This document is an amendment to a solicitation providing clarification responses to contractor questions regarding project number 664-18-320 for energy management controls integration at a VA medical center in San Diego, California. The project scope includes replacing existing pneumatic terminal units and controls on air handling units with direct digital controls, including new VAV terminal boxes except in operating and procedure rooms. Clarifications were provided that new VAV boxes and controls enclosures will be furnished and installed to replace the existing system. Only the basement, third, and fourth floors of building 1 and an emergency workstation in building 11 are within scope; other areas are excluded. The solicitation number is 36C26223B0003 with a July 2023 effective date. The amendment aims to resolve conflicts and provide additional details to support contractor bidding.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
07/25/2023
664-18-320
36C262
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
To all Offerors/Bidders
36C26223B0003
07-27-2023
X
X
NOT APPLICABLE.
AMENDMENT 0004 IS ISSUED TO PROVIDE CLARIFICATIONS TO VA RESPONSES TO CONTRACTOR'S RFIs POSTED IN AMENDMENT 0003.
CLARIFICATION TO VA RESPONSE CAN BE FOUND IN PAGES 2, 3, AND 4 OF 4.
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN UNCHANGED.
KEVIN VO
CONTRACTING OFFICER
AMENDMENT 0004 TO
SOLICITATION 36C26223B0003
PROJECT NO.: 664-18-320
RFI Questions & Answers
Project Name: 664-18-320 – ENERGY MANAGEMENT CONTROLS
INTEGRATION 1
Solicitation Number: 36C26223B0003
CLARIFICATIONS TO VA RESPONSES TO RFIs
Question 1 Q: There are conflicting RFI responses to Questions 20 and 76. One response appears to say that the VAV box is being replaced, while the other response appears to say the VAV box is not being replaced. Please clarify.
A: The project scope is to replace existing (pneumatic) terminal units with DDC terminal units. All new DDC points including but not limiting to HHW, Air CFM must be provided for the new terminal units. New CAV/VAV boxes except boxes that serve Operating rooms or Procedure rooms shall have hospital grade liner. New CAV/VAV boxes must be provided with new control valves and appurtenances for a complete and operable system. Follow details on drawings for more specific information. For bidding purposes, contractor should include the cost for a new BAC Net control system to replace the existing Metasys system; if it is found once the job is underway that the existing system can be utilized, a deductive change order will be issued.
Question 2 Q: In Response to RFI #21 & #34 – It is clear that the scope of work only requires Building 1 – basement level, third level, and fourth level as per RFI responses.
Why are there still RFI responses regarding the need for a new workstation for building 11 then?
A: The drawing scope of work G-001 states “It is required to design redundancy into the system to ensure we have remote controls available during emergencies.”
The Engineering office is located in building 11 Room BB107 and is identified as the new workstation location.
Question 3 Q: In response to RFI #76 – Does this mean New VAV Boxes will not be furnished and installed? Just the controls and HTG Valve?
A: New VAV boxes will be furnished and installed. Please refer to the drawings.
Question 4 Q: In Response to RFI #81 – Does this mean local readout as in having display on the wall thermostat?
A: Yes, it means a display on the wall T-Stat (Display only and all controls shall be made by Metasys operator)
Question 5 Q: In response to RFI #49 – We are questioning whether we are to provide a new controller or not for the AHUs? Do we know what type of sensors these are? If the sensors are compatible, we would just need to change the controller. Knowing this information is valuable to save cost.
A: Please follow the drawing. We answered question #49 about the existing sensors.
Question 6 Q: In Response to RFI #45 – We were told this was Metasys 9.0 but now are seeing it is version 11.0.0.3369? Are we still to provide a new server?
A: MetaSys UI: Version: 11.0.0.3369 was updated as the current version being used. Please refer to RFI question #77 “Confirming the scope requires a new server.”
Question 7 Q: Will the New VAV units be coming with controls enclosures? Specs do not state if they do or do not and 1M-7xxx schedule notes states: “Unit Control System (VMA 1832 or Approved Equal) shall include direct digital variable volume terminal unit controller mounted in nema 1 enclosure.” Please clarify.
A: Yes, the new unit shall be provided with controls enclosure.
Question 8 Q: What is going to occur with the other floors that are no longer part of the scope of work (i.e. L1,L2, L5, L6, Building 11)?
A: Building 1 basement level, 3rd level, 4th level & emergency redundancy workstation will be located in building 11 Room BB107 are only included for this project.
Question 9 Q: Clarifications on if the VAV boxes are getting replaced of not.
please see below the conflicting RFI responses. One response appears to say that the VAV box is being replaced, while the other response appears to say the VAV box is not being replaced.
A: The project scope is to replace existing (pneumatic) terminal units with DDC terminal units. All new DDC points including but not limiting to HHW, Air CFM must be provided for the new terminal units. New CAV/VAV boxes except boxes that serve Operating rooms or Procedure rooms shall have hospital grade liner. New CAV/VAV boxes must be provided with new control valves and appurtenances for a complete and operable system. Follow details on drawings for more specific information. For bidding purposes, contractor should include the cost for a new BAC Net control system to replace the existing Metasys system; if it is found once the job is underway that the existing system can be utilized, a deductive change order will be issued.