36E77618R0017-001.docx

DOCX document 116 KB Posted

Attached to
VISN 23 RF Room Upgrades Multi-Site Prep Construction - Install RF Equipment Federal contract opportunity
Solicitation number
36E77618R0017
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77618R0017 36E77618R0017_1.docx

View the file

Other files for this federal contract opportunity

Other files attached to VISN 23 RF Room Upgrades Multi-Site Prep Construction - Install RF Equipment, newest first.
File Type Posted
36E77618C0011-000.docx DOCX document
36E77618R0017-00003003.pdf PDF
36E77618R0017-00003005.pdf PDF
36E77618R0017-00003001.pdf PDF
36E77618R0017-00003004.pdf PDF
36E77618R0017-00003002.pdf PDF
36E77618R0017-00003006.pdf PDF
36E77618R0017-00003000.docx DOCX document
36E77618R0017-00003007.pdf PDF
36E77618R0017-00002000.docx DOCX document
36E77618R0017-00002005.pdf PDF
36E77618R0017-00002003.pdf PDF
36E77618R0017-00002001.pdf PDF
36E77618R0017-00002002.pdf PDF
36E77618R0017-00002006.pdf PDF
36E77618R0017-00002004.pdf PDF
36E77618R0017-00001000.docx DOCX document
36E77618R0017-00001003.pdf PDF
36E77618R0017-00001002.pdf PDF
36E77618R0017-00001001.docx DOCX document
36E77618R0017-005.pdf PDF
36E77618R0017-016.pdf PDF
36E77618R0017-012.pdf PDF
36E77618R0017-011.pdf PDF
36E77618R0017-019.docx DOCX document
36E77618R0017-013.pdf PDF
36E77618R0017-015.pdf PDF
36E77618R0017-004.pdf PDF
36E77618R0017-002.pdf PDF
36E77618R0017-008.pdf PDF
36E77618R0017-010.pdf PDF
36E77618R0017-009.pdf PDF
36E77618R0017-017.pdf PDF
36E77618R0017-007.pdf PDF
36E77618R0017-018.docx DOCX document
36E77618R0017-006.pdf PDF
36E77618R0017-003.pdf PDF
36E77618R0017-014.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36E77618R0017

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT

NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV.

8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that t ime. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.

36E77618R0017 X 11-17-2017

618-CSI-401

PCAC

Donald A. Marsh III Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 Donald A. Marsh III Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131 Donald A.

Marsh III 216-447-8300x3582 In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside.

The contractor shall provide all labor, equipment, materials and supervision necessary to perform all the work required for the Site Prep of the VISN 23 RF Room Upgrades project, in accorda nce with the solicitation and attached specifications, drawings and other documents.

The project will take place at the following locations in VISN 23:

Grand Island VA Medical Center - 2201 N. Broadwell Avenue, Grand Island, NE 6880 Iowa City VA Health Care System - 601 Highway 6 W, Iowa City, IA 52246 Lincoln VA Medical Center - 600 South 70th Street, Lincoln, NE 68510 Omaha VA Medical Center - 4101 Woolworth Avenue, Omaha, NE 68105 St. Cloud VA Health Care System - 4801 Veterans Drive, St. Cloud, MN 56303

VAAR Magnitude of Construction: $1,000,000 to $2,000,000

10 (TEN)

X X 52.211-10 X

10 (TEN)

0 (ZERO)

2:00 PM ET

12-22-2017 X

90 (NINETY)

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER

THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Con tractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

See Price Schedule.

PCAC

Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131

VAFSC

Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically www.ob10.com/us/en/veterans-affairs/ e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429 Donald A. Marsh III

