ATTACHMENT A -2 - REVISED DRAWINGS 664-17-303 061123.pdf

PDF 7 MB Posted

Attached to
Replace Roof Drain Stormwater Piping Deficiencies, West
Solicitation number
36C26223B0004
Issued by

About this file

This solicitation package outlines a project to upgrade storm drain piping at the VA San Diego Healthcare System located at 3350 La Jolla Village Drive in San Diego, California. The project scope includes removing and replacing existing storm drain piping from the basement floor to the sixth floor roof in Building 1. Key details include upgrading branch lines, mains, and risers throughout the specified areas, whether indicated or not, to a point 18 inches above the floor. Work must be coordinated with the VA to determine acceptable evacuation areas and durations. Personal protective equipment is required when working in interstitial spaces or enclosed areas.

View the file

Other files

File Type Posted
C01 36C26223C0216 Award Notice.pdf PDF
ATTACHMENT B1 - Revised 01 00 00 General Requirements - Amendment 0008.pdf PDF
S06 36C26223B0004 AMENDMENT 0008.pdf PDF
ATTACHMENT 1 - DRAWING SIZE - AMENDMENT 0008.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-14.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-11.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-10.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-8.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-5.pdf PDF
ATTACHMENT G-1 -Interstitial photos.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-9.pdf PDF
ATTACHMENT A -1 - REVISED DRAWINGS 664-17-303 061123.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-12.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-4.pdf PDF
ATTACHMENT A -3 - REVISED DRAWINGS 664-17-303 061123.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-2.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-1.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-3.pdf PDF
ATTACHMENT G - VA RESPONSES TO CONTRACTORS RFI.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-13.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-6.pdf PDF
ATTACHMENT F - Architectural As-BuiltsPart-7.pdf PDF
ATTACHMENT A - 4 - REVISED DRAWINGS 664-17-303 061123.pdf PDF
S02 36C26223B0004 0007.pdf PDF
S02 36C26223B0004 0006.pdf PDF
S06 ATTACHMENT D - RFI FORM.docx DOCX document
S06 36C26223B0004 0005.pdf PDF
ATTACHMENT F4 - HAZARDOUS MATERIAL INSPECTION REPORT.pdf PDF
ATTACHMENT F6 - HAZARDOUS MATERIALS INSPECTION REPORT.pdf PDF
ATTACHMENT F5 - HAZARDOUS MATERIALS INSPECTION REPORT.pdf PDF
ATTACHMENT F3 - HAZARDOUS MATERIALS INSPECTION REPORT.pdf PDF
ATTACHMENT F2 - HAZARDOUS MATERIALS INSPECTION REPORT.pdf PDF
S02 36C26223B0004 0004.docx DOCX document
ATTACHMENT F1 - HAZARDOUS MATERIALS INSPECITION REPORT.pdf PDF
S06 36C26223B0004 0003.pdf PDF
S06 36C26223B0004 0002.pdf PDF
S02 36C26223B0004 0001 4APR23.pdf PDF
S02 ATTACHMENT A1 - DRAWINGS - 664-17-303 - PAGES 1 - 42.pdf PDF
S02 SOLICITATION 36C26223B0004.docx DOCX document
S02 ATTACHMENT D - RFI FORM.docx DOCX document
S02 ATTACHMENT E - WAGE DETERMINATION - CA20230001 - 01-13-2023.pdf PDF
S02 ATTACHMENT B2 - SPECIFICATIONS - 664-17-303 PAGES 473 - 944.pdf PDF
S02 ATTACHMENT B1 - SPECIFICATION - 664-17-303 PAGES 1 - 472.pdf PDF
S02 ATTACHMENT A2 - DRAWINGS - 664-17-303 - Pages 43 - 85.pdf PDF
S02 ATTACHMENT C - 664-17-303 P09 SOW Replace Roof Drain Construction.docx DOCX document
S03 36C26223B0004 Pre-Solicitation Notice.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O R

M

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.GR963.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

6-

GR

Si xth

F loo r P ho tos

6-

6-

6-

6-

6-

6-

6-

6-

6-

6-

6-

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

DO

W

N

FR

OM

R

OO

F

DR

AI

N

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

6-

6-

6-

6-

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

DO

W

N

FR

OM

R

OO

F

DR

AI

N

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

SL

OP

E

SE

E

SH

EE

T

PD

RI

SE

R

W T-

R4 S

TO

RM

D

RA

IN

P

IP

IN

G

SL

OP

E

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

DO

W

N

FR

OM

R

OO

F

DR

AI

N

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

DO

W

N

FR

OM

R

OO

F

DR

AI

N

SE

E

SH

EE

T

PD

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

DO

W

N

FR

OM

R

OO

F

DR

AI

N

SE

E

SH

EE

T

PD

RI

SE

R

W T-

R3 S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R3

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.GR964.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

GR

Si xth

F loo r P ho tos

6-

6-

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

DO

W

N

FR

OM

R

OO

F

DR

AI

N

SE

E

SH

EE

T

PD

6-

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

6-

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

6-

RI

SE

R W

T- R4

S

TO

RM

D

RA

IN

P

IP

IN

G

SE

E

SH

EE

T

PD

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.GR971.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

7-

GR

Ro of

Ph oto s

7-

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.GR972.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

7-

GR

Ro of

Ph oto s

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

7-

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.GR973.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

7-

GR

Ro of

Ph oto s

7-

7-

7-

R

O O

F D

R A

IN

S

E E

S H

E E

T P

D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

R O

O F

D R

A

IN

S E

E S

H E

E T

P D

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.A-501.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

A-

Ar ch ite ctu ra l D eta ils

M E

TA

L

P

IP

E T

H R

O U

G H

C O

N C

R E

TE

D

E

TA

IL

P

IP

E

P E

N E

TR

A

TI

O

N T

H R

O U

G H

F

IR

E R

A

TE

D W

A

LL

D E

TA

IL

H A

N G

E R

U P

P E

R A

TT

A

C H

M E

N T

TO

C

O N

C R

E

TE

D E

TA

IL

F1

D

NO

T

TO

S

CA

LE

D

NO

T

TO

S

CA

LE

P

IP

E T

H R

O U

G H

-H

O U

R W

A

LL

D E

TA

IL

F4

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.A-502.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

A-

NO

TE

S:

1.

CO

NT

RA

CT

OR

S

HA

LL

T

AK

E

SP

EC

IA

L C

AR

E

W

HE

N

RE

MO

VI

NG

T

HE

E

XI

ST

IN

G

W

AL

L A

ND

S

TO

RM

D

RA

IN

P

IP

E

RI

SE

R.

T

HE

E

XI

ST

IN

G

SH

AF

T

CO

NT

AI

NS

E

XI

ST

IN

G

GL

AS

S

PI

PI

NG

D

RA

IN

AG

E

SY

ST

EM

W

HI

CH

S

HA

LL

R

EM

AI

N

AN

D

PR

OT

EC

TE

D

IN

P

LA

CE

2.

CO

NT

RA

CT

OR

IS

V

IS

UA

LL

Y

TO

IN

VE

ST

IG

AT

E

TH

E

IN

TE

RI

OR

O

F

TH

E

PI

PE

S

HA

FT

P

RI

OR

T

O

RE

MO

VA

L O F

TH

E

EX

IS

TI

NG

W

AL

L T O

DE

TE

RM

IN

E

TH

E

LO

CA

TI

ON

O

F

AN

D

SU

PP

OR

TS

F

OR

T

HE

P

IP

IN

G

TO

P

RE

VE

NT

A

NY

D

AM

AG

E

TO

T

HE

P

IP

IN

G W

HI

LE

R

EM

OV

IN

G

TH

E W

AL

L.

3.

IT

IS

N

OT

K

NO

W

N

IF

T

HE

RE

IS

A N

OP

EN

S

HA

FT

IN

SI

DE

T

HE

P

LU

MB

IN

G

CH

AS

E

OR

A

C

ON

CR

ET

E

DE

CK

W

IT

H

PE

NE

TR

AT

IO

NS

. T

HE

CO

NT

RA

CT

OR

IS

T O

AS

SU

ME

T

HA

T

A

NE

W P

EN

ET

RA

TI

ON

W

ILL

N

EE

D

TO

B

E

CU

T

TH

RO

UG

H

TH

E

FL

OO

R

SL

AB

. A

PP

RO

PR

IA

TE

PR

EC

AU

TI

ON

S

SH

AL

L B E

TA

KE

N

NO

T

TO

H

AV

E

AN

Y W

AT

ER

R

UN

NI

NG

U

NC

ON

TR

OL

LE

D

FR

OM

O

NE

F

LO

OR

T O

TH

E

NE

XT

O R

OU

TS

ID

E

TH

E

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

4.

TH

E

CO

NT

RA

CT

OR

IS

F

UL

LY

R

ES

PO

NS

IB

LE

F

OR

T

HE

C

OO

RD

IN

AT

IO

N

OF

A

NY

S

HU

T-

DO

W

NS

O F

TH

E

UT

ILI

TI

ES

W

IT

H

TH

E

FA

CI

LIT

Y.

TH

ES

E

SH

UT

-D

OW

NS

S

HA

LL

B E

AS

F

EW

A

S

PO

SS

IB

LE

A

ND

S

HA

LL

B E

KE

PT

T O

A

MN

IM

UM

D

UR

AT

IO

N.

