36C25919R0090-003.pdf

PDF 17 MB Posted

Attached to
Replace Air Handling Units Federal contract opportunity
Solicitation number
36C25919R0090
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25919R0090 18-235-Combined-DWGs.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Air Handling Units, newest first.
File Type Posted
36C25919R0090-0007000.docx DOCX document
36C25919R0090-0006000.docx DOCX document
36C25919R0090-0005000.docx DOCX document
36C25919R0090-0004001.pdf PDF
36C25919R0090-0004002.pdf PDF
36C25919R0090-0004000.docx DOCX document
36C25919R0090-0004003.pdf PDF
36C25919R0090-0003000.docx DOCX document
36C25919R0090-0002003.pdf PDF
36C25919R0090-0002001.pdf PDF
36C25919R0090-0002002.pdf PDF
36C25919R0090-0002000.docx DOCX document
36C25919R0090-0001000.docx DOCX document
36C25919R0090-0001002.pdf PDF
36C25919R0090-0001001.pdf PDF
36C25919R0090-001.docx DOCX document
36C25919R0090-007.pdf PDF
36C25919R0090-002.pdf PDF
36C25919R0090-005.docx DOCX document
36C25919R0090-006.pdf PDF
36C25919R0090-004.docx DOCX document
36C25919R0090-000.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upgrade Hazardous Drug Workspace

VA Western Colorado Health Care System 2121 North Avenue

Grand Junction, CO 81501

100% Bid Documents

VA PROJECT NO. 575-18-110

Covered Egress

B

A

P:A

P:A

P:B

P:B

G O

V E

R N

M E

N T

V

E H

I C

L

P

A R

K I N

G

P:B

VAMC GRAND JUNCTION, CO

NORTH AVENUE

R

D

S

T R

E E

T

VAMC GRAND JUNCTION, CO

H

G

F

E

D

AREA OF WORK

CONTRACTOR ROUTE

LEGEND

Covered Egress

P

M

1DM HM

G-001

Scale: Not To Scale

VICINITY MAP

Scale: Not To Scale

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

GRAND JUNCTION VA MEDICAL CENTER

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

CAMPUS MAP

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN - ACCESS PATH

MATERIAL

LAY-DOWN

AREA

CONSTRUCTION

ACCESS

DocuSign Envelope ID: 76B90236-EAB3-4993-9340-AF4987CA253A

3/29/2019

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

CLEAR

1'-3" 1'-3" 2'

-5 " M

IN

2' -1

0" M

A X

4' -0

" M A

X

6' -8

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

4'-0"

1'-6"

MISC. WALL DEVICES

MOUNTING HEIGHTS

CLEARANCE AT LAVATORY

WALL SECTION

SYMBOL INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

PLAN

TRUE

GENERAL SYMBOL LEGEND

TITLE SHEET

GENERAL INFORMATION

INFECTION CONTROL RISK ASSESSMENT DETAILS (ICRA)

PRE CONSTRUCTION RISK ASSESSMENT (PCRA)

FIRST FLOOR DEMOLITION PLANS

FIRST FLOOR PLANS AND EQUIPMENT LIST

INTERIOR ELEVATIONS, PARTITION TYPES, AND DETAILS

SCHEDULES, DIAGRAMS, DOOR AND WINDOW DETAILS

PLUMBING LEGEND, ABBREVIATIONS, GENERAL NOTES, AND SCHEDULES

FIRST FLOOR PLUMBING DEMOLITION PLAN

FIRST FLOOR PLUMBING PLAN

G-001 G-100 G-101 G-102

AD101

A-101 A-201 A-601

P-001

PD101

P-101

MECHANICAL LEGEND, ABBREVIATIONS, GENERAL NOTES, AND SCHEDULES

MECHANICAL DEMOLITION PLANS

MECHANICAL PLAN

FIRST FLOOR MECHANICAL PIPING PLAN

MECHANICAL SCHEDULES AND DETAILS

HVAC CONTROLS

MECHANICAL SCHEDULES AND DETAILS

M-001

MD101

M-101

MP101

M-301 M-501 M-601

GENERAL

ARCHITECTURAL

PLUMBING

MECHANICAL

ELECTRICAL SYMBOLS, GENERAL NOTES AND ABBREVIATIONS

FIRST FLOOR ELECTRICAL DEMOLITION PLAN

ELECTRICAL ROOF PLAN

FIRST FLOOR POWER PLAN

FIRST FLOOR MECHANICAL POWER PLAN

MECHANICAL ROOF PLAN

FIRST FLOOR LIGHTING PLAN

PANEL SCHEDULES AND ONE-LINE DIAGRAM

E-001

ED101

ED102

EP101

EM101

EM102

EL101

E-601

ELECTRICAL

SHEET NAMESHEET # DWG

OF

DWG

SHEET INDEX

TECHNOLOGY SYMBOLS, GENERAL NOTES AND ABBREVIATIONS

FIRST FLOOR TECHNOLOGY PLAN

TK001

TK101

TECHNOLOGY

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

IDPH ILLINOIS DEPARTMENT OF

PUBLIC HEALTH

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

ABBREVIATIONS

3/

/2

:3 5:

A

M

2DM HM

G-100

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

GRAND JUNCTION VA MEDICAL CENTER

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

G-101

CORRIDOR

02 03

ROOM

A P

P R

O X

" A .F

.F

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS VISIBLE

TO PUBLIC

G-101

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING

BRAKES

MOBILE CART

A D

JU

S

TA

B

LE

H

E

IG

H T

HEPA

NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING

CEILINGFLEX DUCT

A

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S , F

IE

LD

V E

R

IF

Y

W A

LL

H

E

IG

H T

V A

R

IE

S F

IE

LD

V E

R

IF

Y

4 7/8"

B

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S , F

IE

LD

V E

R

IF

Y

EXISTING CEILING SYSTEM

UNDERSIDE OF EXISTING

DECK

DE-MOUNTABLE CONTAINMENT

BARRIER SYSTEM

SMOKE-TIGHT BARRIER

INFECTION CONTROL RISK ASSESSMENT MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

III/IVLOW Risk Group

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

II

MEDIUM Risk Group HIGH Risk Group HIGHEST Risk Group IV

IV

IV

III/IV

III/IV

III

III/IV

II

II

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete cabling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet

- painting (but not sanding)

- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction Project Activity (Type A-D)

Group 2 Medium Risk

Group 1 Low Risk

- Cardiology

- Echocardiography

- Endoscopy

- Nuclear Medicine

- Physical Therapy

- Radiology / MRI

- Respitory Therapy

- Office areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- CCU

- Emergency Room

- Labor & Delivery

- Laboratories (soecimen)

- Newborn Nursery

- Outpatient Surgery

- Pediatrics

- Pharmacy

- Post Anesthesia Care Unit

- Surgical Units

IIII

TYPE DTYPE CTYPE B

Class IVor Control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove or isolation of HVAC system in areas where work was being performed.

