580-20-103 Project Drawings.pdf
PDF 14 MB Posted
- Solicitation number
- 36C25622R0102
About this file
This document provides details regarding a federal contract opportunity for replacing sanitary sewer lines at a VA medical center in Houston, Texas. The solicitation number is 36C25622R0102 and seeks to replace sanitary sewer line piping throughout the basement and first floor of Building 100 on the campus of the Michael E. DeBakey VA Medical Center in Houston. This is a 100% Service-Disabled Veteran-Owned Small Business set-aside contract with an anticipated value between $1,000,000 and $2,000,000. Offerors must be registered in the Vendor Information Pages, System for Award Management, and have completed online Representations and Certifications. The period of performance is 300 calendar days from notice to proceed. A bid bond must be submitted with proposals and performance and payment bonds will be required from the awardee. The solicitation will be issued as a request for proposals on or around July 7, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 580-20-103 Pre-Award Site Visit Sign-In Sheet.pdf | ||
| Hard Ceiling Basement.pdf | ||
| 36C25622R0102 0001.docx | DOCX document | |
| Sewer Line Area C Rev1.pdf | ||
| 580-20-103 Project Specifications.pdf | ||
| 580-20-103 Statement of Work.docx | DOCX document | |
| DOL Wage Determination TX20220253 dated 7-8-22.pdf | ||
| 36C25622R0102_1.docx | DOCX document | |
| SF24 Bid Bond.pdf | ||
| 36C25622R0102.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENDERED IMAGEAREA OF WORK SHEET INDEX
MICHAEL E. DEBAKEY VA MEDICAL CENTER
HOUSTON, TEXAS
VAMC PROJECT #: 580-20-103
REPLACE SANITARY SEWER LINES AT B100
Plan
North
07/09/2021 MB RL
GI001
COVER SHEET
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
P l a n
N o r t h
T r u e
N o r t h
AREA OF WORK
SHEET NO. SHEET NAME
GENERAL
GI001 COVER SHEET
PLUMBING
P-001 PLUMBING ABBREVIATIONS AND SYMBOLS
P-301 PLUMBING TYPICAL INTERSTITIAL SPACE SECTIONS
P-302 PLUMBING TYPICAL INTERSTITIAL SPACE SECTION S-2A
P-501 PLUMBING DETAILS
P-601 PLUMBING SANITARY RISER DIAGRAM
P-602 PLUMBING SANITARY RISER DIAGRAM
P-603 PLUMBING SANITARY RISER DIAGRAM
PD101 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA A
PD102 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA B
PD103 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA C
PD104 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA D
PD105 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA E
PD106 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA F
PD107 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA G
PD108 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA H
PD109 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA J
PD110 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA K
PD111 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA L
PD112 PLUMBING DEMOLITION PLAN - BASEMENT LEVEL - AREA N
PW101 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA A
PW102 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA B
PW103 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA C
PW104 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA D
PW105 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA E
PW106 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA F
PW107 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA G
PW108 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA H
PW109 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA J
PW110 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA K
PW111 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA L
PW112 PLUMBING SANITARY PLAN - BASEMENT LEVEL - AREA N
07/07/2021
VHAHOUDiazA4 Reviewed
VHAHOUDiazA4 Approved
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
07/09/2021 MB RL
P-001
PLUMBING ABBREVIATIONS AND
SYMBOLS
PLUMBING ABBREVIATIONS
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
DCW DOMESTIC COLD WATER
DCWR DOMESTIC COLD WATER RETURN
