S
IT
IO
N
D A
M P
E R
P O
S
IT
IO
N
JOB: 0555.09
VAV AIR HANDLER
VA SAMPLE POINTS LIST
SYSTEM:
BUILDING:
LEGEND
POINT
BINARY
T E
M P
E R
A T U
R E
T I)
L oc a l A la rm
P a ne l
M as te r A la rm
P a ne l
A re a A la rm
P an el
H
IG
H S
T A
T
IC
P R
E S
S U
R E
H
IG
H H
U M
ID
IT
Y
P R
E S
S U
R E
--L O
W T
E M
P E
R A
T U
R E
P E
R C
E N
T
P R
E S
S U
R E
P O
S
IT
IO
N
F
LO
W
H
IG
H L
IM
IT
L O
W L
IM
IT
SYSTEM INPUTS
ANA- BINARY ANALOG
S P
A C
E T
E M
P . C
O N
T R
O L
--S T A
T
IC
P R
E S
S U
R E
R E
S E
T
--D E
M A
N D
L
IM
IT
IN
G
T E
M P
E R
A T U
R E
R E
S E
T
T E
M P
E R
A T U
R E
O V
E R
R
ID
E
E N
T H
A
LP
Y E
C O
N O
M
IZ
E R
T E
M P
E R
A T U
R E
E C
O N
O M
IZ
E
R
F A
IL
U
R E
M O
D E
P R
E S
S U
R E
/V O
LU
M
E C
O N
T R
O L
REMARKS
F U
LL
C
O M
M U
N
IC
A T
IO
N
SYSTEM SOFTWARE/CONTROL
APPLICATION/FUNCTION
PAGE:
RETURN AIR HUMIDITY
SUPPLY FAN STATUS
MIXED AIR LOW LIMIT
RETURN AIR DAMPER
RETURN FAN START/STOP
STEAM HUMIDIFIER VALVE V-4
COILING VALVE V-1
PRE-HEAT VALVE V-2
EXHAUST AIR DAMPER
MINIMUM OUTSIDE AIR DAMPER
SUPPLY FAN VSMC
OUTSIDE AIR DAMPER
RETURN FAN VSMC
S T A
T
IC
P R
E S
S U
R E
C A
R B
O N
M O
N O
X
ID
E
H U
M
ID
IT
Y
V A
C U
U M
STEAM ISOLATION VALVE V-3
SUPPLY FAN START/STOP
AI-1
AI-2
AI-3
AI-4
AI-5
AI-6
AI-7
AI-8
AI-9
AI-10
T R
E N
D
IN
G
OUTSIDE AIR TEMPERATURE AI-11
BI-1
BI-2
BI-3
BI-4
BI-5
BI-6
BI-7
BI-8
AO-1
AO-2
AO-3
AO-4
AO-5
AO-7
AO-8
AO-9
AO-10
BO-1
BO-2
BO-3
FULL COMMUNICATION
FULL COMMUNICATION
A B
B R
E V
IA
T
IO
N
RAT
RAH
RAF
MAT
PHT
CCT
DAT
DASP
DAH
SAF
OAT
RLP
RF-STS
SF-STS
TSL-1
SPS-2
HHL
SF-ALA
RF-ALA
RF-SPD
SF-SPD
OAD
RAD
EAD
MIN-OAD
PHT-V1
CLG-V1
HUM-V4
RF-SST
SF-SST
HUM-ISO-V3
WITH MINIMUM OUTSIDE AIR
POINTS LIST FOR VAV AIR HANDLING UNIT
OUTPUTS
LOG
SCALE: NOT TO SCALE
VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR CONTROL DIAGRAM
EXHAUST AIR
D-3
D-2
P R
E
F
IL
T E
R
OUTSIDE AIR
D-1
C O
IL
P
R E
H E
A T
C O
IL
C
O O
L
IN
G
LOCATE SENSOR
OUTSIDE UNDER
SHIELD
MPS
V-2
V-1
CHR
CHS
RETURN FAN
SUPPLY FAN
A F
M D
RETURN
AIR
F
IN
A L F
IL
T
E R
A F
M D
TT
TT
TT TT FT
A F
T E
R
F
IL
T E
R
TT HT
D-4
A F
M D
MINIMUM
OUTSIDE
AIR
HS
CS
VFD
HSVFD
FT
T-5
T-2
T-3 T-6
H-1
IT
SD
ONLY WHERE
REQUIRED
HOT GLYCOL
WATER, HOT
WATER OR
ELECTRIC
COILS ARE
PERMISSIBLE
SUBSTITUTES
CURRENT
TRANSMITTER
FOR FAN
STATUS ,TYP.
