36C25623R0031 - Exhibit A .docx

DOCX document 28 KB Posted

Attached to
Z2DA--Project #629-22-133 Site Modifications for Tele-Critical Care (DB)
Solicitation number
629-22-133
Issued by

View the file

Other files

File Type Posted
36C25623R0031 IMG 0557 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR AREA C1 1 - S02.pdf PDF
36C25623R0031 POWER-THIRD FLOOR AREA C2 ALL ELEC HUEN FAB-2 - S02.pdf PDF
36C25623R0031 014500 - Quality Control Edited - S02.docx DOCX document
36C25623R0031 THIRD FLOOR AREA C1 PLUMB-GRAVITY NASH FAB - S02.pdf PDF
36C25623R0031 013323 - Shop Drawings Product Data - S02.docx DOCX document
36C25623R0031 RFP.docx DOCX document
36C25623R0031 SOW 10142022 - S02.docx DOCX document
36C25623R0031 015719 - Temporary Environment Controls Not Edited - S02.doc DOC document
36C25623R0031 IMG 0559 - S02.jpg JPG image
36C25623R0031 IMG 0555 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR C1 PLUMB-PRESSURE NASH FAB - S02.pdf PDF
36C25623R0031 OVERALL THIRD FLOOR PLAN 5 - S02.pdf PDF
36C25623R0031 WD LA20230041 Mod 0 01062023 - S02.docx DOCX document
36C25623R0031 POWER-THIRD FLOOR AREA C1 ALL ELEC HUEN FAB - S02.pdf PDF
36C25623R0031 015816 - Temporary Inside Signage 1 Edited - S02.docx DOCX document
36C25623R0031 IMG 0556 - S02.jpg JPG image
36C25623R0031 - Exhibit B.docx DOCX document
36C25623R0031 VHA Supplemental Contract Rqts for Combatting COVID-19.docx DOCX document
36C25623R0031 018113 - Sustainable Construction Requirements Edited - S02.docx DOCX document
36C25623R0031 IMG 0558 - S02.jpg JPG image
36C25623R0031 010000 - General Requirements - S02.docx DOCX document
36C25623R0031 01321615 - Schedules Edited - S02.docx DOCX document
36C25623R0031 THIRD FLOOR AREA C2 - S02.pdf PDF
36C25623R0031 IMG 0560 - S02.jpg JPG image
36C25623R0031 013526 - Safety Requirements Edited - S02.docx DOCX document
36C25623R0031 IMG 0554 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR AREA C2 PLUMB-PRESSURE NASH FAB - S02.pdf PDF
36C25623R0031 ICRA ILSM - S02.xlsx XLSX spreadsheet
36C25623R0031 IMG 0553 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR AREA C2 PLUMB-GRAVITY NASH FAB - S02.pdf PDF
36C25623R0031 THIRD FLOOR C2 ALL LIGHT HUEN FAB-2 - S02.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 629-22-133 Site Modifications for Tele-Critical Care 36C25623R0031

Exhibit A Contractor Evaluation Form Construction Safety

Company Name:

Address:

Telephone: Fax:

Email:

Contact:

1. Utilizing your OSHA 300 Forms, please complete the following information:

Category
2019
2020
2021

Number of man hours (jobsite and office).

Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanations for any violations.

Please attach copies of the following documents: OSHA 300 and 300a Forms.

These forms can be accessed through the OSHA publications search page:

http://www.osha.gov/pls/publications/publication.html.

2.Who administers your company’s Safety and Health Program?
3.Company’s current Insurance Experience Modification Rate (EMR):

The above EMR rate must be obtained from offeror’s insurance carrier and furnished on insurance carrier’s letterhead. If EMR is greater than 1.0, attach a written explanation of the EMR from insurance carrier on insurance carrier’s letterhead describing the reasons for the EMR and the anticipated date the EMR may be reduced to 1.0 or below.