H

OW

T

HI

S

W

OR

K

IS

T O

BE

DO

NE

IS

U

LT

IM

AT

EL

Y

TO

B

E

DE

TE

RM

IN

ED

B Y

TH

E

CO

NT

RA

CT

OR

2- H

O U

R F

IR

E

W A

LL

IN

S

TA

LL

A

TI

O

N E

N

LA

R G

E D

P

LA

N 2-

H O

U R

F

IR

E W

A

LL

D E

M O

LI

TI

O N

E N

LA

R

G E

D P

LA

N

SDSD

NO

TE

S:

1.

CO

NT

RA

CT

OR

S

HA

LL

T

AK

E

SP

EC

IA

L C

AR

E

W

HE

N

RE

MO

VI

NG

T

HE

E

XI

ST

IN

G

W

AL

L A

ND

S

TO

RM

D

RA

IN

P

IP

E

RI

SE

R.

T

HE

E

XI

ST

IN

G

SH

AF

T

CO

NT

AI

NS

E

XI

ST

IN

G

GL

AS

S

PI

PI

NG

D

RA

IN

AG

E

SY

ST

EM

W

HI

CH

S

HA

LL

R

EM

AI

N

AN

D

PR

OT

EC

TE

D

IN

P

LA

CE

2.

CO

NT

RA

CT

OR

IS

V

IS

UA

LL

Y

TO

IN

VE

ST

IG

AT

E

TH

E

IN

TE

RI

OR

O

F

TH

E

PI

PE

S

HA

FT

P

RI

OR

T

O

RE

MO

VA

L O F

TH

E

EX

IS

TI

NG

W

AL

L T O

DE

TE

RM

IN

E

TH

E

LO

CA

TI

ON

O

F

AN

D

SU

PP

OR

TS

F

OR

T

HE

P

IP

IN

G

TO

P

RE

VE

NT

A

NY

D

AM

AG

E

TO

T

HE

P

IP

IN

G W

HI

LE

R

EM

OV

IN

G

TH

E W

AL

L.

3.

IT

IS

N

OT

K

NO

W

N

IF

T

HE

RE

IS

A N

OP

EN

S

HA

FT

IN

SI

DE

T

HE

P

LU

MB

IN

G

CH

AS

E

OR

A

C

ON

CR

ET

E

DE

CK

W

IT

H

PE

NE

TR

AT

IO

NS

. T

HE

CO

NT

RA

CT

OR

IS

T O

AS

SU

ME

T

HA

T

A

NE

W P

EN

ET

RA

TI

ON

W

ILL

N

EE

D

TO

B

E

CU

T

TH

RO

UG

H

TH

E

FL

OO

R

SL

AB

. A

PP

RO

PR

IA

TE

PR

EC

AU

TI

ON

S

SH

AL

L B E

TA

KE

N

NO

T

TO

H

AV

E

AN

Y W

AT

ER

R

UN

NI

NG

U

NC

ON

TR

OL

LE

D

FR

OM

O

NE

F

LO

OR

T O

TH

E

NE

XT

O R

OU

TS

ID

E

TH

E

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

4.

TH

E

CO

NT

RA

CT

OR

IS

F

UL

LY

R

ES

PO

NS

IB

LE

F

OR

T

HE

C

OO

RD

IN

AT

IO

N

OF

A

NY

S

HU

T-

DO

W

NS

O F

TH

E

UT

ILI

TI

ES

W

IT

H

TH

E

FA

CI

LIT

Y.

TH

ES

E

SH

UT

-D

OW

NS

S

HA

LL

B E

AS

F

EW

A

S

PO

SS

IB

LE

A

ND

S

HA

LL

B E

KE

PT

T O

A

MN

IM

UM

D

UR

AT

IO

N.

H

OW

T

HI

S

W

OR

K

IS

T O

BE

DO

NE

IS

U

LT

IM

AT

EL

Y

TO

B

E

DE

TE

RM

IN

ED

B Y

TH

E

CO

NT

RA

CT

OR

W

HE

N

RE

PA

IR

IN

G

TH

E

W

AL

L, FI

LL

A

NY

LA

RG

E

GA

PS

W

IT

H A

MA

TE

RI

AL

S

IM

ILA

R

TO

T

HA

T

US

ED

IN

IT

S

CO

NS

TR

UC

TI

ON

A

ND

TH

EN

F

IR

E

CA

UL

K

TH

E

RE

MA

IN

IN

G

GA

P

W

IT

H

TH

E

MA

TE

RI

AL

IN

DI

CA

TE

D

IN

D

ET

AI

L D 4 O

N A-

1.

SE

E

DE

TA

IL

FO

R

MO

RE

IN

FO

RM

AT

IO

N.

IN

ST

AL

L A

N

EW

F

IR

E W

AL

L P

AR

TI

TI

ON

PA

IN

T

TH

E

NE

W

P

AR

TI

TI

ON

W

AL

L T

O

MA

TC

H

TH

AT

O F

TH

E

OR

IG

IN

AL

W

AL

L.

FI

RE

W

AL

L D

ET

AI

L D 1 S

HE

ET

A -5

W

HE

N

RE

PA

IR

IN

G

TH

E

3-

IN

CH

S

HA

FT

F

IR

EW

AL

L I S

RE

MO

VE

D, T

HE

RE

W

ILL

B

E

OP

EN

C

OM

MU

NI

CA

TI

ON

S

BE

TW

EE

N

TH

E

IN

TE

RS

TI

TI

AL

S

PA

CE

A

ND

F

LO

OR

BE

LO

W

. S

IN

CE

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

C

ON

TA

IN

S

ST

EE

L H

AV

IN

G

AS

BE

ST

OS

IN

T

HE

F

IR

EP

RO

OF

IN

G, AN

IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

PR

IO

R

TO

T

HE

OP

EN

IN

G

OF

T

HE

3-

IN

CH

F

IR

EW

AL

L.

CA

RE

FU

LL

Y

RE

MO

VE

A S

LIT

TL

E

AS

PO

SS

IB

LE

O F

TH

E

W

AL

L M

AT

ER

IA

L F

OR

TH

E

RE

MO

VA

L O

F

TH

E

EX

IS

TI

NG

PI

PI

NG

TH

E

EN

TI

RE

2-

HO

UR

W

AL

L A S

SH

AD

ED

IS

T O

BE

D

EM

OL

IS

HE

D

UP

T O

TH

E

AD

JO

IN

IN

G W

AL

LS

T O

AC

CE

SS

T

HE

EX

IS

TI

NG

M

AI

N

PI

PE

R

IS

ER

. T

HE

AD

JO

IN

IN

G

W

AL

L I S

NO

T

TO

B

E

DI

ST

UR

BE

D.

F1 F6

NO

T

TO

S

CA

LE

NO

T

TO

S

CA

LE

RE

FE

R

TO

S

HE

ET

A

-5

D

ET

AI

L D

EX

IS

TI

NG

S

TO

RM

D

RA

IN

R

IS

ER

T O

BE

D

EM

OL

IS

HE

D, R

EF

ER

T O

TH

E

DR

AW

IN

GS

F

OR

P

IP

E

SI

ZE

SDSD

RE

FE

R

TO

S

HE

ET

A

-5

D

ET

AI

L F

RE

FE

R

TO

S

HE

ET

A -5

D

ET

AI

L D

Ar ch ite ctu ra l D eta ils

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.A-503.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

A-

D

2- H

O U

R S

H A

FT

W

A

LL

D E

TA

IL

P

LA

N

V

IE

W

NO

T

TO

S

CA

LE

NO

TE

S:

1.

SH

OU

LD

T

HE

A

NN

UL

AR

S

PA

CE

A

RO

UN

D

TH

E

PI

PE

, IN

T

HE

E

XI

ST

IN

G

FI

RE

W

AL

L

CO

NT

AI

NI

NG

T

HE

S

TR

UC

TU

RA

L S

TE

EL

, E

XC

EE

D

TH

E

TW

O

IN

CH

ES

IN

DI

CA

TE

D

ON

D

ET

AI

L

F4 O

N

SH

EE

T

A-

1, TH

E W

AL

L S

HA

LL

B E

PA

TC

HE

D

AN

D

RE

PA

IR

ED

U

SI

NG

T

HE

S

AM

E

CO

NS

TR

UC

TI

ON

M

ET

HO

D

AS

U

SE

D

FO

R

TH

E

OR

IG

IN

AL

C

ON

ST

RU

CT

IO

N.

T

HE

P

AT

CH

AN

D

RE

PA

IR

S

HA

LL

R

ED

UC

E

TH

E

OP

EN

IN

G

TO

LE

SS

T

HA

N

A

TW

O-

IN

CH

A

NN

UL

AR

SP

AC

E.

2.

TH

E

MA

XI

MU

M

OP

EN

IN

G

IN

T

HE

W

AL

L C

AN

N

OT

E

XC

EE

D

-IN

CH

O

R

TH

E

PI

PE

S

IZ

E

W

IT

H A

2-

IN

CH

A

NN

UL

AR

S

PA

CE

A

RO

UN

D

IT

, W

HI

CH

EV

ER

IS

LE

SS

3.