1.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.

4 Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covers.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

- Any area caring for immunocompromised patients

- Burn Unit

- Cardiac Cath Lab

- Central Sterile Supply

- Intensive Care Units

- Medical Unit

- Negative pressure isolation rooms

- Oncology

- Operation rooms including C-section rooms

1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

4. Wet mop area with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.

4. Seal holes, pipes, conduits, and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.

INFECTION CONTROL RISK

ASSESSMENT, ILSM, FIRE WATCH

AND MISC. FORMS

PAPER

CADDY

3/

/2

:3 4:

A

M

3DM HM

G-101

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

01 PROVIDE A MINIUM 6'-0" X 4'-0" WALK OFF MAT

INSIDE OF THE WORK AREA. CHANGE WHEN

NECESSARY TO MAINTAIN CLEANLINESS.

02 PROVIDE STICKY MATS, CHANGED AT END OF SHIFT

OR MORE IN NECESSARY TO MAINTAIN

CLEANLINESS.

03 POST INFECTION CONTROL. I.L.S.M. FIRE INSPECTION

TAGS VISIBLE TO THE PUBLIC. REFER TO SHEET G-101

DETAIL 4 FOR DETAILS.

04 SUSPENDED PLASTIC ZIPPER WALL CURTAIN

BARRIER.

05 FIRE EXTINGUISHER ON PORTABLE FLOOR

BRACKET.

06 HEPA FILTRATION IS REQUIRED WHERE THE

EXHAUST DUST MAY RE-ENTER THE BREATHING

ZONE. CONTRACTOR SHALL VERIFY THAT

CONSTRUCTION EXHAUST FILTERS ARE CLEAN AND

PREVENTING DUST FROM EXITING THE

CONTAINMENT AREA.

A.

B.

C.

D.

E.

TAPE ALL SERVICES TO PROTECT AGAINST

CONTAMINATION.

DO NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR AND

THE MEDICAL CENTER.

USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER

AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.

ANY CEILING ACCESS PANELS OPENED FOR

INVESTIGATION BEYOND SEALED AREAS SHALL BE

SEALED IMMEDIATELY WHEN UNATTENDED.

AT COMPLETION, REMOVE CONSTRUCTION BARRIERS

AND CEILING PROTECTION CAREFULLY, OUTSIDE OF

NORMAL WORK HOURS. VACUUM AND CLEAN ALL

SURFACES FREE OF DUST AFTER THE REMOVAL.

THE MEDICAL CENTER HAS PERFORMED A

COMPREHENSIVE ASBESTOS SURVEY AND HAS

IDENTIFIED ACCESSIBLE ACM. SOME AREAS

CONTAIN DAMAGED ASBESTOS AND SHOULD NOT BE

ACCESSED WITHOUT PRIOR ABATEMENT.

Scale: 1/8" = 1'-0"

TYPICAL INFECTION CONTROL LAYOUT AT

MECHANICAL AND ELECTRICAL ROOMS

Scale: NO SCALE

INTERIOR ELEVATION

Scale: 3/4" = 1'-0"

INFECTION CONTROL PARTITION WALL TYPES

Scale: 1/4" = 1'-0"

MOBILE CONTAINMENT CART

Scale: 3" = 1'-0"

INFECTION CONTROL SIGNAGE

F. WALL TYPE 'B' SHALL PROVIDE SMOKE-TIGHT

SEPARATIONS BETWEEN CONSTRUCTION AREAS

AND ADJOINING AREAS. CONSTRUCT PARTITIONS

OF GYPSUM BOARD OR TREATED PLYWOOD (FLAME

SPREAD RATING OF 25 OR LESS IN ACCORDANCE

WITH ASTM E84) ON BOTH SIDES OF FIRE

RETARDANT TREATED WOOD OR METAL STEEL

STUDS. EXTEND THE PARTITIONS THROUGH

SUSPENDED CEILINGS TO FLOOR SLAB DECK OR

ROOF. SEAL JOINTS AND PENETRATIONS. AT DOOR

OPENINGS, INSTALL CLASS C, ¾ HOUR FIRE/SMOKE

RATED DOORS WITH SELF-CLOSING DEVICES.

G. ALL CLASS LEVEL STEPS (CLASS I, CLASS II, CLASS III, AND

CLASS IV) MUST BE FOLLOWED ON THIS PROJECT.

H

AD101

AREA OF WORK

CONTRACTOR ROUTE

ICRA BARRIERS

LEGEND

4' MIN.

ACCESS TO

CONTRACTOR

LAY-DOWN AREA.

CONFIRM

CONTRACTOR

LAY-DOWN AREA

WITH COR.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

3/

/2

:3 6:

A

M

4DM HM

G-102

1 FIRST FLOOR - INFECTION CONTROL PLAN

SCALE: 1/8" = 1'-0"

0 2 4 8

NORTH

PLAN

PROVIDE TEMPORARY INFECTION CONTROL

PARTITION BARRIER TYPE 'B'. REFER TO

SHEET G-101 FOR DETAILS.

PROVIDE TEMPORARY DE-MOUNTABLE

CONTAINMENT PARTITION BARRIER 'A'. REFER

TO SHEET G-101 FOR DETAILS. BARRIER FOR

DEBRIS REMOVAL SHALL ONLY BE IN PLACE

FOR SHORT DURATIONS. CONFIRM TIME WITH

PHARMACY STAFF AND COR.

CONTRACTOR ROUTE AND ACCESS PATH.

AREA OF WORK

PROVIDE STICKY MATS, CHANGED AT END OF

SHIFT OR MORE IN NECESSARY TO MAINTAIN

CLEANLINESS.

CONTRACTOR PERSONNEL WILL HAVE TO

BADGE IN THE FRONT DOOR OF THE

PHARMACY. MATERIALS CAN MOVE IN AT THE

NOTE 05 LOCATION WITH PHARMACY ESCORT

ONLY.

