36C78618R0097-002.pdf

PDF 3 MB Posted

Attached to
FORT GIBSON GROUNDS MAINTENANCE
Solicitation number
36C78618R0097
Issued by

About this file

36C78618R0097 36C7861R0097 - Grounds Maintenance (Mow and Trim) - For Release.pdf

View the file

Other files

File Type Posted
36C78618D0211-000.docx DOCX document
36C78618R0097-0002000.docx DOCX document
36C78618R0097-00001002.pdf PDF
36C78618R0097-00001000.docx DOCX document
36C78618R0097-00001001.pdf PDF
36C78618R0097-004.pdf PDF
36C78618R0097-003.pdf PDF
36C78618R0097-001.docx DOCX document
36C78618R0097-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. DUNS: DUNS+4:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 122

36C7861R0048 02-13-2018

Ann Manning (303) 914-5710 03-12-2018

43C1 Department of Veterans Affairs NCA Contracting Service 155 Van Gordon Street Suite 520 Lakewood CO 80228

X 100

X

561730

$7.5 Million

N/A

X

Fort Gibson National Cemetery 1423 Cemetery Road Fort Gibson, OK 74434

43C1

Department of Veterans Affairs NCA Contracting Service 155 Van Gordon Street Suite 520 Lakewood CO 80228

43C1 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

SEE VAAR 852.232-72 ELECTRONIC

SUBMISSION OF PAYMENT REQUESTS

1-877-752-0900

This is a SDVOSB set aside. Service Disabled Veteran Owned Business Set-Aside, Authority, 38 USC 8127(d).

The contractor shall provide all personnel, supervision, i t equipment, and miscellaneous items to provide ground i Maintenance services at Fort Gibson National Cemetery, OK.

THE DUE DATE FOR PROPOSALS IS 3/12/2018, 4:00pm MST

Faxed and emailed offers will not be accepted

All proposals must be submitted through the Department of Veterans Affairs Electronic Management System (eCMS) Vendor

Portal website https://www.vendorportal.ecms.va.gov to be considered.

CONTRACTOR DUNS NO. ________________________________________

CONTRACTOR EMAIL ADDRESS:___________________________________

CONTRACTOR PHONE NUMBER:____________________________________

X 1

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED CORRECT 36. PAYMENT 37. CHECK NUMBER

FOR

PARTIAL FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

36C78618R0097

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN

2011)

B.3 PRICE SCHEDULE AND PERFORMANCE WORK STATEMENT

PRICE SCHEDULE OF SERVICES: BLOCK 19 AND BLOCK 20 .......... Error! Bookmark not defined.

SECTION C - CONTRACT CLAUSES

C.1 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

C.2 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN

2017)

C.3 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2017)

C.4 52.216-18 ORDERING (OCT 1995)

C.5 52.216-19 ORDER LIMITATIONS (OCT 1995)

C.6 52.216-21 REQUIREMENTS (OCT 1995)

C.7 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.8 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

C.9 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997) . 81

C.10 SUPPLEMENTAL INSURANCE REQUIREMENTS

C.11 52.232-18 AVAILABILITY OF FUNDS (APR 1984)

C.12 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)

C.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (DEC 2009)

C.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2012)

C.15 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2015)

ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS

E.2 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE

CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS—

REPRESENTATION (JAN 2017)

E.3 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL

2016)

E.4 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)

E.5 52.204-20 PREDECESSOR OF OFFEROR (JUL 2016)

E.6 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015) 98

E.7 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) ... 100

E.8 52.212-2 EVALUATION—COMMERCIAL ITEMS (JAN 1999)

ADDENDUM TO 52.212-2 EVALUATIONS--COMMERCIAL ITEMS

E.9 52.216-1 TYPE OF CONTRACT (APR 1984)

E.10 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN

CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRAN—REPRESENTATION

AND CERTIFICATIONS (OCT 2015)

E.11 52.233-2 SERVICE OF PROTEST (SEP 2006)

E.12 52.237-1 SITE VISIT (APR 1984)

E.13 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION

(JAN 2008)

E.14 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)

E.15 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)

E.16 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL

ITEMS (JUL 2016)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

(Continuation from Standard Form 1449)

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contract Specialist – Ann R. Manning Department of Veterans Affairs NCA Contracting Service 155 Van Gordon Street Suite 510

Lakewood, CO 80228

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-34, Payment by Electronic Funds Transfer—Other Than System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] Monthly

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Also reference Block 18A for identification of the Tungsten electronic site address for post award submission of all addresses.

