36C25623R0031 015816 - Temporary Inside Signage 1 Edited - S02.docx

DOCX document 18 KB Posted

Attached to
Z2DA--Project #629-22-133 Site Modifications for Tele-Critical Care (DB)
Solicitation number
629-22-133
Issued by

View the file

Other files

File Type Posted
36C25623R0031 IMG 0557 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR AREA C1 1 - S02.pdf PDF
36C25623R0031 POWER-THIRD FLOOR AREA C2 ALL ELEC HUEN FAB-2 - S02.pdf PDF
36C25623R0031 014500 - Quality Control Edited - S02.docx DOCX document
36C25623R0031 THIRD FLOOR AREA C1 PLUMB-GRAVITY NASH FAB - S02.pdf PDF
36C25623R0031 013323 - Shop Drawings Product Data - S02.docx DOCX document
36C25623R0031 RFP.docx DOCX document
36C25623R0031 SOW 10142022 - S02.docx DOCX document
36C25623R0031 015719 - Temporary Environment Controls Not Edited - S02.doc DOC document
36C25623R0031 IMG 0559 - S02.jpg JPG image
36C25623R0031 IMG 0555 - S02.jpg JPG image
36C25623R0031 - Exhibit A .docx DOCX document
36C25623R0031 THIRD FLOOR C1 PLUMB-PRESSURE NASH FAB - S02.pdf PDF
36C25623R0031 OVERALL THIRD FLOOR PLAN 5 - S02.pdf PDF
36C25623R0031 WD LA20230041 Mod 0 01062023 - S02.docx DOCX document
36C25623R0031 POWER-THIRD FLOOR AREA C1 ALL ELEC HUEN FAB - S02.pdf PDF
36C25623R0031 IMG 0556 - S02.jpg JPG image
36C25623R0031 - Exhibit B.docx DOCX document
36C25623R0031 VHA Supplemental Contract Rqts for Combatting COVID-19.docx DOCX document
36C25623R0031 018113 - Sustainable Construction Requirements Edited - S02.docx DOCX document
36C25623R0031 IMG 0558 - S02.jpg JPG image
36C25623R0031 010000 - General Requirements - S02.docx DOCX document
36C25623R0031 01321615 - Schedules Edited - S02.docx DOCX document
36C25623R0031 THIRD FLOOR AREA C2 - S02.pdf PDF
36C25623R0031 IMG 0560 - S02.jpg JPG image
36C25623R0031 013526 - Safety Requirements Edited - S02.docx DOCX document
36C25623R0031 IMG 0554 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR AREA C2 PLUMB-PRESSURE NASH FAB - S02.pdf PDF
36C25623R0031 ICRA ILSM - S02.xlsx XLSX spreadsheet
36C25623R0031 IMG 0553 - S02.jpg JPG image
36C25623R0031 THIRD FLOOR AREA C2 PLUMB-GRAVITY NASH FAB - S02.pdf PDF
36C25623R0031 THIRD FLOOR C2 ALL LIGHT HUEN FAB-2 - S02.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-15

SECTION 01 58 16

TEMPORARY INTERIOR SIGNAGE

PART 1 GENERAL

DESCRIPTION

This section specifies temporary interior signs.

PART 2 PRODUCTS

2.1 TEMPORARY SIGNS

A.Fabricate from 50 Kg (110 pound) mat finish white paper.
B.Cut to 100 mm (4-inch) wide by 300 mm (12 inch) long size tag.
C.Punch 3 mm (1/8-inch) diameter hole centered on 100 mm (4-inch) dimension of tag. Edge of Hole spaced approximately 13 mm (1/2-inch) from one end on tag.
D.Reinforce hole on both sides with gummed cloth washer or other suitable material capable of preventing tie pulling through paper edge.
E.Ties: Steel wire 0.3 mm (0.0120-inch) thick, attach to tag with twist tie, leaving 150 mm (6-inch) long free ends.

PART 3 EXECUTION

3.1 INSTALLATION

A.Install temporary signs attached to room door frame or room door knob, lever, or pull for doors on corridor openings.
B.Mark on signs with felt tip marker having approximately 3 mm (1/8-inch) wide stroke for clearly legible numbers or letters.
C.Identify room with numbers as designated on floor plans.

3.2 LOCATION

A.Install on doors that have room, corridor, and space numbers shown.
B.Doors that do not require signs are as follows:
1.Corridor barrier doors (cross-corridor) in corridor with same number.
2.Folding doors or partitions.
3.Toilet or bathroom doors within and between rooms.
4.Communicating doors in partitions between rooms with corridor entrance doors.
5.Closet doors within rooms.
C.Replace missing, damaged, or illegible signs.

- - - E N D - - - 01 58 16 - 1