HAC

EXISTING

TOILET

STERILE

PREP AREA

1010B

CHEMO

PREP AREA

1010A

HAC

EXISTING

TOILET

STERILE

PREP AREA

1010B

CHEMO

PREP AREA

1010A

HAC

EXISTING

TOILET

1'-1112"

1'-1112"

JSN:

M2022 F0535 A1015 A5077 F3200 U0038 A5145 F0535 A5075 P1965 U3500 M1801 F0280 R6200 P3000

NAME:

Shelving, Storage, Wire, CRS, w/Adjustable Shelves Compound Aseptic Containment Isolator (C.A.C.I) Telephone, Desk, Multiple Line Dispenser, Hand Sanitizer, Hands-Free Clock, Battery, 12" Diameter Personal Protective Equipment Dispenser Hook, Garment, Double, SS, Surface Mounted Cart, Utility Dispenser, Soap, Disposable Eyewash, Eye/Face, Sink Mounted, Hands-free Compounding Aseptic Containment Isolator (C.A.I) Computer, Microprocessing, w/Flat Panel Monitor Chair, Swivel, Low Back Refrigerator, U/C or F/S, 5 Cu Ft Lavatory, Vitreous China, Straight Back

EXISTING EQUIPMENT LIST

C C - CONTRACTOR FURNISHED AND INSTALLED

V C - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED

V V - GOVERNMENT FURNISHED AND INSTALLED

REMARKS:

QUANTITY:

2 FIRST FLOOR - CEILING DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

1 FIRST FLOOR DEMOLITION AND EQUIPMENT DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

HMDM 1

AD101

REMOVE DOOR AND FRAME. TYPICAL UNLESS NOTED

OTHERWISE.

REMOVE CASEWORK AND OTHER FIXTURES.

REMOVE CEILINGS AND CEILING MOUNTED FIXTURES. REFER

TO ELECTRICAL PLANS FOR DETAILS.

REMOVE PORTION OF WALL TO ALLOW FOR NEW PASS-THRU.

SEE DETAIL 8 SHEET A-201 FOR VERTICAL DIMENSIONS.

REMOVE LAVATORY. REFER TO PLUMBING PLAN FOR

REMOVAL OF ASSOCIATED PIPING.

EQUIPMENT AND FURNITURE, SALVAGE AND STORE TO BE

REUSED AFTER CONSTRUCTION IS COMPLETE. COORDINATE

STORAGE LOCATION WITH COR. NEW LOCATION FOR

EQUIPMENT AND FURNITURE SHOWN ON SHEET A-101 FIRST

FLOOR EQUIPMENT PLAN.

REMOVE PORTION OF WALL AND WINDOW.

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

A. FIELD VERIFY ALL DIMENSIONS.

B. REFER TO SHEET A-601 FOR DOOR AND FRAME TYPES, F1, F2 AND

F3.

C. REFER TO SHEET G-101 FOR INFECTION CONTROL BARRIER

LOCATIONS AND DETAILS.

D. AT EXISTING HANDWASH SINK TO BE REMOVED, SALVAGE SINK,

MIRROR, PAPER TOWEL DISPENSER AND SOAP DISPENSER.

DELIVER TO VA.

DocuSign Envelope ID: F83F8A6A-17D3-4C36-90CE-5BBBC6557111

3/28/2019

EXISTING

TOILET

A-201

A-201

A2013 4

A201 5

'-4

V.

I.F

9'-4" V.I.F.

1'-10" V.I.F.

10'-8 1/2" V.I.F.

6'- 7"

V.

I.F

3'-

2" 3'-

3"

3'-7 1/2"

4'- 8"

8'-11 1/2" V.I.F.

ANTE

ROOM

STERILE

PREP AREA

1010B

CHEMO

PREP AREA

1010A

A201

1'- 111 2"

1'- 111 2"

F1

A201

F2

F3

CORRIDOR

PHARMACY

A-601

A-201

A-601

A-201

A-201

HAC

EXISTING

TOILET

ANTE

ROOM

1010B

1010A

STERILE

PREP AREA

CHEMO

PREP AREA

A-201

F2245

HAC

EXISTING

TOILET

M2022

U0038

EXISTING SHELVES TO REMAIN

A5145

A5075

A5077 F3200

P3000 P1965

F2010

R6200

F2010M2022F0535M2022

U3501

F0535

M3073

R6200

COMPOUNDING ASEPTIC

CONTAINMENT ISOLATOR

(C.A.C.I)

HEPA FILTERED CABINET,

DUCTED EXHAUST

COMPOUNDING

ASEPTIC

ISOLATOR

(C.A.I.)

PASS THRU - WALL

MOUNTED HEPA

FILTER,

INTERLOCKING

DOORS, STAINLESS

STEEL U1200

ANTE

ROOM

STERILE

PREP AREA

1010B

CHEMO

PREP AREA

1010A UNDER

CABINET

UNDER CABINET

A1085

F0280

F0535 A1011

JSN:

M2022 F2010 F0535 A1015 A5077 P3000 F2245 F3200 U0038 A5145 F0535 A5075 P1965 U3500 U1200 M3073 U3501 M1801 M1840 F0280 R6200 A1085

NAME:

Shelving, Storage, Wire, CRS, w/Adjustable Shelves Basket, Wastepaper, Step-On Compound Aseptic Containment Isolator (C.A.C.I) Telephone, Desk, Multiple Line Dispenser, Hand Sanitizer, Hands-Free Lavatory, Stainless Steel, Straight Back Camera, Video Surveillance, HD, IP Powered Clock, Battery, 12" Diameter Personal Protective Equipment Dispenser Hook, Garment, Double, SS, Surface Mounted Cart, Utility Dispenser, Soap, Disposable Eyewash, Eye/Face, Sink Mounted, Hands-free Compounding Aseptic Containment Isolator (C.A.I) Pass-Thru, Vented, Interlocking doors, Stainless Steel Container, Biohazard Waste, Step-on, Fire Safe Sharps Container 20G Computer, Microprocessing, w/Flat Panel Monitor Printer/Copier/Fax Combination Chair, Swivel, Low Back Refrigerator, U/C or F/S, 5 Cu Ft Mirror, SS, with SS Frame

TYPE COMMENTS:

V V V V V V V V V V C C V V V V V V C C V V V V C C V V C C V V V V V V V V V V V V V V

EQUIPMENT LIST

C C - CONTRACTOR FURNISHED AND INSTALLED

V C - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED

V V - GOVERNMENT FURNISHED AND INSTALLED

REMARKS:QUANTITY:

