36C26118B0611-0006002.pdf
PDF 553 KB Posted
- Attached to
- East-West Entrance Modification Federal contract opportunity
- Solicitation number
- 36C26118B0611
About this file
36C26118B0611 0006 10034656-A-VA-EASTWEST ENTRANCE_BOLLARD DETAIL-ADDENDUM 1-AS100.pdf
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REMOVE EXISTING DECORATIVE BOLLARDS
WITHIN THIS BOUNDARY. INSTALL LIGHTED
K4 SECURITY BOLLARDS AT ALL ORIGINAL
EXISTING DECORATIVE LIGHTED BOLLARD
LOCATIONS. CONTRACTOR TO VERIFY ALL
BOLLARD LOCATIONS.
C6
AS100
TYP
C6
AS100
TYP
REMOVE EXISTING DECORATIVE BOLLARDS
WITHIN THIS BOUNDARY. INSTALL LIGHTED K4
SECURITY BOLLARDS AT ALL ORIGINAL
EXISTING DECORATIVE LIGHTED BOLLARD
LOCATIONS. CONTRACTOR TO VERIFY ALL
BOLLARD LOCATIONS.
FIXED SECURITY BOLLARD NOTES:
FIXED EMBED-MOUNT SECURITY
BOLLARD AS RECOMMENDED BY
THE MFG TO PROVIDE ANTI-RAM
RESISTANCE CAPABLE OF
STOPPING A 4,000-LB. MIN. VEHICLE
TRAVELING 30 MILES PER HOUR
MIN.
8" DIAMETER LIGHTED K4 SECURITY
BOLLARD BY CALPIPE INDUSTRIES
OR APPROVED EQUAL.
BOLLARD FINISH PER
SPECIFICATION 34 71 13 VEHICLE
BARRIERS
PEDESTRIAN SIDE
CONTINUOUS STRIP FOOTING
FOUNDATION SIZE AND REINFORCING
BY MANUFACTURER
AS REQ. BY MFG.
A S
R E
Q B
Y M
F G
3' -0
MATCH PROFILE AND SLOPE OF EXISTING CURB,
PAINT TO MATCH EXISTING CURB
FLAT CAP AND STACKED LOUVER
STYLE GLASS REFRACTOR.
12 GA METAL COVER
8" SCH. 80 A53 PIPE
STIFFENER PLATE
4 X 3/8" ANCHOR BOLTS
3/4" DIA. CONDUIT EACH WAY
AS REQUIRED. STUB-UP
SHALL BE GALVANIZED RIGID
METAL, HALF-LAP WRAPPED
WITH 10 MIL PVC TAPE.
0 4'-0" 8'-0" 16'-0"
NORTH
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e -h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Drawing number
Drawn
Building Number
Location
Project Title
Date
Contract Number
Checked by
Drawing Title
Approved : Project Director
CONSULTANTS: ARCHITECTS/ENGINEERS: Office of Construction and Facilities Management
ARCHITECTURE/
INTERIOR DESIGN:
HDR Architecture, Inc.
3200 E Camelback Road, Suite 350 Phoenix, AZ 85018
FULLY SPRINKLERED
Project Number
VA101CFM-P-0159
VA262-16-F-5914
593-15-330
1 2 3 4 5 6
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
7 8 9
U.S. Department of Veterans Affairs
C :\U se rs
\S Q
A F
IS
H
E \D oc um en ts
\1
6- A
-V A
-E A
S T
W E
S T
E N
T R
A N
C E
_C en tr al
_R 1_
S Q
A F
IS
H
E .r vt
2/ 1/
:3
3:
P M
AS100
PARTIAL SITE PLANS & DETAILS
JG SQ08/30/2017
EAST-WEST ENTRANCE
MODIFICATIONS
6900 North Pecos Road North Las Vegas, NV 89086
1/16" = 1'-0" A1
EAST BOLLARDS DEMOLITION
1/16" = 1'-0"
A6
WEST BOLLARDS DEMOLITION
1" = 1'-0" C6
SECURITY BOLLARD
1. DRAWINGS & SPECIFICATIONS ARE COMPLIMENTARY COMPONENTS
OF THE CONTRACT DOCUMENTS, REVIEW ALL DRAWINGS AND
SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK. NOTIFY
ARCHITECT IMMEDIATELY FOR CLARIFICATION IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED.
2. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, NOTIFY ARCHITECT IMMEDIATELY FOR
CLARIFICATION.
3. CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN
THROUGH TRAFFIC FOR PATIENT DROP OFF VEHICLES AT BOTH
ENTRANCES AT ALL TIMES DURING CONSTRUCTION.
4. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS INCLUDING
EXISTING STRUCTURES, PAVED SURFACES, AND UNDERGROUND
UTILITIES IN THE AREA OF WORK PRIOR TO STARTING
CONSTRUCTION.
5. IF EXISTING CONDITIONS PREVENT CONTRACTOR FROM
CONSTRUCTING SHALLOW-MOUNT STRIP BOLLARD FOOTINGS,
CONTRACTOR SHALL CONSTRUCT DEEP-MOUNT BOLLARD
FOOTINGS IN REQUIRED LOCATIONS AS RECOMMENDED BY THE
MANUFACTURER.
6. PROTECT ALL EXISTING CONSTRUCTION ADJACENT TO PROJECT
AREA FROM DAMAGE DURING PROJECT CONSTRUCTION.
7. PROVIDE CLEAN AND SMOOTH TRANSITION FROM EXISTING
CONSTRUCTION TO NEW CONSTRUCTION.
SHEET NOTES:
NO REVISIONS DATE
1 100% FINAL CONSTRUCTION DOCUMENTS 08/30/2017
2 100% FINAL CONSTRUCTION DOCUMENTS-ADDENDUM 1 02/01/2018
| Sheets |
| AS100 - PARTIAL SITE PLANS & DETAILS |
File details come from the government source that posted it.