5. GOVERNMENT HOLIDAYS

Holidays observed by the Federal Government:

New Year's Day 1 January

Martin Luther King's Birthday Third Monday in January

President's Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day 11 November

Thanksgiving Day 4th Thursday in November

Christmas Day 25 December

If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies.

Also included would be any day specifically declared by the President of the United States of America as a national holiday.

6. SITE VISIT - Offerors may elect to inspect all sites where services are to be performed and to understand all general and local conditions that may affect the cost of contract performance (See Provision 52.237-1 Site Visit. In no event shall failure to inspect constitute grounds for a claim or request for equitable adjustment after contract award.

To make arrangements for a site visit contact: Guy Passman

Main Phone (918) 478-2334

Cell (918) 616-8862

B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND

COMPLIANCE (JUN 2011)

Any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.

B.3 PRICE SCHEDULE AND PERFORMANCE WORK STATEMENT

Base Year: Date of Award thru September 30, 2018

CLIN

No.

Supplies/Services Est. Qty Unit Unit Cost Total Cost

Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 35 acres, mowed 27 times = Est. 945 acres mowed.)

945 Acre $ ____________ $ ____________

String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est.

35 acres, trimmed 27 times = Est. 945 acres trimmed.)

945 Acre $ ____________ $ ____________

Trim headstones and markers in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones and flat markers. (Est. 22,688 headstones and markers, trimmed 27 times = Est. 612,576 headstones/markers)

612,576 Headstone or Marker

Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est.

17,100 linear feet, edged 6 times = Est.

102,600 linear feet edged.)

102,600 Linear Feet $ ____________ $ ____________

Pre-Emergent Herbicide Applications (Est.

35 acres, applied 2 times = 70 acres treated.)

70 Acre $ ____________ $ ____________

Post-Emergent Herbicide Applications (Est. 35 acres, applied 3 times = 105 acres treated.) 105 Acre $ ____________ $ ____________

Fertilizer Applications (Est. 35 acres, applied 3 times = 105 acres treated.)

105 Acre $ ____________ $ ____________

Total Estimated Cost:

Base Year:

Option Year 1: October 1, 2018 thru September 30, 2019

No.

Supplies/Services Est. Qty Unit Unit Cost Total Cost

Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas.

(Est. 35 acres, mowed 36 times = Est. 1,260 acres mowed.)

1,260 Acre $ ____________ $ ____________

String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces.

Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 35 acres, trimmed 36 times = Est. 1,260 acres trimmed.)

1,260 Acre $ ____________ $ ____________

Trim headstones and markers in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones and flat markers. (Est. 23,125 headstones and markers, trimmed 36 times = Est. 832,500 headstones/markers trimmed.)

832,500 Headstone or Marker

Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 17,100 linear feet, edged 6 times = Est. 102,600 linear feet edged.)

102,600 Linear Feet $ ____________ $ ____________

Pre-Emergent Herbicide Applications (Est.

35 acres, applied 2 times = 70 acres treated.) 70 Acre $ ____________ $ ____________

Post-Emergent Herbicide Applications (Est.

35 acres, applied 3 times = 105 acres treated.) 105 Acre $ ____________ $ ____________

Fertilizer Applications (Est. 35 acres, Option Year 1:

Option Year 2: October 1, 2019 thru September 30, 2020

No.

Supplies/Services Est. Qty Unit Unit Cost Total Cost

Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas.

(Est. 35 acres, mowed 36 times = Est. 1,260 acres mowed.)

1,260 Acre $ ____________ $ ____________

String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces.

Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 35 acres, trimmed 36 times = Est. 1,260 acres trimmed.)

1,260 Acre $ ____________ $ ____________

Trim headstones and markers in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones and flat markers. (Est. 23,562 headstones and markers, trimmed 36 times = Est. 848,232 headstones/markers trimmed.)

848,232 Headstone or Marker

Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 17,100 linear feet, edged 6 times = Est. 102,600 linear feet edged.)

102,600 Linear Feet $ ____________ $ ____________

Pre-Emergent Herbicide Applications (Est.

