36E77618R0092-001.docx

DOCX document 124 KB Posted

Attached to
Construct Community Living Center Cottage Minor - Des Moines
Solicitation number
36E77618R0092
Issued by

About this file

36E77618R0092 36E77618R0092_1.docx

View the file

Other files

File Type Posted
36E77618C0031-000.docx DOCX document
36E77618R0092-0005003.pdf PDF
36E77618R0092-0005002.docx DOCX document
36E77618R0092-0004001.pdf PDF
36E77618R0092-0004003.pdf PDF
36E77618R0092-0004000.docx DOCX document
36E77618R0092-0004002.pdf PDF
36E77618R0092-0003001.pdf PDF
36E77618R0092-0003002.pdf PDF
36E77618R0092-0003000.docx DOCX document
36E77618R0092-0002001.pdf PDF
36E77618R0092-0002000.docx DOCX document
36E77618R0092-0002002.pdf PDF
36E77618R0092-002.pdf PDF
36E77618R0092-004.pdf PDF
36E77618R0092-009.docx DOCX document
36E77618R0092-006.pdf PDF
36E77618R0092-010.pdf PDF
36E77618R0092-008.docx DOCX document
36E77618R0092-003.pdf PDF
36E77618R0092-005.pdf PDF
36E77618R0092-007.pdf PDF
36E77618R0092-000.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36E77618R0092

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WOR

K DESCRIBED IN THESE DOCUMENTS

(Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 - 36E77618R0092 X 07-11-2018 636-123

PCAC

Thomas Council Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 Thomas Council Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 Thomas Council 216-447-8300x3550 In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran- Owned Small Business (SDVOSB) Set-Aside.

The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the construction of a new 13,500SF, 12 bed Community Living Center, which will be connected to the existing building #12. This project also includes constructing underground utility tunnels. These tunnels will be constructed of reinforced cast-in-place concrete. The tunnel construction will also require selective demolition and modification where the tunnel ties into the recently constructed chiller tunnel. Work will be performed in accordance with the solicitation, attached drawings, specifications, and other documents.

This project is located at the:

Des Moines VA Medical Center 3600 30th Street Des Moines, IA 50310

VAAR Magnitude of Construction: $5,000,000 to $10,000,000.

Organized Site Visit (see page 24)

10 (TEN)

X X 52.211-10 X

10 (TEN)

0 (ZERO)

2:00 PM (ET)

08-14-2018 X

90 (NINETY)

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

SEE PRICE SCHEDULE

PCAC

Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131

VAFSC

Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically www.ob10.com/us/en/veterans-affairs/ e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429 Donald A. Marsh III

PCAC15L3-1697

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
PRICE SCHEDULE6
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS8
1.1 PROPOSAL MATERIAL:8
1.2 BID GUARANTEE:8
1.3 PAYMENT & PERFORMANCE BONDS:8
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS9
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:9
2.2 REQUEST FOR PROPOSAL:9
2.3 SDVOSB SET-ASIDE:9
2.4 TECHNICAL QUESTIONS:9
2.5 AMENDMENTS:10
2.6 PREPARATION OF PROPOSALS:10
2.7 PROPOSAL REQUIREMENTS:10
2.9 DETERMINATION OF RESPONSIBILITY:17
2.10 VETS 4212:17
2.11 SYSTEM FOR AWARD MANAGEMENT (SAM):17
2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR17
PERFORMANCE ASSESSMENT SYSTEM (CPARS):17
2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:18
2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:18
2.15 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018)18
2.16 52.216-1 TYPE OF CONTRACT (APR 1984)20
2.17 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)20
2.18 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)20
2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014) AND ALTERNATE II (JUN 2009)21
2.20 52.228-1 BID GUARANTEE (SEP 1996)22
2.21 52.233-2 SERVICE OF PROTEST (SEP 2006)23
2.22 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)24
2.23 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)24
2.24 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)25
2.25 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)25
2.26 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)26
REPRESENTATIONS AND CERTIFICATIONS27
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)27
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)30
GENERAL CONDITIONS32
4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)32
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)33
4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)33
4.4 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)35
4.5 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)36
4.6 52.223-20 AEROSOLS (JUN 2016)36
4.7 52.223-21 FOAMS (JUN 2016)37
4.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2016) ALTERNATE I (MAY 2014)37
4.9 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)42
4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS42
4.11 52.236-4 PHYSICAL DATA (APR 1984)43
4.12 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES (APR 2012)44
4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)44
4.14 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)47
4.15 VAAR 852.211-73 BRAND NAME OR EQUAL (JAN 2008)47
4.16 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016) (DEVIATION)48
4.17 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)49
4.18 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)50
4.19 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)50
4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)50
4.21 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002)51
4.22 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)52
4.23 VAAR 852.236-76 CORRESPONDENCE (APR 1984)52
4.24 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)52
4.25 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)52
4.26 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)52
4.27 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)53
4.28 VAAR 852.236-82 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS) (APR 1984)53
4.29 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)56
4.30 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)56
4.31 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)57
4.32 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)57
4.33 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)57
4.34 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) ALTERNATE I (JAN 2008)59
4.35 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (NOV 1986)60
4.36 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)60
4.37 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)61
4.38 MANDATORY WRITTEN DISCLOSURES61
LIST OF ATTACHMENTS62