TH

ER

E

SH

AL

L B E

NO

W

OR

K

PE

RF

OR

ME

D W

IT

HI

N

TH

E 2-

HO

UR

F

IR

E W

AL

L E

NC

LO

SI

NG

TH

E

ST

RU

CT

UR

AL

S

TE

EL

C

OV

ER

ED

W

IT

H

AS

BE

ST

OS

C

ON

TA

IN

IN

G

FI

RE

PR

OO

FI

NG

S

UC

H

AS

T

HE

IN

ST

AL

LA

TI

ON

O

F A

HA

NG

ER

. A

LL

T

HA

T

IS

IN

TE

ND

ED

T

O

BE

D

ON

E W

IT

HI

N

TH

IS

SP

AC

E

IS

T

O

PA

SS

T

HE

N

EW

P

IP

IN

G

LIN

E

TH

RO

UG

H

TH

E

OP

EN

IN

GS

A

ND

C

ON

NE

CT

IT

T O

TH

E

RI

SE

R.

EX

IS

TI

NG

2-

HO

UR

F

IR

E

W

AL

L

EN

CL

OS

IN

G

ST

RU

CT

UR

AL

S

TE

EL

W

IT

H

AS

BE

ST

OS

C

ON

TA

IN

ED

F

IR

EP

RO

OF

IN

G.

EX

IS

TI

NG

2-

HO

UR

P

LA

ST

ER

W

AL

L

SH

AF

T W

ID

TH

A S

RE

QU

IR

ED

3- 1/2

VE

RI

FY

IN

F

IE

LD

FI

RE

C

AU

LK

IN

G

PE

R

SH

EE

T

A-

1, DE

TA

IL

D4

FI

RE

C

AU

LK

IN

G

PE

R

SH

EE

T

A-

1, DE

TA

IL

F4

NE

W

2-

HO

UR

S

HA

FT

E

NC

LO

SU

RE

(F

IR

E

TE

ST

: U L R

, 0 7N

K2

, U

L D

ES

IG

N

U4

ON

E

LA

YE

R 1"

X2 4"

T

YP

E- X

GY

P.

P

AN

EL

IN

SE

RT

ED

B

ET

W

EE

N

2- 1/2

J"

R

UN

NE

RS

W

IT

H "T

SE

CT

IO

N

OF

2- 1/2

" S

TE

EL

C

-H O

R C-

T

ST

UD

S

BE

TW

EE

N

PA

NE

LS

OP

PO

SI

TE

S

ID

E:

B

AS

E

LA

YE

R 1/2

" P

RO

PR

IE

TA

RY

T

YP

E- X

GY

P.

B D.

A

PP

LIE

D

AT

R

IG

HT

AN

GL

ES

T

O

ST

UD

S

W

IT

H 1"

T

YP

E- S

SC

RE

W S

" O

.C

FA

CE

LA

YE

R 1/2

" T

YP

E- X

PR

OP

RI

ET

AR

Y

GY

P.

B D.

A

PP

LIE

D

PA

RA

LL

EL

T O

ST

UD

S W

IT

H

1- 5/8

" T

YP

E- S

DR

YW

AL

L S

CR

EW

S

" O .C

PR

OP

RI

ET

AR

Y

GY

PS

UM

B

OA

RD

CE

RT

AI

NT

EE

D

GY

PS

UM

IN

C.

1/2

" C

ER

TA

IN

TE

ED

T

YP

E C.

1" G

LA

SR

OC

S

HA

FT

LIN

ER

G

A.

R

UN

NE

R

CH

AN

NE

LS

A

T

BO

TT

OM

S

LIP

CH

AN

NE

L A T

TO

P

FO

R

2-

HO

UR

S

HA

FT

W

AL

L

AS

SE

MB

LY

. 0

.14 5Ø

H

ILT

I D

NI

P8

S

HO

T-

IN

AN

CH

OR

O

R

EQ

UI

VA

LE

NT

1-

1/8 " M

IN

EM

BE

DM

EN

T

" O .C

. A

ND

6" F

RO

M

EN

DS

EX

IS

TI

NG

C

ON

CR

ET

E

SL

AB

, T

YP

NE

W

2-

HO

UR

S

HA

FT

EN

CL

OS

UR

E

PE

R

SH

EE

T

A-

3 D

ET

AI

L D

D

2- H

O U

R S

H A

FT

W

A

LL

D E

TA

IL

S

E C

TI

O

N V

IE

W

NO

T

TO

S

CA

LE

RE

FE

R

TO

S

HE

ET

A

-5

DE

TA

IL

D7

Ar ch ite ctu ra l D eta ils

VE

RI

FY

O

PE

NI

NG

S

IZ

E

W

IT

H

DR

AI

N

MA

NU

FA

CT

UR

ER

ME

TA

L D

EC

K

DE

CK

C

LA

MP

CO

NC

RE

TE

D

EC

K

RI

GI

D

IN

SU

LA

TI

ON

FL

AS

HI

NG

C

LA

MP

SE

E

PL

UM

BI

NG

D

RA

W

IN

GS

F

OR

P

IP

E

SI

ZE

S

CO

NN

EC

TI

ON

S

TO

S

YS

TE

M

DE

CK

D

RA

IN

RD 1

F7 2N

D L

E V

E L

R O

O F

D E

C K

D R

A

IN

R E

P

LA

C E

M E

N T

NO

T

TO

S

CA

LE

RE

PA

IR

M

AS

TI

C

LA

TE

X

DE

CK

C

OA

T

MI

NI

MU

M

" B

EY

ON

D

DE

CK

D

RA

IN

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

UP

DN

B1

SP

S

ST

OR

AG

E

B1

MA

TE

RI

AL

MA

NA

GE

ME

NT

OF

FI

CE

B1

A

EQ

UI

PM

EN

T

ST

OR

AG

E B1

A

GE

NE

RA

L

ST

OR

AG

E

B1

EL

EC

TR

IC

AL

SW

-B -1

LIF

T

B1

HA

S

SW

-B -1

ST

AI

RS

B1

D

ST

OR

GE

NE

RA

L

B1

ME

CH

W 9-

B-

ST

AI

R

B1

B

MA

LE

T

OI

B1

A

MA

LE

T

OI

B1

KI

TC

HE

N

ST

OR

SW

8-

B-

ST

AI

RS

B1

OF

FI

CE

B1

CE

NT

ER

O

FF

IC

E

IT

S

ER

VI

CE

B1

ST

OR

GE

NE

RA

L

B1

B

ST

OR

GE

NE

RA

L

B1

ST

OR

GE

NE

RA

L

B1

ST

OR

GE

NE

RA

L

B1

OF

FI

CE

(S

B1

OF

FI

CE

(S

B1

ST

OR

GE

NE

RA

L

B1

A

ST

OR

GE

NE

RA

L

B1

B

CO

RR

B1

M

CO

RR

RE

FE

R.

B1

RE

FE

R.

B1

D

ST

OR

AG

E

GE

NE

RA

L

B1

N

ST

OR

AG

E

GE

NE

RA

L

B1

A

CO

RR

B1

C

CO

RR

B1

ST

OR

AG

E

OX

YG

EN

B1

P

CO

RR

B1

A

OF

FI

CE

(T

B1

B

CO

RR

B1

OF

FI

CE

(T

B1

H

RE

CE

IV

IN

G

B1

E

ST

OR

AG

E

EQ

UI

PM

EN

T

B1

F

UT

ILI

TY

B1

J

ST

OR

AG

E

GE

NE

RA

L

B1

K

ST

OR

AG

E

OI

T

B1

L

ST

OR

AG

E

GE

NE

RA

L

NW R1

NW R2

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

NO N.

N.

N.

N.

7S P O.

1QR Q.

N.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD101-3.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

NO

RT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Ba se me nt

Flo or

D em oli tio n P lan

No rth we st

F1 B

A S

E M

E N

T

FL

O O

R D

E M

O

LI

TI

O

N P

LA

N

N

O R

TH

W

E S

T (F

O R

R E

FE

R

E N

C E

O N

LY

. R

E

FE

R T

O S

H E

E T

P D

4)

SC

AL

E:

1/

8"

1' -0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

B1

C

DA

RK

R

M

DU

MB

DW

1-

B-

FE

C

CA

RT

W

AS

H B1

A

MA

LE

T

OI

LE

T

B1

FE

CO

RR

ID

OR

B1

SP

S

AD

MI

NI

ST

RA

TI

ON

OF

FI

CE

(S

B1

ST

ER

ILI

ZE

R B1

B

B1

G

CO

RR

B1

B

DR

ES

SI

NG

R

M

B1

C

CO

RR

B1

ST

OR

AG

E

B1

B

CO

RR

B1

A

CO

RR

B1

C

CO

OR

.O

FF

.(S

U.

O.

P.

R

EG

IO

NA

L

B1

A

OF

F.

(S

) N

UT

RI

TI

ON

F

OO

D

SE

R.

ED

. S

EC

T.B1

B

OF

FI

CE

B1

ME

CH

B1

A P

HA

RM

. S

VC

O

FF

.(S

AS

S.

C

HI

EF

B1

B

SA

FE

TY

O

FF

.(S

DI

R.

M

ED

B1

ME

CH

AN

IC

AL

B1

A

MG

R.