Refer to Plan 2/A101 for Details Refer to Plumbing Plan for Details

HAC

EXISTING

TOILET

S-1, SOLID SURFACE

COUNTERTOP

S-1, SOLID

SURFACE

COUNTERTOP

ANTE

ROOM

STERILE

PREP AREA

1010B

CHEMO

PREP AREA

1010A

CORRIDOR

PHARMACY

RF-1, RF 4" INTEGRAL BASE, TYPICAL

RF-1, RF 4" INTEGRAL

BASE, TYPICAL

RF-1, RF 4" INTEGRAL

BASE, TYPICAL RB-1, MATCH NEW BASE

TO EXISTING AT

CORRIDOR

ROOM #

1010A 1010B

FLOOR

RF

RF

RF

EXISTING, CPT

BASE

RF, HEIGHT 4"

RF, HEIGHT 4"

RF, HEIGHT 4"

EXISTING, RB

ROOM FINISH SCHEDULE

CEILINGWALL

GWB / SC

GWB / SC

GWB / SC

MATCH EXISTING

FINISH

GWB / SC

GWB / SC

GWB / SC

ACT

HEIGHT

8' - 0" 8' - 0" 8' - 0" 8' - 0"

REMARKS:

ROOM NAME

ANTE ROOM

CHEMO PREP AREA

STERILE PREP AREA

PHARMACY

SC HIGH BUILD GLAZED COATING (SPECIAL COATING)

GWB GYPSUM WALLBOARD SYSTEMS

RF WELDED RESILEINT SHEET FLOORING

ACT ACOUSTICAL CEILING TILE

RB RESILIENT BASE (RUBBER OR VINYL WITH FACTORY FORMED INSIDE AND OUTSIDE CORNERS)

CPT CARPET TILE

S SOLID SURFACE

SS STAINLESS STEEL

ITEMS:

SC-1

GWB-1

RF-1

ACT-1

RB-1

CPT-1

S-1

SS-1

MATERIAL SELECTION:

EXPOXY PAINT

GYPSUM WALLBOARD

WELDED RUBBER FLOOR

ACOUSTICAL CEILING TILE

RESILIENT BASE

CARPET TILE

SOLID SURFACE

STAINLESS STEEL

COLOR AND FINISH SCHEDULE

COLOR SELECTION:

WHITE

FACTORY FINISH

MATCH EXISTING

WHITE

MATCH EXISTING

MATCH EXISTING

COCONUT OIL/ SIMILAR TO EXT.

BRUSHED

1 FIRST FLOOR PLAN

SCALE: 1/4" = 1'-0"

2 FIRST FLOOR - REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

3 FIRST FLOOR EQUIPMENT PLAN

SCALE: 1/4" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

HMDM 2

A-101

PROVIDE AUTOMATIC MOTION/PRESENCE SENSOR SLIDING

DOOR WITH SIDELITES AND VERTICAL NON SHEDDING

WEATHERSTRIP IN A NEW PARTITION WHERE INDICATED .

COORDINATE WITH DOOR MANUFACTURER'S

REQUIREMENTS.

PROVIDE INFILL PARTITION MATCHING EXISTING TO MAKE

THE DOOR OPENING MATCH THE NEW DOOR

REQUIREMENTS. COORDINATE WITH DOOR

MANUFACTURER'S REQUIREMENTS.

PROVIDE SURFACE MOUNTED SLIDING DOOR ON EXISTING

WALL AND INFILL PARTITION. DOOR TO BE SENSOR

ACTIVATED.

PROVIDE NEW GYPSUM BOARD CEILING ON SUSPENDED

METAL FRAMING.

INTERLOCK ALL NEW DOORS SO ONLY ONE CAN OPEN AT A

TIME. DOORS TO BE SENSOR ACTIVATED.

NEW SINK - SEE PLUMBING

A. FIELD VERIFY ALL DIMENSIONS.

B. REFER TO SHEET A-601 FOR DOOR AND FRAME TYPES, F1, F2 AND

F3.

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

0 2 4 8

NORTH

PLAN

4 FIRST FLOOR FINISH PLAN

SCALE: 1/4" = 1'-0"

0 2 4 8

NORTH

PLAN

A-201

P3000

R6200

PASS THRU

WALL MOUNT

HEPA FILTER

F2022

F0280

M3073

U3501

A-601

F2022

A5145

A5075

F2010

P1965 P3000

F2022A5077F3200

HEPA FILTERED CABINET

EXHAUST TO EXTERIOR

F0280

A-601

A-601

F2010

A-201

OPP.

F0535

INTEGRAL COVE BASE,

TYP.

PASS THRU WALL

MOUNT HEPA FILTER

F2010

A-601

A-601

F1

SOLID SURFACE

COUNTERTOP

F0280

R6200

F3F2

REFER TO SHEET A-601

DETAIL 10 FOR MORE

INFORMATION ON

COUNTERTOP

HAND WAVE DOOR OPERATORS,

REFER TO ELECTRICAL SHEETS

FOR DETAILS

FINISH FLOOR

INTEGRAL COVE BASE

5/8" GYPSUM BOARD,

BOTH SIDES

5/8" GYPSUM BOARD,

CEILING

SOUND ATTENUATION

INSULATION

5/8" GYPSUM

BOARD, CEILING

8" SLIP TRACK STUD

TRACK ANCHORED TO

BOTTOM OF ROOF DECK.

CHEMO PREP AREA STERILE PREP

AREA

A-201

NOTE: MATCH EXISTING

WALL THICKNESS. FIELD

VERIFY.

EXISTING WINDOW / WALL,

VERIFY DIMENSIONS IN

FIELD

5/8" GYPSUM BD.

3 5/8" GALVANIZED

LIGHT GAUGE

METAL STUDS

AUTOMATIC MOTION SENSOR DOOR,

COMPLY WITH MANUFACTURER'S

WRITTEN INSTRUCTIONS FOR INSTALLING

DOORS AND FRAMES. REFER TO SHEET

A-601 FOR DETAILS.

AUTOMATIC MOTION SENSOR DOOR,

COMPLY WITH MANUFACTURER'S

WRITTEN INSTRUCTIONS FOR INSTALLING

DOORS AND FRAMES. REFER TO SHEET

A-601 FOR DETAILS.

4"X4"X0.1875" STRUCTURAL STEEL TUBE

CHEMO PREP AREA

1010A

STERILE PREP AREA

1010BALIGN NEW WALL WITH

EXISTING WALL

EXTRUDED ALUMINUM CHANNEL TO

MATCH ALUMINUM FRAMING OF SLIDING

DOORS BY MANUFACTURE. MOUNTING

FOR DOOR OPERATING CONTROLS.

4"

3"

3' 7 1/2"

DOOR OPENING

5/8" GYPSUM BD.

