Hard Ceiling Basement.pdf

PDF 504 KB Posted

Attached to
Y1NZ--Project 580-20-103 Replace Sanitary Sewer Lines in B100
Solicitation number
36C25622R0102
Issued by

About this file

This document contains a federal contract opportunity and related project file. The federal contract opportunity is a pre-solicitation notice for project 580-20-103 to replace sanitary sewer lines in Building 100 at the Michael E. DeBakey VA Medical Center in Houston, Texas. The opportunity is available only to service-disabled veteran-owned small businesses. The contractor shall furnish all labor, materials, tools and equipment to demolish and replace sanitary sewer line piping throughout the basement and first floor, including construction labor and supervision for demolition, architectural, plumbing, fire protection and interior finishes work. The period of performance is 300 calendar days from notice to proceed. The solicitation will be issued as a request for proposals on or around July 7, 2022. The related project file contains basement reflected ceiling plans for an area renovation, with notes on ceiling materials and layout.

View the file

Other files

File Type Posted
580-20-103 Pre-Award Site Visit Sign-In Sheet.pdf PDF
36C25622R0102 0001.docx DOCX document
Sewer Line Area C Rev1.pdf PDF
580-20-103 Project Drawings.pdf PDF
580-20-103 Project Specifications.pdf PDF
580-20-103 Statement of Work.docx DOCX document
DOL Wage Determination TX20220253 dated 7-8-22.pdf PDF
36C25622R0102_1.docx DOCX document
SF24 Bid Bond.pdf PDF
36C25622R0102.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S S

S S

SS SSSSSSSSSS

SS

SS SSSS S

S

S

SSS

S S

S S

SS SS

S S

SS

S

SSS SS

S S

SS

S S

SS

S S

SS SSS

S S

S S

S S

SS SSSS

S S

SS

S S

SS

S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S SS

S S

S S

S SS S S S S SS S

S S

S S

S S

S S

S S

SS

S S

S S

S S

S S

S S

S S

S S

S S

S S

SS SS

1017 111213141516

G

H

J

K

AE301

AE301

AE301

AE301

BB-285

SUPPLY

PROCESSING AND

DISTRIBUTION

BB-220C

HAC

BB-230D

FEMALE LOCKER

BB-230E

TOILET - FEMALE

BB-230

LOCKER

BB-242B

FEMALE TOILET

BB-240

VEST

BB-240A

MEN TOILET

BB-240B

MEN LOCKER

BB-242A

FEMALE LOCKER

BB-242

VEST

BA-203A

PATIENT STORAGE

BC-352A

OFFICE

BC-352B

OFFICE, SHARED

BC-352

SPS OFFICE

BB-248A

LOGISTIC OFFICE

BB-248B

RECEIVING

BC-352C

MULTI-PURPOSE

BB-260A

EQ STORAGE &

TEST

BB-230B

TOILET - MEN'S

BB-230A

MEN LOCKER

BB-290

ATS CONT

BB-350F

MACH ROOM

BB-220B

EQ WASH

BB-230C

ELEVATOR MACH.

BB-261B

HAC

BB-220

DECONTAMINATION

BB-210

PREP/ASSEMBLY

BB-261

STERILE STORAGE

BA-201

UNIFORM STORAGE

BA-203

PATIENT CLOTHING

RM & LUGGAGE

STORAGE

CBA-200

PASSENGER

ELEVATOR LOBBY

BC-350A

REP

BC-350C

MECHANIAL ROOM

BC-350B

HAC

BB-231A

ANTE ROOM

BB-262

ANTEROOM

BB-263

LOCKER

BB-264

TOILET

BB-265

LOCKER

BB-266

TOILET

BB-248C

ANTE ROOM

BB-260D

T-5 ROOM

AREA OF

WORK

AREA OF

WORK

AREA OF

WORK

AREA OF

WORK

PHASE 6B

PHASE 6B

BB-261A

COOLING ROOM

BB-210A

STERILIZER ROOM

A T

T S

XETE

FO

S A

C U

LL

ENS.KE

E N

2 6 112

R E G

IS

TE

RED

ARCH

IT

E C T

A

LA

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

Engineers Architects

N

AREA OF WORK

KEY PLAN

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:5

:0

A

M

AE126

BASEMENT REFLECTED CEILING PLAN -

PHASE 6

25 46

ANGEL DIAZ - COR

HM

UPGRADE/RENOVATE/RELOCATE

SPS

Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.

Houston, TX 77030 01/15/2021

BID DOCUMENTS

580-17-12118-317

TM

A. ACCESS PANELS ARE NOT PERMITTED IN SOFFITS,

CHECK ALL VALVES, FIRE DAMPERS, REHEAT BOXES,

ETC. FOR ACCESS POINTS. ARRANGE FIRE AND

SMOKE DAMPER ACCESS FROM NON-CORRIDOR

SIDE

B. LIGHTS, DIFFUSERS, EXIT SIGNAGE, SPRINKLER

HEADS, AND SMOKE DETECTORS MUST BE

CENTERED IN CEILING PANELS IN WHICH THEY

OCCUR

C. COORDINATE WITH SEPARATE MECHANICAL AND

ELECTRICAL DESIGN PACKAGES FOR CEILING

MOUNTED DEVICES

D. PAINT CUT EDGES OF ACT TO MATCH CEILING TILE

WHERE EXPOSED TO VIEW

E. REVIEW CEILING LAYOUT AS SHOWN AND NOTIFY

COR OF CONFLICTS BEFORE PROCEEDING WITH

CONSTRUCTION

Scale: 1/8" = 1'-0"

BASEMENT REFLECTED CEILING PLAN - PHASE 6 0 4 8 16

NORTH

PLAN

DocuSign Envelope ID: 9DF87E1A-11EE-47C5-83EE-3998E92AD2AF

1/14/2021

VHAHOUDiazA4 Polygonal Line

VHAHOUDiazA4 Text Box Area in Red have plaster/gypson board ceiling.

File details come from the government source that posted it. Updated .