35 acres, applied 2 times = 70 acres treated.)

70 Acre $ ____________ $ ____________

Post-Emergent Herbicide Applications (Est.

35 acres, applied 3 times = 105 acres treated.)

105 Acre $ ____________ $ ____________

Fertilizer Applications (Est. 35 acres, Option Year 2:

Option Year 3: October 1, 2020 thru September 30, 2021

No.

Supplies/Services Est. Qty Unit Unit Cost Total Cost

Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas.

(Est. 35 acres, mowed 36 times = Est. 1,260 acres mowed.)

1,260 Acre $ ____________ $ ____________

String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces.

Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 35 acres, trimmed 36 times = Est. 1,260 acres trimmed.)

1,260 Acre $ ____________ $ ____________

Trim headstones and markers in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones and flat markers. (Est. 23,999 headstones and markers, trimmed 36 times = Est. 863,964 headstones/markers trimmed.)

863,964 Headstone or Marker

Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 17,100 linear feet, edged 6 times = Est. 102,600 linear feet edged.)

102,600 Linear Feet $ ____________ $ ____________

Pre-Emergent Herbicide Applications (Est.

35 acres, applied 2 times = 70 acres treated.)

70 Acre $ ____________ $ ____________

Post-Emergent Herbicide Applications (Est.

35 acres, applied 3 times = 105 acres treated.)

105 Acre $ ____________ $ ____________

Fertilizer Applications (Est. 35 acres, Option Year 3:

Option Year 4: October 1, 2021 thru September 30, 2022

No.

Supplies/Services Est. Qty Unit Unit Cost Total Cost

Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est. 35 acres, mowed 36 times = Est. 1,260 acres mowed.)

1,260 Acre $ ____________ $ ____________

String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est.

35 acres, trimmed 36 times = Est. 1,260 acres trimmed.)

1,260 Acre $ ____________ $ ____________

Trim headstones and markers in conjunction with every mowing. Remove and replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones and flat markers. (Est. 24,436 headstones and markers, trimmed 36 times = Est. 879,696 headstones/markers trimmed.)

879,696 Headstone or Marker

Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. (Est.

17,100 linear feet, edged 6 times = Est.

102,600 linear feet edged.)

102,600 Linear Feet $ ____________ $ ____________

Pre-Emergent Herbicide Applications (Est. 35 acres, applied 2 times = 70 acres treated.)

70 Acre $ ____________ $ ____________

Post-Emergent Herbicide Applications (Est. 35 acres, applied 3 times = 105 acres treated.)

105 Acre $ ____________ $ ____________

Fertilizer Applications (Est. 35 acres, Option Year 4:

PRICE SUMMARY TOTALS

Total Estimated Cost

Base Year – Date of Award thru 9/30/18: $_______________________

Option Year 1 – 10/1/18 – 9/30/19: $ ______________________

Option Year 2 – 10/1/19 – 9/30/20: $ ______________________

Option Year 3 - 10/1/20 – 9/30/21: $ ______________________

Option Year 4 - 10/1/21 – 9/30/22: $ ______________________

Grand Total (Base + all Option Years): $ ______________________

Offerors shall enter unit cost and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.

Offerors shall enter the Total Cost for each year in the “Summary Totals” where indicated. Offeror shall calculate the Grand Total for all years and enter where indicated.

Offeror is to understand the quantities stated in the schedule are estimates for pricing purposes only.

Acreage, linear feet, or headstone count stated in the schedule may not be exact.

PERFORMANCE WORK STATEMENT

1. GENERAL INFORMATION

1.1. This is a performance-based contract for cemetery grounds maintenance services at Fort Gibson National Cemetery, Fort Gibson, Oklahoma and hereafter referred to as Fort Gibson or “Cemetery.”

The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities of mowing and trimming; curb/sidewalk edging; and fertilizing and weed control; and associated services described herein required to maintain a healthy and aesthetic appearance of the Cemetery grounds. The Cemetery is located at 1423 Cemetery Road, Fort Gibson, Oklahoma 74434.

