36C25919R0090-003.pdf
PDF 17 MB Posted
- Attached to
- Replace Air Handling Units Federal contract opportunity
- Solicitation number
- 36C25919R0090
About this file
36C25919R0090 18-235-Combined-DWGs.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25919R0090-0007000.docx | DOCX document | |
| 36C25919R0090-0006000.docx | DOCX document | |
| 36C25919R0090-0005000.docx | DOCX document | |
| 36C25919R0090-0004001.pdf | ||
| 36C25919R0090-0004002.pdf | ||
| 36C25919R0090-0004000.docx | DOCX document | |
| 36C25919R0090-0004003.pdf | ||
| 36C25919R0090-0003000.docx | DOCX document | |
| 36C25919R0090-0002003.pdf | ||
| 36C25919R0090-0002001.pdf | ||
| 36C25919R0090-0002002.pdf | ||
| 36C25919R0090-0002000.docx | DOCX document | |
| 36C25919R0090-0001000.docx | DOCX document | |
| 36C25919R0090-0001002.pdf | ||
| 36C25919R0090-0001001.pdf | ||
| 36C25919R0090-001.docx | DOCX document | |
| 36C25919R0090-007.pdf | ||
| 36C25919R0090-002.pdf | ||
| 36C25919R0090-005.docx | DOCX document | |
| 36C25919R0090-006.pdf | ||
| 36C25919R0090-004.docx | DOCX document | |
| 36C25919R0090-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade Hazardous Drug Workspace
VA Western Colorado Health Care System 2121 North Avenue
Grand Junction, CO 81501
100% Bid Documents
VA PROJECT NO. 575-18-110
Covered Egress
B
A
P:A
P:A
P:B
P:B
G O
V E
R N
M E
N T
V
E H
I C
L
P
A R
K I N
G
P:B
VAMC GRAND JUNCTION, CO
NORTH AVENUE
R
D
S
T R
E E
T
VAMC GRAND JUNCTION, CO
H
G
F
E
D
AREA OF WORK
CONTRACTOR ROUTE
LEGEND
Covered Egress
P
M
1DM HM
G-001
Scale: Not To Scale
VICINITY MAP
Scale: Not To Scale
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
GRAND JUNCTION VA MEDICAL CENTER
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
CAMPUS MAP
Scale: 1/16" = 1'-0"
FIRST FLOOR PLAN - ACCESS PATH
MATERIAL
LAY-DOWN
AREA
CONSTRUCTION
ACCESS
DocuSign Envelope ID: 76B90236-EAB3-4993-9340-AF4987CA253A
3/29/2019
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
CLEAR
1'-3" 1'-3" 2'
-5 " M
IN
2' -1
0" M
A X
4' -0
" M A
X
6' -8
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
4'-0"
1'-6"
MISC. WALL DEVICES
MOUNTING HEIGHTS
CLEARANCE AT LAVATORY
WALL SECTION
SYMBOL INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
PLAN
TRUE
GENERAL SYMBOL LEGEND
TITLE SHEET
GENERAL INFORMATION
INFECTION CONTROL RISK ASSESSMENT DETAILS (ICRA)
PRE CONSTRUCTION RISK ASSESSMENT (PCRA)
FIRST FLOOR DEMOLITION PLANS
FIRST FLOOR PLANS AND EQUIPMENT LIST
INTERIOR ELEVATIONS, PARTITION TYPES, AND DETAILS
SCHEDULES, DIAGRAMS, DOOR AND WINDOW DETAILS
PLUMBING LEGEND, ABBREVIATIONS, GENERAL NOTES, AND SCHEDULES
FIRST FLOOR PLUMBING DEMOLITION PLAN
FIRST FLOOR PLUMBING PLAN
G-001 G-100 G-101 G-102
AD101
A-101 A-201 A-601
P-001
PD101
P-101
MECHANICAL LEGEND, ABBREVIATIONS, GENERAL NOTES, AND SCHEDULES
MECHANICAL DEMOLITION PLANS
MECHANICAL PLAN
FIRST FLOOR MECHANICAL PIPING PLAN
MECHANICAL SCHEDULES AND DETAILS
HVAC CONTROLS
MECHANICAL SCHEDULES AND DETAILS
M-001
MD101
M-101
MP101
M-301 M-501 M-601
GENERAL
ARCHITECTURAL
PLUMBING
MECHANICAL
ELECTRICAL SYMBOLS, GENERAL NOTES AND ABBREVIATIONS
FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ELECTRICAL ROOF PLAN
FIRST FLOOR POWER PLAN
FIRST FLOOR MECHANICAL POWER PLAN
MECHANICAL ROOF PLAN
FIRST FLOOR LIGHTING PLAN
PANEL SCHEDULES AND ONE-LINE DIAGRAM
E-001
ED101
ED102
EP101
EM101
EM102
EL101
E-601
ELECTRICAL
SHEET NAMESHEET # DWG
OF
DWG
SHEET INDEX
TECHNOLOGY SYMBOLS, GENERAL NOTES AND ABBREVIATIONS
FIRST FLOOR TECHNOLOGY PLAN
TK001
TK101
TECHNOLOGY
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
ABBREVIATIONS
3/
/2
:3 5:
A
M
2DM HM
G-100
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
GRAND JUNCTION VA MEDICAL CENTER
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
G-101
CORRIDOR
02 03
ROOM
A P
P R
O X
" A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
G-101
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING
BRAKES
MOBILE CART
A D
JU
S
TA
B
LE
H
E
IG
H T
HEPA
NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILINGFLEX DUCT
A
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S , F
IE
LD
V E
R
IF
Y
W A
LL
H
E
IG
H T
V A
R
IE
S F
IE
LD
V E
R
IF
Y
4 7/8"
B
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S , F
IE
LD
V E
R
IF
Y
EXISTING CEILING SYSTEM
UNDERSIDE OF EXISTING
DECK
DE-MOUNTABLE CONTAINMENT
BARRIER SYSTEM
SMOKE-TIGHT BARRIER
INFECTION CONTROL RISK ASSESSMENT MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
III/IVLOW Risk Group
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
II
MEDIUM Risk Group HIGH Risk Group HIGHEST Risk Group IV
IV
IV
III/IV
III/IV
III
III/IV
II
II
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction Project Activity (Type A-D)
Group 2 Medium Risk
Group 1 Low Risk
- Cardiology
- Echocardiography
- Endoscopy
- Nuclear Medicine
- Physical Therapy
- Radiology / MRI
- Respitory Therapy
- Office areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- CCU
- Emergency Room
- Labor & Delivery
- Laboratories (soecimen)
- Newborn Nursery
- Outpatient Surgery
- Pediatrics
- Pharmacy
- Post Anesthesia Care Unit
- Surgical Units
IIII
TYPE DTYPE CTYPE B
Class IVor Control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove or isolation of HVAC system in areas where work was being performed.