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
PLUMBING ABBREVIATIONS
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW ROOF DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
KW KILOWATT
KWH KILOWATT-HOUR
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
PLUMBING ABBREVIATIONS
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE
INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH
GAGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
PLUMBING PIPING SYMBOLS
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOT WATER RETURN, HOT WATER RETURN
STORM WATER, BELOW GRADE
STORM WATER
SANITARY SEWER, BELOW GRADE
DRAIN
DRINKING WATER SUPPLY
DRINKING WATER RETURN
NITROUS OXIDE
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
MA MA MA
MV MV MV
LA LA LA
LV LV LV
OA OA OA
IA IA IA
D D D
SS SS SS
SD SD SD
SD SD SD
TWR TWR TWR
DWS DWS DWS
DWR DWR DWR
TWS TWS TWS
SOIL, WASTE, OR SANITARY SEWERSS SS SS
SOFTEN COLD WATERSCW SCW SCW
FILTERED COLD WATERFCW FCW FCW
N20 N20 N20
OXYGEN0 0 0
NITROGENN2 N2 N2
NATURAL GAS, BELOW GRADE
NATURAL GAS
NG NG NG
NG NG NG
FUEL OIL DISCHARGEFOD FOD FOD
FUEL OIL SUPPLYFOS FOS FOS
FUEL OIL RETURN
FUEL OIL VENT
FOR FOR FOR
FOV FOV FOV
VENT (SANITARY)
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENTFE
PIPE UP
PIPE DOWN
WCO WALL CLEAN OUT
HOSE BIB
WATER HAMMER ARRESTOR
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
FCO FLOOR CLEAN OUT
PIPE SECTION CALLOUT DESIGNATIONS-#
STORM DRAIN SPOUT#
DS
PLUMBING RISER#
P
CHEMICAL RESISTANT DRAIN RISER NO#
CRP
FIRE STAND PIPE RISER#
F
07/07/2021
07/09/2021 MB RL
P-301
PLUMBING TYPICAL INTERSTITIAL
SPACE SECTIONS
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
SCALE: NO SCALE
TYPICAL INTERSTITIAL SPACE SECTIONS
FOR REFERENCE ONLY
FOR ABOVE DATA, REFER TO VAMC HOUSTON, TEXAS, RECORD DRAWING ASBUILTS:
PROJECT NO. 580-040, REPLACEMENT/MODERNIZATION MEDICAL CENTER, ORIGINAL DATE: 2
JAN 87, REVISION'S BLOCK SHOWS RECORD DRAWING DATE: 6/1/92, STAMPED/SIGN BY
HERBURT NEWFELD, REGISTERED P.E. # 49034.
P-302
PLUMBING TYPICAL INTERSTITIAL
SPACE SECTION S-2A
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
SCALE: NO SCALE
TYPICAL INTERSTITIAL SPACE SECTION S-2A
FOR REFERENCE ONLY
FOR ABOVE DATA, REFER TO VAMC HOUSTON, TEXAS, RECORD DRAWING ASBUILTS:
PROJECT NO. 580-040, REPLACEMENT/MODERNIZATION MEDICAL CENTER, ORIGINAL DATE: 2
JAN 87, REVISION'S BLOCK SHOWS RECORD DRAWING DATE: 6/1/92, STAMPED/SIGN BY
HERBURT NEWFELD, REGISTERED P.E. # 49034.
P-501
PLUMBING DETAIL
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. REFER TO SPECIFICATION SECTION 22 13 00 FOR REQUIRED SLOPE OF
ALL PLUMBING PIPES, REGARDLESS OF SLOPE ON EXISTING PIPES.
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEYNOTES
GENERAL NOTES
EXTERIOR SIDE OF
CONCRETE WALL
RESILIENT FIREPROOF
CAULKING
MODULAR TYPE WALL
PENETRATION SEAL
STANDARD WEIGHT GAL.
STEEL PIPE SLEEVE
INTERIOR SIDE OF WALL
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB.
UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
BAND
1-5/8" 12 GAUGE
CHANNEL OR 2"x2"x1/4" ANGLE
1/2" DIA
HANGER RODS WITH
36" MAX SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
HANGER ROD
1" M
AX
NOTES:
SEE SPECIFICATIONS FOR DETAILED
HANGER REQUIREMENTS
8 97
THRU 3/4 1 1/41 1 1/2 2 1/22 3 54 6 108 12 1614 18 2420
30 322825 27
2319 221714 16
-16 -1412 13 -
1210 119
5 FTFT
FT
IN
TUBING
PIPE
NOM SIZE
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
SCALE: NO SCALE
PIPE PENTRATION THROUGH WALLS
SCALE: NO SCALE
PIPE HANGERS
SCALE: NO SCALE
PIPE REPLACEMENT LAYOUT DETAIL
1. 10 FOOT INTERVALS MINIMUM, I.E. FULL SECTIONS OF NEW MAIN PIPING
ONLY. NO FIELD CUTS U.N.O.
2. MINIMUM REPLACEMENT EXTENTS PER PLAN BASED ON PIPE
CONDITION ASSESSMENT.
3. ADDITIONAL DEMO EXTENTS AS REQUIRED BY KEYNOTE 1.
4. PREP AND INSTALL NEW PIPING MAIN RUNS WHILE
EXISTING-TO-BE-DEMOLISHED REMAINS IN SERVICE, AS REQUIRED TO
MEET MAXIMUM SYSTEM DOWNTIMES UPSTREAM PER PHASING
SPECIFICATION 01 00 00 REQUIREMENTS.