PRICE SCHEDULE

CLIN 0001, Bid Item I (Base Bid): Construct Community Living Center Cottages – Cottage 1: The project includes construction of a new 13,500 SF, 12-bed Community Living Center (CLC). The CLC will be connected to the existing Building #12. A series of duct banks and utilities will connect from the CLC Cottage 1 to the Chiller Tunnel. The period of performance is 540 calendar days after date of receipt of Notice to Proceed.

CLIN 0001: $__________________________________

CLIN 0002, Bid Item II (Deduct 1): Not Used. Perform all work described in Bid Item I (Base Bid).

CLIN 0002: N/A

CLIN 0003, Bid Item III (Deduct 2): Perform all work described in Bid Item I (Base Bid), above except the following: Provide Asphalt Shingles (color/style to be selected by architect) in lieu of Metal Shingles. Verify that the components of the roof system (sheathing, vapor barriers, etc.) are compatible with asphalt shingles. Make any necessary adjustments to provide a system that is in compliance with the manufacturer’s standards. All work, including final cleanup and completion of any punch list items, shall be performed within 540 calendar days (after date of receipt of Notice to Proceed).

CLIN 0003: $__________________________________

CLIN 0004, Bid Item IV (Deduct 3): Perform all work described in Bid Item I (Base Bid) above except the following: Bid Item III and the following: Provide 3” caliper white oak trees in lieu of 6” caliper white oak trees. All work, including final cleanup and completion of any punch list items, shall be performed within 540 calendar days after date of receipt of Notice to Proceed.

CLIN 0004: $__________________________________

CLIN 0005, Bid Item V (Deduct 4): Perform all work described in Bid Item I (Base Bid) above except the following: Bid Item III, IV and the following: Remove raised portico at the south entrance (end of connecting corridor) in its entirety (including structural columns, footings, piping for downspouts, etc.). All work, including final cleanup and completion of any punch list items, shall be performed within the 540 calendar days after date of receipt of Notice to Proceed.

CLIN 0005: $__________________________________

CLIN 0006, Bid Item VI (Deduct 5): Perform all work described in Bid Item I (Base Bid), above except the following: Bid Items III, IV, V, and the following: All stone veneer and stone banding to be replaced with cementitious siding. All work, including final cleanup and completion of any punch list items, shall be performed with 540 calendar days after date of receipt of Notice to Proceed.

CLIN 0006: $__________________________________

NOTICE

1. The Department of Veterans Affairs intends to award a single contract to the Offeror whose proposal is in conformance with this solicitation and is determined to be the best value in accordance with the evaluation criteria.