1.2. This Performance Work Statement describes the basic objectives of the Fort Gibson National Cemetery Grounds Maintenance Program. The Performance Based Service Contract provides potential Offerors the flexibility to develop cost effective solutions and the opportunity to propose innovative alternatives to meet the stated objectives. It also presents the Government with an opportunity to assess the Offeror’s understanding of all aspects of the effort to be performed by eliminating the "how to" instructions to accomplish the required effort normally contained on the Statement of Work that the Government traditionally provides to prospective Offerors. Minimum acceptable levels of performance to meet the minimum requirements are outlined in the “Performance Work Requirements Summary” contained in Attachment 1.

1.3. The National Cemetery Administration Mission.

1.3.1. The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures performed by the Contractor have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, the Contractor’s strict adherence to the Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications shall be required and shall be essential.

1.4. Background.

1.4.1. In 1999 Congress passed legislation requiring VA to ensure that National Cemeteries serve as a dignified and respectful setting. Each Cemetery is to be an expression of appreciation and respect of a grateful Nation for the service and sacrifice of her veterans.

1.4.2. Further, each National Cemetery is to be maintained as a National Shrine. A National Shrine is defined as a place of honor and memory that declares to the visitor/family who views it as a majestic setting, offering a sense of serenity, historic sacrifice and nobility of purpose. The National Cemetery is a beautiful and awe-inspiring tribute to those who gave much to preserve our Nation’s freedom and way of life.

2. DESCRIPTION OF CONTRACT OBJECTIVES

2.1. The Contractor shall furnish all labor, supervision, professional expertise, vehicles, tools, equipment, materials, and services necessary to ensure that grounds maintenance is performed in a manner that shall meet or exceed the requirements to maintain healthy grass and that presents a clean, neat, professional and aesthetic grounds appearance throughout the Cemetery. The Contractor’s performance will be based on the Contracting Officer’s (CO) and Contracting Officer’s Representative (COR) evaluation and of the results required by the Service Delivery Summary (SDS) and not the frequency or method of performance. It is at the Contractor’s discretion to determine the levels of frequencies to attain the level of service at the best value. The evaluation of results will be based on COR performance assessment, tenant satisfaction, and customer complaints. The Contractor shall comply with applicable federal, regional, state, local laws, and commercial standards.

2.2. Services include, but are not limited to, mowing, trimming, edging, removal of trash (generated by the Contractor), as well as sweeping or blowing off grass from sidewalks, roads and headstones.

Scheduling of services shall be coordinated with the COR to avoid disruption of ongoing Cemetery operations. All work shall be done during normal Federal workdays during Cemetery workday hours. The exception is Memorial Day, which may be a workday for Federal employees, but not for the Contractor. No work shall be allowed during special weekend activities.

2.3. The Contractor shall be responsible for full management of the facility’s grounds maintenance services described herein. The Government’s objectives and Contractor compliance standards are described in the NCA’s “Operational Standards and Measures” (given upon request of the Contracting Officer), the Performance Work Statement (PWS), and other requirements identified herein, as they are applicable to the services required in the Pricing Schedule. The Contractor may use whatever method it chooses to meet the objectives, as long as the end result satisfies the minimum acceptable levels of performance as defined in Services Delivery Summary (SDS).

2.4. Contract Objectives.

2.4.1. To use an innovative and creative technical approach to manage the Cemetery grounds maintenance operation at the Fort Gibson National Cemetery in order to maintain the high standards of appearance as a National Shrine, in accordance with best commercial practices and the requirements identified in this solicitation.

2.4.2. To have the Contractor comply with criteria designed to maintain healthy grass and a clean, neat and professional grounds appearance overall.

3. DESCRIPTION OF SERVICES: Improved Grounds Maintenance. Improved Grounds are identified in Attachment 6, Definitions. Improved Grounds are visually prominent and medium visual impact areas requiring more frequent maintenance, such as burial areas, high visibility specialty areas, and non-burial areas (see Attachment 6, Definitions). All Improved Grounds shall be maintained in the same manner as a high quality residential lawn under contract from a professional lawn maintenance service. Mowing for special events (“Special Cuts”) shall not be included in this requirement.

3.1. Mowing. The Contractor shall mow all Improved Grounds to look well-manicured, with a neat and professional appearance at all times. Mowed areas shall be uniform in appearance, free of skips, gaps, scalping, rutting, bruising, and uneven and rough cutting.