1.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
4 Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covers.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
- Any area caring for immunocompromised patients
- Burn Unit
- Cardiac Cath Lab
- Central Sterile Supply
- Intensive Care Units
- Medical Unit
- Negative pressure isolation rooms
- Oncology
- Operation rooms including C-section rooms
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
INFECTION CONTROL RISK
ASSESSMENT, ILSM, FIRE WATCH
AND MISC. FORMS
PAPER
CADDY
3/
/2
:3 4:
A
M
3DM HM
G-101
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
01 PROVIDE A MINIUM 6'-0" X 4'-0" WALK OFF MAT
INSIDE OF THE WORK AREA. CHANGE WHEN
NECESSARY TO MAINTAIN CLEANLINESS.
02 PROVIDE STICKY MATS, CHANGED AT END OF SHIFT
OR MORE IN NECESSARY TO MAINTAIN
CLEANLINESS.
03 POST INFECTION CONTROL. I.L.S.M. FIRE INSPECTION
TAGS VISIBLE TO THE PUBLIC. REFER TO SHEET G-101
DETAIL 4 FOR DETAILS.
04 SUSPENDED PLASTIC ZIPPER WALL CURTAIN
BARRIER.
05 FIRE EXTINGUISHER ON PORTABLE FLOOR
BRACKET.
06 HEPA FILTRATION IS REQUIRED WHERE THE
EXHAUST DUST MAY RE-ENTER THE BREATHING
ZONE. CONTRACTOR SHALL VERIFY THAT
CONSTRUCTION EXHAUST FILTERS ARE CLEAN AND
PREVENTING DUST FROM EXITING THE
CONTAINMENT AREA.
A.
B.
C.
D.
E.
TAPE ALL SERVICES TO PROTECT AGAINST
CONTAMINATION.
DO NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR AND
THE MEDICAL CENTER.
USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER
AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ANY CEILING ACCESS PANELS OPENED FOR
INVESTIGATION BEYOND SEALED AREAS SHALL BE
SEALED IMMEDIATELY WHEN UNATTENDED.
AT COMPLETION, REMOVE CONSTRUCTION BARRIERS
AND CEILING PROTECTION CAREFULLY, OUTSIDE OF
NORMAL WORK HOURS. VACUUM AND CLEAN ALL
SURFACES FREE OF DUST AFTER THE REMOVAL.
THE MEDICAL CENTER HAS PERFORMED A
COMPREHENSIVE ASBESTOS SURVEY AND HAS
IDENTIFIED ACCESSIBLE ACM. SOME AREAS
CONTAIN DAMAGED ASBESTOS AND SHOULD NOT BE
ACCESSED WITHOUT PRIOR ABATEMENT.
Scale: 1/8" = 1'-0"
TYPICAL INFECTION CONTROL LAYOUT AT
MECHANICAL AND ELECTRICAL ROOMS
Scale: NO SCALE
INTERIOR ELEVATION
Scale: 3/4" = 1'-0"
INFECTION CONTROL PARTITION WALL TYPES
Scale: 1/4" = 1'-0"
MOBILE CONTAINMENT CART
Scale: 3" = 1'-0"
INFECTION CONTROL SIGNAGE
F. WALL TYPE 'B' SHALL PROVIDE SMOKE-TIGHT
SEPARATIONS BETWEEN CONSTRUCTION AREAS
AND ADJOINING AREAS. CONSTRUCT PARTITIONS
OF GYPSUM BOARD OR TREATED PLYWOOD (FLAME
SPREAD RATING OF 25 OR LESS IN ACCORDANCE
WITH ASTM E84) ON BOTH SIDES OF FIRE
RETARDANT TREATED WOOD OR METAL STEEL
STUDS. EXTEND THE PARTITIONS THROUGH
SUSPENDED CEILINGS TO FLOOR SLAB DECK OR
ROOF. SEAL JOINTS AND PENETRATIONS. AT DOOR
OPENINGS, INSTALL CLASS C, ¾ HOUR FIRE/SMOKE
RATED DOORS WITH SELF-CLOSING DEVICES.
G. ALL CLASS LEVEL STEPS (CLASS I, CLASS II, CLASS III, AND
CLASS IV) MUST BE FOLLOWED ON THIS PROJECT.
H
AD101
AREA OF WORK
CONTRACTOR ROUTE
ICRA BARRIERS
LEGEND
4' MIN.
ACCESS TO
CONTRACTOR
LAY-DOWN AREA.
CONFIRM
CONTRACTOR
LAY-DOWN AREA
WITH COR.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
3/
/2
:3 6:
A
M
4DM HM
G-102
1 FIRST FLOOR - INFECTION CONTROL PLAN
SCALE: 1/8" = 1'-0"
0 2 4 8
NORTH
PLAN
PROVIDE TEMPORARY INFECTION CONTROL
PARTITION BARRIER TYPE 'B'. REFER TO
SHEET G-101 FOR DETAILS.
PROVIDE TEMPORARY DE-MOUNTABLE
CONTAINMENT PARTITION BARRIER 'A'. REFER
TO SHEET G-101 FOR DETAILS. BARRIER FOR
DEBRIS REMOVAL SHALL ONLY BE IN PLACE
FOR SHORT DURATIONS. CONFIRM TIME WITH
PHARMACY STAFF AND COR.
CONTRACTOR ROUTE AND ACCESS PATH.
AREA OF WORK
PROVIDE STICKY MATS, CHANGED AT END OF
SHIFT OR MORE IN NECESSARY TO MAINTAIN
CLEANLINESS.
CONTRACTOR PERSONNEL WILL HAVE TO
BADGE IN THE FRONT DOOR OF THE
PHARMACY. MATERIALS CAN MOVE IN AT THE
NOTE 05 LOCATION WITH PHARMACY ESCORT
ONLY.