2. CLIN 0001, Bid Item I (Base Bid) contains all of the work for the project. Each Deduct removes a portion of the work.

3. The order of the Deduct CLIN items are listed in order of priority.

4. Offerors must provide a lump sum price for each of the CLIN items. For each Deduct CLIN item, the Offeror shall provide the pricing that reflects the new total value inclusive of the Deduct CLIN item.

5. The intent is to award CLIN 0001, Bid Item I (Base Bid). For this procurement CLIN 0002 Bid Item II (Deduct 1) will not apply. However, if the proposal price exceeds the funds available for CLIN 0001, CLIN 0003 Bid Item III (Deduct 2), will be applied. If the price still exceeds the available funding, then the next Deduct will be applied. This process will be repeated until the price is within the available funding, or all of the Deducts have been applied.

6. If all Deducts have been applied and no offerors are within the available funding limitation, the VA reserves the right to enter into discussions with those offerors who are determined to be within the competitive range, if a competitive range is determined in the interest of the VA, otherwise discussion will be with all offerors.

7. If following the initial Non-Price and Price evaluations and/or receipt of Final Proposal Revisions resulting from discussion, an offeror’s total evaluated price still exceeds the VA's funding limitation, the VA will no longer consider the offeror to be eligible for award.

8. All references to Alternate Deducts in Specifications and Drawings shall be replaced with the term Deduct.

Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 PROPOSAL MATERIAL:

Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request For Proposal. The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.

1.2 BID GUARANTEE:

A Bid Guarantee, SF 24, is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid (proposal) guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the rejection of the proposal. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

1.3 PAYMENT & PERFORMANCE BONDS:

The offeror to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Solicitation. Copies of SFs 25 and 25A may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

All solicitation related documents will be published to http://www.fedbizopps.gov.

2.2 REQUEST FOR PROPOSAL:

This is a Request For Proposal (RFP) in accordance with FAR Part 15. In accordance with FAR Part 15, the Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value after evaluation in accordance with the factors in the solicitation. Responsibility determination will be made in accordance with FAR 9.1 “Responsible Prospective Contractors.”

All proposals shall be subject to evaluation by a team of Government personnel. The Government reserves the right to award without discussions based upon the initial evaluation of the proposals. The proposals will be evaluated in accordance with the content provided in the solicitation. Using the tradeoff process under best value, it may be in the Government’s best interest to consider award to other than the lowest price Offeror or other than highest Non-Price rated Offeror. All evaluation factors other than price, when combined are approximately equal to price. The evaluation factors are listed in descending order of importance.

Evaluations will be based on the following evaluation factors:

1. Construction Experience (Non-Price)

2. Project Execution (Non-Price)

3. Key Personnel Experience (Non-Price)

4. Past Performance (Non-Price)

2.3 SDVOSB SET-ASIDE:

This procurement is100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as verified by the VA’s Center for Veterans Enterprises (CVE) (http://www.vetbiz.gov). Offerors must be verified by CVE and visible in the Vendor Information Portal (VIP) database at TIME OF SUBMISSION OF OFFERS. Failure to be BOTH visible and verified at the time of proposal submission will result in the offeror’s proposal being deemed unacceptable and ineligible for award.

2.4 TECHNICAL QUESTIONS:

Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Tom Council. Questions shall be submitted only via e-mail to: thomas.council@va.gov. The subject line must read: Des Moines CLC – Technical Questions. Oral questions of a technical nature are not acceptable. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS July 27, 2018 at 2:00 PM (ET).

2.5 AMENDMENTS:

Amendments to this solicitation will be posted at http://www.fedbizopps.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.

2.6 PREPARATION OF PROPOSALS:

The Government will not pay for any costs incurred in preparation and submission of proposals.