O

FF

IC

E( S)

CL

IN

IC

AL

N

UT

RI

TI

ON

B1

CO

RR

B1

F

CO

RR

B1

E

CO

RR

. B1

B

OF

F.

OF

F.

(S

AD

MI

N.

B1

B

ME

CH

B1

A

LO

CK

ER

(M

B1

SH

OW

ER

(M

B1

A

HA

C

B1

FE

MA

LE

T

OI

B1

A

MA

LE

T

OI

B1

SH

OW

ER

(F

B1

ST

AI

R

SW

-B -1

ST

AI

RS

B1

C

ST

OR

EQ

UI

PM

EN

T

B1

CO

RR

ID

OR

B1

B

ST

OR

EQ

UI

PM

EN

T

B1

A

ST

OR

GE

NE

RA

L

B1

SE

RV

IC

E

OF

FI

CE

(S

EN

VI

RO

NM

EN

TA

L

SW

1-

B-

ST

AI

R

B1

CO

RR

ID

OR

B1

C

OF

FI

CE

(S

DI

ET

IN

FO

B1

AR

EA

PH

AR

MA

CY

B1

A

OF

FI

CE

B1

B

OF

FI

CE

B1

C

SV

C

OF

F.

(S

CH

IE

F

PH

AR

M.

B1

KI

TC

HE

N

B1

AD

MI

N.

0F

FI

CE

PH

AR

MA

CY

B1

D

DA

TA

A

PP

S.

AN

AL

YS

IS

O

FF

.(S

DI

R.

P

HA

RM

B1

E

ED

. T

RA

IN

IN

G

OF

F.

(S

DI

R.

P

HA

RM

B1

CO

RR

B1

ST

OR

VA

UL

T

B1

VA

UL

T

B1

PR

EP

B1

CO

RR

BB

2A

OF

FI

CE

(S )B1

OF

FI

CE

PH

AR

MA

CO

EC

O.

B1

LO

CK

ER

(M

B1

A

LO

CK

ER

(F

B1

CO

NF

. R M

/O

FF

IC

E(

S)

PH

AR

MA

CY

B1

LO

CK

ER

(F

B1

B

SU

PP

LY

ST

ER

ILE

B1

D

LA

B

B1

MI

CR

OS

CO

PE

F

AC

ILI

TY

CO

RE

E

LE

CT

RO

N

B1

A

LA

B

B1

RE

SI

DE

NT

B1

E

LA

B

B1

LA

B

B1

A

LA

B

B1

LA

B

B1

CO

RR

B1

A

RE

FE

R.

B1

W

AS

H

CA

R

B1

DI

SH

W

AS

HI

NG

B1

MA

NA

GE

ME

NT

RE

CO

RD

S

B1

OF

FI

CE

(S

B1

OF

FI

CE

(S

B1

A

OF

FI

CE

(S

B1

C

OF

FI

CE

(S

B1

OF

FI

CE

(S

B1

A-

OF

FI

CE

(S

B1

D

OF

FI

CE

(S

B1

OF

FI

CE

(S

B1

CO

NF

ER

EN

CE

B1

OF

FI

CE

(S

B1

OF

FI

CE

B1

A

OI

T

ST

OR

B1

TE

LE

PH

ON

E

B1

EL

EC

TR

IC

AL

B1

RE

FE

R.

B1

RE

FE

R.

B1

RE

FE

R.

B1

KI

TC

HE

N

W T R1

W T R3W T R3

W T R4

W T R2

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

GHJ G.

J.1J.5KL J.4M L.1

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD101-3.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

W

ES

T

CE

NT

ER

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Ba se me nt

Flo or

D em oli tio n P lan

W es t

Ce nte r

F1 B

A S

E M

E N

T

FL

O O

R D

E M

O

LI

TI

O

N P

LA

N

W

E S

T C

E N

TE

R

(F O

R R

E

FE

R E

N C

E O

N

LY

. R E

FE

R

T O

S H

E E

T P

D

5)

SC

AL

E:

1/ 8"

1'

-0

PD

NO

RT

H

1.

EN

D

OF

B

AS

EM

EN

T

FL

OO

R, S

EE

P D1

F

OR

CO

NT

IN

UA

TI

ON

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

AC

-6

AC

-3

B-

A

NW R1 NW R2

3"

SD

U P

C.

O.

3"

SD

3"

SD

U P

3"

SD

3"

SD

U P

C.

O.

6"

SD

U P

3"SD

6"

SD

TY

P

3"

SD

UP

3"

SD

C.

O.

4"

SD

3"

SD

U

P 3"

SD

3"

SD

U

P C.

O.

6"

SD

U P

5"

SD

D N.

5"

SD

D

OW

N

TO

BE

LO

W F

LO

OR

C.

O.

6"

SD

B F

C.

O.

3"

SD

3" U

P

3"

SD

U P

TY

P

3"SD

3"

SD

U P

3"

SD

D N.

4" D

OW

N

TO

BE

LO

W

F

LO

OR

C.

O.

3"

SD

U

P

3"

SD

3"

SD

C.

O.

3"

SD

U P

4"

SD

B F

6"

SD

B F

6"SD BF 6"SD BF

3"SD

3"SD

TY

P

TY

P

TY

P

TY

P

TY

P

TY

P

TY

P 4

TY

P

TY

P

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

NO N.

N.

N.

N.

7S P O.

1QR Q.

N.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD104-6.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

NO

RT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Ba se me nt

Ab ov e C eil ing D em oli tio n

Pl an

No rth we st

F1 B

A S

E M

E N

T A

B O

V E

C E

IL

IN

G D

E M

O

LI

TI

O

N P

LA

N

N

O R

TH

W

E S

T

SC

AL

E:

1/ 8"

1'

-0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

1.

DE

MO

LIS

H

ST

OR

M

DR

AI

N

PI

PI

NG

W

IT

HI

N

4'

FR

OM

RO

OF

/D

EC

K

DR

AI

N.

M

AI

NT

AI

N

EX

IS

TI

NG

R

OO

F/

DE

CK

D

RA

IN

AN

D

IT

S

VE

RT

IC

AL

C

OM

PO

NE

NT

S

AN

D

FI

TT

IN

GS

2.

EX

IS

TI

NG

S

TO

RM

D

RA

IN

B

EL

OW

F

LO

OR

T O

RE

MA

IN

3.

DE

MO

LIS

H

HO

RI

ZO

NT

AL

S

TO

RM

D

RA

IN

A

BO

VE

C

EI

LIN

G.

4.

EX

IS

TI

NG

S

TO

RM

D

RA

IN

R

IS

ER

T

O

RE

MA

IN

5.

NO

D

RA

IN

A

BO

VE

. D

EM

OL

IS

H

AB

AN

DO

NE

D

PI

PE

6.

PI

PI

NG

A

RR

AN

GE

ME

NT

A T

BA

SE

ME

NT

LE

VE

L B

AS

ED

O

N

AV

AI

LA

BL

E

AS

-B

UI

LT

D

OC

UM

EN

TS

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

AN

IT

AR

Y

PI

PI

NG

. O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

. IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

. IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

F.

C

.O

W T R3

W T R1 W T R2

W T R4

TY

P

5"SD BF

C.

O.

5"

SD

D

OW

N

TO

BE

LO

W F

LO

OR

5"

SD

D N.

5"SD

C.

O.

5"

SD

B F

C.

O.

5"

SD

U P

6" D

OW

N

TO

BE

LO

W

F

LO

OR

6"

SD

D N.

C.

O.

6"

SD

6"

SD

U P

C.

O.

3"

SD

3" U

P

3"SD

6"S

D BF

5"S D

C.

O.

5"

SD

5"

SD

UP

C.

O.

8"

SD

8"SD

5"

SD

TY

P

5"

SD

U P

4"

SD

U P

C.

O.

3"

SD

3"

SD

U P

6"SD BF

TY

P

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

GHJ G.

J.1J.5KL J.4M L.1

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD104-6.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

W

ES

T

CE

NT

ER

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Ba se me nt

Ab ov e C eil ing D em oli tio n

Pl an

W es t C en ter

F1 B

A S

E M

E N

T A

B O

V E

C E

IL

IN

G D

E M

O

LI

TI

O

N P

LA

N

W

E S

T C

E N

TE

R

SC

AL

E:

1/

8"

1' -0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

1.

DE

MO

LIS

H

ST

OR

M

DR

AI

N

PI

PI

NG

W

IT

HI

N

4'

FR

OM

RO

OF

/D

EC

K

DR

AI

N.

M

AI

NT

AI

N

EX

IS

TI

NG

R

OO

F/

DE

CK

D

RA

IN

AN

D

IT

S

VE

RT

IC

AL

C

OM

PO

NE

NT

S

AN

D

FI

TT

IN

GS

2.

EX

IS

TI

NG

S

TO

RM

D

RA

IN

B

EL

OW

F

LO

OR

T O

RE

MA

IN

CO

NN

EC

T

RE

VI

SE

D

PI

PI

NG

T

O

EX

IS

TI

NG

S

TU

B

UP

A

T

AB

OV

E

FL

OO

R.

3.

DE

MO

LIS

H

AL

L H

OR

IZ

ON

TA

L S

TO

RM

D

RA

IN

A

BO

VE

CE

ILI

NG

4.

