36C26119R0025-002.docx

DOCX document 106 KB Posted

Attached to
Project 612A4-19-011 | Replacement of Bldg. 649 Roofing System
Solicitation number
36C26119R0025
Issued by

About this file

36C26119R0025 36C26119R0025_3.docx

View the file

Other files

File Type Posted
36C26119R0025-0005005.pdf PDF
36C26119R0025-0005004.pdf PDF
36C26119R0025-0005002.pdf PDF
36C26119R0025-0005001.docx DOCX document
36C26119R0025-0005003.pdf PDF
36C26119R0025-0004000.docx DOCX document
36C26119R0025-0003000.docx DOCX document
36C26119R0025-0003001.dwg DWG drawing
36C26119R0025-0002000.docx DOCX document
36C26119R0025-0001001.pdf PDF
36C26119R0025-0001000.docx DOCX document
36C26119R0025-014.pdf PDF
36C26119R0025-017.pdf PDF
36C26119R0025-007.pdf PDF
36C26119R0025-010.pdf PDF
36C26119R0025-016.docx DOCX document
36C26119R0025-008.pdf PDF
36C26119R0025-009.pdf PDF
36C26119R0025-003.pdf PDF
36C26119R0025-004.pdf PDF
36C26119R0025-015.pdf PDF
36C26119R0025-011.pdf PDF
36C26119R0025-006.pdf PDF
36C26119R0025-013.pdf PDF
36C26119R0025-005.pdf PDF
36C26119R0025-012.pdf PDF
36C26119R0025-001.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26119R0025

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE

DOCUMENTS (

Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C26119R0025 X 06-1 -2019 36C26119R0025 612A4-19-011 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Northern California HealthCare System 5342 Dudley Blvd., Bldg. 98 McClellan CA 95652-1001 Offers have been authorized and are to be sent via email to:

Robert Parke at robert.parke2@va.gov Subject Line Shall Read:

Building 649 Roof - "Company Name" Robert Parke 916-923-4922 Project Title: Replacement of Building 649 Roofing System VA Northern California Healthcare System 10535 Hospital Way Mather, CA 95655-4200 Project #: 612A4-19-011

Contractor shall provide all supervision, labor, materials, services, tools, equipment, and transportation perform all demolition, renovation, installation, and finishes to provide a second application of a hot applied rolled asphalt shingle over existing roofing system located on the roof of Building 649 at the Veterans Affairs Northern California Health Care System (VANCHCS), Mather, CA 95655 as required by the Statement of Work, Specifications and Drawings.

In accordance with VAAR 836.204 - Disclosure of the magnitude of construction projects, the magnitude of construction for Project 612A4-19-011 is between $250,000 and $500,000.

This Project is being solicited under NAICS code 238160 and Small Business Size Standard of $15 million.

Note #1 to OFFERORS: This contract will be awarded in accordance with FAR Part 15 -- Lowest Price Technically Apcceptable (LPTA) source selection process (FAR 15.101-2).

Note #2 to OFFERORS: Bid Bonds, Payment Bonds and Performance bonds shall be required under this solicitation and any resultant contract.

Note #3 to OFFERORS: This procurement is a 100% Total Service-Disabled Veteran-Owned Small Business Set-Aside

Note #4 to OFFERORS: All Requests for Information (RFI's) shall be submitted to the Contract Specialist, robert.parke2@va.gov in writing, by Ju ly

, 2019 @ 11AM PDT.

Note #5 to OFFERORS: Gauranteed Period Services are applicable to this solicitation.

Note #6 to OFFERORS: In accordance with established public law, all Contractors are required to be registered and current in System for Award Management (SAM), the official web-site of the U.S. Government at www.sam.gov

Note #7 to OFFERORS: A pre-proposal conference and site visit shall be held on June 2 , 2019 at 10AM PDT at the VA Northern California Health Care System, 10535 Hospital Way, Mather, CA. 95655 Bldg. 650 3rd Floor Engineering Lobby.

