UPDATED 660-15-111 Construction SOW.pdf
PDF 98 KB Posted
- Attached to
- Z2DA--Legionella - Mixing Valves, Schematics, Controls Federal contract opportunity
- Solicitation number
- 36C25921R0015
About this file
This document contains a statement of work for construction services and a related federal contract opportunity notice. The statement of work is for upgrades to plumbing systems in several buildings at the George E. Wahlen Department of Veterans Affairs Medical Center in Salt Lake City, Utah. The scope of work includes mechanical, plumbing and testing services to address Legionella bacteria and involves replacing mixing valves, updating schematics and installing new controls. The period of performance is 365 days. Safety and infection control are priorities given that work will take place in active hospital areas. The related federal contract opportunity is a pre-solicitation notice for the same project, with an estimated value between $1 million and $5 million. The procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The contracting agency is the Veterans Health Administration Veterans Integrated Service Network 19. Interested vendors must be verified and listed in the Vendor Information Pages database to be considered for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25921R0015 0007.pdf | ||
| 36C25921R0015 0006.pdf | ||
| 36C25921R0015 0005.pdf | ||
| S02 2016-10-20 Instructions to Offerors - PPT.pdf | ||
| Specs-Final Combined set Legionella.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| NESHAP VA Limited ACM Building 3 SLC UT 01-04-21.pdf | ||
| 660-15-111 Equipment Cut Sheets.pdf | ||
| 36C25921R0015 0004.pdf | ||
| NESHAP VA Limited ACM Bldg 1 SLC UT 01-04-20.pdf | ||
| Legionella questions.pdf | ||
| 36C25921R0015 0003.pdf | ||
| 2016-09-07 S04 -Site Visit Meeting Doc.pdf | ||
| Site Walk 1- attendance.pdf | ||
| 36C25921R0015 0002.pdf | ||
| Site Walk 2- attendance.pdf | ||
| 36C25921R0015 0001.pdf | ||
| C27 660-15-111 100 percent Drawings.pdf | ||
| 36C25921R0015_1.pdf | ||
| C27 Specs-Final Combined set.pdf | ||
| 36C25921R0015.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Salt Lake City Health Care System
Legionella- Mixing Valves, Schematics, Controls
Project No. 660-15-111
STATEMENT OF WORK
CONSTRUCTION SERVICES
Project Title: Legionella- Mixing Valves, Schematics, Controls
Project No.: 660-15-111
Location: Bldgs. 1, 3, 32, 42, 43 Salt Lake City, UT, George E. Wahlen, Depart. of Veteran Affairs Medical
Center
I. SCOPE OF WORK:
A. Furnish all necessary services, equipment, labor, materials, supervision, and tools to perform construction services for the NRM Project #660-15-111, “Legionella- Mixing Valves, Schematics, Controls”, located at
500 Foothill Drive, Salt Lake City, UT 84148 on the George E. Wahlen Department of Veterans Affairs
Medical Center campus.
The project is an upgrade to the plumbing system located in buildings 1, 3, 32(the Fisher house), 42 and 43.
The upgrade encompasses all floors of 1 and 3 (unless otherwise noted) but with a focus on these areas:
Building 1 2nd Floor 56,300 square feet, Building 1 3rd Floor 47,350 square feet, Building 3 1st Floor 23,650 square feet (excludes 8,650 SF Psych Rehab Bed), Building 3 2nd Floor 12,465 square feet (excludes vacant, common, & engineering spaces). The project site includes areas within the main hospital building on campus, which will remain active during construction. As such, thorough attention to keeping a secure site and keeping all items that could pose a self-harm risk or be used to hurt others must be kept in locked construction site at all times. Infection control requirements shall be adhered to at all times. Some work shall be done outside of normal business hours to reduce the effect on the medical centers operations.
Contractor shall review all specifications and drawings, and shall identify any issues to the contracting officer before solicitation deadline. Contractor shall perform work as specified and shall adhere to standard practices for the industry.
The Prime Contractor shall designate a minimum of one Site Safety and Health Officer (SSHO) to administer the contractor’s safety program and government-accepted Accident Prevention Plan. Each subcontractor shall designate a minimum of one Competent Person (CP) in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs. Also, The SSHO or an equally-qualified designated representative/alternative will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor. CPs will maintain presence during their construction activities in accordance with above mentioned clause. A listing of the designated SSHO and all known CPs shall be submitted prior to the start of work as part of the APP with the training documentation and/or AHA.
In order to comply with above, please do NOT bid for same SSHO that would or would potentially cover multiple projects on the campus.
B. The scope of work includes, but is not limited to, performing construction including but not limited to architectural, electrical, mechanical, plumbing, site investigation, and testing/special inspection services.
The contractor shall review all drawings, with the assigned VA COR (Contracting Officer’s Representative), to verify the project area/s and what the project entails. The contractor shall be required to lead meetings to discuss progress and problems with the VA staff. The contractor shall be required to take meeting minutes and distribute to the VA for approval and as documentation of what was covered within the meeting.
The contractor shall show a detailed containment plan for infection control and hazmat control. This plan shall be detailed showing locations and what infection and hazmat control requirements are to be used for each area. Safety and infection control requirements shall be enforced for the duration of the project, regardless of any disruptions, to protect patients, visitors, VA staff, and contractors/subcontractors. The contractor shall be responsible for the site during construction and shall ensure all contractor employees and subcontractors adhere to all safety and infection control requirements at all times.
Total Period of Performance: 365 Days
VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE
VA INFORMATION CUSTODIAL LANGUAGE:
a. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.
BADGING:
a. All employees of general contractor and subcontractors shall comply with VA security management program and obtain temporary VA badges. This will require fingerprinting and background checks of each individual. The employees of the general contractor will obtain permission of the VA Human Resources, be identified by project and employer, and restricted from unauthorized access.
TRAINING:
a. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete VA Privacy and Information Security Awareness and Rules of Behavior Training.
***************End of Construction Services SOW****************