36C25919R0090-0001002.pdf
PDF 18 MB Posted
- Attached to
- Replace Air Handling Units Federal contract opportunity
- Solicitation number
- 36C25919R0090
About this file
36C25919R0090 0001 Drawings Combined Signed Sealed.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25919R0090-0007000.docx | DOCX document | |
| 36C25919R0090-0006000.docx | DOCX document | |
| 36C25919R0090-0005000.docx | DOCX document | |
| 36C25919R0090-0004003.pdf | ||
| 36C25919R0090-0004001.pdf | ||
| 36C25919R0090-0004002.pdf | ||
| 36C25919R0090-0004000.docx | DOCX document | |
| 36C25919R0090-0003000.docx | DOCX document | |
| 36C25919R0090-0002000.docx | DOCX document | |
| 36C25919R0090-0002003.pdf | ||
| 36C25919R0090-0002001.pdf | ||
| 36C25919R0090-0002002.pdf | ||
| 36C25919R0090-0001001.pdf | ||
| 36C25919R0090-0001000.docx | DOCX document | |
| 36C25919R0090-006.pdf | ||
| 36C25919R0090-004.docx | DOCX document | |
| 36C25919R0090-002.pdf | ||
| 36C25919R0090-005.docx | DOCX document | |
| 36C25919R0090-001.docx | DOCX document | |
| 36C25919R0090-007.pdf | ||
| 36C25919R0090-003.pdf | ||
| 36C25919R0090-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURE ENGINEERING CONSTRUCTION
PROJECT NUMBER 623-15-104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
GENERAL NOTES
VA PROJECT TEAM
OWNER: OWNER'S CONTRACTING OFFICER:
DRAWING TITLEDWG NO.
SHEET OF #
ABBREVIATIONS
PHASING
SITE PLAN
ED101 BUILDING 1AB FIRST FLOOR ELECTRICAL DEMOLITION PLAN
GI001
WLFDJR, JAV
GENERAL INFORMATION
NORTH
E-501 ELECTRICAL DETAILS
SIGNATURE BLOCK
E-601
MECHANICAL EQUIP. CONNECTION & LUMINAIRE SCHEDULE
ED102 BUILDING 1AB SECOND FLOOR ELECTRICAL DEMOLITION PLAN
ED103 BUILDING 1AB THIRD FLOOR ELECTRICAL DEMOLITION PLAN
ED104 BUILDING 1AB FOURTH FLOOR ELECTRICAL DEMOLITION PLAN
ED105 BUILDING 1AB FIFTH FLOOR ELECTRICAL DEMOLITION PLAN
ED106 BUILDING 1AB ATTIC ELECTRICAL DEMOLITION PLAN
ED107 BUILDING 1C CRAWL SPACE ELECTRICAL DEMOLITION PLAN
ED110 BUILDING 1C THIRD FLOOR ELECTRICAL DEMOLITION PLAN
ED111 BUILDING 1C ROOF ELECTRICAL DEMOLITION PLAN
EP101 BUILDING 1AB FIRST FLOOR ELECTRICAL POWER PLAN
EP102 BUILDING 1AB SECOND FLOOR ELECTRICAL POWER PLAN
EP103 BUILDING 1AB THIRD FLOOR ELECTRICAL POWER PLAN
EP104 BUILDING 1AB FOURTH FLOOR ELECTRICAL POWER PLAN
EP105 BUILDING 1AB FIFTH FLOOR ELECTRICAL POWER PLAN
EP106 BUILDING 1AB ATTIC ELECTRICAL POWER PLAN
EP110 BUILDING 1C THIRD FLOOR ELECTRICAL POWER PLAN
EP111 BUILDING 1C ROOF ELECTRICAL POWER PLAN
ELECTRICAL
E-001
ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS
OF45
OF46
OF47
OF48
OF
OF51
OF50
OF
OF52
OF53
OF54
OF55
OF56
OF57
OF58
OF59
INDEX OF DRAWINGS
DRAWING TITLEDWG NO.
GENERAL INFORMATION OF
SHEET OF #
GI001
GENERAL
OF2
OF 3
OF18
MECHANICAL
MD101 BUILDING 1AB FIRST FLOOR MECHANICAL DEMOLITION PLAN
OF19
OF4
OF5
OF14
OF15
OF16
OF17
OF10
OF11
OF12
OF13
OF6
OF7
OF8
OF
OF21
OF20
OF
OF22
OF23
OF24
OF25
M-501 MECHANICAL DETAILS
OF26
OF27
OF28
OF29
OF30
OF31
OF32
OF33
OF34
OF35
OF36
OF37
OF9
M-605 STEAM PRESSURE REDUCING VALVES DIAGRAM
M-606 MECHANICAL SCHEDULES
MD102 BUILDING 1AB SECOND FLOOR MECHANICAL DEMOLITION PLAN
MD103 BUILDING 1AB THIRD FLOOR MECHANICAL DEMOLITION PLAN
MD104 BUILDING 1AB FOURTH FLOOR MECHANICAL DEMOLITION PLAN
MD105 BUILDING 1AB FIFTH FLOOR MECHANICAL DEMOLITION PLAN
MD106 BUILDING 1AB ATTIC MECHANICAL DEMOLITION PLAN
MD107 BUILDING 1C CRAWL SPACE MECHANICAL DEMOLITION PLAN
MD108 BUILDING 1C FIRST FLOOR MECHANICAL DEMOLITION PLAN
MD109 BUILDING 1C SECOND FLOOR MECHANICAL DEMOLITION PLAN
MD110 BUILDING 1C THIRD FLOOR MECHANICAL DEMOLITION PLAN
MD111 BUILDING 1C ROOF MECHANICAL DEMOLITION PLAN
MH101 BUILDING 1AB FIRST FLOOR MECHANICAL PLAN
