36C26118B0611-0006003.pdf

PDF 556 KB Posted

Attached to
East-West Entrance Modification Federal contract opportunity
Solicitation number
36C26118B0611
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26118B0611 0006 10034656-E-VA-EASTWEST ENTRANCE_BOLLARD ELEC SITE LIGHTING DEMO PLAN-ADDENDUM 1-ELD101.pdf

View the file

Other files for this federal contract opportunity

Other files attached to East-West Entrance Modification, newest first.
File Type Posted
36C26118B0611_0009.docx DOCX document
Wage_Determination_NV180075_Dated_12.14.18.pdf PDF
36C26118B0611_0008.docx DOCX document
36C26118B0611-0007001.pdf PDF
36C26118B0611-0007000.docx DOCX document
36C26118B0611-0006000.docx DOCX document
36C26118B0611-0006002.pdf PDF
36C26118B0611-0006004.pdf PDF
36C26118B0611-0006005.pdf PDF
36C26118B0611-0006001.pdf PDF
36C26118B0611-0005000.docx DOCX document
36C26118B0611-0004001.pdf PDF
36C26118B0611-0004000.docx DOCX document
36C26118B0611-0003000.docx DOCX document
36C26118B0611-0002001.pdf PDF
36C26118B0611-0002000.docx DOCX document
36C26118B0611-0001001.pdf PDF
36C26118B0611-0001000.docx DOCX document
36C26118B0611-005.docx DOCX document
36C26118B0611-002.pdf PDF
36C26118B0611-003.docx DOCX document
36C26118B0611-010.pdf PDF
36C26118B0611-004.docx DOCX document
36C26118B0611-007.pdf PDF
36C26118B0611-011.pdf PDF
36C26118B0611-006.pdf PDF
36C26118B0611-008.pdf PDF
36C26118B0611-009.doc DOC document
36C26118B0611-001.docx DOCX document
36C26118B0611-000.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D O

W N

V A N

~ U P

V A N

V A N

S12 S12

S12 S12

S12

S12

S12

S12

S12

S12

S12 S12

S12 S12

S12 S12

S12 S12 S12

S12 S12 S12

S12 S12

S12 S12

S12 S12

S12 S12

S12 S12

S12 S12

S12 S12

S12

S12

S12

S12

S12

S12

S12

S12

2 (E) 2-L-1D-37,39,41

S21

S21

S12

S12

S12

S12

S12

S21 S21 S21

S21

S12 S12

S12

S12

S12

S12

S12

S12

S12

S12

S12

S12

S12

S12

S12

S12

S21S21S21S21

S12

S12

S12

S12

S12

S12

38 42 40 38

(E) 4-L-1C-38,40,422

KEY PLAN

15 17

C

E

NORTH

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

Drawing number

Drawn

Building Number

Location

Project Title

Date

Contract Number

Checked by

Drawing Title

Approved : Project Director

CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management

ARCHITECTURE/

INTERIOR DESIGN:

HDR Architecture, Inc.

3200 E Camelback Road, Suite 350 Phoenix, AZ 85018

Project Number

VA101CFM-P-0159

VA262-16-F-5914

593-15-330

1 2 3 4 5 6

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

7 8 9

U.S. Department of Veterans Affairs

C :\r vt \2

6\

-M E

P -V

A -E

A S

T W

E S

T E

N T

R A

N C

E _C en tr al _J

O E

S T

R A

D A

.r vt

2/ 1/

1:

:4

A

M

ELD101

ELECTRICAL SITE LIGHTING DEMOLITION

PLAN

Checker Author08/30/2017

EAST WEST ENTRANCE

MODIFICATIONS

6900 North Pecos Road North Las Vegas, NV 89086

1/16" = 1'-0" A1

ELECTRICAL EAST BOLLARD - PARTIAL DEMOLITION SITE PLAN

1/16" = 1'-0" A6

ELECTRICAL WEST BOLLARD - PARTIAL DEMOLITION SITE PLAN

A. FOR ELECTRICAL SYMBOLS AND ABBREVIATIONS REFER TO

DRAWINGS SHEET E001 AND E002

1. REMOVE WIRING AND CONDUIT FROM BOLLARDS TO BE

DEMOLISHED BACK TO NEAREST REMAINING FIXTURE. WHERE

A BOLLARD IS REMOVED AND CIRCUITING TO OTHER ITEMS

WILL BE INTERRUPTED, CONTRACTOR SHALL EXTEND

CONDUIT, WIRE, BOX, ETC. AS REQUIRED TO MAINTAIN THE

OPERATION OF THOSE ITEMS NOT AFFECTED BY THE

DEMOLITION. COORDINATE WITH ARCHITECTURAL SHEET

AS100 FOR DEMOLITION WORK.

2. EXISTING CIRCUITS MAY NOT BE THE SAME AS THOSE SHOWN.

CONTRACTOR TO VERIFY BEFORE STARTING WORK. EXISTING

CIRCUIT WILL BE REUSED.

SHEET NOTES

KEYNOTES

NO REVISIONS DATE

1 100% FINAL CONSTRUCTION DOCUMENTS 08/30/2017

2 100% FINAL CONSTRUCTION DOCUMENTS-ADDENDUM 1 02/01/2018

Sheets
ELD101 - ELECTRICAL SITE LIGHTING DEMOLITION PLAN

File details come from the government source that posted it.