7 1/2" GALVANIZED

LIGHT GAUGE

METAL STUDS

AUTOMATIC MOTION SENSOR DOOR,

COMPLY WITH MANUFACTURER'S

WRITTEN INSTRUCTIONS FOR

INSTALLING DOORS AND FRAMES.

REFER TO SHEET A-601 FOR

DETAILS.

EXISTING WALL

CORRIDOR

ANTE ROOM

10"

ALIGN NEW PARTITION WITH

EXISTING PARTITION, VERIFY

EXISTING PARTITION DIMENSIONS IN

FIELD.

6"

2'-6"

4"

4'-8"

PASS THRU

WALL MOUNT

HEPA

FILTERED,

DUCTED

EXHAUST

SOLID SURFACE

COUNTERTOP

F1REFER TO SHEET A-201

DETAIL 8 FOR MORE

INFORMATION ON

COUNTERTOP

PASS THRU

HAND WAVE DOOR OPERATOR,

REFER TO ELECTRICAL SHEETS

FOR DETAILS

FINISH FLOOR

7-1/2" GALVANIZED LIGHT

GAUGE METAL STUDS @ 16"

O.C. W/ CONTINUOUS

STIFFENER CHANNELCOVE BASE

5/8" GYPSUM BOARD,

BOTH SIDES

EXISTING ACOUSTICAL

CEILING TILE

5/8" GYPSUM BOARD,

CEILING

ANTE ROOM CORRIDOR

8" SLIP TRACK STUD

TRACK ANCHORED TO

BOTTOM OF

STRUCTURAL DECK.

SOUND ATTENUATION

INSULATION

BOTTOM OF STRUCTURE

ABOVE

NOTE: MATCH EXISTING

WALL THICKNESS. FIELD

VERIFY.

NEW PASS-THRU

WINDOW

EXISTING WALL

SOLD SURFACE

COUNTERTOP

PER MANUFACTURER

2'-6"

PHARMACY STERILE

PREP AREA

18"

MIN.

INTEGRAL COVE BASE INTEGRAL COVE BASE

NEW STAINLESS STEEL

SHELF AND MOUNTING

BRACKETS

4"

2'-6"

6"

EXISTING STRUCTURE ABOVE

SEALANT, BOTH SIDES

SLIP TRACK WITH ELONGATED LEGS AND SLOTTED

HOLES

GYPSUM BOARD

BATT INSULATION

PARTITION AS SCHEDULED

WELDED VINYL BASE WITH

SLOPED TOP CAP. BOTH SIDES.

FINISH FLOOR

A-201

HMDM 3

3/

/2

:3 8:

A

M

3 INTERIOR ELEVATION

SCALE: 1/4" = 1'-0"

6 INTERIOR ELEVATION

SCALE: 1/4" = 1'-0" 4 INTERIOR ELEVATION

SCALE: 1/4" = 1'-0"

1 INTERIOR ELEVATION

SCALE: 1/4" = 1'-0"

7 DETAIL- NEW PARTITION/JAMB

SCALE: 1-1/2" = 1'-0"

11 DETAIL - JAMB

SCALE: 1-1/2" = 1'-0"

10 WALL SECTION

SCALE: 1" = 1'-0"

2 INTERIOR ELEVATION

SCALE: 1/4" = 1'-0"

9 WALL SECTION

SCALE: 1" = 1'-0" 8 WALL SECTION

SCALE: 1" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

A. FIELD VERIFY ALL DIMENSIONS

B. REFER TO SHEET A-101 FOR EQUIPMENT LIST

5 INTERIOR ELEVATION

SCALE: 1/4" = 1'-0"

12 DEFLECTION TRACK DETAIL

SCALE: 3" = 1'-0"13 WELDED BASE DETAIL

SCALE: 3" = 1'-0"

DOOR SCHEDULE

DOOR

NO.

DOOR

ROOM NO. WIDTH HEIGHT THICK MAT'L FINISH TYPE

DOOR FRAME

MAT'L

DOOR FRAME

TYPEFINISH

HEAD

DETAIL NO.

JAMB

DETAIL

NO.

THRESHOLD

DETAIL NO. LBL HDWR

SET

REMARKS

1010A

1010B

3'-0"

3'-0"

3'-0"

7'-0"

7'-0 1/2"

7'-0 1/2"

0'-4 1/2"

0'-4 1/2"

0'-4 1/2"

MTL./GLASS

MTL./GLASS

MTL./GLASS

FACTORY FIN.

FACTORY FIN.

FACTORY FIN.

SLIDING

SLIDING

SLIDING

MTL.

MTL.

MTL.

FACTORY FIN.

FACTORY FIN.

FACTORY FIN.

F-1

F-3

F-2

HAND WAVE SENSOR ACTIVATED

HAND WAVE SENSOR ACTIVATED

HAND WAVE SENSOR ACTIVATED

NOTE: DOORS 2 AND 3 SHALL BE

INTERLOCKED SO ONLY ONE WILL

OPEN AT A TIME.

2" 81

2"

WALL TYPE AS SCHEDLED, REFER TO

PARTITION TYPE FOE DETAILS

DOOR AS SCHEDULED

EXISTING CEILING

ANTE ROOMCORRIDORPREP ROOMANTE ROOM

CEILING AS

SCHEDULED

CEILING AS

SCHEDULED

CEILING AS

SCHEDULED

BOX HEADER

REFER TO

DETAIL A/A601

BOX HEADER,

REFER TO

DETAIL A/A-601

ANTE ROOM

CORRIDOR

F-1 F-2 F-3

2" ANTE ROOMCORRIDOR

2" PREP ROOMANTE ROOM

A-601

EXISTING PARTITION

EXISTING WINDOW

EXISTING PARTITION

BULL NOSE CORNERS, EXISTING

CEILING AS SCHEDULED

ANTE ROOM

STAINLESS STEEL , ANGLED TRIM STRIP, BOTH SIDES

EXISTING BULL NOSE TRIM

EXISTING PARTITION

EXISTING BORROWED LITE

8" 1

2"

2" 3

4"

2"

SOLID SURFACE COUNTERTOP

STAINLESS STEEL

UNDER COUNTER

MOUNTING BRACKETS

SOLID SURFACE BACKSPLASH

WITH 45 DEGREE CHAMFER

ALONG TOP EDGE

RIDGED POLYCARBONATE

SHEET OVEREXISTING WINDOW

OPENING. SEAL ALL AROUND

WINDOW WITH SILICONE

SEALANT

CONTINUOUS

FRAMING

NOTE: NO

HORIZONTAL EDGES

SOLID

SURFACE

COUNTERTOP

1/2" PLYWOOD SHEATHING

BEVEL EDGE

1X4 WOOD BLOCKING

METAL ANGLE, WITH

HEAVY DUTY UNDER

COUNTER MOUNTING

BRACKETS

NOTE: NO

HORIZONTAL EDGES

A-601

A-601

2'-9"

3'-0"

2"

VERIFY IN FIELD

EXISTING

EXTERIOR

WALL

NOTE: NO HORIZONTAL EDGES

SCREWS AS

REQUIRED

SCREWS AS

REQUIRED

TRACK PIECE, SIZE

AND GAGE AS

REQUIRED. SCREW TO

JAMB AND LINTEL AS

REQUIRED

JAMB, SIZE AND GAGE

AS REQUIRED

SUPPORT CLIP

WITH SCREWS

AS REQUIRED

NOTE: HEADER FRAME

MUST BE 16 GAUGE

MINIMUM.