3.1.1. The Contractor shall maintain grass height at a height within one inch (+/-) of that which is professionally recommended for the recommended grass type for the Fort Gibson/Muskogee, Oklahoma geographic region and as directed by the COR. Optimally, the height should be no more than one-half an inch (½”) above the recommended range for the type of turf at the Cemetery as directed by the COR. The typical acceptable height ranges between 1 and 3 inches; however, the COR, with input from the Continental District (CD) Agronomist, may direct the Contractor on the particular height to mow at any given time depending on weather conditions.

3.1.2. The Contractor shall be required to pick up, collect and dispose of debris and trash (see Attachment 6 Definitions), natural and manmade, prior to and after mowing/trimming any area.

3.1.3. The Contractor shall identify, move and replace all floral or commemorative items, etc. to their original locations as necessary while performing mowing/trimming services.

3.1.4. The Contractor shall keep all headstones, flat markers, monuments, roadways, walkways (inside and out), flagpole bases, public visitor areas including at the Committal Shelter, or other non-turf areas free of clipping or edging deposits. Clippings shall be mechanically blown or swept onto nearby turf areas when possible, or collected and disposed of on the same day as the mowing, trimming, or edging event that produced them. At no time is freshly mowed grass to be blown onto headstones

3.1.5. The Contractor shall immediately remove and dispose of, or mulch clearly visible clumps of grass clippings on top of the turf to prevent the appearance of windrows.

3.1.6. The Contractor shall use commercial grade rear-discharge mowers or commercial grade mowers with mulching decks only. The Contractor shall use properly maintained and adjusted cutting equipment to prevent streaks or irregularities, uneven cutting, plowing, or gouging of the soil. Cutting blades on mowing and trimming equipment must be kept sharp so that grass tips are cleanly cut and not torn or damaged. Riding mowers may be used if they are not operated within four (4) inches of markers, monuments, tree trunks or other vertical surfaces.

3.1.7. All mowing equipment shall be cleaned before unloading or mowing at the Cemetery to reduce the risk of introducing contaminant weed seeds into the Cemetery turf. No equipment shall be cleaned on Cemetery property.

3.1.8. The Contractor shall hand mow new seed/sod areas (present at all newly buried gravesites, second interment gravesites, and repaired gravesite locations) until they are fully established to the point where they will not be damaged by riding mowers.

3.1.9. The Contractor shall be familiar with and utilize different mowing patterns and shall change direction, change patterns, and vary mower wheel width patterns with after each mowing thereby reducing turf wear, prevent wheel rutting, and provide a neater appearance. All mowing around trees will be accomplished in a manner that prevents a “ringing pattern” around the tree and associated damage to turf.

3.1.10. There may be periods of excessive rainfall when the Contractor cannot access areas for mowing due to excessive wetness. The COR has the authority to stop work if weather conditions are such that work that day will do more damage than good to the Cemetery grounds. During these periods, the Contractor shall be expected to ensure the grass is cut in less than a week’s time once grass is suitable for mowing.

3.2. Trimming. The Contractor shall trim grass and vegetation around vertical surfaces or any other structure or area that cannot be maintained by traditional mowing equipment to match surrounding area grass height within Improved Grounds. Streaks or irregularities, uneven cutting, plowing, or gouging of the soil is unacceptable. The vertical surfaces to be trimmed include headstones, flat markers, section markers, monuments, trees, planting beds, shrubs, buildings, curbs/curbing, fences, walls, poles, signs, fire hydrants, parking lot bumper blocks, boulders, utility/valve boxes and covers.

3.2.1. The Contractor shall trim all areas concurrent with mowing. Trimming operations of all non-mowed turf areas shall be considered a part of mowing.

3.2.2. The Contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area.

3.2.3. The Contractor shall exercise caution to avoid contact with headstones, markers, monuments, building walls, trees, shrubs, flowers, any other desirable plant materials, etc.

or any other structure than can be damaged by contact with the trimming device’s cutting instrument.

3.2.4. The Contractor shall use commercial grade power trimmers and power edgers to trim grass from around headstones, flat markers, monuments, section markers, etc. The Contractor shall use trimmers with a plastic blade attachment to cleanly trim edges around all headstones and flat markers, monuments, section markers, etc. or as otherwise approved by the COR.