2.7 PROPOSAL REQUIREMENTS:

A. General:

a. Proposals shall be based on solicitation document issued for RFP number 36E77618R0092. Proposals will be in the format stipulated in this document.

b. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals.

c. Submit proposals via email to:

1. thomas.council@va.gov
2. Emails are limited to five (5) MB.

d. Submit the original of the Bid Guarantee by mail to:

1. US Postal Service Deliveries:

Thomas Council Veterans Health Administration Program Contracting Activity Central (VHA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131

2. Commercial Delivery Services / Hand Carry (Monday- Friday, 8:00 AM to 4:30 PM (EDT)) Thomas Council Veterans Health Administration Program Contracting Activity Central (VHA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131

3. Failure to furnish the required bid guarantee in the proper form and amount, by the time specified in Block 13 of SF 1442, may result in rejection of the proposal. SEE FAR Provision 52.228-1, Bid Guarantee, of this Solicitation.

B. Proposal Format:

a. Non-Price and Price sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in two (2) Volumes (Volume I: Non-Price and Volume II: Price). In order that the Volume I Non-Price may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I. Offeror shall separate Volumes I and II. Both Non-Price and Price volumes, therefore, must be labeled with the Offeror's organization, business address, and VA Solicitation Number.

b. The Offeror shall submit Volumes I and II in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed two emails (one email for Price proposal, and one email for Non-Price proposal) of 5MB each. Include page numbers and the company name in the header or footer of each page.

c. The offer, including title page, detailed table of contents, preface, for Volume I Non-Price shall not exceed a total of THIRTY-FIVE (35) pages in Microsoft Arial size 12 font. This page limit does not apply for any of the Past Performance Questionnaires that are submitted directly to the Contracting Officer. Volume II Price Proposal shall not exceed a total of TWENTY (20) pages in Arial size 12 font. The SF 1442, Representations and Certifications and acknowledged amendments shall all be part of Volume II and will not count against the page limitations. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

d. A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. Note, submission of the draft project schedule only, can be submitted by utilizing larger paper (11 X 17 inch). All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. Note, this does not apply for the submission of the draft project schedule. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

e. The Offeror’s responses shall clearly address each evaluation factor listed in this solicitation. Failure to submit in the format required and clearly address those factors may result in this offer being rated unacceptable.

f. Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by filling out Section 19 of the SF 1442 and returning a signed copy of the amendment(s) with the offer. The Representations and Certifications and acknowledged Amendments shall be included in Volume II of the proposal and will not count as part of the page limitations.

g. Offeror shall include the Safety or Environmental Violations and Experience Modification Rating Information as part of Volume II, including filling out ATTACHMENT 8. It will not be evaluated as Price, nor will it count against the page limitations.

1.All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
2.All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
3.Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
4.If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.
5.The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
6.This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

*If the EMR rating for the subcontracting tiers cannot be provided at time of proposal submission, the prime contractor shall acknowledge this and provide as a submittal with the insurance and bonding requirements.

7. Failure to provide the ATTACHMENT 8 containing the above information, may result in a determination that an Offeror is not responsible and therefore ineligible for award.

C. Final Proposal Revisions

a. If determined to be necessary, proposal revisions will be requested from the proposals received. The CO will identify those Offerors, whose proposals are within the competitive range, considering the selection criteria identified in this section. Discussions may be conducted with those Offerors falling within the competitive range, after which proposal revisions will be requested. Sealed proposal revisions will be submitted as per Section 2.7(A), above, except as noted below and will be due at a time and place to be determined.

b. Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents, which clarifies where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions Offeror’s price proposal is greater than its initial price proposal.

*Note this section 2.7(C) only applies if discussions are conducted.

D. Non-Price Proposal Requirements (Volume I)

a. The proposal shall address the following Non-Price evaluation factors. Evaluations will be conducted in accordance with criteria in section 2.8(F) of the solicitation.

1. Volume I, Factor 1, Construction Experience (Non-Price):

Submit a maximum of three (3) construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. The projects must demonstrate an offeror’s construction experience as a prime construction contractor directly responsible to the owner and managing multiple subcontractors.
For purposes of this evaluation, a relevant project is further defined as “a construction, alteration, or repair of completed long term care facilities similar in size and scope to this project.” Project(s) shall have a minimum value of $5,000,000 and be 100% completed. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
Offeror’s submission should include at a minimum:

· Provide the Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design Build, Design Bid Build).