DE

MO

LIS

H

VE

RT

IC

AL

S

TO

RM

D

RA

IN

P

IP

IN

G

TO

A

P

OI

NT

AB

OV

E

BA

SE

ME

NT

F

LO

OR

5.

DE

MO

LIS

H

AN

D

RE

PA

IR

P

OR

TI

ON

O F

EX

IS

TI

NG

2-

HO

UR

SH

AF

T

W

HE

RE

R

EQ

UI

RE

D

FO

R

AC

CE

SS

T

O

SD

R

IS

ER

PI

PI

NG

6.

DI

SC

ON

NE

CT

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

P

IP

IN

G

AB

OV

E

CE

ILI

NG

S

ER

VI

NG

A

RE

AS

O

UT

SI

DE

T

HE

S

CO

PE

O

F

TH

IS

P

RO

JE

CT

. T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E

EX

IS

TI

NG

PI

PE

T

O

RE

MA

IN

7.

PI

PI

NG

A

RR

AN

GE

ME

NT

A

T

BA

SE

ME

NT

LE

VE

L B

AS

ED

O N

AV

AI

LA

BL

E

AS

-B

UI

LT

D

OC

UM

EN

TS

8.

EN

D

OF

B

AS

EM

EN

T

FL

OO

R, S

EE

P

D1

F

OR

CO

NT

IN

UA

TI

ON

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

AN

IT

AR

Y

PI

PI

NG

. O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

. IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

. IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

IN

V.

E L.

8.0

0'

8"

SD

8"

SD

U P

10"SD

3"

SD

U P

3"

SD

10"SD

C.

O.

3"

SD

U P

8"S

D BF

8"

SD

U P

8"

SD

B F

4"

SD

B F

10"SD

3"

SD

U P

4"

SD

B F

3"

SD

U P

TY

P

4"

SD

B F

3"

SD

U P

F.

C.

O.

3"

SD

U P

3"SD BF

3"

RD

F.

C.

O.

3"

SD

U P

SW R1

SW R2

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

ABD C B.

1E D.

D.

4F E.

E.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD104-6.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

SO

UT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Un de rg ro un d P ipi ng

P lan

So uth we st

F1 U

N D

E R

G R

O U

N D

P

IP

IN

G

P

LA

N

S O

U

TH

W E

S T

(F O

R R

E

FE

R E

N C

E O

N

LY

SC

AL

E:

1/ 8"

1'

-0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

1.

EX

IS

TI

NG

S

TO

RM

D

RA

IN

B

EL

OW

F

LO

OR

T

O

RE

MA

IN

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

AN

IT

AR

Y

PI

PI

NG

. O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

. IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

. IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

UP

DN

VO

ID

0-

1-

VO

ID

8-

1-

VO

ID

0-

1-

VO

ID

1-

1-

VO

ID

3-

1-

VO

ID

8-

1-

1 VO

ID

7- 1-

VO

ID

5- 1-

VO

ID

3-

1-

VO

ID 02

1-

1-

VO

ID

2-

1-

R M

CO

NT

RO

L

SC

AN

NE

R

CT

SW

8-

ST

AI

R

W

AS

H

CO

NT

RO

L

AN

GI

O

ST

OR

GE

N.

A

AL

CO

VE

KI

TC

HE

N

A

OF

FI

CE

(S

CO

RR

FE

MA

LE

T

OI

TO

ILE

T( P

EQ

UI

P

C

RE

FR

SW

9A

-1

ST

AI

R

A

CH

EM

IS

TR

Y

B

CO

RR

TO

I.(

P)

TO

I.(

P)

HA

C

T

AN

D L

A

SA

NI

TI

ZE

R

IN

ST

RU

ME

NT

A

CO

RR

CO

NT

RO

L

A

CO

NT

RO

L

CO

RR

CO

RR

LO

UN

GE

TO

I.

FE

MA

LE

PH

YS

TO

I.

MA

LE

MA

LE

T

OI

R M

CO

NT

RO

L

C

VI

EW

IN

G

CO

RR

D

OF

F.

(S

SC

AN

NE

R

CT

OF

F.

SC

RU

B

CO

NT

RO

L

AN

GI

O

CO

RR

09 -

UL

TR

AS

OU

ND

CO

RR

A

OF

FI

CE

(S

OF

FI

CE

(S

OF

FI

CE

(S

OF

FI

CE

(S

TO

I.(

P)

CO

RR

DI

AG

X -R

AY

AN

GI

O

CO

RR

AR

EA

HO

LD

IN

G

A

DR

ES

S

W

AI

T.18

EX

AM

R M

BO

NE

D

EN

SI

TY

VI

EW

IN

G

ST

OR

EQ

UI

P.

OF

F.

(S

OF

F.

W

AI

T.

GE

NE

TI

CS

O

FF

.(S

SU

PV

IM

MU

NO

OF

F.

(S )12

ST

OR

EQ

UI

P.

OF

F.

(S

LA

B

C

LA

B

CH

EM

IS

TR

Y

CO

RR

CO

RR

CO

RR

P

RE

P

ME

DI

A

CO

RR

CO

RR

CY

TO

ME

TR

Y

FL

OW

11 -

UL

TR

AS

OU

ND

B

OF

FI

CE

TE

CH

A

OF

F.

(S

OF

F.

OF

FI

CE

OF

FI

CE

OF

F.

(S

12 -

UL

TR

AS

OU

ND

A

PH

YS

MY

CO

LO

GY

MY

CO

LO

GY

A

RE

AD

IN

G

PH

YS

CO

RR

PA

TH

.O

FF

.S

AN

AT

OM

IC

B

PA

TH

. O

FF

SU

RG

IC

AL

ST

OR

EQ

UI

P.

A

GR

OS

S

RM

IM

MU

NO

/G

EN

ET

IC

S

PH

YS

RE

SE

AR

CH

B

OF

FI

CE

(S

MI

CR

OB

IO

LO

GY

HA

C

CO

RR

OF

F.

VI

EW

IN

G

CO

RR

CO

NF

OF

FI

CE

(S

LA

B

OF

FI

CE

A

CO

RR

OF

FI

CE

(S

OF

F.

PH

YS

IC

IA

N

RE

SI

DE

NT

HI

ST

OL

OG

Y

LA

B

A

OF

FI

CE

(S

PH

YS

IC

IA

N

RDRDRD

RD

RD

RD

RD

RD

(E ) R

D

NW R1

NW R2

NW R2

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

NO N.

N.

N.

N.

7S P O.

1QR Q.

N.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD111-3.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

NO

RT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

D em oli tio n P lan

No rth we st

F1 F

IR

S

T

FL

O O

R D

E M

O

LI

TI

O

N P

LA

N

N

O R

TH

W

E S

T (F

O R

R E

FE

R

E N

C E

O N

LY

. R

E

FE

R T

O S

H E

E T

P D

4)

SC

AL

E:

1/

8"

1' -0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

" H

IG

H

W

AL

L

VO

ID

6-

1-

AL

CO

VE

VO

ID

0-

1-

9-

1-

VO

ID

4-

1-

DU

MB

W

AI

TE

R

DW

-1

VO

ID

2-

1-

VO

ID

5-

1-

VO

ID

8-

1-

VO

ID

7-

1-

VO

ID

6-

1-

KI

TC

HE

NE

TT

E

E

VO

ID

4-

1-

VO

ID

5-

1-

VO

ID

9-

1-

A

CA

SH

IE

R

SW

1-

ST

AI

R

SW

2-

ST

AI

R

TO

I.(

P)

A

TO

I.( S)

TO

I.(

S)

OF

FI

CE

(S

) 15

W

AR

S

OF

VE

T

OF

F O

BO

OT

H

SO

UN

D

A

EX

AM

AU

DI

OM

ET

RI

C

A

F

ST

AI

R

CO

RR

CO

RR

A

CO

NS

UL

T

SL

EE

P

RM

FE

MA

LE

T

OI

MA

LE

T

OI

A

TO

I.

E

CO

RR

A

ST

OR

ST

OR

C

CO

RR

B

ST

OR

MA

LE

T

OI

D

OF

F.

(S

B

OF

F.

(S

OF

F.

(S

G

LO

UN

GE

CO

RR

F

OF

FI

CE

(S

EX

AM

R M

EX

AM

R M

EX

AM

R M

AR

EA

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

E

EX

AM

R

M

B

EX

AM

R

M

A

EX

AM

R

M

D

OF

F.

(S

C

OF

F.

(S

OF

F.

S)

A

OF

F.

(S

CO

RR

CO

RR

AR

EA

OF

F.

OF

F.

OF

F.

(S

PH

AR

MA

CY

OF

F. 11

D

OF

F.

VA

UL

T

D

EX

AM

LA

B

HE

AR

IN

G

CO

RR

A

CO

RR

OF

F.

(S

CO

RR

CO

RR

A

OF

F.

(S

EX

AM

R M

EX

AM

R M

EX

AM

R M

W

AI

T.

D

OF

F.

(S

CO

RR

G

CO

RR

B

OF

F.

(S

A

OF

F.

(S

C

EX

AM

R

M

F

OF

F.

(S

W

AI

T.

E

EX

AM

R M

DR

AW

IN

G

A

OF

F.

