36E77618R0017-00002001.pdf

PDF 60 KB Posted

Attached to
VISN 23 RF Room Upgrades Multi-Site Prep Construction - Install RF Equipment Federal contract opportunity
Solicitation number
36E77618R0017
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77618R0017 00002 Technical Questions Tracking Spreadsheet - Grand Island - 12-15-2017.pdf

View the file

Other files for this federal contract opportunity

Other files attached to VISN 23 RF Room Upgrades Multi-Site Prep Construction - Install RF Equipment, newest first.
File Type Posted
36E77618C0011-000.docx DOCX document
36E77618R0017-00003003.pdf PDF
36E77618R0017-00003005.pdf PDF
36E77618R0017-00003002.pdf PDF
36E77618R0017-00003006.pdf PDF
36E77618R0017-00003000.docx DOCX document
36E77618R0017-00003007.pdf PDF
36E77618R0017-00003001.pdf PDF
36E77618R0017-00003004.pdf PDF
36E77618R0017-00002003.pdf PDF
36E77618R0017-00002004.pdf PDF
36E77618R0017-00002002.pdf PDF
36E77618R0017-00002006.pdf PDF
36E77618R0017-00002000.docx DOCX document
36E77618R0017-00002005.pdf PDF
36E77618R0017-00001003.pdf PDF
36E77618R0017-00001001.docx DOCX document
36E77618R0017-00001002.pdf PDF
36E77618R0017-00001000.docx DOCX document
36E77618R0017-011.pdf PDF
36E77618R0017-019.docx DOCX document
36E77618R0017-013.pdf PDF
36E77618R0017-015.pdf PDF
36E77618R0017-006.pdf PDF
36E77618R0017-003.pdf PDF
36E77618R0017-014.pdf PDF
36E77618R0017-004.pdf PDF
36E77618R0017-002.pdf PDF
36E77618R0017-008.pdf PDF
36E77618R0017-001.docx DOCX document
36E77618R0017-010.pdf PDF
36E77618R0017-009.pdf PDF
36E77618R0017-017.pdf PDF
36E77618R0017-007.pdf PDF
36E77618R0017-018.docx DOCX document
36E77618R0017-005.pdf PDF
36E77618R0017-016.pdf PDF
36E77618R0017-012.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 36E77618R0017 TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET – GRAND ISLAND

ITEM

NO.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

1. 11/30/2017 12/04/2017 Who is the Siemens Project Manager for Grand Island? Angela Mulinix is the COR for the equipment contract. Chaz Williamson will be acting as the Technical Monitor for construction issues locally at the Grand Island site and Ron RIce will be acting as the Technical Monitor for the equipment issues locally at the Grand Island site.

2. 11/30/2017 12/14/2017 What are the normal working hours for contractors at Grand Island? Will nightwork be approved for the project?

Normal working hours are 7:00 a.m. – 5:30 p.m., M – F. Night and/or weekend work may be coordinated with the on-site technical representative (Chaz Williamson).

3. 11/30/2017 12/14/2017 What are the working hours of the clinic area where the project will take place?

Normal clinic hours are 7:00 a.m. – 4:30 p.m., M

– F.

4. 11/30/2017 12/14/2017 Where is the laydown and staging areas for the site? The contractor should make every effort to limit the amount of material and equipment needed to be stored on-site and, as much as possible, limit storage to the work area. Limited storage in the facility basement can be coordinated with the on-site technical representative.

5. 11/30/2017 12/14/2017 Is the work area noise sensitive? Work will be conducted in a patient care area. In addition to strict dust and infectious control requirements for the work, work generating high noise levels and/or having the potential to transmit vibration through the facility structure shall be coordinate with the on-site technical representative and completed outside of clinic hours.

6. 11/30/2017 12/14/2017 Is there interstitial space? No. There is a plenum between the acoustic ceiling and the deck above, with between 18” and 36” of clear space, depending on beam locations.

ITEM

NO.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

7. 11/30/2017 12/04/2017 What is the lead time for the Siemens delivery of the equipment?

The turnaround time for Siemens is 6-8 weeks – but really the construction contractor will not be coordinating the delivery date with the vendor – the VA (Biomedical engineer rep from each site and Angela Mulinix) will be working with Siemens to secure the delivery date for the equipment once we have a confirmed construction schedule from the awarded contractor.

8. 11/30/2017 12/14/2017 How thick is the lead lining in the walls? Lead shielding is 1/8” thick.

9. 11/30/2017 12/14/2017 Do the doors to the RF Room contain any sensors? Yes, per construction drawings.

10. 11/30/2017 12/14/2017 Are contractors allowed to use the VA restrooms? VA restrooms are available for contractor use, with the expectation that contractor employees will not soil the area.

11. 11/30/2017 12/14/2017 What parking is available on site? Contractor employees shall use VA employee parking.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.