5. MAIN RUNS MAY BE DEMOLISHED AND REPLACED IN -PLACE WITHOUT
OFFSETS, PROVIDED TOTAL DISCONNECTION DOWNTIME DOES NOT
EXCEED MAXIMUM PHASING PER SPECIFICATION 01 00 00
REQUIREMENTS. KEYNOTE 1 STILL APPLIES.
6. OFFSET WITH SIXTEENTH BENDS ONLY.
S
P-601
PLUMBING SANITARY RISER
DIAGRAM
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
SCALE: NO SCALE
PLUMBING SANITARY RISER DIAGRAM
P-1 THRU P-12 & CRP 1, CRP 4, & CRP 5
FOR REFERENCE ONLY
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 010000 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
FOR ABOVE DATA, REFER TO VAMC HOUSTON, TEXAS, RECORD DRAWING ASBUILTS:
PROJECT NO. 580-040, REPLACEMENT/MODERNIZATION MEDICAL CENTER, ORIGINAL DATE: 2
JAN 87, REVISION'S BLOCK SHOWS RECORD DRAWING DATE: 6/1/92, STAMPED/SIGN BY
HERBURT NEWFELD, REGISTERED P.E. # 49034.
RISER P/2 IS LOCATED ON BOTH PD101 AND PW101 BASEMENT SHEETS.
1 2
RISER P/5 IS LOCATED ON BOTH PD102 AND PW102 BASEMENT SHEETS.
RISERS P/7, P/8, & P/9 ARE LOCATED ON BOTH PD103 AND PW103
BASEMENT SHEETS.
3 3 3
4 RISER CRP/5 IS LOCATED ON BOTH PD103 AND PW103 BASEMENT
SHEETS.
4 5
5 RISER P/11 IS LOCATED ON BOTH PD104 AND PW104 BASEMENT SHEETS.
6 TYPICAL FOR VARIOUS REMOVAL AND INSTALLATION WORK SHOWN ON
PD AND PW SHEETS: TERMINATE VERTICAL PIPING RISERS AS CLOSE
AS POSSIBLE TO PENETRATIONS TO FIRST LEVEL ABOVE. SEE PD AND
PW SHEETS FOR EXACT LOCATIONS. SEE SPECIFICATIONS FOR
CONNECTIONS, FIREPROOF CAULKING, AND ALL OTHER PENETRATION
REQUIREMENTS.
6 6
P-602
PLUMBING SANITARY RISER
DIAGRAM
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
SCALE: NO SCALE
PLUMBING SANITARY RISER DIAGRAM
P-13 THRU P-22 & CRP 3, CRP 6, CRP 8, & CRP 9
FOR REFERENCE ONLY
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 010000 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
RISERS P/13, P/14, CRP 6, AND P/15 ARE LOCATED ON BOTH PD105 AND
PW105 BASEMENT SHEETS.
FOR ABOVE DATA, REFER TO VAMC HOUSTON, TEXAS, RECORD DRAWING ASBUILTS:
PROJECT NO. 580-040, REPLACEMENT/MODERNIZATION MEDICAL CENTER, ORIGINAL DATE: 2
JAN 87, REVISION'S BLOCK SHOWS RECORD DRAWING DATE: 6/1/92, STAMPED/SIGN BY
HERBURT NEWFELD, REGISTERED P.E. # 49034.
RISERS P/16, P/17, AND CRP/8 ARE LOCATED ON BOTH PD106 AND PW106
BASEMENT SHEETS.
RISERS P/18, P/19, AND P/20 ARE LOCATED ON BOTH PD107 AND PW107
BASEMENT SHEETS.
4 RISERS CRP/3, P/21, AND P/22 ARE LOCATED ON BOTH PD108 AND PW108
BASEMENT SHEETS.
1 11 1 2 2 2 33 3 4 4 4
TYPICAL FOR VARIOUS REMOVAL AND INSTALLATION WORK SHOWN ON
PD AND PW SHEETS: TERMINATE VERTICAL PIPING RISERS AS CLOSE
AS POSSIBLE TO PENETRATIONS TO FIRST LEVEL ABOVE. SEE PD AND
PW SHEETS FOR EXACT LOCATIONS. SEE SPECIFICATIONS FOR
CONNECTIONS, FIREPROOF CAULKING, AND ALL OTHER PENETRATION
REQUIREMENTS.