(S

OF

F.

(S

A W

AI

T.

OF

F.

(S

OF

F.

(S

OF

F.

A

CO

RR

CO

NT

RO

L

DR

ES

S

TO

I.(

S)

TO

I.(

S)

ST

OR

GE

N.

CO

RR

E

CO

RR

OF

F.

(S

CH

F.

A

UT

OP

SY

CO

RR

CO

PY

R M

HA

C

SW

-1

ST

AI

R

RE

CE

PT

IO

N

HA

C

CO

RR

TO

I.

FE

MA

LE

TO

I.

MA

LE

CO

RR

X -R

AY

DI

AG

TO

I.

MA

LE

B

DR

ES

S

A

DR

ES

S

SC

HE

DU

LIN

G

TO

I.

FE

MA

LE

CO

RR

A

RE

AD

IN

G

RE

AD

IN

G

CH

EM

.O

FF

.(S

CH

IE

F

CL

IN

IC

AL

OF

F.

S)

CO

RR

DI

AG

X -R

AY

X-

RA

Y

DI

AG

CO

RR

OF

F.

(S

RE

CE

P.

TE

CH

.O

FF

CH

IE

F

CO

RR

C

CO

RR

OF

F.

(S

OF

F.

(S

OF

F.

S)

CO

NF

. R M

RA

DI

OL

OG

Y

VA

CA

NT

A

ST

OR

OF

FI

CE

(S

B

OF

FI

CE

(S

ST

OR

EQ

UI

P.

SU

PV

O

FF

.(S

CO

RE

LA

B

CH

EM

. O

FF

.(S

CL

IN

IC

AL

M

GR

O

FF

.(S

ON

CO

.D

AT

A

W

AI

T.

HE

MA

TO

LO

GY

D

IM

MU

NO

LO

GY

ST

OR

GE

N.

RE

FR

GE

N.

S

TO

R.

GE

N.

S

TO

R.

AN

CI

L T

ES

T

HE

MA

TO

LO

GY

C

BL

OO

D

BA

NK

A

OF

F.

(S

A

LO

UN

GE

A

ST

AT

IO

N

NU

RS

E

99ER

RDRD

3" U

P

W T R1

W T R3

W T R2

W T R4

4"

SD

U P

DN

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

GHJ G.

J.1J.5KL J.4M L.1

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD111-3.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

W

ES

T

CE

NT

ER

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

D em oli tio n P lan

W es t

Ce nte r

F1 F

IR

S

T

FL

O O

R D

E M

O

LI

TI

O

N P

LA

N

W

E S

T C

E N

TE

R

(F O

R R

E

FE

R E

N C

E O

N

LY

. R E

FE

R

T O

S H

E E

T P

D

5)

SC

AL

E:

1/ 8"

1'

-0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

FEC

EM

ER

GE

NC

Y

DE

PA

RT

ME

NT

PH

LE

BO

TO

MY

TO

ILE

T( S)

A

VO

ID

8-

1-

VO

ID

9-

1-

VO

ID

0-

1-

VO

ID

2-

1-

VO

ID

1-

1-

VO

ID

7-

1-

BI

O-

HA

ZA

RD

ST

OR

AG

E

A

FE

MA

LE

TO

ILE

T

ST

OR

AG

E

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

AR

MO

RY

B

IN

TA

KE

EQ

UI

PM

EN

T

ST

OR

AG

E

B

PR

OC

ED

UR

E

OF

FI

CE

(S

A

CO

RR

ID

OR

UR

GE

NT

CA

RE

CO

RR

ID

OR

W

OR

K

ST

AT

IO

NS

SE

CU

RI

TY

HA

C

CA

ST RM 11

EX

AM

OF

FI

CE

(S

AR

EA

OF

FI

CE

(S

CO

RR

ID

OR

(1 B)

17CO

RR

ID

OR

CO

RR

ID

OR

FE

MA

LE

TO

ILE

T

CO

RR

ID

OR

MA

LE

TO

ILE

T

PR

OC

ED

UR

E

EQ

UI

PM

EN

T

ST

OR

AG

E

RE

ST

RO

OM

HA

C

EX

AM RM 10

18EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

FE

MA

LE

TO

ILE

T

MA

LE

TO

ILE

T

RE

CE

PT

IO

N

EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

RE

AD

IN

G

BR

EA

K

EX

AM

CH

EC

K-

IN

AR

EA

2 16

CO

RR

ID

OR

MA

LE

TO

ILE

T

EX

AM RM 10

EX

AM RM 10

SP

EC

IA

L M

OD

E

TR

AN

SP

OR

TA

TI

ON

CO

OR

DI

NA

TI

ON

OF

FI

CE

(S

OF

FI

CE

(S

PO

LIC

E

SE

CY

KE

Y

DI

ST

RI

BU

TI

ON

OF

FI

CE

(S

LIN

EN

CO

RR

ID

OR

CO

RR

ID

OR

EX

AM RM 16

EX

AM RM 16

AT

TE

ND

IN

G

DI

RT

Y

UT

ILI

TY

EX

AM RM 16

EX

AM RM 16

EX

AM RM 16

EX

AM RM 16

EX

AM

EX

AM RM 16

EX

AM RM 16

VA

P

OL

IC

E

CO

MM

UN

IC

AT

IO

N

CE

NT

ER

HO

LD

IN

G

C

TO

ILE

T(

P)

A

NU

RS

E

RM 16

NU

RS

E

ST

AT

IO

N

EX

AM RM 16

EX

AM RM 16

EX

AM RM 16

RE

CE

PT

IO

N

HA

C

OF

FI

CE

(S

ED

UC

AT

IO

N

IN

TA

KE

EX

AM RM 10

EX

AM RM 10

EX

AM RM 10

EX

AM RM 11

TO

ILE

T

ST

AI

R

SW

A-

A

A

RE

CE

PT

IO

N

CO

RR

ID

OR

W

AI

TI

NG

EX

AM

R M

RE

AD

IN

G

DA

RK

HA

C

ST

OR

AG

E

FE

MA

LE

T

OI

LE

T

ST

OR

AG

E

OF

FI

CE

(S

EX

AM

R

M

EX

AM

R

M

EX

AM

R

M

EX

AM

R M

ST

OR

AG

E

EX

AM

R M

EX

AM

R M

EX

AM

R

MCO

RR

ID

OR

CO

RR

ID

OR

EX

AM

R M

EX

AM

R M

EX

AM

R M

CO

NF

ER

EN

CE

MA

LE

T

OI

LE

T

CO

RR

ID

OR

OF

FI

CE

(S

LA

B

EX

AM

R M

OF

FI

CE

(S

ST

OR

AG

E

EQ

UI

PM

EN

T

ST

OR

AG

E

A

BI

O-

HA

ZA

RD

ST

OR

AG

E

EX

AM RM

EX

AM RM

SW

3-

ST

AI

R

CO

RR

B

CO

UN

TE

R

BR

EA

K

RM

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

EX

AM

R M

C

VA

UL

T

C

BO

OT

H

CO

NT

RO

L

B

BO

OT

H

CO

NT

RO

L

CO

RR

A

CO

RR

RD

RD

RD

RD

RD

RD

RD

SW R1

SW R2 SW R2

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

ABD C B.

1E D.

D.

4F E.

E.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD111-3.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

SO

UT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

D em oli tio n P lan

So uth we st

F1 F

IR

S

T

FL

O O

R D

E M

O

LI

TI

O

N P

LA

N

S

O U

TH

W

E S

T (F

O R

R E

FE

R

E N

C E

O N

LY

. R

E

FE

R T

O S

H E

E T

P D

6)

SC

AL

E:

1/

8"

1' -0

PD

NO

RT

H

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

ST

AI

R

NO

A1

A1

ST

AI

R

NO

9A

A1

1A

A1

A1

A1

C.

O.3" U

P C.

O.

C.

O.

4" U

P

4" U

P

4" U

P

4" U

P

3" U

P

C.

O.

C.

O.

3" U

P

3" U

P

4" U

P

C.

O.

C.

O.

3" U

P

3" U

P

4" U

P

3" U

P 3"

U P

3" U

P 3"

U P

3" U

P 3"

U P

3" U

P

2" U

P

3"

SD

3"

SD

2"SD

3"SD

3"SD

3"

SD

3"SD

4"SD

4"

SD

4"

SD

4"SD

3"

SD

3"SD

3"

SD

4"

SD

4"

SD

3"SD

4"SD4"SD

4"

SD

4"SD

6"SD

3"SD

4"

SD

4"

SD

U P

6"

SD

D

N

6"

SD

U P

C.

O.

6"

SD

D N

NW R1

NW R2

NW R2

TY

P.

3" U

P

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

NO N.

N.

N.

N.

7S P O.

1QR Q.

N.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD114-6.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

NO

RT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

In ter sti tia l D em oli tio n P lan

No rth we st

F1 F

IR

S

T

FL

O O

R

IN

TE

R

S

TI

TI

A

L D

E M

O

LI

TI

O

N P

LA

N

N

O R

TH

W

E S

T

SC

AL

E:

1/ 8"

1'

-0

PD

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

AN

IT

AR

Y

PI

PI

NG

. O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

. IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

. IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

1.