PCAC15L3-1697

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
PRICE SCHEDULE6
PROJECT SCHEDULE8
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS9
1.1 PROPOSAL MATERIAL:9
1.2 BID GUARANTEE:9
1.3 PAYMENT & PERFORMANCE BONDS:9
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS10
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:10
2.2 REQUEST FOR PROPOSAL:10
2.3 SDVOSB SET-ASIDE:10
2.4 JOINT VENTURES:10
2.5 TECHNICAL QUESTIONS:10
2.6 AMENDMENTS:11
2.7 PREPARATION OF PROPOSALS:11
2.8 PROPOSAL REQUIREMENTS:11
2.9 USE OF ADVISORS:17
2.10 DETERMINATION OF RESPONSIBILITY:17
2.11 VETS 4212:17
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):17
2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:18
2.14 52.216-1 TYPE OF CONTRACT (APR 1984)18
2.15 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)18
2.16 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)18
2.17 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)20
2.18 52.228-1 BID GUARANTEE (SEP 1996)21
2.19 52.233-2 SERVICE OF PROTEST (SEP 2006)21
2.20 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)22
2.21 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)22
2.22 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (JAN 2008)23
2.23 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)23
2.24 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)23
2.25 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)24
REPRESENTATIONS AND CERTIFICATIONS25
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)25
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)28
GENERAL CONDITIONS30
4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)30
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)31
4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)31
4.4 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)33
4.5 52.223-20 AEROSOLS (JUN 2016)33
4.6 52.223-21 FOAMS (JUN 2016)34
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)34
4.8 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)37
4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS38
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)38
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)41
4.12 VAAR 852.211-73 BRAND NAME OR EQUAL (JAN 2008)41
4.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)42
4.14 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)43
4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)43
4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)44
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)44
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002)45
4.19 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)45
4.20 VAAR 852.236-76 CORRESPONDENCE (APR 1984)46
4.21 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)46
4.22 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)46
4.23 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)46
4.24 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)47
4.25 VAAR 852.236-82 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS) (APR 1984)47
4.26 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)50
4.27 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)50
4.28 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)51
4.29 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)51
4.30 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)51
4.31 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)53
4.32 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)54
4.33 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)54
LIST OF ATTACHMENTS56

PRICE SCHEDULE

CLIN 0001, SITE PREP FOR RF EQUIPMENT, ST. CLOUD:

General Construction: Work includes general construction, alterations and necessary removal of existing structures and construction of certain other items, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

Electrical Work: Work includes all labor, material, equipment and supervision to perform the required Electrical construction work on this project, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

CLIN 0001: $__________________________________

CLIN 0002, SITE PREP FOR RF EQUIPMENT, IOWA CITY:

General Construction: Work includes demolition, general construction, mechanical, electrical, architectural alterations and certain other items, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

CLIN 0002: $__________________________________

CLIN 0003, SITE PREP FOR RF EQUIPMENT, OMAHA: Work includes general construction, alterations, architectural, mechanical, electrical, structural, plumbing, room finishes and casework, necessary removal of existing structures and construction and certain other items, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

CLIN 0003: $__________________________________

CLIN 0004, SITE PREP FOR RF EQUIPMENT, GRAND ISLAND: Work includes general construction, alterations, architectural, mechanical, electrical, structural, plumbing, room finishes and casework, necessary removal of existing structures and construction and certain other items, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

CLIN 0004: $__________________________________

CLIN 0005, SITE PREP FOR RF EQUIPMENT, LINCOLN: Work includes general construction, alterations, architectural, mechanical, electrical, structural, plumbing, room finishes and casework, necessary removal of existing structures and construction and certain other items, as described in the specifications and drawings attached to the solicitation and incorporated herein by reference.

CLIN 0005: $__________________________________

TOTAL (ALL CLINS): $__________________________________

NOTICE

1. The Department of Veterans Affairs intends to award a single contract to the Offeror whose proposal is in conformance with this solicitation and is determined to be the best value in accordance with the evaluation criteria.

2. CLINs 0001 through 0005, contain all of the work for the project.

3. Prices for each Deduct Alternate shall be expressed as the dollar amount to be deducted from CLIN 0001, Item I.

4. Offerors must provide a price for each of the CLIN items.

5. If following the initial Non-Price and Price evaluations and/or receipt of Final Proposal Revisions resulting from discussion, an offeror’s total evaluated price still exceeds the VA's funding limitation, the VA will no longer consider the offeror to be eligible for award.

6. Please note that all references to Resident Engineer or RE in the Drawings and Specifications shall be replaced with Contracting Officer’s Representative or COR.

7. Also note that the some of the CLINs identified in the Price Schedule are labeled differently than how they are labeled in the Specifications, Statement of Bid Items.

PROJECT SCHEDULE

The period of performance for this project is 200 calendar days after issuance of the Notice to Proceed (NTP). Below is the breakdown of the schedule for the project. All days are in calendar days.

1. D+0: Issuance of NTP.

1. D+15: Contractor to provide all Submittals to the VA; Phase I - Contractor to mobilize and initiate work at Iowa City VAMC, Omaha VAMC and St. Cloud VAMC.

1. D+105: Contractor to complete Phase I, Iowa City VAMC (Room 2W172 & Room 2W173), Omaha VAMC and St. Cloud VAMC. Included in this time period is the VA Submittal Review and Approval period of 20 calendar days.