MH102 BUILDING 1AB SECOND FLOOR MECHANICAL PLAN
MH103 BUILDING 1AB THIRD FLOOR MECHANICAL PLAN
MH104 BUILDING 1AB FOURTH FLOOR MECHANICAL PLAN
MH105 BUILDING 1AB FIFTH FLOOR MECHANICAL PLAN
MH106 BUILDING 1AB ATTIC MECHANICAL PLAN
MH107 BUILDING 1C CRAWL SPACE MECHANICAL PLAN
MH108 BUILDING 1C FIRST FLOOR MECHANICAL PLAN
MH109 BUILDING 1C SECOND FLOOR MECHANICAL PLAN
MH110 BUILDING 1C THIRD FLOOR MECHANICAL PLAN
MH111 BUILDING 1C ROOF MECHANICAL PLAN
ICRA TYPICAL PHASING AND ENLARGED AREA PLANSGI401
INFECTION CONTROL RISK ASSESSMENT DETAILSGI501
MH401 LARGE-SCALE MECHANICAL PLANS
M-001 MECHANICAL LEGENDS AND ABBREVIATIONS
OF38
OF39
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL CONTROLS
M-506 MECHANICAL CONTROLS
M-507 MECHANICAL CONTROLS
M-601 AIRFLOW DIAGRAMS
M-602 AIRFLOW DIAGRAMS
M-603 AIRFLOW DIAGRAMS
M-604 HYDRONIC FLOW DIAGRAMS
MD401 LARGE-SCALE MECHANICAL DEMOLITION PLANS
OF
OF41
OF40
OF
OF
OF61
OF60
OF
OF62
OF63
OF64
OF65
OF66
OF67
OF68
ED401 ENLARGED AREAS ELECTRICAL DEMOLITION PLANS
EP401 ENLARGED AREAS ELECTRICAL POWER PLANS
M-607 MECHANICAL SCHEDULES
OF42 OF
M-608 MECHANICAL SCHEDULES
OF43 OF
MP105 BUILDING 1AB FIFTH FLOOR MECHANICAL PIPING PLAN
OF44 OF
ARCHITECTURAL
A-105 BUILDING 1AB FIFTH FLOOR ARCHITECTURAL PLAN
EL105 BUILDING 1AB FIFTH FLOOR ELECTRICAL LIGHTING PLAN
MP104 BUILDING 1AB FOURTH FLOOR MECHANICAL PIPING PLAN
MP103 BUILDING 1AB THIRD FLOOR MECHANICAL PIPING PLAN
OF69
OF70
STRUCTURAL
S101 BUILDING 1C ROOF STRUCTURAL PLAN
OF71 82
M-508 MECHANICAL CONTROLS
OF49 82
OF72 82
AD101 BUILDING 1AB FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN
AD102 BUILDING 1AB SECOND FLOOR ARCHITECTURAL DEMOLITION PLAN
AD103 BUILDING 1AB THIRD FLOOR ARCHITECTURAL DEMOLITION PLAN
AD104 BUILDING 1AB FOURTH FLOOR ARCHITECTURAL DEMOLITION PLAN
AD105 BUILDING 1AB FIFTH FLOOR ARCHITECTURAL DEMOLITION PLAN
A-101 BUILDING 1AB FIRST FLOOR ARCHITECTURAL PLAN
A-102 BUILDING 1AB SECOND FLOOR ARCHITECTURAL PLAN
A-103 BUILDING 1AB THIRD FLOOR ARCHITECTURAL PLAN
A-104 BUILDING 1AB FOURTH FLOOR ARCHITECTURAL PLAN
MECHANICAL (CONTINUED)
FIRE PROTECTION
FP105 BUILDING 1AB FIFTH FLOOR FIRE PROTECTION PLAN OF73
OF74
OF75
OF76
OF77
OF78
OF79
OF80
OF81 82
OF82 82
DocuSign Envelope ID: 4071FBF3-839D-481D-8146-381D02560B60
11/21/2018
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. ICRA CONTROL BOUNDARY. PROVIDE
TEMPORARY PARTITION. PARTITION SHALL BE
INSPECTED BY VA ICRA STAFF PRIOR TO START
OF CONSTRUCTION IN SPACE. MAINTAIN
NEGATIVE PRESSURE VENTILATION IN THE
CONSTRUCTION SPACE.
2. WORK AREA.
3. PROVIDE STICKY MAT
4. CONTRACTOR SHALL REMOVE OR COVER ALL
FURNITURE WITHIN ROOM WITH PLASTIC PRIOR
TO COMMENCING WORK IN A SPACE AND
REPLACE OR REMOVE COVER PRIOR TO
POST-CONSTRUCTION TERMINAL CLEANING.
5. EXHAUST NEGATIVE AIR MACHINE OUT WINDOW.
CONTRACTOR SHALL FABRICATE DEVICE FOR
TEMPORARY INSTALLATION OF THE EXHAUST
DUCT IN WINDOW. AFTER REMOVAL OF
NEGATIVE AIR PRESSURE MACHINE, WINDOW
TO BE SECURED AND CHECKED BY VA STAFF.
6. PROVIDE NEGATIVE PRESSURE TO SPACE
DURING CONSTRUCTION DISCHARGE AIR
THROUGH HEPA FILTRATION.
7. EXHAUST NEGATIVE AIR MACHINE OUT DOOR
OPENING. CONTRACTOR SHALL FABRICATE
DEVICE FOR TEMPORARY INSTALLATION OF THE
EXHAUST DUCT IN DOOR FRAME. AFTER
REMOVAL OF NEGATIVE AIR PRESSURE
MACHINE, DOOR TO BE SECURED AND CHECKED
BY VA STAFF.
8. CONTRACTOR TO COVER FLOOR WITH
PLYWOOD OR SIMILAR MATERIAL TO PREVENT
DAMAGE TO FLOOR COVERINGS.
1 AB
GI401
WLF DJR
ICRA TYPICAL PHASING AND
ENLARGED AREA PLANS
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. PROVIDE ENGINEERED ICRA CONTROL BOUNDARY
UNLESS OTHERWISE COORDINATED WITH THE VA.