DE

MO

LIS

H

ST

OR

M

DR

AI

N

PI

PI

NG

W

IT

HI

N

4'

FR

OM

RO

OF

/D

EC

K

DR

AI

N.

M

AI

NT

AI

N

EX

IS

TI

NG

R

OO

F/

DE

CK

D

RA

IN

AN

D

IT

S

VE

RT

IC

AL

C

OM

PO

NE

NT

S

AN

D

FI

TT

IN

GS

2.

EX

IS

TI

NG

S

TO

RM

D

RA

IN

R

IS

ER

T

O

RE

MA

IN

3.

DE

MO

LIS

H

PI

PI

NG

A

ND

R

D

AB

OV

E, S

EE

P D-

1.

NO

RT

H

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

R

NO

ST

AI

R

NO

A1

A1

A1

A1

ST

AI

R

NO

ST

AI

R

NO

ME

CH

RM

C.

O.

4" U

P 4"

U P

4" U

P

3" U

P C.

O.

C.

O.

3" U

P

3" U

P

3" U

P

4" U

P

4" U

P

3" U

P

3" U

P

3" U

P

3" U

P

3" U

P 3"

U P

3" U

P

3" U

P 3"

U P

3" U

P

3" U

P

3" U

P

3" U

P

3" U

P

C.

O.

CA

PP

ED

3"

U P

3"SD

3" S

D

3"SD

3"

SD

3"

SD

3"SD3"

SD

3"SD

3"SD

3"

SD

3"SD

3"SD

3"

SD

3"SD

3"SD

3"S D

3"

SD

5" S

D

UP

D

N.

6"

SD

U

P

DN

5"

SD

U P

DN

5"

SD

U P

DN

1 1

1 1

W T R1

W T R3

W T R2

W T R4

TY

P.

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

GHJ G.

J.1J.5KL J.4M L.1

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD114-6.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

W

ES

T

CE

NT

ER

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

In ter sti tia l D em oli tio n P lan

W es t C en ter

F1 F

IR

S

T

FL

O O

R

IN

TE

R

S

TI

TI

A

L D

E M

O

LI

TI

O

N P

LA

N

W

E S

T C

E N

TE

R

SC

AL

E:

1/

8"

1' -0

PD

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1- 52 1-

531-

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

NO

RT

H

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

AN

IT

AR

Y

PI

PI

NG

. O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

. IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

. IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

1.

DE

MO

LIS

H

ST

OR

M

DR

AI

N

PI

PI

NG

W

IT

HI

N

4'

FR

OM

RO

OF

/D

EC

K

DR

AI

N.

M

AI

NT

AI

N

EX

IS

TI

NG

R

OO

F/

DE

CK

D

RA

IN

AN

D

IT

S

VE

RT

IC

AL

C

OM

PO

NE

NT

S

AN

D

FI

TT

IN

GS

2.

DE

MO

LIS

H

EX

IS

TI

NG

S

TO

RM

D

RA

IN

R

IS

ER

C

ON

NE

CT

IO

N

IN

ST

AL

LE

D.

3.

DE

MO

LIS

H

AL

L H

OR

IZ

ON

TA

L S

TO

RM

D

RA

IN

P

IP

IN

G

TO

T

HE

MA

IN

R

IS

ER

4.

W

HE

N

TH

E

EX

IS

TI

NG

S

HA

FT

F

IR

EW

AL

L I

S

RE

MO

VE

D, TH

ER

E

W

ILL

B E

OP

EN

C

OM

MU

NI

CA

TI

ON

S

BE

TW

EE

N

TH

E

IN

TE

RS

TI

TI

AL

S

PA

CE

A

ND

F

LO

OR

B

EL

OW

. S

IN

CE

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

C

ON

TA

IN

S

ST

EE

L H

AV

IN

G

AS

BE

ST

OS

IN

T

HE

F

IR

EP

RO

OF

IN

G, A N

IN

FE

CT

IO

N

CO

NT

RO

L

PR

OC

ED

UR

ES

A

ND

E

NC

LO

SU

RE

S

MU

ST

B E

IN

ST

AL

LE

D

PR

IO

R

TO

T

HE

O

PE

NI

NG

O

F

TH

E

SH

AF

T

FI

RE

W

AL

L.

5.

TH

E

EX

TE

NT

O

F

RE

MO

VA

L F

OR

E

AC

H

BI

D

IT

EM

S

HA

LL

B E

TO

A

P

OI

NT

A

S

IN

DI

CA

TE

D

ON

T

HE

B

ID

IT

EM

D

IA

GR

AM

SH

OW

N

ON

S

HE

ET

G I00

3.

TH

E

CO

NT

RA

CT

OR

S

HA

LL

CO

NS

UL

T W

IT

H

TH

E

VA

O

N

TH

E

EX

AC

T

EX

TE

NT

O

F

TH

E

RE

MO

VA

L.

6.

DE

MO

LIS

H

PI

PI

NG

A

ND

R

D

AB

OV

E, S

EE

P D-

2.

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

R

NO

A1

A1

A1

ST

AI

R

NO

A

4" U

P

C.

O.

C.

O.

4" U

P

4" U

P

3" U

P

4" U

P

3" U

P

4" S

D U

P

C.

O.

CA

PP

ED

3" U

P

3" U

P

4"SD

4"

SD

4"

SD

3"

SD

3"SD

3"SD

4"SD

2 1/2"SD

5"

SD

3"SD

6"

SD

U P

DN

8"

SD

D N.

6"

SD

U P

6"

SD

5"SD

4"

SD

SW R1

SW R2

SW R2

2 2

3" U

P

C.

O.

3" U

P

3" U

P

C.

O.

3" S

D

UPC.

O.

5"

S D

5"

SD

4"

SD

C.

O.

3"

SD

6"SD

4"SD

2.1

3.1

3.2

4.2

5.1

7.1

9.1

9.5

ABD C B.

1E D.

D.

4F E.

E.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD114-6.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

SO

UT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

In ter sti tia l D em oli tio n P lan

So uth we st

F1 F

IR

S

T

FL

O O

R

IN

TE

R

S

TI

TI

A

L D

E M

O

LI

TI

O

N P

LA

N

S

O U

TH

W

E S

T

SC

AL

E:

1/ 8"

1'

-0

PD

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1- 60 1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

1-

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

NO

RT

H

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

AN

IT

AR

Y

PI

PI

NG

. O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

. IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

. IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

1.

DE

MO

LIS

H

ST

OR

M

DR

AI

N

PI

PI

NG

W

IT

HI

N

4'

FR

OM

RO

OF

/D

EC

K

DR

AI

N.

M

AI

NT

AI

N

EX

IS

TI

NG

R

OO

F/

DE

CK

D

RA

IN

AN

D

IT

S

VE

RT

IC

AL

C

OM

PO

NE

NT

S

AN

D

FI

TT

IN

GS

2.

EX

IS

TI

NG

S

TO

RM

D

RA

IN

R

IS

ER

T

O

RE

MA

IN

3.

DE

MO

LIS

H

PI

PI

NG

A

ND

R

D

AB

OV

E, S

EE

P D-

3.

4.

NO

D

RA

IN

A

BO

VE

, D

EM

OL

IS

H

AB

AN

DO

NE

D

PI

PE

1-

1- 911-

1-

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

2N W

D

EC

K

2N W

R

OO

F

ST

AI

R

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

ME

CH

R

OO

M

RO

OF

PA

TI

O

RO

OF

D

EC

K

2.1

3.2

4.2

5.1

2.1

3.2

4.2

5.1

7.1

9.1 9.5

NO N.

N.

N.

N.

7S P O.

1QR Q.

N.

2 NO N.

N.

N.

N.

7S P O.

1QR Q.

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD121.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

NO

RT

HW

ES

T

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Fir st

Flo or

R oo f D em oli tio n P lan

No rth we st

F1 F

IR

S

T

FL

O O

R R

O O

F D

E M

O

LI

TI

O

N P

LA

N

N

O R

TH

W

E S

T

SC

AL

E:

1/ 8"

1'

-0

PD

NO

RT

H

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

M

DR

AI

N

LIN

E

RE

PL

AC

EM

EN

T

SH

AL

L B E

BY

M

EA

NS

A

ND

M

ET

HO

DS

D

ET

ER

MI

NE

D

BY

T

HE

CO

NT

RA

CT

OR

IN

T

HE

F

IE

LD

D

UE

T O

FI

EL

D

CO

ND

IT

IO

NS

4.

BE

FO

RE

C

OM

ME

NC

IN

G W

OR

K, C

OO

RD

IN

AT

E

EV

AC

UA

TI

ON

AR

EA

S

W

IT

H

VA

S

AN

D

IE

GO

'S

C

OR

T O

DE

TE

RM

IN

E

TH

E

AC

CE

PT

AB

LE

E

XT

EN

T

AN

D

DU

RA

TI

ON

5.

DI

SC

ON

NE

CT

A

LL

E

XI

ST

IN

G

RO

OF

A

ND

D

EC

K

DR

AI

NS

FR

OM

E

XI

ST

IN

G

ST

OR

M

DR

AI

N

BR

AN

CH

LI

NE

S.

T

AK

E

CA

UT

IO

N

NO

T

TO

D

AM

AG

E (E

)S

TO

RM

D

RA

IN

P

IP

IN

G

TO

RE

MA

IN

6.

