36C25919R0061 0003 Questions and answers 3.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Install Fire Pump, newest first.
File Type Posted
36C25919R0061-0003000.docx DOCX document
36C25919R0061-0002001.pdf PDF
36C25919R0061-0002000.docx DOCX document
36C25919R0061-0001004.jpg JPG image
36C25919R0061-0001003.pdf PDF
36C25919R0061-0001002.pdf PDF
36C25919R0061-0001001.pdf PDF
36C25919R0061-0001000.docx DOCX document
36C25919R0061-0001005.jpg JPG image
36C25919R0061-004.pdf PDF
36C25919R0061-007.pdf PDF
36C25919R0061-002.pdf PDF
36C25919R0061-009.docx DOCX document
36C25919R0061-008.pdf PDF
36C25919R0061-003.pdf PDF
36C25919R0061-005.pdf PDF
36C25919R0061-001.docx DOCX document
36C25919R0061-006.pdf PDF
36C25919R0061-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: Is the following dropped from the scope completely? "the contractor to install 6 Tamper Switches and 1 Switch Flow, 3 0-300 psig Pressure gages, 1 0-1500 gpm Flow Meter, 4 Hand Wheel Operated Butterfly Valves with Victaulic Flanges, 1 6inch Swing Check Valve with Victaulic Flanges."

Answer: Yes

Question: Are items removed from scope replaced with "List of Contractor supplied equipment or material:

Answer: No. Contractor supplied equipment will be any equipment necessary to complete items listed in statement of work.

Question: Can I get confirmation of the previously required items to be furnished has been removed and clarify which valves in the picture are to be replaced?

Answer: Gate Valve replacement has been removed from scope. Government furnished property listed in scope of work. All other materials required to complete project as listed in scope of work will be furnished by the contractor.