EDGE-GUARD OR APPROVED EQUAL. WITH
NEGATIVE AIR PRESSURE WITH HEPA FILTERS IN
MACHINE. ALSO PROVIDE STEP-OFF PADS (STICKY
MATS).
4. WHERE THERE ARE NOT EXISTING FIRE
PROTECTION SPRINKLER HEADS ON BOTH SIDES
OF ICRA PARTITIONS, THE PARTITION MUST BE
CONSTRUCTED ON NON-COMBUSTABLE
MATERIALS.
GI501
WLFJMB3
INFECTION CONTROL RISK
ASSESSMENT DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. REMOVE ACOUSTICAL CEILING PANELS AND GRID
THIS AREA AS REQUIRED TO PERFORM
DEMOLITION WORK INDICATED ON MECHANICAL
AND ELECTRICAL DEMOLITION SHEETS.
2. EXISTING LOUVER TO REMAIN.
3. REMOVE PORTIONS OF EXISTING WALL AND
CEILING THIS ROOM AS REQUIRED TO COMPLETE
MECHANICAL AND ELECTRICAL WORK.
AD101
RMCDJR
BUILDING 1AB FIRST FLOOR
ARCHITECTURAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
DocuSign Envelope ID: BFD0B71E-8238-4B00-9E14-3CA9592C9A44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
AD102
RMCDJR
BUILDING 1AB SECOND FLOOR
ARCHITECTURAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
1. REMOVE ACOUSTICAL CEILING PANELS AND GRID
THIS AREA AS REQUIRED TO PERFORM
DEMOLITION WORK INDICATED ON MECHANICAL
AND ELECTRICAL DEMOLITION SHEETS.
2. EXISTING LOUVER TO REMAIN.
3. REMOVE PORTIONS OF EXISTING WALL AND
CEILING THIS ROOM AS REQUIRED TO COMPLETE
MECHANICAL AND ELECTRICAL WORK.
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
AD103
RMCDJR
BUILDING 1AB THIRD FLOOR
ARCHITECTURAL DEMOLITION PLAN
N O
R T
H
1. REMOVE ACOUSTICAL CEILING PANELS AND GRID
THIS AREA AS REQUIRED TO PERFORM DEMOLITION
WORK INDICATED ON MECHANICAL AND
ELECTRICAL DEMOLITION SHEETS.
2. EXISTING LOUVER TO REMAIN.
3. REMOVE PORTIONS OF EXISTING WALL AND
CEILING THIS ROOM AS REQUIRED TO COMPLETE
MECHANICAL AND ELECTRICAL WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
AD104
RMCDJR
BUILDING 1AB FOURTH FLOOR
ARCHITECTURAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
1. REMOVE ACOUSTICAL CEILING PANELS AND GRID
THIS AREA (OR GYPSUM BOARD CEILING WHERE
OCCURS) AS REQUIRED TO PERFORM DEMOLITION
WORK INDICATED ON MECHANICAL AND
ELECTRICAL DEMOLITION SHEETS.
2. EXISTING LOUVER TO REMAIN.
3. REMOVE PORTIONS OF EXISTING WALL AND
CEILING THIS ROOM AS REQUIRED TO COMPLETE
MECHANICAL AND ELECTRICAL WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
AD105
RMCDJR
BUILDING 1AB FIFTH FLOOR
ARCHITECTURAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
1. REMOVE EXISTING CEILING TILES AND GRID THIS
ROOM.
2. EXISTING LOUVER TO REMAIN.
3. REMOVE PORTIONS OF EXISTING WALL AND
CEILING THIS ROOM AS REQUIRED TO COMPLETE
MECHANICAL AND ELECTRICAL WORK.
4. REMOVE EXISTING CEILING TILES THIS AREA.
EXISTING GRID TO REMAIN.
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
A-101
RMCDJR
BUILDING 1AB FIRST FLOOR
ARCHITECTURAL PLAN
N O
R T
H
1. REINSTALL EXISTING CEILING PANELS AND GRID
REMOVED DURING DEMOLITION. REPLACE ANY
CEILING PANELS OR GRID THAT WAS DAMAGED
DURING DEMOLITION. MATCH HEIGHT AND TYPE
OF EXISTING ADJACENT CEILING SYSTEM.
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
4. IF SOME OF THE EXISTING CEILING GRID AND/OR
TILE IS DAMAGED DURING CONSTRUCTION AND
MATCHING MATERIAL IS NOT AVAILABLE, REPLACE
CEILING AND/OR TILE IN ENTIRE ROOM WITH
MATERIAL SPECIFIED IN 09 51 00 ACOUSTICAL
CEILINGS.
5. MAINTAIN EXISTING FIRE SEPARATION HOUR
RATINGS AT ALL NEW PENETRATIONS.
A-102
RMCDJR
BUILDING 1AB SECOND FLOOR
ARCHITECTURAL PLAN
N O
R T
H
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. REINSTALL EXISTING CEILING PANELS AND GRID
REMOVED DURING DEMOLITION. REPLACE ANY
CEILING PANELS OR GRID THAT WAS DAMAGED
DURING DEMOLITION. MATCH HEIGHT AND TYPE
OF EXISTING ADJACENT CEILING SYSTEM.
2. PATCH ANY FLOOR OR WALL OPENINGS THAT
REMAIN AFTER DEMOLITION OF MECHANICAL AND
ELECTRICAL EQUIPMENT THIS ROOM. PATCH TO
MATCH EXISTING ADJACENT CONDITIONS.
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
4. IF SOME OF THE EXISTING CEILING GRID AND/OR
TILE IS DAMAGED DURING CONSTRUCTION AND
MATCHING MATERIAL IS NOT AVAILABLE, REPLACE
CEILING AND/OR TILE IN ENTIRE ROOM WITH
MATERIAL SPECIFIED IN 09 51 00 ACOUSTICAL
CEILINGS.
5. MAINTAIN EXISTING FIRE SEPARATION HOUR
RATINGS AT ALL NEW PENETRATIONS.