HAC
EXISTING
TOILET
STERILE
PREP AREA
1010B
CHEMO
PREP AREA
1010A
HAC
EXISTING
TOILET
STERILE
PREP AREA
1010B
CHEMO
PREP AREA
1010A
HAC
EXISTING
TOILET
1'-1112"
1'-1112"
JSN:
M2022 F0535 A1015 A5077 F3200 U0038 A5145 F0535 A5075 P1965 U3500 M1801 F0280 R6200 P3000
NAME:
Shelving, Storage, Wire, CRS, w/Adjustable Shelves Compound Aseptic Containment Isolator (C.A.C.I) Telephone, Desk, Multiple Line Dispenser, Hand Sanitizer, Hands-Free Clock, Battery, 12" Diameter Personal Protective Equipment Dispenser Hook, Garment, Double, SS, Surface Mounted Cart, Utility Dispenser, Soap, Disposable Eyewash, Eye/Face, Sink Mounted, Hands-free Compounding Aseptic Containment Isolator (C.A.I) Computer, Microprocessing, w/Flat Panel Monitor Chair, Swivel, Low Back Refrigerator, U/C or F/S, 5 Cu Ft Lavatory, Vitreous China, Straight Back
EXISTING EQUIPMENT LIST
C C - CONTRACTOR FURNISHED AND INSTALLED
V C - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
V V - GOVERNMENT FURNISHED AND INSTALLED
REMARKS:
QUANTITY:
2 FIRST FLOOR - CEILING DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
1 FIRST FLOOR DEMOLITION AND EQUIPMENT DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
HMDM 1
AD101
REMOVE DOOR AND FRAME. TYPICAL UNLESS NOTED
OTHERWISE.
REMOVE CASEWORK AND OTHER FIXTURES.
REMOVE CEILINGS AND CEILING MOUNTED FIXTURES. REFER
TO ELECTRICAL PLANS FOR DETAILS.
REMOVE PORTION OF WALL TO ALLOW FOR NEW PASS-THRU.
SEE DETAIL 8 SHEET A-201 FOR VERTICAL DIMENSIONS.
REMOVE LAVATORY. REFER TO PLUMBING PLAN FOR
REMOVAL OF ASSOCIATED PIPING.
EQUIPMENT AND FURNITURE, SALVAGE AND STORE TO BE
REUSED AFTER CONSTRUCTION IS COMPLETE. COORDINATE
STORAGE LOCATION WITH COR. NEW LOCATION FOR
EQUIPMENT AND FURNITURE SHOWN ON SHEET A-101 FIRST
FLOOR EQUIPMENT PLAN.
REMOVE PORTION OF WALL AND WINDOW.
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
A. FIELD VERIFY ALL DIMENSIONS.
B. REFER TO SHEET A-601 FOR DOOR AND FRAME TYPES, F1, F2 AND
F3.
C. REFER TO SHEET G-101 FOR INFECTION CONTROL BARRIER
LOCATIONS AND DETAILS.
D. AT EXISTING HANDWASH SINK TO BE REMOVED, SALVAGE SINK,
MIRROR, PAPER TOWEL DISPENSER AND SOAP DISPENSER.
DELIVER TO VA.
DocuSign Envelope ID: F83F8A6A-17D3-4C36-90CE-5BBBC6557111
3/28/2019
EXISTING
TOILET
A-201
A-201
A2013 4
A201 5
'-4
V.
I.F
9'-4" V.I.F.
1'-10" V.I.F.
10'-8 1/2" V.I.F.
6'- 7"
V.
I.F
3'-
2" 3'-
3"
3'-7 1/2"
4'- 8"
8'-11 1/2" V.I.F.
ANTE
ROOM
STERILE
PREP AREA
1010B
CHEMO
PREP AREA
1010A
A201
1'- 111 2"
1'- 111 2"
F1
A201
F2
F3
CORRIDOR
PHARMACY
A-601
A-201
A-601
A-201
A-201
HAC
EXISTING
TOILET
ANTE
ROOM
1010B
1010A
STERILE
PREP AREA
CHEMO
PREP AREA
A-201
F2245
HAC
EXISTING
TOILET
M2022
U0038
EXISTING SHELVES TO REMAIN
A5145
A5075
A5077 F3200
P3000 P1965
F2010
R6200
F2010M2022F0535M2022
U3501
F0535
M3073
R6200
COMPOUNDING ASEPTIC
CONTAINMENT ISOLATOR
(C.A.C.I)
HEPA FILTERED CABINET,
DUCTED EXHAUST
COMPOUNDING
ASEPTIC
ISOLATOR
(C.A.I.)
PASS THRU - WALL
MOUNTED HEPA
FILTER,
INTERLOCKING
DOORS, STAINLESS
STEEL U1200
ANTE
ROOM
STERILE
PREP AREA
1010B
CHEMO
PREP AREA
1010A UNDER
CABINET
UNDER CABINET
A1085
F0280
F0535 A1011
JSN:
M2022 F2010 F0535 A1015 A5077 P3000 F2245 F3200 U0038 A5145 F0535 A5075 P1965 U3500 U1200 M3073 U3501 M1801 M1840 F0280 R6200 A1085
NAME:
Shelving, Storage, Wire, CRS, w/Adjustable Shelves Basket, Wastepaper, Step-On Compound Aseptic Containment Isolator (C.A.C.I) Telephone, Desk, Multiple Line Dispenser, Hand Sanitizer, Hands-Free Lavatory, Stainless Steel, Straight Back Camera, Video Surveillance, HD, IP Powered Clock, Battery, 12" Diameter Personal Protective Equipment Dispenser Hook, Garment, Double, SS, Surface Mounted Cart, Utility Dispenser, Soap, Disposable Eyewash, Eye/Face, Sink Mounted, Hands-free Compounding Aseptic Containment Isolator (C.A.I) Pass-Thru, Vented, Interlocking doors, Stainless Steel Container, Biohazard Waste, Step-on, Fire Safe Sharps Container 20G Computer, Microprocessing, w/Flat Panel Monitor Printer/Copier/Fax Combination Chair, Swivel, Low Back Refrigerator, U/C or F/S, 5 Cu Ft Mirror, SS, with SS Frame
TYPE COMMENTS:
