36C25919R0061-0003000.docx
DOCX document 19 KB Posted
- Attached to
- Install Fire Pump Federal contract opportunity
- Solicitation number
- 36C25919R0061
About this file
36C25919R0061 0003 36C25919R0061 0003.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25919R0061-0003001.pdf | ||
| 36C25919R0061-0002001.pdf | ||
| 36C25919R0061-0002000.docx | DOCX document | |
| 36C25919R0061-0001000.docx | DOCX document | |
| 36C25919R0061-0001005.jpg | JPG image | |
| 36C25919R0061-0001004.jpg | JPG image | |
| 36C25919R0061-0001003.pdf | ||
| 36C25919R0061-0001002.pdf | ||
| 36C25919R0061-0001001.pdf | ||
| 36C25919R0061-007.pdf | ||
| 36C25919R0061-002.pdf | ||
| 36C25919R0061-003.pdf | ||
| 36C25919R0061-005.pdf | ||
| 36C25919R0061-001.docx | DOCX document | |
| 36C25919R0061-006.pdf | ||
| 36C25919R0061-004.pdf | ||
| 36C25919R0061-009.docx | DOCX document | |
| 36C25919R0061-008.pdf | ||
| 36C25919R0061-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-12-2019 62319-1011 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village
CO
80111 To all Offerors/Bidders
36C25919R0061 02-11-2019
X X X
The purpose of this amendment is as follows:
1. Provide answers to additional questions.
2. Provide updated statement of work clarifying scope and detailing Government Furnished Equipment.
3. Email for proposals: robyn.young2@va.gov
3. Solicitation closes on February 19, 2019 at 2:00 p.m. CT.
All other terms and conditions remain unchanged.
STATEMENT OF WORK
Installation of Facility Fire Pump, Jockey Pump and ATS
Location: Jack C. Montgomery Veterans Affairs Medical Center (JCM VAMC) in Muskogee, OK, 1011 Honor Heights Dr., Muskogee, OK 74401
1. GENERAL REQUIREMENTS: Install Government Supplied Equipment Consisting of: 50 HP, 750 GPM @81 PSI UL/FM Fire Pump at 3600 RPM, Wye-Delta Closed Transition controller with ATS (Automatic Transfer Switch), Jockey pump and Jockey Controller.
2. Work required includes
a. The installation of Government furnished equipment
b. Removing cracked fire pump pad, install leveling anchors for fire pump and repour cement pad
c. Piping realignment / modification for installation of Jockey Pump requiring approximately 20 ft of 2” steel pipe.
d. ATS installation, which will require replacement of all existing wiring from the ATS to the pumps.
e. Installation will require Manufacture Start Up and Commissioning for warranty purposes. The installation contractor will not be responsible for equipment warranty – only for installation warranty. We will also require a Fire Pump Test to ensure required flows and a Stand Pipe Flow Test IAW NFPA
3. Government furnished equipment is listed below. All other materials required to install government furnished equipment and complete project shall be furnished by the contractor.
4. All Government furnished equipment is located in close proximity for installation.
5. Period of performance will be 60 days after NTP.
6. See attached specifications for equipment.
List of Government furnished equipment:
Fire Pump Fire Pump Controller Jockey Pump Jockey Pump Controller
ATS
See attached document: Questions and answers 3.
File details come from the government source that posted it.