13 2
A-103
RMCDJR
BUILDING 1AB THIRD FLOOR
ARCHITECTURAL PLAN
N O
R T
H
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. REINSTALL EXISTING CEILING PANELS AND GRID
REMOVED DURING DEMOLITION. REPLACE ANY
CEILING PANELS OR GRID THAT WAS DAMAGED
DURING DEMOLITION. MATCH HEIGHT AND TYPE
OF EXISTING ADJACENT CEILING SYSTEM.
2. PATCH ANY FLOOR OR WALL OPENINGS THAT
REMAIN AFTER DEMOLITION OF MECHANICAL AND
ELECTRICAL EQUIPMENT THIS ROOM. PATCH TO
MATCH EXISTING ADJACENT CONDITIONS.
3. PATCH ANY DAMAGE TO ROOFING MATERIAL
RESULTING FROM DEMOLITION OF MECHANICAL
EQUIPMENT. PATCH TO MATCH EXISTING
ADJACENT ROOFING. COORDINATE ROOF
REPAIRS WITH VA AND ROOFING CONTRACTOR
TO MAINTAIN EXISTING ROOF WARRANTY.
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
4. IF SOME OF THE EXISTING CEILING GRID AND/OR
TILE IS DAMAGED DURING CONSTRUCTION AND
MATCHING MATERIAL IS NOT AVAILABLE, REPLACE
CEILING AND/OR TILE IN ENTIRE ROOM WITH
MATERIAL SPECIFIED IN 09 51 00 ACOUSTICAL
CEILINGS.
5. ANY ROOF PATCHING IS TO BE DONE IN
ACCORDANCE WITH THE CURRENT ROOF
MANUFACTURERS SPECIFICATIONS TO MAINTAIN
EXISTING ROOF WARRANTY.
6. MAINTAIN EXISTING FIRE SEPARATION HOUR
RATINGS AT ALL NEW PENETRATIONS.
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
A-104
RMCDJR
BUILDING 1AB FOURTH FLOOR
ARCHITECTURAL PLAN
N O
R T
H
1. REINSTALL EXISTING CEILING PANELS AND GRID
REMOVED DURING DEMOLITION. REPLACE ANY
CEILING PANELS OR GRID THAT WAS DAMAGED
DURING DEMOLITION. MATCH HEIGHT AND TYPE
OF EXISTING ADJACENT CEILING SYSTEM.
2. PATCH ANY FLOOR OR WALL OPENINGS THAT
REMAIN AFTER DEMOLITION OF MECHANICAL AND
ELECTRICAL EQUIPMENT THIS ROOM. PATCH TO
MATCH EXISTING ADJACENT CONDITIONS.
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN, REFER
TO SHEET GI501 AND NARRATIVE.
4. IF SOME OF THE EXISTING CEILING GRID AND/OR
TILE IS DAMAGED DURING CONSTRUCTION AND
MATCHING MATERIAL IS NOT AVAILABLE, REPLACE
CEILING AND/OR TILE IN ENTIRE ROOM WITH
MATERIAL SPECIFIED IN 09 51 00 ACOUSTICAL
CEILINGS.
5. ANY ROOF PATCHING IS TO BE DONE IN
ACCORDANCE WITH THE CURRENT ROOF
MANUFACTURERS SPECIFICATIONS TO MAINTAIN
EXISTING ROOF WARRANTY.
6. MAINTAIN EXISTING FIRE SEPARATION HOUR
RATINGS AT ALL NEW PENETRATIONS.
2 3
2 3
2 3
2 3
2 3
2 3
2 3
1 2
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 32 32 3
2 3 2 3 2 3
2 3
1 2
1 2
1 2
1 2
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. REPLACE EXISTING CEILING GRID AND
PANELS THIS CORRIDOR WITH NEW
ASSEMBLY (ACT-1). CEILING HEIGHT TO
MATCH HEIGHT OF EXISTING CORRIDOR
CEILINGS.
2. PATCH ANY FLOOR OR WALL OPENINGS
THAT REMAIN AFTER DEMOLITION OF
MECHANICAL AND ELECTRICAL EQUIPMENT
THIS ROOM. PATCH TO MATCH EXISTING
ADJACENT CONDITIONS.
3. PROVIDE NEW 2'X2' CEILING PANELS AND
GRID ASSEMBLY (ACT-1) THIS ROOM PER
SPECIFICATION SECTION 09 51 00. NEW
CEILING HEIGHT IS TO BE 8'-0" AFF.
A-105
RMCDJR
BUILDING 1AB FIFTH FLOOR
ARCHITECTURAL PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. IN ROOMS/CORRIDORS WHERE NEW CEILINGS WILL
BE INSTALLED LOWER THAN THE EXISTING
CEILINGS, PATCH AND SEAL EXISTING WALL
OPENINGS WHERE SIDE WALL GRILLES WERE
REMOVED.
4. MAINTAIN EXISTING FIRE SEPARATION HOUR
RATINGS AT ALL NEW PENETRATIONS.
11/20/18
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. AREA OF WORK.
2. DROP EXISTING SPRINKLER HEADS
APPROXIMATELY 2 FEET TO MATCH NEW CEILING
HEIGHT.
3. PROVIDE NEW SPRINKLER HEADS.
FP105
WLFRK
BUILDING 1AB FIFTH FLOOR FIRE
PROTECTION PLAN
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
DocuSign Envelope ID: 8B0D9B45-E8D6-491F-B574-0EC382C37ACB
CONTROL WIRING
LIMITS OF DEMOLITION
POINT OF CONNECTION TO EXISTING
SUPPLY DIFFUSER
RETURN GRILLE
FIRE DAMPER
DUCT SMOKE DETECTOR
DIFFUSER NECK SIZE
DIFFUSER CFM
T
THERMOSTAT
VOLUME DAMPER
8"Ø
SUPPLY TOP REGISTER OR GRILLE
(WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP
GRILLE (WALL TYPE)
FLEXIBLE DUCTWORK (INSULATED)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND DUCTWORK
DN
DN
DNUP
UP
UP
8"Ø
RECTANGULAR DUCTWORK
10x10
VAV BOX
EXISTING DUCTWORK
DUCTWORK TO BE DEMOLISHED
AIRFLOW DIRECTION
PIPING DOWN
PIPING UP
TEE UP
TEE DOWN
EXISTING PIPING TO REMAIN
PIPING TO BE DEMOLISHED
TEST PLUG (PRESSURE/TEMPERATURE)
EXHAUST GRILLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
M-001
WLFDJR
MECHANICAL LEGENDS AND
ABBREVIATIONS
DocuSign Envelope ID: 5F9F06D1-A25A-4512-B486-D4673CACB0C3
AREA SERVED BY CHAPEL 1-AHU-3
EA
EA
EX LOUVER
EX 1-EF-1
EX EA
EX CD
EX CD
EX CD
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. DISCONNECT EXHAUST DUCTS CONNECTED TO
FAN.
2. DISCONNECT POWER CONNECTION TO FAN AND
REMOVE VFD. DISPOSE OF VFD PER SPECIFICATION
REQUIREMENTS.
3. REMOVE EXHAUST FAN AND CONNECTING
DUCTWORK.
4. REMOVE EXISTING THERMOSTAT FOR
REPLACEMENT WITH NEW COMPATIBLE WITH NEW
CONTROLS SYSTEM.
5. EXISTING DUCTWORK TO REMAIN AS IS.
6. REMOVE EXISTING CEILING DIFFUSER TO BE
REPLACED AS INDICATED ON THE NEW WORK
SHEET.
MD101
WLF / JMB2DJR
BUILDING 1AB FIRST FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
12"Ø
8"Ø
6"Ø
6"Ø
8"Ø
8"Ø
8"Ø
10"Ø
6"Ø
EX 22x10 EA
EX HOOD
WITH (4)
EX 8"Ø EA
(TYP.)
AREA SERVED BY 1-AHU-4 LOCATED
AT FIRST FLOOR MECHANICAL ROOM
EA
EA
EX LOUVER
EX 1-EF-4
EX 1-EF-2
EX 1-EF-3
EX EA
16"Ø SA UP
16"x16" EA UP
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. DISCONNECT EXHAUST DUCTS CONNECTED TO
FAN.
2. DISCONNECT POWER CONNECTION TO FAN AND
REMOVE VFD. DISPOSE OF VFD PER SPECIFICATION
REQUIREMENTS.
3. REMOVE EXHAUST FAN AND CONNECTING
DUCTWORK.
4. DISCONNECT POWER AND DEMOLISH EXHAUST
FAN.
5. DEMOLISH EXISTING FAN COIL AND SUPPLY AIR
DUCTS, DIFFUSERS, AND CHILLED WATER PIPING
TO MAINS ABOVE CORRIDOR CEILING.
6. DEMOLISH EXISTING CAV BOX AND ASSOCIATED
DUCTWORK, AND GRILLES/DIFFUSERS.
7. DEMOLISH STEAM AND CONDENSATE PIPING
ASSOCIATED WITH REHEAT COILS TO MAINS ABOVE
CEILING.
8. DEMOLISH ALL CONTROLS ASSOCIATED WITH CAV
AND STEAM COIL. CUT AND CAP PNEUMATIC
TUBING UP TO MAIN ABOVE CEILING.
9. REMOVE EXISTING THERMOSTAT FOR
REPLACEMENT WITH NEW COMPATIBLE WITH NEW
CONTROLS SYSTEM.
10. EXISTING DUCTWORK TO REMAIN AS IS.
11. EXISTING DUCT RISERS TO BE REMOVED AND
REPLACED WITH NEW IN SAME LOCATION. SEE
NEW WORK PLAN FOR NEW DUCT INFORMATION.
MD102
WLF / JMB2DJR
BUILDING 1AB SECOND FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
E A
EX 24/9 EA
EX 10"Ø SA
EX 6"Ø EA
SEE 1C THIRD FLOOR
PLANS FOR
CONTINUATION
EX CD
EX RG
EX RG
EX CD
EX 6"Ø SA
EX 10"Ø SA
EX CD
EX 12"Ø EA
EX RG
EX CD
EX 6"Ø SA
EX 12"Ø EA
EX CD
EX 1-MB-1
EX 20x10 SA
EX RG
EX 8"Ø EA
EX 1-EF-6
EX 8"Ø SA
EX CD
EX RG
EX 1-CU-1
EX 1-CU-2
EX 1-EF-9
EX 1-EF-11
EX 1-EF-10
EX 8"Ø SA
EX CD
EX 10"Ø EA
EX 12x6 EA
EX RG
EX 8"Ø EA
EX CD
EX 6"Ø SA
EX CD
EX 6"Ø SA
EX 16x7 SA
EX CD
EX 8"Ø SA
EX RG
EX 12"Ø EA
EX RG
EX 8"Ø EA
EX RG
EX 6"Ø EA
EX RG
EX 6"Ø EA
EX 14x8 EA
EX 10"Ø SA
EX CD
EX RG
EX 12"Ø EA
EX CD
EX RG
EX 12"Ø EA
EX 12"Ø EA
EX RG
EX 12"Ø EA
EX RG
EX CD
EX CD
EX 10"Ø SA
EX 10"Ø SA
(2) EX12"Ø SA UP
(COLD & HOT)
EX 10"Ø SA
EX EA
EX EA
EX 10"Ø SA
EX 1-MB-2
EA
EA
EX LOUVER
EX 1-EF-5
EX 1-EF-7
EX 12"Ø SA
UP AND DOWN
EX 24x10 EA
UP AND DOWN
EX EA
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
MD103
WLF / JMB2DJR
BUILDING 1AB THIRD FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. DISCONNECT EXHAUST DUCTS CONNECTED TO
FAN.
2. DISCONNECT POWER CONNECTION TO FAN AND
REMOVE VFD. DISPOSE OF VFD PER SPECIFICATION
REQUIREMENTS.
3. REMOVE EXHAUST FAN AND CONNECTING
DUCTWORK.
4. DISCONNECT POWER AND DEMOLISH EXHAUST
FAN.
5. DEMOLISH DUCTWORK AND ASSOCIATED
GRILLES/DIFFUSERS.
6. DEMOLISH EXISTING DUAL DUCT MIXING BOX AND
ASSOCIATED CONTROLS.
7. EXISTING DUCTWORK TO REMAIN.
8. DISCONNECT POWER AND DEMOLISH
CONDENSING UNIT ALONG WITH ASSOCIATED
REFRIGERANT PIPING.
9. REMOVE REFRIGERANT PER LOCAL AND VA CODES.
10. PATCH ANY DAMAGE TO ROOFING MATERIAL
RESULTING FROM MECHANICAL DEMOLITION.
PATCH TO MATCH EXISTING ADJACENT ROOFING.
COORDINATE ROOF REPAIRS WITH
ARCHITECTURAL REQUIREMENTS, VA, AND
ROOFING CONTRACTOR TO MAINTAIN EXISTING
ROOF WARRANTY.
11. EXISTING DUCT RISERS TO BE REMOVED AND
REPLACED WITH NEW IN SAME LOCATION. SEE
NEW WORK PLAN FOR NEW DUCT INFORMATION.
EX 1-EF-13
EX 1-EF-14
EA
EX LOUVER
EX 1-EF-12
EX RG
EX 6x10 SA
EX 12x10 SA
EX 8"Ø SA
EX CD
EX 1-MB-6
EX 1-MB-3
EX 1-MB-7
EX 1-MB-4
EX 1-MB-8
EX 1-MB-5
EX 6"Ø SA
EX CD
(2) EX 15"Ø SA UP AND (2) 12"Ø DOWN
(COLD & HOT)
EX 8"Ø SA
EX CD
EX 10"Ø SA
EX CD
EX 10"Ø SA
EX CD
EX 10"Ø SA
EX CD
(2) EX 8"Ø SA
EX 8"Ø SA
EX 5x10 SA
EX 12x10 SA
EX CD
EX 8"Ø SA
EX 10"Ø SA
EX CD
EX 14"Ø SA
UP AND DOWN
EX 24x14 RA/EA
UP AND DOWN
EX 20x10/EA
EX RG AND 6"Ø EA
EX 16x8 EA
EX 20/10 EA
EX RG AND DUCT
EX 16x8 EA
EX SD AND DUCT
EX SD AND DUCT
EX SD AND DUCT
EX EA
EX CAV BOX
EX TSTAT
EX TSTAT
EX TSTAT
EX TSTAT
EX TSTAT
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
MD104
WLF / JMB2DJR
BUILDING 1AB FOURTH FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
1. DISCONNECT EXHAUST DUCTS CONNECTED TO
FAN.
2. DISCONNECT POWER CONNECTION TO FAN AND
REMOVE VFD. DISPOSE OF VFD PER SPECIFICATION
REQUIREMENTS.
3. REMOVE EXHAUST FAN AND CONNECTING
DUCTWORK.
4. DISCONNECT POWER AND DEMOLISH EXHAUST
FAN.
5. DEMOLISH DUCTWORK AND ASSOCIATED
GRILLES/DIFFUSERS.
6. DEMOLISH EXISTING DUAL DUCT MIXING BOX AND
ASSOCIATED CONTROLS.
7. EXISTING DUCTWORK TO REMAIN.
8. DEMOLISH STEAM AND CONDENSATE PIPING
ASSOCIATED WITH REHEAT COILS TO MAINS ABOVE
CEILING.
9. DEMOLISH ALL CONTROLS ASSOCIATED WITH CAV
AND STEAM COIL. CUT AND CAP PNEUMATIC
TUBING UP TO THE MAIN ABOVE CEILING.
10. DEMOLISH EXISTING CAV BOX AND ASSOCIATED
CONTROLS.
EX 18x18 SA UP
EX-1-EF-17
EX 1-EF-18
EA
EA
EX 14"Ø SA
UP AND DOWN
EX 24x14 RA/EA
UP AND DOWN
EX 12x8 SAEX 12x8 SA
EX CD
EX RR 20x8
EX 20x10 EA
EX RR 30x12
EX 18x10 SA
EX 18x8 SA
EX SD 20x8
EX RR 18x8
EX 18x14 SA UP
EX SD 20x8
EX 15x8 SA
EX RR 18x8
EX SD 20x8
EX RR 14x8
EX 20x14 EA
EX 18x10 SA
EX RR 20x8
EX 18x8 SA
EX RR 16x8
EX SD 20x8
EX RR 14x8
EX RR 14x8
EX 20x20 EA
EX 24x20 EA
EX 30x20 EA
EX 10x8 SA
EX CD
EX 30x20 EA
EX SD 20x8EX SD 20x8
EX
10x10
SA
EX SD 20x8
EX RR 20x8
EX 8x6 SA
EX CD
EX 12x8 SA
EX RR 20x8
EX SD 20x8
EX 20x10 EA
EX SD 20x8
EX RR 16x8
EX 16x16 SA UP
EX SD
20x8
EX
12x8
SA
EX RG
EX 6X6 EA
EX 24x12 EA
EX 24x18 EA
EX 12x8 SA
EX 18x20 SA UP
EX 24x20 EA
EX CD
EX 12"Ø SA
EX CD
EX 12"Ø SA
EX RG
EX 18x10 SA
EX RG
EX LOUVER
EX EF
EX EF
EX RR 20x8
EX EF
EX SD 20x8
EX 16x14 SA
EX SD 20x8
EX 18x8 SA
EX RR 30x12
EX SD 20x8
EX 18x8 SA
EX SD 20x8
EX SD 24x8
EX 18x12 SA
EX 14"Ø SA
EX CD
EX LOUVER
EX 1-EF-15
EX LOUVER
EX 1-EF-16
EX SD 20x8
EX SD 20x8
EX SD 20x8
(2) EX12"Ø SA UP
(COLD & HOT)
EX EA
EX EA
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
MD105
WLF / JMB2DJR
BUILDING 1AB FIFTH FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. AHU-MICU DUCTWORK REVISIONS AND HW PIPING
INSTALLATION SHALL BE PHASED BASED ON
INDIVIDUAL FLOORS STARTING ON THE 3RD FLOOR.
2. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
3. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
4. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
1. DISCONNECT EXHAUST DUCTS CONNECTED TO
FAN.
2. DISCONNECT POWER CONNECTION TO FAN AND
REMOVE VFD. DISPOSE OF VFD PER SPECIFICATION
REQUIREMENTS.
3. REMOVE EXHAUST FAN AND CONNECTING
DUCTWORK.
4. DISCONNECT POWER AND DEMOLISH EXHAUST
FAN.
5. DEMOLISH DUCTWORK AND ASSOCIATED
GRILLES/DIFFUSERS.
6. DEMOLISH EXISTING DUAL DUCT MIXING BOX
CONTROLS.
7. EXISTING DUCTWORK TO REMAIN.
H
C
H
C
C
H
C
H
C
EX-1-EF-21
EX 1-EF-22
EX 18x18 SA DOWN
EX 18x14 SA DOWN
EX 18x20 SA DOWN
EX 4" CHS/R
EX 4" CHS/R
EX 1-AHU-2
EX 14"Ø SA DUCT
EX OA DUCT AND LOUVER
EX 16" Ø RA DUCT
EX 16"Ø RA DUCT
EX 18x13 EA DUCT UP THRU ROOF TO EXHAUST HOOD
EX 16"Ø RA/EA DUCT
EX HEPA
FILTER BOX
EX 14"Ø
SA DOWN
EX 24x12
RA/EA DOWN
EX CONTROL PANEL
EX 1-AHU-1
EX 16x16 SA DOWN
EX OA DUCT
AND LOUVER
EX HOT AND COLD SA DUCTS (STACKED)
EX 4" CHS/R DOWN
ON EXTERIOR WALL
EX 2" CHS/R
EX LPS/LPR
H
EX STEAM PIPING
EX HOT AND COLD SA DUCTS (STACKED)
EX 1-EF-20
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. DISCONNECT POWER CONNECTION TO THE UNIT.
2. DISCONNECT DUCTS CONNECTED TO THE UNIT,
AND STEAM/CONDENSATE PIPING AND CHILLED
WATER SUPPLY/RETURN PIPING.
3. DEMOLISH EXISTING DUAL DUCT MIXING BOX AND
ASSOCIATED CONTROLS.
4. DEMOLISH SUPPLY, RETURN, AND EXHAUST DUCT
AS INDICATED.
5. EXISTING AHU TO BE REMOVED.
6. EXISTING 15"Ø DUCTS DOWN TO BE REMOVED.
7. DEMOLISH FILTER BOX AS INDICATED.
8. DISCONNECT POWER AND DEMOLISH RETURN AND
FAN.
9. EXISTING TO REMAIN.
MD106
WLF / JMB2DJR
BUILDING 1AB ATTIC MECHANICAL
DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
4. ROOF ACCESS HATCH MAY BE USED FOR REMOVAL
OF AHU, DUCTS, AND OTHER EQUIPMENT.
5. UNIT MAY BE DISASSEMBLED OR CUT IN SMALLER
SECTIONS TO FACILITATE REMOVAL.
EX CAPPED
EX UP TO
FCU ABOVE
EX CAPPEDEX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX 2" HWS/HWR UP
EX CAPPED
EX CAPPED
EX CAPPED
EX CAPPED
EX 2" HWS/HWR
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. DEMOLISH EXISTING HEATING HOT WATER PUMPS,
HEAT EXCHANGER, AIR SEPARATOR, EXPANSION
TANK, CHEM POT FEEDER AND CONTROLS.
2. DEMOLISH EXISTING DUPLEX CONDENSATE
TRANSFER PUMP.
3. DEMOLISH EXISTING HEATING HOT WATER PIPING
TO THE LIMITS OF DEMOLITION.
4. REMOVE ALL EXISTING INSULATION FOR
REPLACEMENT. IF ASBESTOS IS FOUND IN THE
INSULATION, STOP WORK AND INFORM COR.
MD107
WLF / JMB2DJR
BUILDING 1C CRAWLSPACE
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
189.3322
43.806652.9300
12.7772
EX UP TO
FCU ABOVE
EX 2" HWS/HWR DOWN
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX 1" HWS/HWR UP
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX UP TO
FCU ABOVE
EX 1-1/2"
HWS/HWR
EX 1-1/2"
HWS/HWR
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. REMOVE EXISTING HEATING HOT WATER RISERS.
MD108
WLF / JMB2DJR
BUILDING 1C FIRST FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
EX TO FCU
EX 1" HWS/HWR DOWN
EX TO FCU
EX 1"
HWS/HWR
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. DEMOLISH EXISTING HEATING HOT WATER DOWN
TO FIRST FLOOR. EXISTING WALL WILL NEED TO BE
REMOVED FOR ACCESS.
MD109
WLF / JMB2DJR
BUILDING 1C SECOND FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
EX. HX
CHS
CHR
S-30
S-15
HWS
HWR
CHS
CHS
CHR
CHR
EX. HWP
S-30
S-60 DN
CR-15
S-15 S-15
S-30
CR-15S-15
EX. AS
CR-15
CR-15
S-15
CHR
CHR
C H
R
CHS
CHS
C H
S
EX S-30 TO LAB
STERILIZERS
EX CHS/R UP
EX AHU-4
EX AHU-3
EX AHU-7
EX AHU-6
EX AHU-5
EX 24/9 EA
SEE 1AB THIRD FLOOR PLANS
FOR CONTINUATION
EX 24/9 EA UP TO FAN ON ROOF ABOVE
EX PRV-2EX PRV-1
EX PRV-3
EX AHU-2
CR-15
S-15
EX. HX
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1. DISCONNECT HEATING HOT WATER SUPPLY AND
RETURN PIPING TO HEAT EXCHANGER
(APPROXIMATELY 10 FEET).