V V V V V V V V V V C C V V V V V V C C V V V V C C V V C C V V V V V V V V V V V V V V
EQUIPMENT LIST
C C - CONTRACTOR FURNISHED AND INSTALLED
V C - GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
V V - GOVERNMENT FURNISHED AND INSTALLED
REMARKS:QUANTITY:
Refer to Plan 2/A101 for Details Refer to Plumbing Plan for Details
HAC
EXISTING
TOILET
S-1, SOLID SURFACE
COUNTERTOP
S-1, SOLID
SURFACE
COUNTERTOP
ANTE
ROOM
STERILE
PREP AREA
1010B
CHEMO
PREP AREA
1010A
CORRIDOR
PHARMACY
RF-1, RF 4" INTEGRAL BASE, TYPICAL
RF-1, RF 4" INTEGRAL
BASE, TYPICAL
RF-1, RF 4" INTEGRAL
BASE, TYPICAL RB-1, MATCH NEW BASE
TO EXISTING AT
CORRIDOR
ROOM #
1010A 1010B
FLOOR
RF
RF
RF
EXISTING, CPT
BASE
RF, HEIGHT 4"
RF, HEIGHT 4"
RF, HEIGHT 4"
EXISTING, RB
ROOM FINISH SCHEDULE
CEILINGWALL
GWB / SC
GWB / SC
GWB / SC
MATCH EXISTING
FINISH
GWB / SC
GWB / SC
GWB / SC
ACT
HEIGHT
8' - 0" 8' - 0" 8' - 0" 8' - 0"
REMARKS:
ROOM NAME
ANTE ROOM
CHEMO PREP AREA
STERILE PREP AREA
PHARMACY
SC HIGH BUILD GLAZED COATING (SPECIAL COATING)
GWB GYPSUM WALLBOARD SYSTEMS
RF WELDED RESILEINT SHEET FLOORING
ACT ACOUSTICAL CEILING TILE
RB RESILIENT BASE (RUBBER OR VINYL WITH FACTORY FORMED INSIDE AND OUTSIDE CORNERS)
CPT CARPET TILE
S SOLID SURFACE
SS STAINLESS STEEL
ITEMS:
SC-1
GWB-1
RF-1
ACT-1
RB-1
CPT-1
S-1
SS-1
MATERIAL SELECTION:
EXPOXY PAINT
GYPSUM WALLBOARD
WELDED RUBBER FLOOR
ACOUSTICAL CEILING TILE
RESILIENT BASE
CARPET TILE
SOLID SURFACE
STAINLESS STEEL
COLOR AND FINISH SCHEDULE
COLOR SELECTION:
WHITE
FACTORY FINISH
MATCH EXISTING
WHITE
MATCH EXISTING
MATCH EXISTING
COCONUT OIL/ SIMILAR TO EXT.
BRUSHED
1 FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
2 FIRST FLOOR - REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
3 FIRST FLOOR EQUIPMENT PLAN
SCALE: 1/4" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
HMDM 2
A-101
PROVIDE AUTOMATIC MOTION/PRESENCE SENSOR SLIDING
DOOR WITH SIDELITES AND VERTICAL NON SHEDDING
WEATHERSTRIP IN A NEW PARTITION WHERE INDICATED .
COORDINATE WITH DOOR MANUFACTURER'S
REQUIREMENTS.
PROVIDE INFILL PARTITION MATCHING EXISTING TO MAKE
THE DOOR OPENING MATCH THE NEW DOOR
REQUIREMENTS. COORDINATE WITH DOOR
MANUFACTURER'S REQUIREMENTS.
PROVIDE SURFACE MOUNTED SLIDING DOOR ON EXISTING
WALL AND INFILL PARTITION. DOOR TO BE SENSOR
ACTIVATED.
PROVIDE NEW GYPSUM BOARD CEILING ON SUSPENDED
METAL FRAMING.
INTERLOCK ALL NEW DOORS SO ONLY ONE CAN OPEN AT A
TIME. DOORS TO BE SENSOR ACTIVATED.
NEW SINK - SEE PLUMBING
A. FIELD VERIFY ALL DIMENSIONS.
B. REFER TO SHEET A-601 FOR DOOR AND FRAME TYPES, F1, F2 AND
F3.
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
0 2 4 8
NORTH
PLAN
4 FIRST FLOOR FINISH PLAN
SCALE: 1/4" = 1'-0"
0 2 4 8
NORTH
PLAN
A-201
P3000
R6200
PASS THRU
WALL MOUNT
HEPA FILTER
F2022
F0280
M3073
U3501
A-601
F2022
A5145
A5075
F2010
P1965 P3000
F2022A5077F3200
HEPA FILTERED CABINET
EXHAUST TO EXTERIOR
F0280
A-601
A-601
F2010
A-201
OPP.
F0535
INTEGRAL COVE BASE,
TYP.
PASS THRU WALL
MOUNT HEPA FILTER
F2010
A-601
A-601
F1
SOLID SURFACE
COUNTERTOP
F0280
R6200
F3F2
REFER TO SHEET A-601
DETAIL 10 FOR MORE
INFORMATION ON
COUNTERTOP
HAND WAVE DOOR OPERATORS,
REFER TO ELECTRICAL SHEETS
FOR DETAILS
FINISH FLOOR
INTEGRAL COVE BASE
5/8" GYPSUM BOARD,
BOTH SIDES
5/8" GYPSUM BOARD,
CEILING
SOUND ATTENUATION
INSULATION
5/8" GYPSUM
BOARD, CEILING
8" SLIP TRACK STUD
TRACK ANCHORED TO
BOTTOM OF ROOF DECK.
CHEMO PREP AREA STERILE PREP
AREA
A-201
NOTE: MATCH EXISTING
WALL THICKNESS. FIELD
VERIFY.
EXISTING WINDOW / WALL,
VERIFY DIMENSIONS IN
FIELD
5/8" GYPSUM BD.
3 5/8" GALVANIZED
LIGHT GAUGE
METAL STUDS
AUTOMATIC MOTION SENSOR DOOR,
COMPLY WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS FOR INSTALLING
DOORS AND FRAMES. REFER TO SHEET
A-601 FOR DETAILS.
AUTOMATIC MOTION SENSOR DOOR,
COMPLY WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS FOR INSTALLING
DOORS AND FRAMES. REFER TO SHEET
A-601 FOR DETAILS.
4"X4"X0.1875" STRUCTURAL STEEL TUBE
CHEMO PREP AREA
1010A
STERILE PREP AREA
1010BALIGN NEW WALL WITH
EXISTING WALL
EXTRUDED ALUMINUM CHANNEL TO
MATCH ALUMINUM FRAMING OF SLIDING
DOORS BY MANUFACTURE. MOUNTING
FOR DOOR OPERATING CONTROLS.
4"
3"
3' 7 1/2"
DOOR OPENING
5/8" GYPSUM BD.
7 1/2" GALVANIZED
LIGHT GAUGE
METAL STUDS
AUTOMATIC MOTION SENSOR DOOR,
COMPLY WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS FOR
INSTALLING DOORS AND FRAMES.
REFER TO SHEET A-601 FOR
DETAILS.
EXISTING WALL
CORRIDOR
ANTE ROOM
10"
ALIGN NEW PARTITION WITH
EXISTING PARTITION, VERIFY
EXISTING PARTITION DIMENSIONS IN
FIELD.
6"
2'-6"
4"
4'-8"
PASS THRU
WALL MOUNT
HEPA
FILTERED,
DUCTED
EXHAUST
SOLID SURFACE
COUNTERTOP
F1REFER TO SHEET A-201
DETAIL 8 FOR MORE
INFORMATION ON
COUNTERTOP
PASS THRU
HAND WAVE DOOR OPERATOR,
REFER TO ELECTRICAL SHEETS
FOR DETAILS
FINISH FLOOR
7-1/2" GALVANIZED LIGHT
GAUGE METAL STUDS @ 16"
O.C. W/ CONTINUOUS
STIFFENER CHANNELCOVE BASE
5/8" GYPSUM BOARD,
BOTH SIDES
EXISTING ACOUSTICAL
CEILING TILE
5/8" GYPSUM BOARD,
CEILING
ANTE ROOM CORRIDOR
8" SLIP TRACK STUD
TRACK ANCHORED TO
BOTTOM OF
STRUCTURAL DECK.
SOUND ATTENUATION
INSULATION
BOTTOM OF STRUCTURE
ABOVE
NOTE: MATCH EXISTING
WALL THICKNESS. FIELD
VERIFY.
NEW PASS-THRU
WINDOW
EXISTING WALL
SOLD SURFACE
COUNTERTOP
PER MANUFACTURER
2'-6"
PHARMACY STERILE
PREP AREA
18"
MIN.
INTEGRAL COVE BASE INTEGRAL COVE BASE
NEW STAINLESS STEEL
SHELF AND MOUNTING
BRACKETS
4"
2'-6"
6"
EXISTING STRUCTURE ABOVE
SEALANT, BOTH SIDES
SLIP TRACK WITH ELONGATED LEGS AND SLOTTED
HOLES
GYPSUM BOARD
BATT INSULATION
PARTITION AS SCHEDULED
WELDED VINYL BASE WITH
SLOPED TOP CAP. BOTH SIDES.
FINISH FLOOR
A-201
HMDM 3
3/
/2
:3 8:
A
M
3 INTERIOR ELEVATION
SCALE: 1/4" = 1'-0"
6 INTERIOR ELEVATION
SCALE: 1/4" = 1'-0" 4 INTERIOR ELEVATION
SCALE: 1/4" = 1'-0"
1 INTERIOR ELEVATION
SCALE: 1/4" = 1'-0"
7 DETAIL- NEW PARTITION/JAMB
SCALE: 1-1/2" = 1'-0"
11 DETAIL - JAMB
SCALE: 1-1/2" = 1'-0"
10 WALL SECTION
SCALE: 1" = 1'-0"
2 INTERIOR ELEVATION
SCALE: 1/4" = 1'-0"
9 WALL SECTION
SCALE: 1" = 1'-0" 8 WALL SECTION
SCALE: 1" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
A. FIELD VERIFY ALL DIMENSIONS
B. REFER TO SHEET A-101 FOR EQUIPMENT LIST
5 INTERIOR ELEVATION
SCALE: 1/4" = 1'-0"
12 DEFLECTION TRACK DETAIL
SCALE: 3" = 1'-0"13 WELDED BASE DETAIL
SCALE: 3" = 1'-0"
DOOR SCHEDULE
DOOR
NO.
DOOR
ROOM NO. WIDTH HEIGHT THICK MAT'L FINISH TYPE
DOOR FRAME
MAT'L
DOOR FRAME
TYPEFINISH
HEAD
DETAIL NO.
JAMB
DETAIL
NO.
THRESHOLD
DETAIL NO. LBL HDWR
SET
REMARKS
1010A
1010B
3'-0"
3'-0"
3'-0"
7'-0"
7'-0 1/2"
7'-0 1/2"
0'-4 1/2"
0'-4 1/2"
0'-4 1/2"
MTL./GLASS
MTL./GLASS
MTL./GLASS
FACTORY FIN.
FACTORY FIN.
FACTORY FIN.
SLIDING
SLIDING
SLIDING
MTL.
MTL.
MTL.
FACTORY FIN.
FACTORY FIN.
FACTORY FIN.
F-1
F-3
F-2
HAND WAVE SENSOR ACTIVATED
HAND WAVE SENSOR ACTIVATED
HAND WAVE SENSOR ACTIVATED
NOTE: DOORS 2 AND 3 SHALL BE
INTERLOCKED SO ONLY ONE WILL
OPEN AT A TIME.
2" 81
2"
WALL TYPE AS SCHEDLED, REFER TO
PARTITION TYPE FOE DETAILS
DOOR AS SCHEDULED
EXISTING CEILING
ANTE ROOMCORRIDORPREP ROOMANTE ROOM
CEILING AS
SCHEDULED
CEILING AS
SCHEDULED
CEILING AS
SCHEDULED
BOX HEADER
REFER TO
DETAIL A/A601
BOX HEADER,
REFER TO
DETAIL A/A-601
ANTE ROOM
CORRIDOR
F-1 F-2 F-3
2" ANTE ROOMCORRIDOR
2" PREP ROOMANTE ROOM
A-601
EXISTING PARTITION
EXISTING WINDOW
EXISTING PARTITION
BULL NOSE CORNERS, EXISTING
CEILING AS SCHEDULED
ANTE ROOM
STAINLESS STEEL , ANGLED TRIM STRIP, BOTH SIDES
EXISTING BULL NOSE TRIM
EXISTING PARTITION
EXISTING BORROWED LITE
8" 1
2"
2" 3
4"
2"
SOLID SURFACE COUNTERTOP
STAINLESS STEEL
UNDER COUNTER
MOUNTING BRACKETS
SOLID SURFACE BACKSPLASH
WITH 45 DEGREE CHAMFER
ALONG TOP EDGE
RIDGED POLYCARBONATE
SHEET OVEREXISTING WINDOW
OPENING. SEAL ALL AROUND
WINDOW WITH SILICONE
SEALANT
CONTINUOUS
FRAMING
NOTE: NO
HORIZONTAL EDGES
SOLID
SURFACE
COUNTERTOP
1/2" PLYWOOD SHEATHING
BEVEL EDGE
1X4 WOOD BLOCKING
METAL ANGLE, WITH
HEAVY DUTY UNDER
COUNTER MOUNTING
BRACKETS
NOTE: NO
HORIZONTAL EDGES
A-601
A-601
2'-9"
3'-0"
2"
VERIFY IN FIELD
EXISTING
EXTERIOR
WALL
NOTE: NO HORIZONTAL EDGES
SCREWS AS
REQUIRED
SCREWS AS
REQUIRED
TRACK PIECE, SIZE
AND GAGE AS
REQUIRED. SCREW TO
JAMB AND LINTEL AS
REQUIRED
JAMB, SIZE AND GAGE
AS REQUIRED
SUPPORT CLIP
WITH SCREWS
AS REQUIRED
NOTE: HEADER FRAME
MUST BE 16 GAUGE
MINIMUM.