A

SI

GN

IF

IC

AN

T

AM

OU

NT

O F

TH

E

EX

IS

TI

NG

S

TO

RM

D

RA

IN

PI

PI

NG

C

AN

'T

BE

R

EA

CH

ED

F

RO

M

TH

E

CA

TW

AL

K

SY

ST

EM

TH

E

CO

NT

RA

CT

OR

IS

T O

US

E

ME

AN

S

AN

D

ME

TH

OD

S

TO

RE

MO

VE

S

TO

RM

D

RA

IN

P

IP

IN

G.

O

NE

M

ET

HO

D

US

ED

IN

T

HE

PA

ST

W

AS

LA

YI

NG

W

OO

D

OR

S

TE

EL

S

TA

GI

NG

P

LA

NK

S

OR

SC

AF

FO

LD

IN

G

AC

RO

SS

T

HE

E

XI

ST

IN

G

ST

EE

L S

TR

UC

TU

RE

AN

OT

HE

R

ME

TH

OD

W

OU

LD

B

E

TO

R

EM

OV

E

AN

D

RE

PL

AC

E

TH

E

EX

IS

TI

NG

C

EI

LIN

GS

. S

HO

UL

D

TH

IS

M

ET

HO

D

BE

U

SE

D

FO

R

TH

E

RE

MO

VA

L A

ND

R

EP

LA

CE

ME

NT

O

F

TH

E

ST

OR

M

DR

AI

N

PI

PI

NG

, IT

IS

K

NO

W N

TH

AT

T

HE

E

XI

ST

IN

G

FI

RE

PR

OO

FI

NG

C

ON

TA

IN

S

AS

BE

ST

OS

, IN

FE

CT

IO

N

CO

NT

RO

L P

RO

CE

DU

RE

S

AN

D

EN

CL

OS

UR

ES

M

US

T

BE

IN

ST

AL

LE

D

FO

R

TH

E

SP

AC

E

BE

LO

W

T

HE

C

EI

LIN

G

AN

D

AN

Y

OT

HE

R

AR

EA

S

IM

PA

CT

ED

B Y

TH

E

W

OR

K.

7.

TH

E

LO

CA

TI

ON

A

ND

A

RR

AN

GE

ME

NT

O F

TH

E

IN

FE

CT

IO

N

CO

NT

RO

L E

NC

LO

SU

RE

S

W

ILL

B E

BA

SE

D

ON

T

HE

E

XT

EN

T

OF

T

HE

S

TO

RM

D

RA

IN

S

YS

TE

M

LIN

E

BE

IN

G

RE

MO

VE

D

AT

AN

Y

ON

E

TI

ME

. A

LL

W

OR

K

TH

AT

IM

PA

CT

S

NO

RM

AL

HO

SP

IT

AL

A

CT

IV

IT

IE

S

SH

AL

L B

E

CO

OR

DI

NA

TE

D W

IT

H

TH

E

VA

P

M

BY

T

HE

C

ON

TR

AC

TO

R.

8.

IF

A D

RO

P

CE

ILI

NG

IS

T O

BE

R

EM

OV

ED

F

OR

T

HE

R

EM

OV

AL

AN

D

IN

ST

AL

LA

TI

ON

O

F

NE

W S

TO

RM

D

RA

IN

P

IP

IN

G, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AN

D

ST

OR

E

TH

E

TI

LE

S

W

IT

HO

UT

D

AM

AG

IN

G

TH

EM

O

R

TH

E

SU

PP

OR

TI

NG

FR

AM

EW

OR

K.

9.

IF

A

P

OR

TI

ON

O F

A

HA

RD

C

EI

LIN

G

OR

W

AL

L I S

TO

B

E

RE

MO

VE

D

FO

R

TH

E

RE

MO

VA

L A

ND

IN

ST

AL

LA

TI

ON

O F

NE

W

ST

OR

M

DR

AI

N

PI

PI

NG

, C

AR

E

SH

AL

L B E

TA

KE

N

TO

R

EM

OV

E

AS

LI

TT

LE

A S

PO

SS

IB

LE

O F

TH

E

EX

IS

TI

NG

C

ON

ST

RU

CT

IO

N W

IT

HO

UT

D

AM

AG

IN

G

TH

E

SU

RR

OU

ND

IN

G

AR

EA

W

AL

L A

ND

C

EI

LIN

G

RE

PA

IR

S, F

IN

IS

HE

S, A

ND

F

IR

E

RA

TI

NG

S

SH

AL

L M

AT

CH

E

XI

ST

IN

G

CO

NS

TR

UC

TI

ON

PE

RS

ON

AL

P

RO

TE

CT

IV

E

EQ

UI

PM

EN

T

SH

AL

L B

E W

OR

N

W

HI

LE

W

OR

KI

NG

IN

T

HE

IN

TE

RS

TI

TI

AL

S

PA

CE

O

R

AN

Y

EN

VI

RO

NM

EN

TA

L E

NC

LO

SU

RE

S.

1.

DE

MO

LIS

H

DE

CK

D

RA

IN

A

ND

P

OR

TI

ON

O F

EX

IS

TI

NG

P

AT

IO

DE

CK

R

OO

FI

NG

F

OR

R

EP

LA

CE

ME

NT

O

F

DE

CK

D

RA

IN

S.

2.

RO

OF

D

RA

IN

A

ND

S

OF

FI

T

DE

CK

D

RA

IN

T O

RE

MA

IN

FO

R

CO

NT

IN

UA

TI

ON

S

EE

S

HE

ET

P

D1

A

ND

P D1

/2

6/

B

ID

D

IN

G

A M

E N

D M

E N

T

RD

RD

RD RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

W T R1

W T R3

W T R2

W T R4

RO

OF

D

EC

K (O

PE

N

AB

OV

E)

RO

OF

D

EC

K (O

PE

N

AB

OV

E)

RO

OF

D

EC

K (O

PE

N

AB

OV

E)

RO

OF

D

EC

K (O

PE

N

AB

OV

E)

TY

P.

TY

P.

TY

P.

2.1

3.2

4.2

5.1

7.1

9.1 9.5

GHJ G.

J.1J.5KL J.4M L.1

V ia D el C am po

, S an

D ie go , C

A

P ho ne : 8

.9

.0

P ro je ct

N um be r

B ui ld in g N um be r

D ra w in g N um be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

U .S

. D ep ar tm en t of V et er an s

A ff ai rs

B C D E F

A B C D E F

P ha se

AR

CH

IT

EC

T/

EN

GI

NE

ER

O F

RE

CO

RD

ST

AM

P

CO

NS

UL

TA

NT

Pr oj ec t D ire ct or

Re vis io ns

Da te

1.

TS

4-

-3

BU

ILD

IN

G

NO

. 1

NO

RT

H

KE

Y

PL

AN

SC

AL

E

0' 4'

8'

1/

8"

'-0

GE

NE

RA

L N

OT

ES

KE

Y

NO

TE

S

Re pla ce R oo f D ra in

St or mw ate r P ipi ng De fic ien cie s, W es t

La Jo lla V illa ge

D r, Sa n D ieg o, CA

MA

Y

, 2

LE

W

File Path:P:\18801\.04 VASD Stormwater Piping\Drawings\Plot\664-17-303.001.PD122.20190821.dwg PLOT DATE: May 26, 20236/14/2009 12:39:03 PM

W

ES

T

CE

NT

ER

0%

C

ON

ST

RU

CT

IO

N

DO

CU

ME

NT

S

(C D)

- R

EV

IS

ED

Se co nd F loo r D em oli tio n P lan

W es t Ce nte r

F1 S

E C

O N

D F

LO

O

R D

E M

O

LI

TI

O

N P

LA

N

W

E S

T C

E N

TE

R

SC

AL

E:

1/

8"

1' -0

PD

NO

RT

H

1.

TH

E

IN

TE

NT

IS

T

O

RE

MO

VE

A

LL

S

TO

RM

D

RA

IN

B

RA

NC

H

LIN

ES

, A

ND

M

AI

NS

IN

T

HE

W

ES

T

CE

NT

ER

A

RE

A W

HE

TH

ER

IN

DI

CA

TE

D

OR

N

OT

T

O A

PO

IN

T

" A

BO

VE

T

HE

F

LO

OR

DU

E

TO

IN

AC

CE

SS

IB

LE

C

ON

DI

TI

ON

S

IN

T

HE

IN

TE

RS

TI

TI

AL

SP

AC

ES

, N

OT

A

LL

T

HE

S

TO

RM

D

RA

IN

LI

NE

S

CO

UL

D

BE

AS

-B

UI

LT

. T

HE

R

IS

ER

S

FO

R

TH

E

AR

EA

S

HA

LL

B E

RE

MO

VE

D

AS

W

EL

L A

S

TH

E

PI

PI

NG

A

BO

VE

T

HE

C

EI

LIN

G.

P

IP

IN

G

BE

LO

W

T

HE

F

LO

OR

S

HA

LL

R

EM

AI

N.

2.

W

OR

K

SH

AL

L B E

PE

RF

OR

ME

D

SE

QU

EN

TI

AL

LY

A

T

EA

CH

RI

SE

R.

3.

TH

E

ME

TH

OD

O F

ST

OR

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .