36C25625Q1473 0001.docx
DOCX document 34 KB Posted
- Attached to
- H141--HVAC Fire Damper Testing Services Federal contract opportunity
- Solicitation number
- 36C25625Q1473
About this file
This document is an amendment to a solicitation (36C25625Q1473) for HVAC Fire Damper Testing Services issued by the Department of Veterans Affairs Veterans Health Administration Network Contracting Office. The solicitation is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with NAICS code 541350 for Building Inspection Services. The contract requires comprehensive fire damper testing and inspection across 309 units (103 units in each of three 30-day periods), with vendors responsible for identifying damper locations, creating access points, testing, repairing or replacing dampers as needed, and producing detailed documentation. The firm fixed-price contract mandates that contractors incorporate funding for access panels and additional parts, work within specified scheduling constraints (primarily Monday-Friday), coordinate with on-site HVAC technicians, and ensure compliance with NFPA and Joint Commission/VA facility requirements. The offer due date has been extended to November 3, 2025, at 10:00 AM CST, with the expectation that the winning vendor will develop comprehensive location drawings and provide a complete inspection report.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25625Q1473.docx | DOCX document | |
| Wage Determination 15-5117.txt | TXT text file | |
| JLM Ground to 9th floor life safety drawings.pdf | ||
| NLR-Bldg--170---Dampers 6 year.xlsx | XLSX spreadsheet | |
| LRVA Medical-Center---Dampers 6 year.xlsx | XLSX spreadsheet | |
| North Little Rock ground to 4th floor life safety drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25625Q1473
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 To all Offerors/Bidders
36C25625Q1473
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 11-03-2025 10:00 AM CST x
Th is amendment is to post the questions and answers and extend the offer due date to 11/03/2025 at 10am CST.
CONTINUATION PAGE
1. What is the applicable NAICS code?
541350 Building Inspection Services
2. Who is the incumbent contract holder and what is the value and date of the last awarded contract This is a new contract.
3. What are the HEPA cart requirements if any? Where would we be expected to use the HEPA cart, and will the facility be providing the cart or does AFIC need to provide it?
There will be no government furnished equipment on this project. ICRA determinations are made by IPC.
4.Scheduling mentioned 7-5 M-F but to expect weekend work. Our rotations typically run from Tuesdays through the weekend and into the following Thursday. Do we have approval to work those rotations and work on the weekends?
HVAC technicians onsite and able to disable HVAC systems when testing is being done, they work Mon-Fri 8-4.
5.The solicitation also mentioned that on top of inspecting the damper, we would be expected to provide access when needed and make any repairs we can to bring the dampers into compliance. With that being said, do we need to incorporate funding for access panels and additional parts? Typically, we do the inspection and spec out for additional parts needed to repair deficient dampers and provide a repair quote. Is this an acceptable method of pricing? If not, I'm concerned that our price might not accurately reflect the true value.
This is a firm fixed price contract. Incorporate funding for access panels and additional parts.
6. Is this a new effort or is there a previous contractor that performed these services in the past? If so, could you provide me with the Contract # used?
This is a new effort.
7.Can you please provide any previous reports or documentation that shows the exact damper locations? This information is critical for making the fire dampers accessible or for creating access hatches.
Drawings provided will get you as close to the locations as possible the winning offered will provide a new set of drawings with all locations marked as part of this requirement.
8.The scope mentions “repairing fire dampers that are determined to need repairs.” Please confirm if these repairs are to be billed separately.
This is a firm fixed priced contract no additional bills will be accepted.
9.The scope requires grouping work so that only one air handling system is shut down at a time, with the system operational two hours before the next business day. Could you please confirm how many air handling units are on site, and how many dampers are served by each? This detail will significantly impact scheduling and production.
Part of the contract report provided by the vendor as part of this inspection will be to determine what air handlers are connected to the dampers.
10.The scope states: “Provide a list of all inaccessible damper locations and recommended actions for access. Recommendations will include descriptions of work to correct the access issue and cost estimate for corrections to make them accessible.” Please confirm whether this requirement involves relocating mechanical systems.
The vendor is responsible to determine the most effective plan to correct issues when they present it to the station.
11.The scope references inspections of 103 units within 30 days of NTP, 103 within 60 days, and 103 within 90 days. Would it be acceptable to complete the project in a continuous sequence from start to finish, rather than remobilizing three times?
The vendor will determine their project work and coordinate with the COR prior to start of the project for they sequence that will be most beneficial to all parties.
12.What are the Superintendent requirements?
Superintendent will be the direct coordinator to the COR and ensure all documentation is in compliance. They will ensure all proper hot work and work requirements are being followed on each damper.
13.If SSHO is required, can the Superintendent act as the SSHO?
The safety person can not be doing any of the work as the hot work or damper testing is going on.
14.PPQ requirements?
That the work is compliant with NFPA and Joint Commission/VA facility requirements and a copy of qualifications/certifications.
15.Will there be Laydown areas available?
The tools for each job are minimal unless a door needs to be cut. After that the contractor should bring their tools back with them.
16.Is the Subcontractor's Past Performance acceptable?
No. The Prime vendors past performance must be acceptable.
17. Please provide the damper location drawings referenced in the SOW.
Locations are estimated on the drawings provided the deliverable of this contract is to develop that drawing.
18.Please provide drawings showing the fire dampers that are to be removed or disabled.
Vendor will determine this during the testing.
19.Please provide how many and the locations of the dampers that will require new access doors.
Vendor will determine this during testing.
20.Will any access points need to be made in the ceiling?
Vendor will determine this during testing.
21.Is there any wall patching required? Please provide a patch detail.
Patches will be of the same material and composition of materials removed.
22.Please provide a list of all damper sizes.
Vendor will determine this during testing.
23.The SOW states to repair or replace dampers as needed. With this number being unknown until testing starts, would it be possible to provide an allowance to ensure you receive comparable bids?
See B.3 Price/Cost Schedule 24.What notice is necessary for room access and AHU shutdowns?
HVAC technicians onsite and able to disable HVAC systems when testing is being done, they work Mon-Fri 8-4 25.Can the AHU be shutdown during normal working hours?
HVAC technicians onsite and able to disable HVAC systems when testing is being done, they work Mon-Fri 8-4 26.Alt 4 is to replace damaged fusible links. With this information being unknown until testing begins, should replacing all fusible links be assumed for bidding purposes? ‘ See B.3 Price/Cost Schedule 27.If possible, please extend the Period of Performance to 180 days.
No.
28.Will any of the dampers require the need for a ladder and/or lift?
Yes.
Page 1 of
Page 1 of
File details come from the government source that posted it. Updated .