13 DOOR HEAD DETAIL

SCALE: 3" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

HMDM 4

A-601

A. SEE SHEETS G-100 FOR SYMBOLS AND ABBREVIATIONS.

B. REFER TO PLUMBING DRAWINGS FOR INFORMATION CONCERNING

PLUMBING FIXTURES AND PIPING SYSTEM(S).

C. REFER TO MECHANICAL DRAWINGS FOR INFORMATION

CONCERNING HVAC SYSTEM(S).

D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION CONCERNING

POWER, LIGHTING AND COMMUNICATION SYSTEM(S).

2 DOOR FRAMES 1 DOOR SCHEDULE

5 DOOR JAMB DETAIL

SCALE: 3" = 1'-0"

9 DOOR THRESHOLD DETAIL

SCALE: 3" = 1'-0"

12 DOOR HEAD DETAIL

SCALE: 3" = 1'-0"

6 DOOR JAMB DETAIL

SCALE: 3" = 1'-0"

8 DOOR THRESHOLD DETAIL

SCALE: 3" = 1'-0"

11 WINDOW DETAIL

SCALE: 1-1/2" = 1'-0" 10 WINDOW DETAIL

SCALE: 3" = 1'-0"

4 WINDOW SILL DETAIL

SCALE: 3" = 1'-0" 3 BACKSPLASH AT WINDOW DETAIL

SCALE: 3" = 1'-0"

7 COUNTER EDGE DETAIL

SCALE: 3" = 1'-0"

A BOX HEADER DETAIL

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

APD AIRSIDE PRESSURE DROP

BLDG BUILDING

CFM CUBIC FEET PER MINUTE

CV CONSTANT VOLUME

D DRAIN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ETR EXISTING TO REMAIN

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

FCU FAN COIL UNIT

FPM FEET PER MINUTE

FVAV FAN POWERED VAV BOX

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

HP HORSEPOWER

HWS HEATING HOT WATER SUPPLY

HWR HEATING HOT WATER RETURN

HX HEAT EXCHANGER

IND INDUCTION UNIT

LAT LEAVING AIR TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MC MECHANICAL CONTRACTOR

N/A NOT AVAILABLE

NTS NOT TO SCALE

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

VAV VARIABLE AIR VOLUME

WPD WATERSIDE PRESSURE DROP

FVAV 1-1

KEYED NOTE

EQUIPMENT

TAG

MECHANICAL ABBREVIATIONSDRAWING SYMBOLS

1 WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2 INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3 OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4 PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES

INTENDED.

5 WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR

PERFORMANCE FEATURES ARE REQUIRED.

6 EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE

COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT

SPECIFIED, AS SOLELY DETERMINED BY THE COR.

7 PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

8 INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

9 INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL

EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND

APPLICABLE CODES AND STANDARDS.

10 COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

11 PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO

INSTALLATION.

12 PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

13 PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 26.

14 DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE

EXACT ROUTING OF DUCTWORK AND PIPING IN THE FIELD.

15 FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING

OR EQUIPMENT.

16 NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE

PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS

AS FIT FOR THE PROPER EXECUTION OF THE WORK.

17 SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

18 INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND

ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM

CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

19 PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS

NOTED OTHERWISE.

20 SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

21 INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22 MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM

INSTALLATION. RESOLVE CONFLICTS WITH COR.

23 INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL

TO BUILDING WALLS. DIAGONAL RUNS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

24 INSTALL PIPING FREE OF SAGS AND BENDS.

25 INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

26 PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND

WORK BY THE GOVERNMENT.

a. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND

EXISTING CONDITIONS.

b. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL

PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS

AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING

MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

c. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE

CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.

d. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

e. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK.

MODIFY, MOVE OR RECONFIGURE WORK LACKING COORDINATION AT NO ADDITIONAL COST.

27 PROVIDE TEMPORARY HEATING OR COOLING UNITS TO MAINTAIN SPACES AFFECTED BY THIS CONSTRUCTION BETWEEN 72 AND 75°F

AND HUMIDITY BETWEEN 20-60% RELATIVE HUMIDITY DURING OCCUPIED HOURS.

GENERAL NOTES

CONTROL WIRING

LIMITS OF DEMOLITION

POINT OF CONNECTION TO EXISTING

MECHANICAL LEGEND

FD

SUPPLY DIFFUSER

RETURN DIFFUSER

FIRE DAMPER

DIFFUSER MARK

DIFFUSER CFM

T

THERMOSTAT

VOLUME DAMPER

8"Ø

SDI-275

SUPPLY TOP REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN REGISTER OR TOP

GRILLE (WALL TYPE)

FLEXIBLE DUCTWORK (INSULATED)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

ROUND DUCTWORK

DN

DN

DNUP

UP

UP

8"Ø

RECTANGULAR DUCTWORK

10x10

VAV BOX

EXISTING DUCTWORK

DUCTWORK TO BE DEMOLISHED

FAN POWERED VAV BOX

AIRFLOW DIRECTION

PL105

PL105

A

DRAWING NUMBER

WHERE SHOWN

SECTION LETTER

DRAWING NUMBER

WHERE DRAWN

DETAIL NUMBER

HWS

HWR

PIPING DOWN

PIPING UP

TEE UP

TEE DOWN

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

EXISTING PIPING TO REMAIN

PIPING TO BE DEMOLISHED

GATE VALVE

BALL VALVE

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

P

M

M-001

WRSRCM

MECHANICAL LEGEND,

ABBREVIATIONS, GENERAL NOTES,

AND SCHEDULES

FULLY SPRINKLERED

DocuSign Envelope ID: 4D271319-E35D-4EB1-8EC6-E055841F6311

3/26/2019

1010B

ANTE

ROOM

HAC

EXISTING

TOILET

STERILE

PREP AREA

CHEMO

PREP AREA

1010A

E. AFMS

EXHAUST

FAN 1-EF-11

EXHAUST

FAN 1-EF-10

EXHAUST

FAN 1-EF-9

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

P

M

MD101

WRSRCM

MECHANICAL DEMOLITION PLAN

FULLY SPRINKLERED

NORTH

PLAN

Scale: 1/4" = 1'-0"

FIRST FLOOR MECHANICAL DEMOLITION PLAN

1. MAINTAIN THE PHARMACY AREA OUTSIDE THE

PROJECT WORK BOUNDARY BETWEEN 68°F AND

77°F. PROVIDE TEMPORARY COOLING AND

HEATING IF NEEDED DURING OUTAGES.