PSH
SMOKE
DETECTOR
VARIABLE
FREQUENCY DRIVE,
TYP.
DISCHARGE
PLENUM
ZC
ZC
ZC
ZC
FT DPS DPS
TT
T-1
SST
SPD
DPS
PSL
CS
T4
SST
SPD
AIA
COMM SD
TSL
TSL-1
1. GENERAL
1.1 UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE.
WHEN THE UNIT IS "OFF" D-1, D-3, SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" D-1, SD-1 AND
SD-2 SHALL BE FULLY OPEN. D-2 AND D-3 SHALL MODULATE IN ACCORDANCE WITH THE FOLLOWING
SEQUENCE:
2. TEMPERATURE CONTROL
2.1
2.2
2.3
2.4
3. AIR FLOW CONTROL
3.1
3.2
3.3
4. HUMIDITY CONTROL
4.1
4.2
5. FREEZE PROTECTION
5.1
6. AUTOMATIC SHUTDOWN/RESTART
6.1
6.2
7. EMERGENCY CONSTANT SPEED OPERATION
7.1
SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL
CONTROL PANEL BY MODULATING V-1 OR D-2 AND D-3 OR V-2 IN SEQUENCE.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS ABOVE 75°F (ADJ) [23.8°C], THE DIGITAL CONTROL PANEL SHALL PREVENT THE MODULATION OF D-2 AND D-3 AND SHALL ASSUME THE MINIMUM OUTSIDE AIR POSITION (D-2 FULLY OPENED AND D-3 FULLY CLOSED). THE DIGITAL
CONTROL PANEL SHALL MODULATE V-1 TO MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY
TT-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS BETWEEN 65°F [18.3°C] AND THE SUPPLY AIR TEMPERATURE SENSED BY TT-1, DAMPER D-2 SHALL FULLY CLOSE AND D1 AND D3 SHALL BE FULLY OPEN (MAXIMUM OUTSIDE AIR POSITION). THE DIGITAL CONTROL PANEL SHALL
MODULATE V-1 TO MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY TT-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-2, IS BELOW THE SUPPLY AIR
TEMPERATURE, SENSED BY TT-1, DAMPERS D1, D-2 AND D-3 SHALL MODULATE TO MAINTAIN THE SCHEDULED SUPPLY AIR TEMPERATURE. IF D-2 IS OPEN AND D-3 IS CLOSED TO MINIMUM OUTSIDE AIR, V-2 SHALL MODULATE OPEN TO MAINTAIN THE SUPPLY AIR TEMPERATURE, SENSED BY TT-1.
THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING THE
SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" [25mm] OF DUCT STATIC PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON ACTUAL
BUILDING LOAD BY POLLING ALL ATU
THE DIGITAL CONTROL PANEL, USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS, SHALL
RESET THE RETURN AIR FAN VSMC TO MAINTAIN A CONSTANT AIR FLOW DIFFERENCE BETWEEN
THE SUPPLY AIR AND THE RETURN AIR EQUAL TO MINIMUM OUTSIDE AIR.
USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY FAN DISCHARGE, SHALL PREVENT
THE SUPPLY FAN FROM DEVELOPING OVER 3" [75mm] OF STATIC PRESSURE (FIELD ADJUSTABLE). IF STATIC PRESSURE AT SPS-2 DOES EXCEED 3" [75mm] THE SUPPLY AIR FAN SHALL STOP. SPS-2 SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO
OR BYPASS MODE. SPS-2 WILL REQUIRE MANUAL RESET AT THE DEVICE.
UPON FAILURE OF THE VSMC, THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED
MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER. FANS
SHALL THEN BE OPERATED AT CONSTANT SPEED.
IF THE AIR TEMPERATURE AS SENSED BY TT-3 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY
THE TSL THE SUPPLY AND RETURN FANS SHALL SHUT DOWN AND A CRITICAL ALARM SHALL
INDICATE AT THE DIGITAL CONTROL PANEL AND ECC. TSL SHALL BE HARDWIRED TO THE SUPPLY
FAN UFD AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. TSL WILL REQUIRE
MANUAL RESET AT THE DEVICE.
WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, SD, THE SUPPLY AND RETURN FANS
SHALL SHUT "OFF" AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM.
ALL SMOKE DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE.
EXHAUST FANS SERVING AREA OF THE SUPPLY FAN SHALL CONTINUE TO RUN. SUPPLY AND
RETURN FANS SHALL RESTART AND SMOKE DAMPERS SHALL OPEN WHEN FIRE ALARM CIRCUIT IS
RESET.
WHEN THE DIGITAL CONTROL PANEL IS NOT CALLING FOR HUMIDITY, SENSED BY RETURN AIR
HUMIDITY H-1, 2-WAY "ON-OFF" CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE DIGITAL
CONTROL PANEL IS CALLING FOR HUMIDITY, V-3 SHALL REMAIN OPEN.
RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 35% RH (ADJ) VIA DIGITAL CONTROL PANEL BY MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL
OVERRIDE THIS CONTROL TO MAINTAIN HUMIDITY OF 80% AS SENSED BY H-2. DCP SHALL CLOSE
VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF. VALVE V-4 SHALL BE INTERLOCKED WITH A
TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE
APPROACHES STEAM TEMPERATURE.
SEQUENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR
8. ECONOMIZER
8.1
8.2
THE ECONOMIZER SHALL BE ENABLED WHENEVER THE OUTSIDE AIR TEMPERATURE SENSED BY
TT-2 IS LESS THAN 65°F (ADJ.) AND THE OUTSIDE AIR TEMPERATURE SENSED BY TT-2 IS LESS THAN
THE RETURN AIR TEMPERATURE SENSED BY TT-4 AND THE SUPPLY FAN STATUS IS ON. THE
DIGITAL CONTROL PANEL SHALL MODULATE DAMPERS D-1, D-2 AND D-3 TO MAINTAIN A SUPPLY AIR TEMPERATURE SENSED BY TT-5 AT 2°F (ADJ.) LESS THAN THE SUPPLY AIR TEMPERATURE COOLING
SETPOINT.
THE ECONOMIZER SHALL BE DISABLED WHENEVER THE MIXED AIR TEMPERATURE SENSED BY TT-5 IS LESS THAN 50°F (ADJ.) OR THE FREEZESTAT IS ON OR ON LOSS OF SUPPLY FAN STATUS.
PRESSURE SWITCH LOW
TO DISABLE RETURN FAN WHEN
SMOKE DAMPER IN RETURN DUCT
CLOSES
PRESSURE SWITCH HIGH
TO DISABLE FAN WHEN HIGH
PRESSURE LIMIT SETPOINT IS
REACHED
SCALE: NOT TO SCALE SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
V-3
LPS
V-4
STEAM HUMIDIFIER
[3000mm]
HT
2C
2C
HHL
SPS
10' MIN.