1. D+110: Phase II – Contactor to mobilize and Initiate work at Iowa City VAMC (Room 2W174), Grand Island VAMC and Lincoln VAMC.

1. D+200: Contractor to complete project.

Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 PROPOSAL MATERIAL:

Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request For Proposal. The VA will not provide printed copies of drawings or specifications. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.

1.2 BID GUARANTEE:

A Bid Guarantee, SF 24, is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid (proposal) guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the rejection of the proposal. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

1.3 PAYMENT & PERFORMANCE BONDS:

The offeror to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Solicitation. Copies of SFs 25 and 25A may be obtained from http://www.gsa.gov/portal/forms/type/TOP.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

All solicitation related documents will be published to http://www.fedbizopps.gov.

2.2 REQUEST FOR PROPOSAL:

This is a Request For Proposal (RFP) in accordance with FAR Part 15. In accordance with FAR Part 15, the Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value after evaluation in accordance with the factors in the solicitation.

All proposals shall be subject to evaluation by a team of Government personnel. The Government reserves the right to award without discussions based upon the initial evaluation of the proposals. The proposals will be evaluated in accordance with the content provided in the solicitation. Using the tradeoff process under best value, it may be in the Government’s best interest to consider award to other than the lowest price Offeror or other than highest Non-Price rated Offeror. All evaluation factors other than price, when combined are approximately equal to price. The evaluation factors are listed in descending order of importance.

Evaluations will be based on the following evaluation factors:

1. Project Execution (Non-Price)

2. Construction Experience (Non-Price)

3. Past Performance (Non-Price)

2.3 SDVOSB SET-ASIDE:

This procurement is100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as verified by the VA’s Center for Veterans Enterprises (CVE) (http://www.vetbiz.gov). Offerors must be verified by CVE and visible in the Vendor Information Portal (VIP) database at TIME OF SUBMISSION OF OFFERS. Failure to be BOTH visible and verified at the time of proposal submission will result in the offeror’s proposal being deemed unacceptable and ineligible for award.

2.4 JOINT VENTURES:

If submitting an offer as a joint venture as defined by P.L. 109-461 AND Department of Veterans Affairs I.L. 049-06-4, an offeror must provide a copy of the joint venture agreement specific to the project that is consistent with the requirements of the above Public Law and VA Information Letter. Additionally, the offeror must provide a breakdown or labor of which is to be performed by the SDVOSB firm and that which is performed by the small business joint venture firm and that which is sub-contracted. All Joint Ventures will be required to be registered and verified as an SDVOSB entity in VETBIZ.

2.5 TECHNICAL QUESTIONS:

Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Don Marsh. Questions shall be submitted only via e-mail to: donald.marsh2@va.gov. The subject line must read: VISN 23 RF Room Upgrades – Technical Questions. Oral questions of a technical nature are not acceptable. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS DECEMBER 11, 2017 at 3:00 PM (ET).

2.6 AMENDMENTS:

Amendments to this solicitation will be posted at http://www.fedbizopps.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.

2.7 PREPARATION OF PROPOSALS:

PCAC will not pay for any costs incurred in preparation and submission of proposals.

2.8 PROPOSAL REQUIREMENTS:

A. General:

a. Proposals shall be based on solicitation document issued for RFP number 36E77618R0017. Proposals will be in the format stipulated in this document.

b. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals.

c. Submit proposals via email to:

1. donald.marsh2@va.gov
2. Emails are limited to five (5) MB.

d. Submit the original of the Bid Guarantee by mail to:

1. US Postal Service Deliveries:

Donald A. Marsh III Veterans Health Administration Program Contracting Activity Central (VHA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131

2. Commercial Delivery Services / Hand Carry (Monday- Friday, 8:00 AM to 4:30 PM (EDT)) Donald A. Marsh III Veterans Health Administration Program Contracting Activity Central (VHA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131

3. Failure to furnish the required bid guarantee in the proper form and amount, by the time specified in Block 13 of SF 1442, may result in rejection of the proposal. SEE FAR Provision 52.228-1, Bid Guarantee, of this Solicitation.