3.3. Edging. The Contractor shall blade edge all streets, curbs, walkways, tree wells, permanent building/structure lines, and planting beds. Edging shall provide a clear zone ½” to 1” wide by 2” to 3” deep with all vegetation removed from joints and cracks. Damage to asphalt/concrete shall be avoided. Edging events shall be completed as ordered by the COR. The first edging cycle shall be completed approximately at the start of the mowing season, the second cycle one week prior to Memorial Day, the third during the month of July, and a fourth edging during the month of September. Additional edging events may be scheduled by the COR. The exact dates will be provided by the COR.

3.3.1. Flat Marker Edging. The Contractor shall edge turf perpendicular to the outside perimeter (edge) of flat grave markers to remove all grass/vegetation that is growing around or over the entire outside perimeter of the flat grave markers during each mow/trim cycle.

The depth of the vertical cut at the edge of the flat markers shall be 1” to 2” deep and the width of the cut shall not exceed ½”. There shall be a clean and neat vertical edge left around each flat marker. No metal blades shall be used to edge around flat markers. The Contractor shall exercise caution not to chip flat markers with blades. There are approximately 13 large flat markers (government-issued and private), including 6 large markers measuring about 6 feet by 3 feet.

3.4. Weed Control. The Contractor shall control broadleaf and grassy weeds through execution of a weed control program appropriate for the area, in accordance with NCA Handbook 3410, Integrated Pest Management Procedures for VA National Cemeteries, and current federal, state, and local regulations. The Contractor shall comply with all applicable parts of 29 Code of Federal Regulations (CFR) 1910, Labor, Occupational Safety and Health Standards; 29 CFR 1925, Labor, Safety and Health Standards for Federal Service Contracts; 40 CFR 150-189, Protection of

Environment, Pesticide Program; and 49 CFR 171, Transportation, General Information, Regulations, and Definitions.

3.4.1. The Contractor shall control weeds through broad and selective applications of herbicide.

The herbicide program, in general, shall consist of two (2) pre-emergent herbicide applications and three (3) post-emergent herbicide applications per contract year. The table below serves as a guideline for when the herbicide applications shall be made:

Table 3.4. General Schedule for Herbicide Applications

Pre-Emergent Application #1

Late Winter/Early Spring – exact timing of application based on soil temperature and weather conditions. Prior approval from COR required before application.

Pre-Emergent Application #2

Late Summer/Early Fall – exact timing based on soil temperature and weather conditions. Prior approval from COR required before application.

Post-Emergent Application #1

Early Spring/Mid Spring – exact timing based on weed development. Prior approval from COR required before application.

Post-Emergent Application #2

Early Summer/Mid Summer – exact timing based on weed development and residual period of Post-Emergent Application #1. Prior approval from COR required before application.

Post-Emergent Application #3

Late Summer/Fall – exact timing based on weed development and residual period of Post – Emergent Application #2. Prior approval from COR required before application.

3.4.2. The Contractor shall be responsible for any and all repeat, follow-up, and/or spot spray herbicide applications, as needed between scheduled sprays, to control and maintain a generally weed-free Cemetery. These repeat, follow-up, and spot spray treatments shall be provided at no additional charge to the Government.

3.4.3. The herbicides used by the Contractor shall be specifically labeled for control of weeds in the turf at the Cemetery. The Cemetery turf is pre-dominantly Hybrid Bermuda. The herbicide shall be selected and applied in a manner that does not harm, damage, or kill the turf in any way.

3.4.4. The herbicide applications shall be applied directly by or under the supervision of a current commercially licensed State Certified Pesticide Applicator. All applications shall be performed as per the Rules and Regulations of the Oklahoma State Department of Agriculture.

3.4.5. Either the COR will notify the Contractor prior to each application as needed or the Contractor shall contact the COR (in person, in writing, or by telephone) for permission to spray at least three (3) days in advance of each and any application. The COR will coordinate each spray application with the Contractor. The Contractor shall be responsible for the proper timing of each application so that the highest resulting weed control for that application will be attained.

3.4.6. The Contractor shall be responsible for specifically following all label directions on the bag/container of herbicide at all times. This includes, but is not limited to, all safety, mixing, weather conditions, and application directions and information.

3.4.7. The Contractor shall always mix and apply herbicide so as to provide optimum control of target weeds, according to label directions.