X X 52.211-10 X

11AM PDT

07-1 -2019 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Northern California HealthCare System 5342 Dudley Blvd., Bldg. 98 McClellan CA 95652-1012 Department of Veterans Affairs FMS-VA-2(101) Financial Services Center PO Box 149971 Austin TX 78714-9971 Denise R. Groves Contracting Officer

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS5
BASIS FOR AWARD9
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)12
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)12
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)13
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)14
2.5 52.228-1 BID GUARANTEE (SEP 1996)15
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)15
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)16
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)16
2.9 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)17
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)17
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)17
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)18
REPRESENTATIONS AND CERTIFICATIONS19
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)19
3.2 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018)22
GENERAL CONDITIONS25
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)25
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)25
4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)26
4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)26
4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)28
4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)28
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)29
4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS32
4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)33
4.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)35
4.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)35
4.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)36
4.13 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)37
4.14 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)37
4.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)40
4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)41
4.17 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)42
4.18 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)42
4.19 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)43
4.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019)45
4.21 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018)45
4.22 ADDITIONAL ATTACHMENTS46
4.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)46

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

Replacement of Bldg. 649 Roofing System

Project # 612A4-19-011

General Intention:

A. Contractor shall furnish labor and materials needed to perform all demolition, renovation, installation and finishes required by this scope located at the VA Northern California Health Care System (VANCHCS) as required by specifications.

B. Visits to the site by bidders may be made only by appointment with the Contracting Officer for the project.

C. This project is to take no longer than 150 calendar days from notice to proceed.

Statement of Work:

This project is a second application of a hot applied rolled asphalt shingle over existing roofing system located on the roof of Bldg. 649. The contractor will remove all debris on the rooftop prior to start of work.

This new roofing system shall be a hot applied roofing system and new stainless steel sheet metal top caps at all perimeters. This contract will include reusing existing cricket and drainage system. Contractor shall provide design layout showing all equipment located on the roof and all drainage locations. It is the contractor’s responsibilities to field verify all equipment locations and create a design layout of the roof system. The existing roof covers approximately 11,000 square feet including the rolled up roofing to parapet roof caps. The contractor shall include all new expansion joint material and redo the expansion roofing between 647 and 649.

The contractor shall replace 10 new roof drains in support of this project and the re-use of the existing drain piping. The contractor shall replace all existing roof drains from the roof to the first pee trap. The pee trap shall also be replaced as part of this scope. The roof drain replacement and installation of the new drains shall be completed over weekends only due to needed access inside the building. All new drains include a drain strainers and clamp rings. The contractor shall also replace all pipe boots and conduit boots. Contractor shall provide all new conduit and pipe boots.

Contractor shall replace all parapet caps, column caps and metal wall panel covers with stainless steel to match existing. There is approximately 600 LF of parapet capping to be replaced. The contractor shall repair corners of the stainless steel caps for equipment with epoxy type Volucum material along with stainless steel corners after installation of the new roofing system.

Contractor shall seal all flashing to provide water tight roofing system. The contractor shall also provide 1,000 sq. ft. of walking mats, locations to determine by COR. Please see drawing A in reference to where all work in this location shall be performed only on Saturday and Sunday. The contractor is responsible for managing a schedule of installation that eliminates the risk for damage due to weather; the contractor will need to provide protection to the building if weather were to become a factor. Equipment drains will need to be re-addressed by the contactor to ensure they drain appropriately with the new roofing system. The contractor shall replace all piping supports on the roof with rubber base unit-strut fasteners.

The contractor shall provide a 3rd party roofing inspector with at least 5 years of experience to perform inspections with manufacturers representative prior to, during, and after installation of new roof or as required for manufacturers roof warranty.

(End of Statement of Work)

1. INTRODUCTION:

a. These instructions prescribe the format of Offers. Offers are defined as consisting of both Prime Contractor’s Price Proposal and Prime Contractor’s Technical Proposal. These instructions describe the approach for the development and presentation of the required information and documentation. These instructions are designed to ensure the submission of necessary information and documentation to provide for the comprehensive evaluation of offers.

b. Offerors are cautioned to carefully review this solicitation prior to commencing preparation. In order for offers to receive full consideration for award, offerors should ensure that the information and documentation furnished in support of the price proposal and of the technical proposal are current, factual, accurate, and complete.

c. Offerors are strictly advised to comply with all instructions within this solicitation to ensure submission of a complete Prime Contractor Offer. Failure to furnish a complete offer per the instructions in this solicitation, at the required time and on the required date, may result in the Offeror’s proposal being determined ineligible.

d. The Government intends to award without discussions, unless discussions are in the best interest of the Government.

2. CONTRACT TYPE:

a. The awarded contract will be a firm fixed price (FFP) contract.

b. This solicitation is a total set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) per FAR 19 and Public Law 109-461. The offeror MUST have an active DUNS number and be current in System for Award Management (SAM) as an SDVOSB concern under the applicable NAICS. In addition, the offeror MUST be a Service-Disabled Veteran Owned Small Business (SDVOSB) in the VIP with a “verified” status at time of bid submission and at time of contract award. If the offerors SDVOSB status changes in SAM or VIP at any time prior to award, the offeror will not be eligible for award under FAR Part 9.104.