B. Proposal Format:

a. Non-Price and Price sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in two (2) Volumes (Volume I: Non-Price and Volume II: Price). In order that the Volume I Non-Price may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in Volume I. Offeror shall separate Volumes I and II. Both Non-Price and Price volumes, therefore, must be labeled with the Offeror's organization, business address, and VA Solicitation Number.

b. The Offeror shall submit Volumes I and II in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed two emails (one email for Price proposal, and one email for Non-Price proposal) of 5MB each. Include page numbers and the company name in the header or footer of each page.

c. The offer, including title page, detailed table of contents, preface, for Volume I Non-Price shall not exceed a total of THIRTY-FIVE (35) pages in Microsoft Arial size 12 font. This page limit does not apply for any of the Past Performance Questionnaires that are submitted directly to the Contracting Officer. Volume II Price Proposal shall not exceed a total of TWENTY-FIVE (25) pages in Arial size 12 font. The SF 1442, Representations and Certifications and acknowledged amendments shall all be part of Volume II and will not count against the page limitations. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

d. A page is defined as each face of an 8.5 X 11 inch sheet of paper containing information. Note, submission of the draft project schedule only, can be submitted by utilizing larger paper. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. Note, this does not apply for the submission of the draft project schedule. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

e. The Offeror’s responses shall clearly address each evaluation factor listed in this solicitation. Failure to submit in the format required and clearly address those factors may result in this offer being rated unacceptable.

f. Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by filling out section 19 of the SF 1442 and returning a signed copy of the amendment(s) with the offer. The Representations and Certifications and acknowledged Amendments shall be included in Volume II of the proposal and will not count as part of the page limitations.

g. Offeror shall include the Safety or Environmental Violations and Experience Modification Rating Information as part of Volume II, including filling out ATTACHMENT 11. It will not be evaluated as Price, nor will it count against the page limitations.

1.All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
2.All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
3.Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
4.If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.
5.The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
6.This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

*If the EMR rating for the subcontracting tiers cannot be provided at time of proposal submission, the prime contractor shall acknowledge this and provide as a submittal with the insurance and bonding requirements.

7. Failure to provide the ATTACHMENT 11 containing the above information, may result in a determination that an Offeror is not responsible and therefore ineligible for award.

C. Final Proposal Revisions

a. If determined to be necessary, proposal revisions will be requested from the proposals received. The CO will identify those Offerors, whose proposals are within the competitive range, considering the selection criteria identified in this section. Discussions may be conducted with those Offerors falling within the competitive range, after which proposal revisions will be requested. Sealed proposal revisions will be submitted as per Part III.C1.C, above, except as noted below and will be due at a time and place to be determined.

b. Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents, which clarifies where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions Offeror’s price proposal is greater than its initial price proposal.

*Note this section C.3 only applies if discussions are conducted.

D. Non-Price Proposal Requirements (Volume I)

a. The proposal shall address the following Non-Price evaluation factors. Evaluations will be conducted in accordance with criteria in section 2.2 of the solicitation.

1. Volume I, Factor 1, Project Execution (Non-Price):

Provide a Draft Project Schedule:

Prepare and submit a practicable construction schedule showing all necessary work elements to complete the project identified under this solicitation. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form.

Each Offeror's construction schedule must address the following:

· Multiple VAMC locations of work.

· Order of work elements to include project phasing; work elements that shall be shown on the schedule for each site; Submittals, Mobilization, Demolition, Construction, Punch List, De-Mobilization.

· Number of days for each work element

· Identification of long lead time materials

· Identification of separate work elements

· The VA’s review and approval or RFI’s, Submittals and other pertinent documents.

· Interruption of VA Facilities utilities, delivery of Government furnished equipment, rough-in drawings, project phasing and any other specification requirements.

The proposed schedule must include the activities which are consistent with those described within the project specifications and drawings and must not exceed the Government's maximum allowable performance period, as noted in Block 11 of the SF 1442. The project will start at the issuance of the Notice to Proceed. For scheduling purposes, assume the Notice to Proceed will be issued thirty (30) calendar days after the award date. (Note that there is no guarantee the Notice to Proceed will be issued within this timeframe.)

*The schedule submitted with the offer shall be accepted as the agreed upon schedule per FAR 52.236-15.

If the contractor has any suggested changes to the two phases of the project, they may address this in the schedule.

2. Volume I, Factor 2, Construction Experience (Non-Price):

Submit a maximum of three (3) construction projects for the Offeror that best demonstrates your experience on relevant high-tech equipment site preparation projects that are similar in size, scope, and complexity to the RFP. The projects must demonstrate an offeror’s construction experience as a prime construction contractor directly responsible to the owner and managing multiple subcontractors.
Additionally, submit a maximum of (3) construction projects for the Offeror that best demonstrates your experience managing construction at multiple sites simultaneously. Offerors with experience in both high-tech equipment site preparation and experience managing construction at multiple sites simultaneously will receive additional consideration.
For purposes of this evaluation, a relevant project is further defined as “a construction, alteration, or repair of completed clinical, hospital or other medical related use space similar in size and scope to this project.” Project(s) shall have a minimum value of $200,000 and be 100% completed. Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
Offeror’s submission should include at a minimum:

· Provide the Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design Build, Design Bid Build).