SUPPLY AIR TO
TERMINAL UNIT
DP
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
MECHANICAL CONTROL SEQUENCE
TMJ AJP
BGJ
M301
64 97
06054.032
DP
CHWR
HWR
H W R
(STANDBY)
4" CHWS FROM
CHILLER PLANT
AHU-1
PREHEAT
SAFETY VALVE, RV-1
AND
VENT THROUGH ROOF
AHU-1
HUMIDIFIER
5" (30 PSIG) LPS
CRV-1
VENT TO
ATMOSPHERE
2" PUMPED CONDENSATE
RETURN TO BOILER PLANT
STEAM PRV
ASSEMBLY
105 PSI TO 30 PSI
1/3 & 2/3 CONFIG.
SPRAY
CONDENSER
ST-1a HX-2
REHEAT
HOT
WATER
SYSTEM
HX-1
CP-2
CP-1
AHU-1
4" CHWR TO
CHILLER PLANT
HWP-1
HOT WATER WATER
PUMPS
WITH VFD, SPEED
CONTROLLED BY REMOTE
DIFFERENTIAL SENSOR.
A S
-2
RV-3
ET-1
PROVIDE DIFFERENTIAL
PRESSURE SENSOR AT
MOST
REMOTE COIL, SET TO 2 PSI
(USER ADJUSTABLE) SEE
PLANS FOR LOCATION
H X
-1
H X
-2
(S T
A N
D B
Y
TO HOT WATER REHEAT
DISTRIBUTION NETWORK, SEE
RISER DIAGRAM AND PLANS
FOR
FURTHER DETAILS
REHEAT COIL
3/4" CW FEED
TYPICAL TERMINAL BOX
VAV REHEAT FLOW DIAGRAM
NO SCALE
STEAM & CONDENSATE FLOW DIAGRAM
NO SCALE
CHILLED WATER FLOW DIAGRAM
NO SCALE
4"
4"
TO FD
3/4" 3/4"
4"
4"4"
3/4"
1/2"
4" 4"
TO ROOF
ST-1b
FROM AHU-1
HUMIDIFIER
CONDENSATE TRAP
(TYPICAL)
3" (105 PSI) MPS
FROM BOILER
PLANT
1/2"
1/2"
3"
1"
1"
1"
1"
3"
1-1/2"
2"
1-1/2"
2"
2"
2"
1"
2-1/2"
2"
2"
3"
1"
1"
5" 3" 3"
F C
U -A
3/4"
HWP-2 (STANDBY)
TYPICAL FAN COIL
TO CHILLED WATER
LOOP
PIPING OR RISER
TO HOT WATER
LOOP
PIPING OR RISER
INTEGRAL TO UNIT
CRV-2
HWEX-1
DOMESTIC
HOT
WATER
SYSTEM
HWEX-2
3"
2-1/2"
2"
2"
3"
1 1/2"
1 1/2"
3"
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
TSA PROJECT NO.: Department of Veterans Affairs
CONSTRUCT CLC
COTTAGES - COTTAGE 1
636-123
3600 30TH ST. DES MOINES, IA
4/13/2018
MECHANICAL FLOW DIAGRAMS
TMJ AJP
BGJ
M302
65 97
06054.032
NOTE:
1.
2.
3.
4.
5.
6.
A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, IS SIMILAR. FOLLOW
DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR
SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR
FLOOR AND NOT OUTSIDE THE PENETRATION.
GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER
FRAME AND TO PERIMETER ANGLES.
PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" , 14 GAGE, TO PROVIDE 1"
MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA LPDS,
FIG. 2-13, SEAL JOINTS.
ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
PROVIDE 1/8" CLEARANCE PER EACH 12" OF DUCT HEIGHT AND WIDTH.
SLEEVE, NOTE 2
DUCT
CONNECTION
NOTE 4
DAMPER,
NOTE 1
DAMPER COLLAR
EXTENSION
INTEGRAL
PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 6FIRE BARRIER
PARTITION OR FLOOR
TYPICAL DUCT
INSULATION
PERIMETER ANGLE, NOTE 3
(NOTE FASTENED TO PARTITION)
ACCESS
PANEL
NOTE 5
[2 m m
SEAL HOLE…