2016-09-07 S04 -Site Visit Meeting Doc.pdf

PDF 132 KB Posted

Attached to
Z2DA--Legionella - Mixing Valves, Schematics, Controls Federal contract opportunity
Solicitation number
36C25921R0015
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This pre-solicitation notice and related documents outline requirements for a federal construction contract to complete plumbing upgrades at the Salt Lake City VA Medical Center. The project scope involves replacing mixing valves, updating schematics and controls to address Legionella bacteria concerns across several hospital buildings. The pre-bid meeting agenda reviews the project manager's contact details, submission instructions, question deadlines of March 8th and proposal due date of March 19th. The estimated value is between $2-5 million. Davis Bacon wage compliance is required. The opportunity is 100% set aside for service-disabled Veteran-owned small businesses, which must be verified and listed in the Vendor Information Pages database to be considered eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Legionella - Mixing Valves, Schematics, Controls, newest first.
File Type Posted
36C25921R0015 0007.pdf PDF
36C25921R0015 0006.pdf PDF
36C25921R0015 0005.pdf PDF
S02 2016-10-20 Instructions to Offerors - PPT.pdf PDF
Past Performance Questionnaire.docx DOCX document
NESHAP VA Limited ACM Building 3 SLC UT 01-04-21.pdf PDF
660-15-111 Equipment Cut Sheets.pdf PDF
36C25921R0015 0004.pdf PDF
UPDATED 660-15-111 Construction SOW.pdf PDF
Specs-Final Combined set Legionella.pdf PDF
NESHAP VA Limited ACM Bldg 1 SLC UT 01-04-20.pdf PDF
Legionella questions.pdf PDF
36C25921R0015 0003.pdf PDF
36C25921R0015 0002.pdf PDF
Site Walk 1- attendance.pdf PDF
Site Walk 2- attendance.pdf PDF
36C25921R0015 0001.pdf PDF
C27 660-15-111 100 percent Drawings.pdf PDF
36C25921R0015_1.pdf PDF
C27 Specs-Final Combined set.pdf PDF
36C25921R0015.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting

FOR

Project 660-15-111 Legionella- Mixing Valves, Schematics, Controls

The contractor is to provide all labor, tools, materials, equipment and supervision required to complete the construction of the Station Level Project 660-15-111 entitled Legionella- Mixing Valves, Schematics, Controls. The project is an upgrade to the plumbing system located within Building 1 2nd Floor 56,300 square feet, Building 1 3rd Floor 47,350 square feet, Building 3 1st Floor 23,650 square feet (excludes 8,650 SF Psych Rehab Bed), Building 3 2nd Floor 12,465 square feet (excludes vacant, common, & engineering spaces), Fisher House 14,631 square feet, Building 42, and Building 43. The project site includes areas within the main hospital building on campus, which will remain active during construction.

As such, thorough attention to keeping a secure site and keeping all items that could pose a self-harm risk or be used to hurt others must be kept in locked construction site at all times. Infection control requirements shall be adhered to at all times.

Time: 3/1/2021, 2:00 PM MST

Location: Salt Lake City VAMC, 500 Foothill Drive, Salt Lake City, UT 84148.

AGENDA:

Introduction of Project Manager/COR

Discussing renovation of AMU Renovation The pre-bid meeting/site walk is not mandatory Review Instructions to offerors for information on preparing and submitting proposal.

QUESTIONS During site visit MUST BE WRITTEN DOWN Address where to send RFP:

o Electronic submissions to Robyn.young2@va.gov Pertinent Dates:

o Questions due by 3/8/2021, any questions submitted after this time will not be reviewed or answered. Submit to Robyn.young2@va.gov o We’ll get the answers back to you timely o Proposals due on 3/19/2021 at 2:00 PM MST via email

Confirmation of construction range is between $2,000,000 and $5,000,000.00.

Bid Guarantee & Payment/Performance Bonds: Bid Guarantee & Payment/Performance Bonds:

IAW FAR 52.228-15, offerors are reminded that any award amount exceeding $150,000 shall require both Payment and Performance Bonds. Performance and Payment bonds are due no later than 10 calendar days after award. Original bid guarantee due at time of solicitation closing.

Address to send original bid bonds is in instructions to offerors. If original bid guarantee is not received by the solicitation closing date and time, proposal will be late and will not be considered.

Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 365 days.

Post Award Compliance:

mailto:Robyn.young2@va.gov mailto:Robyn.young2@va.gov o Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.