· Provide the project owner name and telephone number of the owner’s contact person.

· Provide a description of the scope of work, to include the work performed by the prime contractor.

· Provide project statistics including start and completion dates (original vs actual) and project cost (original vs actual. If original vs actual completion dates and project cost differ, please explanation as to why they differ.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower.

2. Volume I, Factor 2, Project Execution (Non-Price):

Provide a Draft Project Schedule:

Prepare and submit a practicable construction schedule showing all necessary work elements to complete the project identified under this solicitation. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form.

Each Offeror's construction schedule must address the following:

· Order of work elements to include project phasing; Submittals, Mobilization, Demolition, Construction, Punch List, De-Mobilization.

· Critical milestone dates

· Number of days for each work element

· Identification of long lead time materials

· Identification of separate work elements

· The VA’s review and approval or RFI’s, Submittals and other pertinent documents.

· Interruption of VA Facilities utilities, delivery of Government furnished equipment, rough-in drawings, project phasing and any other specification requirements.

The proposed schedule must include the activities which are consistent with those described within the project specifications and drawings and must not exceed the Government's maximum allowable performance period, as noted in Block 11 of the SF 1442. The project will start at the issuance of the Notice to Proceed. For scheduling purposes, assume the Notice to Proceed will be issued thirty (30) calendar days after the award date. (Note that there is no guarantee the Notice to Proceed will be issued within this timeframe.)

*The schedule submitted with the offer should not be construed as the agreed upon schedule per FAR 52.236-15, the contractor shall, within five (5) days after receiving the Notice to Proceed, submit a revised schedule which will supersede the proposed schedule. The revised schedule will be subject to VA approval and must show the project being accomplished within the timeframe specified on the SF 1442.

Provide Narrative for Project Challenges:

Describe in a written narrative, the foreseen constructability issues for this project and provide recommendations to mitigate these issues. The narrative shall also take into consideration minimizing the disruption of patient care to the greatest extent possible.

3. Volume I, Factor 3, Key Personnel Experience (Non-Price):

The Offeror shall provide a resume for each of the following key personnel members, to include the Project Manager, On-Site Superintendent, Construction Safety Officer, as defined by OSHA, and all of the identified or known major subcontractors. (It is recognized that not all subcontractors may be identified by the time of proposal submission.) For each resume, include name of company, name of individual, relevant listing of experience, qualifications for each person such as specialized training, education, experience, etc. For the subcontractors identified, provide a resume of that company, identify any of the key personnel that will be working this project and the relevant experience of both the company and any key personnel that were identified. Please delineate the approximate % of work the prime contractor will perform on this job and the approximate % of work the subcontractors (collectively) will perform on this job.

4. Volume I, Factor 4, Past Performance (Non-Price):

Each proposal shall provide current and relevant information regarding an Offeror’s actions under previously awarded contracts referenced under Factor 1, Construction Experience. If a completed past performance evaluation is available in PPIRS, it shall be submitted with the proposal for each project referenced in Factor 2, Construction Experience. If there is not a completed past performance evaluation available in PPIRS, then the Offeror shall submit Past Performance Questionnaires (PPQ) (reference ATTACHMENT 7) for each project referenced in Factor 2, Construction Experience. The Offeror shall notify their client that they PPQ shall be submitted via email to the Government’s point of contact thomas.council@va.gov. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.
The Government reserves the right to contact references for verification or additional information.

E. Price Proposal Requirements (Volume II)

a. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the pricing schedule located on PAGE 6 when submitting price offers. Submit a bid guarantee as stipulated in the solicitation.

b. In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for CLIN 0001.

c. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as unacceptable.

d. If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

F. Evaluation of Offers

a. The evaluation of Offerors will be conducted in accordance with section 2.7(F) of the solicitation.

1. Factor 1, Construction Experience (Non-Price):

Will be evaluated on relevant and recent experience of construction contracts and/or contracts of comparable size, complexity and scope.