3. SUBMISSION INSTRUCTIONS:

a. One (1) electronic copy (email if less than 10MB) of the technical and price proposals are to be sent to arrive on or before the due date/time at the following email address:

robert.parke2@va.gov Subject Line shall read: Building 649 Roof – “Company Name”

b. Faxed proposals are not permitted under any circumstances.

c. Offerors MUST include in the body of the email containing the proposals the following information:

Company Name Building 649 Roof Replacement

RFP 36C26119R0025

4. PROPOSAL DUE DATE SCHEDULE:

Offers/Proposals are due by the date and time set for the receipt of proposals shown in Block 13 of the SF 1442.

5. QUESTIONS CONCERNING THIS RFP:

All Requests for Information (RFIs) regarding this RFP must be submitted in writing and received NLT 11:00 AM PDT on July 08, 2019 in order to allow replies to reach all prospective offerors in a timely manner. Questions/RFIs shall be sent via email to Robert Parke at robert.parke2@va.gov .

6. SITE VISIT/Pre-Proposal Conference:

Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

The site visit is scheduled for:

Dates:Tuesday June 25th, 2019
Time:10:00 AM PDT (promptly)
Location:Engineering Lobby, 3rd Floor Building 650

VA Northern California Health Care System 10535 Hospital Way Sacramento, CA 95655

7. PROPOSAL FORMAT:

a. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Reliance on promotional brochures is discouraged.

b. The Technical Volume shall not exceed the page limits stated herein. If the page limits are exceeded, the pages in excess of the limit will not be read or considered. Page limits for Technical submission (Key Personnel and Prime Previous Experience) is twenty (20) sheets printed front and back.

c. Page Limits Shall Include: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc. except as noted in the instructions. Type size will not be smaller than Microsoft Word Times New Roman 11 point font, normal proportional spacing. Text lines will be single-spaced.

d. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (11). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required.

e. Electronic Copy: Provide one (1) electronic copy of the complete proposal (Volumes 1 and 2). Electronic copies that are to be submitted on CD-ROM must be saved in Microsoft Word or Adobe Acrobat format, and virus checked prior to submission. Electronic copies may be sent via email, but the files shall not exceed 10MB and again, must be virus checked prior to submission.

f. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will allow for easy removal and replacement of pages.

g. Indexing: Each volume will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate. Table of Contents and Tab indexes do not count toward page limitation.

h. Offerors may, at the discretion of the Government, be asked to provide information for clarification purposes regarding their proposals. Requests for such clarification information do not constitute discussions.

i. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including information provided by potential subcontractors. Should subsequent investigation disclose that the fact and conditions were not as stated, the proposal may be rejected and receive no further consideration.

j. If revised proposals are requested, the number of revised copies to be submitted shall be the same as those of initial proposals unless stated otherwise.

8. PROPOSAL VOLUME CONTENTS:

TECHNICAL VOLUME (BINDER - 1): Include the following information on the cover:

Company Name Building 649 Roof Replacement

RFP 36C26119R0025

Volume 1 – Technical Proposal

BINDER INDEX:

Tab 1 Key Personnel Experience; Includes detailed resume showing experience and projects and a Letter of Intent Tab 2 Prime Previous Experience; Includes project information

a. The Technical volume should include necessary information regarding the offeror’s ability to perform requirements outlined in the solicitation. Failure to provide a Technical proposal in accordance with the solicitation instructions shall render an offeror’s proposal incomplete and ineligible for award.

b. The Key Personnel included in the offer shall be the personnel that are assigned to the project for the entire project. In the event a substitution must be made during the course of the project, the contractor shall submit to the contracting officer a request that includes a resume of the proposed substitution which indicates the person meets all of the qualifications in the evaluation sub-factor included in this solicitation.

c. This project requires four positions be assigned. The Safety Manager role may be a collateral duty for the Superintendent or Quality Control Manager provided that all qualifications for the positions can be achieved by one individual. If the Safety Manager is collateral this must be clearly defined, and cannot be transferred between the Superintendent and Quality Control Manager. Note: The Superintendent and Quality Control Manager positions are onsite full time positions.

d. The letter of intent for key personnel shall contain the following information:

i. Current Employees - Letter that is signed by both the employee and contractor that lists the solicitation the contractor is bidding on and his/her proposed roll on the project.

ii. Potential Employees - Contractor must provide a letter of intent signed by both the Contractor and potential employee that lists the following:

1. Specific solicitation/project being offered on

2. The position the proposed employee will be taking

3. Statement that the proposed employee has NO known conflicts that would prevent them from completing this project if awarded and that they possess the skills necessary to perform the required job

e. For every project presented in the offer in response to the evaluation sub-factors must include the following information:

· Project Description

· Contract Number

· Contract Value

· Location

· Type of Contract – Federal, State, Private

· Customer/End-User Point of Contact (email, address, and phone number)

f. If proposing as a joint venture, a copy of the executed joint venture agreement shall be included with the proposal.