3.4.8. The Contractor shall provide to the COR, in writing, a list of all herbicides, mixes, and related surfactants or other chemicals, along with the amount of product per acre, percentage of solution, and/or application rate per 1000 square feet (and/or per acre), prior to any and all applications being performed. The Contractor shall also provide the COR with a copy of the label for any and all herbicides and other chemicals or surfactants, prior to any and all applications being performed. The Contractor shall NOT begin any application without providing this information to the COR, and obtaining the approval of the COR to proceed.

3.4.9. A written record of the application shall be delivered to the COR immediately following the application, whether completed or not, before leaving the Cemetery on the day of any application. The written record shall show the following information:

3.4.9.1. The name of the company and the names and titles of the company’s staff that performed the application.

3.4.9.2. All areas treated on that particular day of application.

3.4.9.3. The chemicals used on that particular day of application.

3.4.9.4. The temperature during the time of application, and the average wind speed during the time of application.

3.4.10. All Contractor personnel shall be properly clothed and wearing proper safety equipment during any and all applications.

3.4.11. All mixing of chemicals and filling of tanks shall be performed off-site or only in appropriate area(s) of the Cemetery as determined by the COR.

3.4.12. Performance of work shall not impede nor disturb any burial or memorial service, or burial operation at any time. Work shall not take place within 1,000 feet of a committal shelter during a service, or during a ceremony in the Cemetery.

3.4.13. The Contractor shall coordinate with the COR any watering requirements to activate chemicals, as needed. The Cemetery will schedule and perform this watering requirement.

3.5. Fertilization. The Contractor shall have a pH adjustment and fertilizer application program. The Contractor shall apply fertilizer using procedures appropriate for the soil conditions found, type of grass, and season. Apply fertilizer and other soil amendments to bring soil condition to that suitable for the vegetation being treated.

3.5.1. The fertilizer program shall consist of three applications per year according to the following schedule:

Table 3.5. General Schedule for Fertilizer Applications

Application #1 Spring – upon order and approval of the COR, after turf has emerged from winter dormancy, has new green flush growth, and has been mowed 1 to 2 times. This is usually in the March-April time period.

Application #2 Summer – upon order and approval of the COR- usually in the May-June time period.

Application #3 Fall – upon order and approval of the COR – usually in the August- September time period.

3.5.2. The fertilizer shall be a 3-1-2 or 4-1-2 ratio (N-P-K) complete fertilizer with 30% to 50% slow release nitrogen. The current formulation used at the Cemetery is a 21-7-14. The fertilizer shall contain micro nutrients. The fertilizer can be a different analysis than 21-7- 14 as long as it is approved by the COR and District Agronomist prior to application.

3.5.3. All fertilizer applications shall only be applied after being ordered by the COR. The Contractor shall schedule to apply fertilizer on the days ordered and agreed to by the COR.

3.5.4. The fertilizer shall be applied according to the manufacturer’s instructions . The fertilizer shall be applied at a rate to achieve 4 to 5 pounds (lbs.) of Nitrogen (N) per 1,000 square feet (s.f.) per year (Example: 1.33 to 1.66 lbs. N/1,000 s.f. per application x 3 applications = 4 to 5 lbs. of N/1,000 s.f. per year)

3.5.5. The fertilizer application equipment shall be correctly calibrated and the application made to achieve a uniform distribution of the fertilizer throughout the application area. The fertilizer shall be applied in a manner that does not harm, damage, or kill the turf in any way.

3.5.6. The Contractor shall ensure that the fertilizer is properly watered in by coordinating the watering schedule with the COR.

3.5.7. The Contractor shall make sure that all headstones, flat markers, monuments, sidewalks, patios, and other like surfaces are free of fertilizer granules immediately after the application and before watering in of fertilizer occurs. This will aid in avoiding staining of surfaces.

3.5.8. The Contractor shall be responsible for removal of any staining, marking, of headstones, flat markers, monuments, sidewalks, patios, and other like surfaces that occurs as result of a fertilizer application made by the Contractor.

3.5.9. The Contractor shall schedule the fertilizer application with the COR and only apply once given approval by the COR. The Contractor shall give the COR a minimum one week notice prior to application.