Scale: 1/4" = 1'-0"

PARTIAL ROOF MECHANICAL DEMOLITION PLAN

0 4 8 16

NORTH

PLAN

1. REMOVE 8Ø EXHAUST DUCT AND EXISTING AIR

CONTROL VALVE EVAV-1 DOWN TO HOOD

CONNECTION. MAKE EXHAUST DUCT READY FOR

NEW CONNECTION TO HOOD AT NEW LOCATION.

SEE M-101. RETAIN AIR CONTROL VALVE FOR

REINSTALLATION.

2. REMOVE PORTION OF 18x6 DUCT FROM MAIN TO

DUCT DROP IN WALL. DUCT DROP TO REMAIN.

3. REMOVE EXISTING HEPA DIFFUSER IN CEILING

AND SUPPLY DUCT FROM MAIN.

4. REMOVE 16x10 SUPPLY DUCT AS SHOWN

DASHED FROM TERMINAL BOX TO DIFFUSERS.

5. MEASURE PRE-DEMOLITION SUPPLY AIRFLOW

NEAR THIS LOCATION IN 14Ø SUPPLY DUCT.

RECORD RESULT FOR USE IN NEW WORK.

6. REMOVE TERMINAL BOX VAV-189 AND HIGH

PRESSURE DUCT BACK TO MAIN AND CAP.

7. REMOVE EXHAUST FAN, EF-10 COMPLETE, MAKE

READY FOR INSTALLATION OF NEW FAN

CONNECTED TO EXISTING DUCT.

8. REMOVE GALVANIZED EXHAUST DUCT FROM

ROOM GRILLE TO LOCATION IDENTIFIED IN

MECHANICAL ROOM.

9. REMOVE EXISTING EXHAUST FAN IN CEILING AND

ALL ASSOCIATED CONTROLS COMPLETE.

10. REMOVE EXHAUST FAN COMPLETE INCLUDING

ROOF SUPPORTS, CABLE STAYS AND EXHAUST

DUCT DOWN THROUGH ROOF. CAP DUCT IN

CEILING SPACE OF FLOOR BELOW ROOF LEVEL.

SEE ARCHITECTURAL DRAWINGS FOR

ADDRESSING THE ROOF OPENING. CCORDINATE

REMOVAL WITH ALL OTHER TRADES.

0 2' 4' 8'

1010B

ANTE

ROOM

STERILE

PREP AREA

CHEMO

PREP AREA

1010A

H

T H

T

HAC

EXISTING

TOILET

E. AFMS

E. AFMS

EXISTING 6x14

SD1-380

TB-1

TB-3

TB-2

SD1-400

SD1-270

T

H

SIDE ACCESS

HEPA FILTER

HOUSING FF-2

SIDE ACCESS

HEPA FILTER

HOUSING

FF-1. SEE M-301

DETAIL 2.

FF-1 ABOVE

RETURN DUCT

EXISTING

ABANDONED

EXISTING

AHU-3

4"Ø

MAINTAIN 6'-6"

CLEAR

NEW EXHAUST

FAN 1-EF-10

FLEXIBLE

CONNECTION

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

P

M

M-101

PARCM

MECHANICAL PLAN

FULLY SPRINKLERED

Scale: 3/8" = 1'-0"

FIRST FLOOR MECHANICAL PLAN

1. MAINTAIN THE PHARMACY AREA OUTSIDE THE

PROJECT WORK BOUNDARY BETWEEN 68°F AND

77°F. PROVIDE TEMPORARY COOLING AND

HEATING IF NEEDED DURING OUTAGES.

0 1 2 4

NORTH

PLAN

Scale: 1/4" = 1'-0"

PARTIAL ROOF MECHANICAL PLAN

1. CONNECT NEW 18x6 TO EXISTING DUCT DROP.

BALANCE EXISTING WALL GRILLE TO 400 CFM.

EXTEND AND CONNECT 18x6 TO EXISTING 26x14

RETURN DUCT.

2. 10"Ø STAINLESS STEEL EXHAUST DUCT FROM

CHASE AND TRANSITION TO HOOD CONNECTION.

BALANCE HOOD EXHAUST TO 500 CFM WITH

DAMPER IN CHASE.

3. 16x8 STAINLESS STEEL EXHAUST DOWN IN HAC

TO EG1-700 AT 8" A.F.F. IN ANTE ROOM 1010.

SEAL DUCT AIRTIGHT AT WALL PENETRATION TO

ANTEROOM.

4. 8x8 STAINLESS STEEL EXHAUST DUCT DOWN IN

CHASE AND TRANSITION TO A EG2-400 AT 8"

A.F.F. INTO CHEMO PREP AREA 1010A. SEAL

DUCT AIR TIGHT AT WALL PENETRATION TO

CHEMO PREP AREA.

5. INSTALL ROOM TEMPERATURE AND HUMIDITY

SENSOR ON WALL AT 48" ABOVE FINISHED

FLOOR.

6. MOUNT ROOM PRESSURE MONITOR ON WALL AT

48" ABOVE FINISHED FLOOR IN ACCORDANCE

WITH MANUFACTURERS INSTRUCTIONS. EXTEND

ROOM PRESSURE BACNET ANALOG SIGNAL TO

BAS.

7. NEW EXHAUST FAN 1-EF-10 TO REPLACE

EXISTING FAN. PROVIDE TRANSITION FROM

DUCT TO FAN INLET. PROVIDE FLEX

CONNECTION.

8. 18Ø OPENING THROUGH DOUBLE CONCRETE

WALL, COORDINATE PENETRATION WITH CHASE

CONTENTS.

9. ADJUST SUPPLY FAN SPEED TO MAINTAIN SPACE

AIRFLOWS. MEASURE PRE-DEMOLITION PLUS

THE CFM ADDED AS NOTED ON THE DRAWINGS.