13 DOOR HEAD DETAIL
SCALE: 3" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
HMDM 4
A-601
A. SEE SHEETS G-100 FOR SYMBOLS AND ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR INFORMATION CONCERNING
PLUMBING FIXTURES AND PIPING SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR INFORMATION
CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION CONCERNING
POWER, LIGHTING AND COMMUNICATION SYSTEM(S).
2 DOOR FRAMES 1 DOOR SCHEDULE
5 DOOR JAMB DETAIL
SCALE: 3" = 1'-0"
9 DOOR THRESHOLD DETAIL
SCALE: 3" = 1'-0"
12 DOOR HEAD DETAIL
SCALE: 3" = 1'-0"
6 DOOR JAMB DETAIL
SCALE: 3" = 1'-0"
8 DOOR THRESHOLD DETAIL
SCALE: 3" = 1'-0"
11 WINDOW DETAIL
SCALE: 1-1/2" = 1'-0" 10 WINDOW DETAIL
SCALE: 3" = 1'-0"
4 WINDOW SILL DETAIL
SCALE: 3" = 1'-0" 3 BACKSPLASH AT WINDOW DETAIL
SCALE: 3" = 1'-0"
7 COUNTER EDGE DETAIL
SCALE: 3" = 1'-0"
A BOX HEADER DETAIL
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
APD AIRSIDE PRESSURE DROP
BLDG BUILDING
CFM CUBIC FEET PER MINUTE
CV CONSTANT VOLUME
D DRAIN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
FCU FAN COIL UNIT
FPM FEET PER MINUTE
FVAV FAN POWERED VAV BOX
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HP HORSEPOWER
HWS HEATING HOT WATER SUPPLY
HWR HEATING HOT WATER RETURN
HX HEAT EXCHANGER
IND INDUCTION UNIT
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MC MECHANICAL CONTRACTOR
N/A NOT AVAILABLE
NTS NOT TO SCALE
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
VAV VARIABLE AIR VOLUME
WPD WATERSIDE PRESSURE DROP
FVAV 1-1
KEYED NOTE
EQUIPMENT
TAG
MECHANICAL ABBREVIATIONSDRAWING SYMBOLS
1 WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2 INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3 OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4 PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES
INTENDED.
5 WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR
PERFORMANCE FEATURES ARE REQUIRED.
6 EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE
COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT
SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7 PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8 INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9 INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL
EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND
APPLICABLE CODES AND STANDARDS.
10 COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11 PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO
INSTALLATION.
12 PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13 PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 26.
14 DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE
EXACT ROUTING OF DUCTWORK AND PIPING IN THE FIELD.
15 FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING
OR EQUIPMENT.
16 NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE
PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS
AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17 SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18 INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND
ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM
CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19 PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS
NOTED OTHERWISE.
20 SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21 INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22 MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM
INSTALLATION. RESOLVE CONFLICTS WITH COR.
23 INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL
TO BUILDING WALLS. DIAGONAL RUNS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24 INSTALL PIPING FREE OF SAGS AND BENDS.
25 INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26 PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND
WORK BY THE GOVERNMENT.
a. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND
EXISTING CONDITIONS.
b. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL
PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS
AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING
MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
c. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE
CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.
d. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
e. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK.
MODIFY, MOVE OR RECONFIGURE WORK LACKING COORDINATION AT NO ADDITIONAL COST.
27 PROVIDE TEMPORARY HEATING OR COOLING UNITS TO MAINTAIN SPACES AFFECTED BY THIS CONSTRUCTION BETWEEN 72 AND 75°F
AND HUMIDITY BETWEEN 20-60% RELATIVE HUMIDITY DURING OCCUPIED HOURS.
GENERAL NOTES
CONTROL WIRING
LIMITS OF DEMOLITION
POINT OF CONNECTION TO EXISTING
MECHANICAL LEGEND
FD
SUPPLY DIFFUSER
RETURN DIFFUSER
FIRE DAMPER
DIFFUSER MARK
DIFFUSER CFM
T
THERMOSTAT
VOLUME DAMPER
8"Ø
SDI-275
SUPPLY TOP REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP
GRILLE (WALL TYPE)
FLEXIBLE DUCTWORK (INSULATED)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND DUCTWORK
DN
DN
DNUP
UP
UP
8"Ø
RECTANGULAR DUCTWORK
10x10
VAV BOX
EXISTING DUCTWORK
DUCTWORK TO BE DEMOLISHED
FAN POWERED VAV BOX
AIRFLOW DIRECTION
PL105
PL105
A
DRAWING NUMBER
WHERE SHOWN
SECTION LETTER
DRAWING NUMBER
WHERE DRAWN
DETAIL NUMBER
HWS
HWR
PIPING DOWN
PIPING UP
TEE UP
TEE DOWN
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
EXISTING PIPING TO REMAIN
PIPING TO BE DEMOLISHED
GATE VALVE
BALL VALVE
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
P
M
M-001
WRSRCM
MECHANICAL LEGEND,
ABBREVIATIONS, GENERAL NOTES,
AND SCHEDULES
FULLY SPRINKLERED
DocuSign Envelope ID: 4D271319-E35D-4EB1-8EC6-E055841F6311
3/26/2019
1010B
ANTE
ROOM
HAC
EXISTING
TOILET
STERILE
PREP AREA
CHEMO
PREP AREA
1010A
E. AFMS
EXHAUST
FAN 1-EF-11
EXHAUST
FAN 1-EF-10
EXHAUST
FAN 1-EF-9
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
P
M
MD101
WRSRCM
MECHANICAL DEMOLITION PLAN
FULLY SPRINKLERED
NORTH
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN
1. MAINTAIN THE PHARMACY AREA OUTSIDE THE
PROJECT WORK BOUNDARY BETWEEN 68°F AND
77°F. PROVIDE TEMPORARY COOLING AND
HEATING IF NEEDED DURING OUTAGES.
Scale: 1/4" = 1'-0"
PARTIAL ROOF MECHANICAL DEMOLITION PLAN
0 4 8 16
NORTH
PLAN
1. REMOVE 8Ø EXHAUST DUCT AND EXISTING AIR
CONTROL VALVE EVAV-1 DOWN TO HOOD
CONNECTION. MAKE EXHAUST DUCT READY FOR
NEW CONNECTION TO HOOD AT NEW LOCATION.
SEE M-101. RETAIN AIR CONTROL VALVE FOR
REINSTALLATION.
2. REMOVE PORTION OF 18x6 DUCT FROM MAIN TO
DUCT DROP IN WALL. DUCT DROP TO REMAIN.
3. REMOVE EXISTING HEPA DIFFUSER IN CEILING
AND SUPPLY DUCT FROM MAIN.
4. REMOVE 16x10 SUPPLY DUCT AS SHOWN
DASHED FROM TERMINAL BOX TO DIFFUSERS.
5. MEASURE PRE-DEMOLITION SUPPLY AIRFLOW
NEAR THIS LOCATION IN 14Ø SUPPLY DUCT.
RECORD RESULT FOR USE IN NEW WORK.
6. REMOVE TERMINAL BOX VAV-189 AND HIGH
PRESSURE DUCT BACK TO MAIN AND CAP.
7. REMOVE EXHAUST FAN, EF-10 COMPLETE, MAKE
READY FOR INSTALLATION OF NEW FAN
CONNECTED TO EXISTING DUCT.
8. REMOVE GALVANIZED EXHAUST DUCT FROM
ROOM GRILLE TO LOCATION IDENTIFIED IN
MECHANICAL ROOM.
9. REMOVE EXISTING EXHAUST FAN IN CEILING AND
ALL ASSOCIATED CONTROLS COMPLETE.
10. REMOVE EXHAUST FAN COMPLETE INCLUDING
ROOF SUPPORTS, CABLE STAYS AND EXHAUST
DUCT DOWN THROUGH ROOF. CAP DUCT IN
CEILING SPACE OF FLOOR BELOW ROOF LEVEL.
SEE ARCHITECTURAL DRAWINGS FOR
ADDRESSING THE ROOF OPENING. CCORDINATE
REMOVAL WITH ALL OTHER TRADES.
0 2' 4' 8'
1010B
ANTE
ROOM
STERILE
PREP AREA
CHEMO
PREP AREA
1010A
H
T H
T
HAC
EXISTING
TOILET
E. AFMS
E. AFMS
EXISTING 6x14
SD1-380
TB-1
TB-3
TB-2
SD1-400
SD1-270
T
H
SIDE ACCESS
HEPA FILTER
HOUSING FF-2
SIDE ACCESS
HEPA FILTER
HOUSING
FF-1. SEE M-301
DETAIL 2.
FF-1 ABOVE
RETURN DUCT
EXISTING
ABANDONED
EXISTING
AHU-3
4"Ø
MAINTAIN 6'-6"
CLEAR
NEW EXHAUST
FAN 1-EF-10
FLEXIBLE
CONNECTION
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
P
M
M-101
PARCM
MECHANICAL PLAN
FULLY SPRINKLERED
Scale: 3/8" = 1'-0"
FIRST FLOOR MECHANICAL PLAN
1. MAINTAIN THE PHARMACY AREA OUTSIDE THE
PROJECT WORK BOUNDARY BETWEEN 68°F AND
77°F. PROVIDE TEMPORARY COOLING AND
HEATING IF NEEDED DURING OUTAGES.
0 1 2 4
NORTH
PLAN
Scale: 1/4" = 1'-0"
PARTIAL ROOF MECHANICAL PLAN
1. CONNECT NEW 18x6 TO EXISTING DUCT DROP.
BALANCE EXISTING WALL GRILLE TO 400 CFM.
EXTEND AND CONNECT 18x6 TO EXISTING 26x14
RETURN DUCT.
2. 10"Ø STAINLESS STEEL EXHAUST DUCT FROM
CHASE AND TRANSITION TO HOOD CONNECTION.
BALANCE HOOD EXHAUST TO 500 CFM WITH
DAMPER IN CHASE.
3. 16x8 STAINLESS STEEL EXHAUST DOWN IN HAC
TO EG1-700 AT 8" A.F.F. IN ANTE ROOM 1010.
SEAL DUCT AIRTIGHT AT WALL PENETRATION TO
ANTEROOM.
4. 8x8 STAINLESS STEEL EXHAUST DUCT DOWN IN
CHASE AND TRANSITION TO A EG2-400 AT 8"
A.F.F. INTO CHEMO PREP AREA 1010A. SEAL
DUCT AIR TIGHT AT WALL PENETRATION TO
CHEMO PREP AREA.
5. INSTALL ROOM TEMPERATURE AND HUMIDITY
SENSOR ON WALL AT 48" ABOVE FINISHED
FLOOR.
6. MOUNT ROOM PRESSURE MONITOR ON WALL AT
48" ABOVE FINISHED FLOOR IN ACCORDANCE
WITH MANUFACTURERS INSTRUCTIONS. EXTEND
ROOM PRESSURE BACNET ANALOG SIGNAL TO
BAS.
7. NEW EXHAUST FAN 1-EF-10 TO REPLACE
EXISTING FAN. PROVIDE TRANSITION FROM
DUCT TO FAN INLET. PROVIDE FLEX
CONNECTION.
8. 18Ø OPENING THROUGH DOUBLE CONCRETE
WALL, COORDINATE PENETRATION WITH CHASE
CONTENTS.
9. ADJUST SUPPLY FAN SPEED TO MAINTAIN SPACE
AIRFLOWS. MEASURE PRE-DEMOLITION PLUS
THE CFM ADDED AS NOTED ON THE DRAWINGS.