2. Factor 2, Project Execution (Non-Price):

Will be evaluated relative to overall coordination of the construction phase, to include ability to identify all necessary work elements of the specific project, and the Offerors ability to schedule the activities in a logical sequence and within the time required in this solicitation. The VA will evaluate the Offeror’s plan for identifying and addressing the constructability issues with this construction project in accordance with the solicitation requirements and minimal impact to patient care.

3. Factor 3, Key Personnel Experience (Non-Price):

Will be evaluated on relevant management and technical personnel and subcontractor capabilities and qualifications to provide the required planning, implantation and completion of the project.

4. Factor 4, Past Performance (Non-Price):

Will be evaluated on the quality of the Offeror’s past performance within the last five (5) years with respect to the projects listed in Evaluation Factor 1, Construction Experience. This includes, the timeliness of contract completion, adherence to contract schedules and timely submission of data deliverables; the contractor’s ability to comply with the terms and conditions of the contract; the overall quality of the work performed on the contract; the Offeror’s managerial performance’ and whether or not the reference would enter into a contract with the contractor again. Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. In the event that the prime contractor does not have relevant past performance, surveys submitted for key personnel will be evaluated. Past performance evaluations may also be conducted using information obtained from CPS or PPIRS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

5. Price:

The total evaluated price will be determined by the Offeror's price for CLIN 0001, Bid Item I (Base Bid), and Bid Items III through VI (Deducts 2-5) in order of priority listed in the Pricing Schedule providing the most features of the work within the funds determined by the Government to be available. Below is the process for determining the total evaluated price for each offer received (*Note that CLIN 0002, Bid Item II (Deduct 1) will not apply):

The VA will review CLIN 0001, Bid Item I (Base Bid). If CLIN 0001 is within the funds determined by the Government to be available, the VA will stop pricing review and not move on to the Deducts. If CLIN 0001 is over the funds determined to be available by the Government, the VA will move on to CLIN 0003, Bid Item III (Deduct 2). The VA will review CLIN 0003. If CLIN 0003 is within the funds determined by the Government to be available, the VA will stop pricing review. If CLIN 0003 is over the funds determined to be available by the Government, the VA will move on to CLIN 0004, Bid Item IV (Deduct 3). The VA will review CLIN 0004. If CLIN 0004 is within the funds determined by the Government to be available, the VA will stop pricing review. If CLIN 0004 is over the funds determined to be available by the Government, the VA will move on to CLIN 0005, Bid Item V (Deduct 4). If CLIN 0005 is within the funds determined by the Government to be available, the VA will stop pricing review. If CLIN 0005 is over the funds determined to be available by the Government, the VA will move on to CLIN 0006, Bid Item VI (Deduct 5). If CLIN 0006 is within the funds determined by the Government to be available, the VA will stop pricing review.

2.8 USE OF ADVISORS:

Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide specific technical advice on specialized matters or on particular problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained as a result of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of an Offeror.

2.9 DETERMINATION OF RESPONSIBILITY:

A Determination of Responsibility will be conducted for the apparent “awardee” prior to award of the project. The required information from the proposal, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines in the proposal may result in a determination of “Non-Responsible” for the Offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Offeror ineligible for award.

2.10 VETS 4212:

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.

2.11 SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their proposal.

2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

PERFORMANCE ASSESSMENT SYSTEM (CPARS):

As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $700,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies. PPIRS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to PPIRS. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.

Each contractor whose contract award is estimated to exceed $700,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438-1690. Registration should occur no later than thirty days after contract award, and must be kept current should there be any change to the contractor’s registered representative.

For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.

Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.

2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor.

2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:

Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”

2.15 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018)

(a) This provision does not apply to acquisitions below the simplified acquisition threshold or to acquisitions of commercial items as defined at FAR 2.101.

(b) Certification. [Offeror shall check either (1) or (2).]

(1) The Offeror certifies that—

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available via the internet at https://www.state.gov/t/avc/rls/rpt/;and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available via the internet at https://www.state.gov/t/avc/rls/rpt/; or

(2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of noncompliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.