2. DISCONNECT STEAM PIPING TO HEAT EXCHANGER
AS SHOWN.
3. DEMOLISH HEATING HOT WATER SYSTEM
CONSISTING OF HEAT EXCHANGERS, PUMPS, AIR
SEPARATOR, OTHER ACCESSORIES, AND
INTERCONNECTED PIPING.
4. DEMOLISH HEATING HOT WATER CONTROLS.
5. SHUT OFF HIGH PRESSURE STEAM SUPPLY MAINS.
6. DEMOLISH THREE EXISTING PRV'S: PRV-1, PRV-2,
AND PRV-3.
7. EXISTING MAIN SUPPLY, EXHAUST, AND RETURN
DUCT TO REMAIN FOR RE-USE AS INDICATED.
MD110
WLF / JMB2DJR
BUILDING 1C THIRD FLOOR
MECHANICAL DEMOLITION PLAN
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
EX 1-EF-8
EX 24x24 EA IN ROOF CURB
EX
CONDENSING
UNIT
EX 4" CHS/R UP ON
EXTERIOR WALL
EX 4" CHS/R EX 4" CHS/R
EX 30"Ø SA
EX 30"Ø SA UP ON
EXTERIOR WALL
EX 20"Ø SA DOWN
EX 48"Ø SA
EX 1-AHU-AB
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
MD111
WLF / JMB2DJR
BUILDING 1C ROOF MECHANICAL
DEMOLITION PLAN
N O
R T
H
1. DEMOLISH EXISTING EXHAUST FAN. EXISTING
DUCT BELOW, ROOF PENETRATION, AND CURB TO
REMAIN FOR USE WITH NEW RETURN AIR DUCT.
2. REMOVE SECTION OF EXISTING PIPING FOR
CONNECTION OF NEW PIPING AND ISOLATION
VALVES.
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO
BE DONE IN A MANNER TO MINIMIZE
DISRUPTIONS TO THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS.
WORK TO PRIMARILY TAKE PLACE AFTER
BUSINESS HOURS AND SCHEDULED WEEKEND
PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN
REFER TO SHEET GI501 AND NARRATIVE.
EX 1-EF-23
EX 1-SWHX-1
EX 1-HWP-1
EX DWH
EX DHW CIRC PUMP
EX AHU-4
EX CONTROL PANEL
EX AHU-3
EX AHU DISCONNECT
EX ELECTRICAL PANEL B-1
EX AHU DISCONNECT
EX 20x20 SA
EX 20x20 RA
EX 26x20 SA
EX 16x42 RA
1. DISCONNECT POWER AND DEMOLISH EXISTING AIR
HANDLING UNIT AS INDICATED.
2. DISCONNECT SUPPLY, RETURN, EXHAUST, AND
OUTSIDE AIR DUCTWORK CONNECTED TO THE AIR
HANDLING UNIT.
3. DISCONNECT HOT WATER SUPPLY AND RETURN
PIPING, CONTROL VALVE, ETC. FROM AIR HANDING
UNIT. DEMOLISH REFRIGERANT PIPING FROM UNIT
TO CONDENSING UNIT ON ROOF.
4. DISCONNECT OR DEMOLISH CONTROLS
ASSOCIATED WITH THIS SYSTEM, BOTH
ELECTRIC/ELECTRONIC AND PNEUMATIC. CAP OR
PLUG PNEUMATIC TUBING THAT REMAINS.
5. DISCONNECT POWER AND DEMOLISH EXISTING
HEATING HOT WATER PUMP, HEAT EXCHANGER,
AIR SEPARATOR, EXPANSION TANK, CHEM POT
FEEDER AND CONTROLS.
6. DISCONNECT EXISTING STEAM, CONDENSATE, AND
HOT WATER SUPPLY AND RETURN PIPING TO THE
HEAT EXCHANGER SYSTEM UP TO THE MAINS IN
THE ROOM.
7. REMOVE ALL PIPE INSULATION ON EXISTING
STEAM, CONDENSATE, AND HEATING HOT WATER
PIPING IN THIS ROOM SO IT CAN BE REINSULATED.
NORTH
KEY PLAN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Apogee Project #
SHEET NOTES:
SHEET KEY NOTES:
100% CONSTRUCTION
DOCUMENTS
November 20, 2018
Replace Air Handling Units VA #623-15-104
FULLY SPRINKLERED
Muskogee, OK
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420 Josh VandenEnde
17-287
STRUCTURAL ENGINEER
ASCENT ENGINEERING
6707 WINCHESTER CIRCLE #100
BOULDER, CO 80301
(303) 499-3022
1AB
FULLY SPRINKLERED MD401
WLFDJR
ENLARGED AREAS MECHANICAL
DEMOLITION PLANS
N O
R T
H
1. FACILITY SHALL BE FULLY OCCUPIED
THROUGHOUT CONSTRUCTION. ALL WORK IS TO BE
DONE IN A MANNER TO MINIMIZE DISRUPTIONS TO
THE REST OF THE BUILDING.
2. COORDINATE WORKING HOURS WITH VA COR AS
INSTRUCTED IN GENERAL REQUIREMENTS. WORK
TO PRIMARILY TAKE PLACE AFTER BUSINESS
HOURS AND SCHEDULED WEEKEND PERIODS.
3. FOR WORK SEQUENCE AND PHASING PLAN REFER
TO SHEET GI501 AND NARRATIVE.
4. ROOF ACCESS HATCH MAY BE USED FOR REMOVAL
OF AHU, DUCTS, AND OTHER EQUIPMENT.
5. UNIT MAY BE…