SEE MD101 ADJUST SUPPLY FAN TO 75HZ
MAXIMUM. NOTIFY THE COR IF AIRFLOW CANNOT
BE OBTAINED.
10. 4"Ø DUCT FROM EXISTING GENERAL EXHAUST
DUCT TO HAC CABINET OUTLET PROVIDE DUCT
TRANSITIONS AS NEEDED. BALANCE TO 30 CFM.
11. CAP DUCT AND SEAL AIR TIGHT.
12. INSTALL NEW STAINLESS STEEL EXHAUST DUCT
IN LOCATION OF EXISTING.
13. PROVIDE STAINLESS STEEL SUPPLY DUCT
DOWNSTREAM OF HEPA FILTERS.
14. AT ABANDONED ROOF PENETRATIONS, PATCH EXISTING
ROOF PER THE ROOFING MANUFACTURER'S
RECOMMENDATIONS AND INSTRUCTIONS.
0 21 4
NORTH
PLAN
ANTE
ROOM
EXISTING
TOILET
1012STERILE
PREP AREA
CHEMO
PREP AREA
1010A
TB-2
TB-3
TB-1
SHUTOFF
VALVES
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
N
AREA OF
WORK
KEY PLAN
ELECTRICAL
CLOSET
P
M
MP101
WRSRCM
FIRST FLOOR MECHANICAL PIPING
PLAN
FULLY SPRINKLERED
Scale: 3/8" = 1'-0"
FIRST FLOOR MECHNICAL PLUMBING PLAN
1. MAINTAIN THE PHARMACY AREA OUTSIDE THE
PROJECT WORK BOUNDARY BETWEEN 68°F AND
77°F. PROVIDE TEMPORARY COOLING AND
HEATING IF NEEDED DURING OUTAGES.
1. CONNECT 3/4" HHWS AND 3/4" HHWR TO
EXISTING 3/4" PIPING.
2. CONNECT 3/4" HHWS AND 3/4" HHWR TO
TERMINAL BOX.
0 21 4
NORTH
PLAN
EXISTING
RETURN
DUCT
EXISTING SUPPLY
DISCHARGE PLENUM
EXISTING AHU-3
FLOOR
EXISTING RETURN DUCT
12"Ø STAINBLESS STEEL EXHAUST
DUCT FROM PHARMACY
EXISTING 14"Ø SUPPLY DUCT
EXISTING SUPPLY DUCT
CONCRETE DECK
INSTALL NEW 14" Ø STAINLESS STEEL
SUPPLY DUCT IN EXISTING CHASE
16x16 STAINLESS STEEL
E. AHU-3 SUPPLY PLENUM
E. 36"Ø SUPPLY DUCT
E. 8"Ø, EXHAUST
E. RETURN DUCT BEYOND. MAINTAIN 20" CLEAR TO ACCESS EXISTING DUCT DETECTOR
FLOOR
FF-2
FF-1 SUPPORTS UP TO
CONCRETE DECK OVERHEAD
E. RETURN
FAN
BEYOND
WALL
E. AFMS IN RETURN DUCT
14" Ø S.S. SUPPLY DUCT
12" Ø S.S. EXHAUST DUCT
16 x 16
SUPPLY
DUCT
FF-1
28x16 INSULATED S.S.
PLENUM UPSTREAM OF
FILTER HOUSING
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 03/29/2019
GRAND JUNCTION VA MEDICAL
CENTER - UPGRADE HAZARDOUS
DRUG WORKSPACE
575-18-110
VA WESTERN COLORADO
HEALTH CARE SYSTEM
2121 NORTH AVENUE
GRAND JUNCTION, CO 81501
18-235
100% BID DOCUMENTS
FULLY SPRINKLERED
Structural Engineer:
P
M
M-301
PARCM
MECHANICAL SCHEDULES AND DETAILS
FULLY SPRINKLERED
Scale: 1/2" = 1'-0"
ELEVATION AT EXISTING AHU-3 DISCHARGE PLENUM (SEE M-101) 0 1 2 4
NORTH
PLAN
0 1 2 4
NORTH
PLAN
0 1 2 4
NORTH
PLAN
Scale: 1/2" = 1'-0"
SECTION 2 (SEE M-101)
DA
AO - REHEATING VALVE
HW
M
HWS HWR
T
AI - DISCHARGE AIR TEMP
AI - AIRFLOW
M
AO - ZONE DAMPER
SA
T
AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
F
T
AI - ZONE HUMIDITY
POINT NAME:
ZONE TEMPERATURE
ZONE TEMPERATURE SETPOINT
AIRFLOW
DISCHARGE AIR TEMPERATURE
ZONE DAMPER
REHEATING VALVE
HEATING MODE
SETPOINT TEMPERATURE
HIGH ZONE TEMPERATURE
LOW ZONE TEMPERATURE
HIGH DISCHARGE TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
X
BI BO
SOFTWARE POINTS
AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
X
TOTAL HARDWARE (7) TOTAL SOFTWARE (13)
5 2
X
X
4 8
X
X
X
X
X
ZONE HUMIDITY
X
X X X
X
SST
EF-10
STS
EF-10
VFD
ALA
EF-10
EF-10
SEQUENCE: EXHAUST FANS SHALL START AND RUN CONTINUOUSLY.
VFD SHALL ADJUST SPEED TO MAINTAIN EXHAUST DUCT PRESSURE
OF -1.0" W.G. (ADJ)..
SP-1
EF-10
EXHAUST DUCT
DSP-1
POINT NAME:
EF-10 STATUS
HARDWARE POINTS
AI AO BI BO
SOFTWARE POINTS
AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
X
X
TOTAL HARDWARE (7) TOTAL SOFTWARE (6)
EF-10 START / STOP
EF-10 ALARM
X
X
X
X X
POINT ID:
STS-1
SST-1
ALA-1
RFR-1
RFR-2
DSP-1
REFRIGERATOR ALARM
REFRIGERATOR ALARM
DUCT PRESS
X
X
X
SP-1 VFD SPEED
X
1 1
X
X
X
X
X
X
X
X
SCALE: N.T.S.
CAV TERMINAL SCHEMATIC
SCALE: N.T.S.
CAV TERMINAL SEQUENCE OF OPERATION
SCALE: N.T.S.
CAV TERMINAL UNIT POINTS LIST
SCALE: N.T.S.
EXHAUST FAN CONTROLS
SCALE: N.T.S
EXHAUST FAN POINTS LIST
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
Locatio…