· Provide the project owner name and telephone number of the owner’s contact person.

· Provide a description of the scope of work, to include the work performed by the prime contractor.

· Provide project statistics including start and completion dates (original vs actual) and project cost (original vs actual. If original vs actual completion dates and project cost differ, please explanation as to why they differ.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit experience for all Joint Venture partners may be rated lower.

3. Volume I, Factor 3, Past Performance (Non-Price):

Each proposal shall provide current and relevant information regarding an Offeror’s actions under previously awarded contracts referenced under Factor 2, Construction Experience. If a completed past performance evaluation is available in PPIRS, it shall be submitted with the proposal for each project referenced in Factor 2, Construction Experience. If there is not a completed past performance evaluation available in PPIRS, then the Offeror shall submit Past Performance Questionnaires (PPQ)(reference ATTACHMENT 10) for each project referenced in Factor 2, Construction Experience. The Offeror shall notify their client that they PPQ shall be submitted via email to the Government’s point of contact Donald.marsh2@va.gov. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.
The Government reserves the right to contact references for verification or additional information.

E. Price Proposal Requirements (Volume II)

a. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the pricing schedule located on PAGE 6 when submitting price offers. Submit a bid guarantee as stipulated in the Section “Instructions, Conditions, and Notices to Offerors”.

b. In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for each CLIN.

c. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as unacceptable.

d. If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

F. Evaluation of Offers

a. The evaluation of Offerors will be conducted in accordance with section 2.2 of the solicitation.

1. Factor 1, Project Execution (Non-Price):

Will be evaluated relative to overall coordination of the construction phase, to include ability to identify all necessary work elements of the specific project, and the Offerors ability to schedule the activities in a logical sequence and within the time required in this solicitation. The VA will evaluate the Offeror’s plan for identifying and addressing the challenges of this construction project in accordance with solicitation requirement and minimize impact to patient care.

2. Factor 2, Construction Experience (Non-Price):

Will be evaluated on relevant and recent experience of high-tech equipment site preparation construction contracts and/or contracts of comparable size, complexity and scope. Additional consideration will be given to Offerors who can also demonstrate past experience managing multiple sites of construction simultaneously.

3. Factor 3, Past Performance (Non-Price):

Will be evaluated on the quality of the Offeror’s past performance within the last five (5) years with respect to the projects listed in Evaluation Factor 2, Construction Experience. This includes, the timeliness of contract completion, adherence to contract schedules and timely submission of data deliverables; the contractor’s ability to comply with the terms and conditions of the contract; the overall quality of the work performed on the contract; the Offeror’s managerial performance’ and whether or not the reference would enter into a contract with the contractor again. Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. In the event that the prime contractor does not have relevant past performance, surveys submitted for key personnel will be evaluated. Past performance evaluations may also be conducted using information obtained from CPS or PPIRS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

4. Price:

The Government will evaluate offers in accordance with the process identified in the Price Schedule. The total evaluated price will be determined by the Offeror’s price for all of the CLINs. The VA reserves the right to award to a higher priced offeror in accordance with the stated evaluation criteria. The VA also reserves the right to award to a lower priced, lower rated offeror if it’s in the interest of the VA.

2.9 USE OF ADVISORS:

Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide specific technical advice on specialized matters or on particular problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained as a result of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of an Offeror.

2.10 DETERMINATION OF RESPONSIBILITY:

A Determination of Responsibility will be conducted for the apparent “awardee” prior to award of the project. The required information from the proposal, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines in the proposal may result in a determination of “Non-Responsible” for the Offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Offeror ineligible for award.

2.11 VETS 4212:

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.

2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their proposal.

2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor.

2.14 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.15 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.16 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
Grand Island, NE – 1.4%
6.9%
Iowa City, IA – 1.5%
6.9%
Lincoln, NE – 2.8%
6.9%
Omaha, NE – 7.6%
6.9%
St. Cloud, MN – 0.5%
6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Grand Island, NE – Hall County Iowa City, IA – Johnson County Lincoln, NE – Lancaster County Omaha, NE – Douglas County St. Cloud, MN – Stearns County

(End of Provision)

2.17 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.18 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be TWENTY (20) percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.19 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Donald A. Marsh III

Hand-Carried Address:

Donald A. Marsh III Department of Veterans Affairs Program Contracting Activity…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.