PRICE VOLUME (BINDER – 2)

Company Name Building 649 Roof Replacement

RFP 36C26119R0025

Volume 2 – Price

BINDER INDEX

Tab 1 Completed SF 1442 Tab 2 Supplemental Price Breakdown Tab 3 Bid Guarantee

g. Offerors shall provide all pricing information necessary to provide a meaningful basis for Government's analysis and evaluation of price for this solicitation. The Government is not and does not intend to request certified cost or pricing data.

9. ADDITIONAL SOLICITATION INFORMATION:

a. Solicitation Authority: This is Solicitation Request for Proposals (RFP) conducted under FAR Part 15 “Contracting by Negotiation” where firms are Offerors and shall submit Offers. References to IFBs, Bids, or Bidders, in technical specifications sections and technical drawings are strictly coincidental and strictly for purposes of administrative convenience and efficiency.

b. Solicitation Clauses and Provisions: Please note that RFP, and any resultant contract, Part 1, Schedule, and all clauses and provisions located there, supersede and contain final authority. Those clauses and provisions that may be referenced in the technical specification sections and technical drawings are strictly coincidental and for purposes of administrative convenience and efficiency.

c. Solicitation Definitions: Throughout this RFP, and any resultant contract, the terms Contracting Officer’s Technical Representative (COTR), Contracting Officer’s Representative (COR), Project Engineer (PE), Resident Engineer (RE), and Project Manager (PM), all denote the same engineering official and may be used equally and interchangeably as described by the Contracting Officer (CO).

BASIS FOR AWARD

1. INTRODUCTION

a. This is a Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation, supplemented by the Department of Veterans Affairs Acquisition Regulation (VAAR). These regulations are available electronically at http://farsite.hill.af.mil and https://www.va.gov/oal/library/vaar/

b. The Government intends to award a firm fixed price (FFP) contract to the technically acceptable offer, with the lowest evaluated fair and reasonable price, which is responsible in accordance with FAR 9.104 received in response to this solicitation.

c. Offers are cautioned that the Government intends to award without discussions based solely on initial offers received. Therefore, each initial offer received should be submitted on the most favorable terms from both a price and a technical standpoint. If, during the evaluations it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the Final Proposal Revision are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award.

d. Adhering to the Solicitation requirements has been determined to be providing all the information and documentation requested in the format requested as required by this solicitation. Failure to provide any requested information will eliminate the offer from consideration.

e. Only one award will be made in response to the solicitation.

2. EVALUATION PROCESS. Offers will be evaluated as follows:

a. Step 1: All offers will be evaluated for adherence to the solicitation requirements. (Failure to provide all necessary and required documents will make the offer ineligible to be ranked based on the lowest price)

b. Step 2: All offers adhering to the requirements of the solicitation will be ranked by price, with the lowest evaluated price offer first.

c. Step 3: The lowest price offer adhering to the requirements of the solicitation will be evaluated for technical acceptability. To be considered technically acceptable the offer must be rated technically acceptable for each technical sub-factor (Key Personnel Experience and Prime Construction Management Previous Experience).

d. Step 4: If the lowest evaluated priced offer adhering to the requirements of the solicitation is determined technically acceptable, the Government will evaluate the offer to determine if the price is fair and reasonable for the work to be performed and not materially unbalanced at the line item or total contract level.

e. Step 5: If the lowest price technically acceptable offer adhering to the requirements of the solicitation is determined fair and reasonable for the work to be performed and not materially unbalanced, the Government will evaluate the offer for responsibility in accordance with FAR Part 9.104.

f. Step 6: If the lowest price technically acceptable offer adhering to the requirements of the solicitation is fair and reasonable and responsible under FAR 9.104, award will be made to that offeror.

g. Step 7: If not, the Government will evaluate the next lowest evaluated price offeror adhering to the requirements of the solicitation, repeat steps 2-6 until a responsive, responsible technically acceptable lowest evaluated fair and reasonable priced offer is identified.

3. EVALUATION FACTORS AND SUB-FACTORS

a. Factor #1 – Technical (Acceptable/Unacceptable): Proposals will be evaluated against the following technical sub-factors. For the technical factor to be considered technically acceptable, the offer must be rated technically acceptable in sub-factors 1A and 1B.

i. Evaluation Sub-Factor 1A: Key Personnel Experience; in order for a technical offer to be rated acceptable for 1A, all four listed below must be rated acceptable.