3.5.10. A written record of the application shall be delivered to the COR immediately following the application, whether completed or not, before leaving the Cemetery on the day of any application. The written record shall show the following information:

3.5.10.1. The name of the company and the names and titles of the company’s staff that performed the application.

3.5.10.2. All areas treated on that particular day of application.

3.5.10.3. The fertilizer used on that particular day of application.

3.5.10.4. The temperature during the time of application, and the average wind speed during the time of application.

3.5.11. The Contractor shall provide to the COR, in writing, a list of all fertilizer and related chemicals along with the amount of application rate per acre and/or application rate per 1,000 square feet, prior to any and all applications being performed. The Contractor shall also provide the COR with a copy of the label for any and all fertilizer and related chemicals, prior to any and all applications being performed. The Contractor shall NOT begin any application without providing this information to the COR, and obtaining the approval of the COR to proceed.

4. SERVICE DELIVERY SUMMARY (SDS). The contract service requirements are summarized in performance objectives that relate directly to requirements. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SDS and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. During the initial 30 days of the contract, two additional errors on each performance objective shall be allowed in an effort to identify normal “phase-in” problems.

4.1. Quality Control. The Contractor shall develop, submit for Contracting Officer approval and COR review, a Quality Control program to ensure grounds maintenance services are performed in accordance with the requirements of this contract.

4.1.1. The Contractor shall submit a Quality Control Plan (QCP) for Contracting Officer review and acceptance/denial within fourteen (14) calendar days after contract award. A copy shall also be forwarded to the COR at this time. Any changes thereafter must also be provided to Contracting Officer for acceptance and COR review.

4.1.2. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the Contractor shall develop Quality Control procedures addressing the areas identified in Paragraph 3, Description of Services.

4.1.3. The Contractor’s QCP shall include the following or have incorporated into during performance of contract, at a minimum:

4.1.3.1. An inspection plan covering all services required by this contract. The inspection plan must specify the areas to be inspected on either a scheduled or unscheduled basis; how often inspections will be accomplished and documented; and the title of the individual(s) who will perform the inspections.

4.1.3.2. On-site records of all inspections conducted by the Contractor noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection.

4.1.3.3. Procedures for updating equipment.

4.1.3.4. The methods for identifying and preventing deficiencies in the quality of service performed, before the level of performance becomes unacceptable and organizational functions noting intermediate supervisory responsibilities and overall management responsibilities for ensuring total acceptable performance.

4.1.3.5. On-site records identifying any required certifications and ongoing training as required for an employee performing services under this contract.

4.1.3.6. A log to account for all requests for immediate service. The log shall indicate the date and time of services, and description of results and completion of these services.

4.1.3.7. On-site records of any complaints or problems, with procedures taken to allow for corrections and/or elimination before effects caused interruption of performance of contract.

4.2. Quality Assurance. The COR will evaluate the Contractor’s performance through on-site inspections and receipt of complaints from Cemetery personnel in accordance with the attached Quality Assurance Surveillance Plan (QASP), Attachment 7.

4.2.1. The COR may inspect each task as completed or increase the number of Quality Assurance inspections if called for by repeated failures discovered during inspections or repeated customer complaints. Likewise, the COR may decrease the number of Quality Assurance inspections if performance dictates.

4.2.2. The COR will also receive and investigate complaints from various customers visiting the Cemetery. The Contractor shall be responsible for initialing validated visitor complaints.

The COR will make final determination of the validity of visitor complaint(s).

4.3. Supervision.

4.3.1. Contractor Superintendent: The Contractor shall provide a competent and experienced supervisor who speaks and writes fluent English on site for at least four (4) hours a day whenever work is being performed, other than trash and debris pick-up.

4.3.2. The Contractor Superintendent must have not less than five (5) years’ experience as a direct supervisor of grounds maintenance operations that included mowing, trimming, edging, and cleanup in industrial, commercial or public sites.

4.3.3. The Contractor Superintendent shall ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained.

4.3.4. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action shall be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor shall not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR, and is later found invalid and/or unreasonable by the CO.

4.3.5. In the absence of the Superintendent, the Contractor shall appoint an English-speaking crew foreman or an employee who shall be responsible to insure that the work is being accomplished in an expeditious manner, is performed in accordance with the contract specifications and that the work will progress without undue delay.

4.4. Inspection and Cleaning of Cemetery Facilities.

4.4.1. The Contractor shall perform inspection as required to determine acceptability of services.

During this inspection the appearance of the Cemetery shall be observed, and any deficiencies noted within the scope of the contract shall be corrected as soon as…