SEE MD101 ADJUST SUPPLY FAN TO 75HZ

MAXIMUM. NOTIFY THE COR IF AIRFLOW CANNOT

BE OBTAINED.

10. 4"Ø DUCT FROM EXISTING GENERAL EXHAUST

DUCT TO HAC CABINET OUTLET PROVIDE DUCT

TRANSITIONS AS NEEDED. BALANCE TO 30 CFM.

11. CAP DUCT AND SEAL AIR TIGHT.

12. INSTALL NEW STAINLESS STEEL EXHAUST DUCT

IN LOCATION OF EXISTING.

13. PROVIDE STAINLESS STEEL SUPPLY DUCT

DOWNSTREAM OF HEPA FILTERS.

14. AT ABANDONED ROOF PENETRATIONS, PATCH EXISTING

ROOF PER THE ROOFING MANUFACTURER'S

RECOMMENDATIONS AND INSTRUCTIONS.

0 21 4

NORTH

PLAN

ANTE

ROOM

EXISTING

TOILET

1012STERILE

PREP AREA

CHEMO

PREP AREA

1010A

TB-2

TB-3

TB-1

SHUTOFF

VALVES

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

N

AREA OF

WORK

KEY PLAN

ELECTRICAL

CLOSET

P

M

MP101

WRSRCM

FIRST FLOOR MECHANICAL PIPING

PLAN

FULLY SPRINKLERED

Scale: 3/8" = 1'-0"

FIRST FLOOR MECHNICAL PLUMBING PLAN

1. MAINTAIN THE PHARMACY AREA OUTSIDE THE

PROJECT WORK BOUNDARY BETWEEN 68°F AND

77°F. PROVIDE TEMPORARY COOLING AND

HEATING IF NEEDED DURING OUTAGES.

1. CONNECT 3/4" HHWS AND 3/4" HHWR TO

EXISTING 3/4" PIPING.

2. CONNECT 3/4" HHWS AND 3/4" HHWR TO

TERMINAL BOX.

0 21 4

NORTH

PLAN

EXISTING

RETURN

DUCT

EXISTING SUPPLY

DISCHARGE PLENUM

EXISTING AHU-3

FLOOR

EXISTING RETURN DUCT

12"Ø STAINBLESS STEEL EXHAUST

DUCT FROM PHARMACY

EXISTING 14"Ø SUPPLY DUCT

EXISTING SUPPLY DUCT

CONCRETE DECK

INSTALL NEW 14" Ø STAINLESS STEEL

SUPPLY DUCT IN EXISTING CHASE

16x16 STAINLESS STEEL

E. AHU-3 SUPPLY PLENUM

E. 36"Ø SUPPLY DUCT

E. 8"Ø, EXHAUST

E. RETURN DUCT BEYOND. MAINTAIN 20" CLEAR TO ACCESS EXISTING DUCT DETECTOR

FLOOR

FF-2

FF-1 SUPPORTS UP TO

CONCRETE DECK OVERHEAD

E. RETURN

FAN

BEYOND

WALL

E. AFMS IN RETURN DUCT

14" Ø S.S. SUPPLY DUCT

12" Ø S.S. EXHAUST DUCT

16 x 16

SUPPLY

DUCT

FF-1

28x16 INSULATED S.S.

PLENUM UPSTREAM OF

FILTER HOUSING

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019

GRAND JUNCTION VA MEDICAL

CENTER - UPGRADE HAZARDOUS

DRUG WORKSPACE

575-18-110

VA WESTERN COLORADO

HEALTH CARE SYSTEM

2121 NORTH AVENUE

GRAND JUNCTION, CO 81501

18-235

100% BID DOCUMENTS

FULLY SPRINKLERED

Structural Engineer:

P

M

M-301

PARCM

MECHANICAL SCHEDULES AND DETAILS

FULLY SPRINKLERED

Scale: 1/2" = 1'-0"

ELEVATION AT EXISTING AHU-3 DISCHARGE PLENUM (SEE M-101) 0 1 2 4

NORTH

PLAN

0 1 2 4

NORTH

PLAN

0 1 2 4

NORTH

PLAN

Scale: 1/2" = 1'-0"

SECTION 2 (SEE M-101)

DA

AO - REHEATING VALVE

HW

M

HWS HWR

T

AI - DISCHARGE AIR TEMP

AI - AIRFLOW

M

AO - ZONE DAMPER

SA

T

AI - ZONE TEMP

AI - ZONE SETPOINT ADJUST

F

T

AI - ZONE HUMIDITY

POINT NAME:

ZONE TEMPERATURE

ZONE TEMPERATURE SETPOINT

AIRFLOW

DISCHARGE AIR TEMPERATURE

ZONE DAMPER

REHEATING VALVE

HEATING MODE

SETPOINT TEMPERATURE

HIGH ZONE TEMPERATURE

LOW ZONE TEMPERATURE

HIGH DISCHARGE TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

X

BI BO

SOFTWARE POINTS

AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

X

TOTAL HARDWARE (7) TOTAL SOFTWARE (13)

5 2

X

X

4 8

X

X

X

X

X

ZONE HUMIDITY

X

X X X

X

SST

EF-10

STS

EF-10

VFD

ALA

EF-10

EF-10

SEQUENCE: EXHAUST FANS SHALL START AND RUN CONTINUOUSLY.

VFD SHALL ADJUST SPEED TO MAINTAIN EXHAUST DUCT PRESSURE

OF -1.0" W.G. (ADJ)..

SP-1

EF-10

EXHAUST DUCT

DSP-1

POINT NAME:

EF-10 STATUS

HARDWARE POINTS

AI AO BI BO

SOFTWARE POINTS

AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

X

X

TOTAL HARDWARE (7) TOTAL SOFTWARE (6)

EF-10 START / STOP

EF-10 ALARM

X

X

X

X X

POINT ID:

STS-1

SST-1

ALA-1

RFR-1

RFR-2

DSP-1

REFRIGERATOR ALARM

REFRIGERATOR ALARM

DUCT PRESS

X

X

X

SP-1 VFD SPEED

X

1 1

X

X

X

X

X

X

X

X

SCALE: N.T.S.

CAV TERMINAL SCHEMATIC

SCALE: N.T.S.

CAV TERMINAL SEQUENCE OF OPERATION

SCALE: N.T.S.

CAV TERMINAL UNIT POINTS LIST

SCALE: N.T.S.

EXHAUST FAN CONTROLS

SCALE: N.T.S

EXHAUST FAN POINTS LIST

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

Locatio…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.