1. Superintendent:

1) Detailed resume

2) Letter of Intent

3) Minimum of three (3) years of experience as a Construction/Roofing Superintendent

4) Superintendent on a minimum of two (2) projects of similar scope and complexity

2. Project Manager:

1) Detailed resume

2) Letter of Intent

3) Minimum of three (3) years of experience as a Construction/Roofing Project Manager

4) Project Manager on a minimum of two (2) projects of similar scope and complexity

ii. Evaluation Sub-Factor 1B: Prime Construction Management Previous Experience:

Minimum of two (2) projects completed within the preceding five (5) years similar in magnitude and complexity to this project.

b. Factor #2 - Price The Government will evaluate the lowest price offer to determine if the price is fair and reasonable for the work to be performed through the use of price analysis. To be considered fair and reasonable for the work performed, the evaluators will also check for appearance of unbalanced line item prices. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluation described above. Offers which are materially unbalanced as to prices for the basic requirement and the option quantities are not fair and reasonable. An Offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

DESCRIPTION
MATERIAL
LABOR
TOTAL

Division 01 -General Requirements

Project Manager
$
$
$
Superintendent
$
$
$
3rd Party Inspection
$
$
$
Design/Layout
$
$
$
Mobilization
$
$
$
Premium Time Work
$
$
$
Division Total
$
$
$

Division 02 – Existing Conditions

Demolition
$
$
$
$
$
$
$
$
$
Division Total
$
$
$

Division 07 – Therm/Moisture Protection

Roofing Preparation
$
$
$
Roofing Installation
$
$
$
Stainless Steel Installation
$
$
$
Drain Replacement and Addition
$
$
$
Division Total
$
$
$

Extra Space if necessary

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Extra Space Total
$
$
$
SUB TOTAL
$
$
$
Overhead
$
$
$
Profit
$
$
$
Bonds and Insurance
$
$
$
TOTAL Offer
$
$
$

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
16.1 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Sacramento, CA

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Robert Parke

Hand-Carried Address:

Department of Veterans Affairs Network Contracting Office (NCO) 21

3230 Peacekeeper Way, BLDG 209 McClellan CA 95652-1012 Mailing Address:

Department of Veterans Affairs Network Contract Office (NCO) 21

5342 Dudley Blvd., Bldg. 98 McClellan CA 95652-1012

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— June 25, 2019 @ 10AM PDT

(c) Participants will meet at— 10535 Hospital Way, Bldg. 650 3rd Floor Engineering Lobby Entrance Mather, CA 95652 (End of Provision)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT
OCT 2018
52.204-16
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
JUL 2016
52.204-22
ALTERNATIVE LINE ITEM PROPOSAL
JAN 2017
52.215-1
INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION ALTERNATE I (OCT 1997)
JAN 2017
52.236-28
PREPARATION OF PROPOSALS—CONSTRUCTION
OCT 1997

2.9 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)

(a) The Contractor shall conform to the standards established by: The Department of Veterans Affairs The VA Northern California Health Care System as to the required standards necessary for this project.

(b) The Contractor shall submit proof of conformance to the standard. This proof may be a label or seal affixed to the equipment or supplies, warranting that the item(s) have been tested in accordance with the standards and meet the contract requirement. Proof may also be furnished by the organization listed above certifying that the item(s) furnished have been tested in accordance with and conform to the specified standards.

(c) Offerors may obtain the standards cited in this provision by submitting a request, including the solicitation number, title and number of the publication to: The Department of Veterans Affairs robert.parke2@va.gov

(d) The offeror shall contact the Contracting Officer if response is not received within two weeks of the request.

(End of Provision)

2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Clause)

2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)

(a) Any protest filed by an interested party shall—

(1) Include the name, address, fax number, email and telephone number of the protester;

(2) Identify the solicitation and/or contract number;

(3) Include an original signed by the protester or the protester’s representative and at least one copy;

(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;

(5) Specifically request a ruling of the individual upon whom the protest is served;

(6) State the form of relief requested; and

(7) Provide all information establishing the timeliness of the protest.

(b) Failure to comply with the above may result in dismissal of the protest without further consideration.

(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.

(End of Provision)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics,
Risk Management Team, Department of Veterans Affairs
810 Vermont Avenue, N.W.
Washington, DC 20420

Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management
811 Vermont Avenue, N.W.
Washington, DC 20420

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238160.

(2) The small business size standard is $15 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(vii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements.

This is the start of the file's text. The full file is on GovTribe.