5 5 5 5 5 5 5 5 5 5 5 5 5
P-603
PLUMBING SANITARY RISER
DIAGRAM
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
SCALE: NO SCALE
PLUMBING SANITARY RISER DIAGRAM
P-23 THRU P-34 & CRP 2, CRP 7, & CRP 10
FOR REFERENCE ONLY
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 010000 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
FOR ABOVE DATA, REFER TO VAMC HOUSTON, TEXAS, RECORD DRAWING ASBUILTS:
PROJECT NO. 580-040, REPLACEMENT/MODERNIZATION MEDICAL CENTER, ORIGINAL DATE: 2
JAN 87, REVISION'S BLOCK SHOWS RECORD DRAWING DATE: 6/1/92, STAMPED/SIGN BY
HERBURT NEWFELD, REGISTERED P.E. # 49034.
RISERS P/23, P/24, CRP/7, AND P/25 ARE LOCATED ON BOTH PD109 AND
PW109 BASEMENT SHEETS.
RISERS P/26, P/27, P/28 ARE LOCATED ON BOTH PD110 AND PW110
BASEMENT SHEETS.
RISERS CRP/9, P/29, CRP/2, P/30, AND P/31 ARE LOCATED ON BOTH PD111
AND PW111 BASEMENT SHEETS.
4 RISERS CRP/10 AND ,P/33 ARE LOCATED ON BOTH PD112 AND PW112
BASEMENT SHEETS.
1 1 1 1 2 2 2 3 3 3 3 4 4
TYPICAL FOR VARIOUS REMOVAL AND INSTALLATION WORK SHOWN ON
PD AND PW SHEETS: TERMINATE VERTICAL PIPING RISERS AS CLOSE
AS POSSIBLE TO PENETRATIONS TO FIRST LEVEL ABOVE. SEE PD AND
PW SHEETS FOR EXACT LOCATIONS. SEE SPECIFICATIONS FOR
CONNECTIONS, FIREPROOF CAULKING, AND ALL OTHER PENETRATION
REQUIREMENTS.
5 5 5 5 5 5 5 5 5 5 5 5 5
R.8
R
Q
P
M
N
8.1 8 6.97 6.5 6 5 4 3.5 3 2.5 2 1.8
8" SAN
8"
6"
6"
6"
8"
4" 3"
4"
3"
3"
4" 4"
4"
THIS PIPING IS ON TOP OF 4" SAN LINE SHOWN
4" 6"
1 1/2"
FD
FDFD
FD
FD
1 1/2"
1 1/2"
2"
3/4"
S
S
8" SAN
6"
3" 3"
3"
6"
S S
S S
1 1/2" 4" 6"
8"
S S
S S
3"
6"
6" 4"
6"
6"
4"
S S
8"
3"
3" 2"
3" 4"
4"
S S
3"
3" 4"
SS
3"
S S
S S
SSSS
SS
SS
SS
S
S
S
S
S S
S
S
SS
S S
SS
S S
SD
3"
8" 3"
3"
1 1/2"
4"
4"
3"
4"
1 1/2"
P-802
4"
6"
1/2"
F
SZ
CV
4"
8"
SS
4"1 1/2"
12956Ø
4"
4" SAN UP
GENERAL CAT
AREAWAY
ZBA05
MECHANICAL
BAY-1 UTILITY
TUNNEL
BB-302A
4" CONCRETE
PAD
SERVICE
MECHANICAL
ROOM
BB-302A
UNEXCAVATED UNEXCAVATED
GENERAL CAT
TRANSFORMER
BB-304
4" CONCRETE
PAD
VERTICAL
STAIR
ZBA02
WIDE
SCREEN
TRASH
COMPACTOR
TRASH
DOCK GENERAL CAT
TRASH DOCK
ZBA03
TRASH
CONTAINER
SERVICE DRIVE
VERTICAL
STAIR
ST-2
DOCK
BUMPER -
TYP
SUMP
PIT
EJECTOR
PIT
THER POOL
PUMP ROOM
BB-300
VERTICAL
STAIR
ZBA04
4"
4"
4"3"
P
THIS PIPING IS ON TOP OF 4" SAN LINE SHOWN
DS
S-2
S-3
S-2A
CONNECT TO
SPRINKLER
SYSTEM
F
3"
2" DR LINE
DN TO OHD
2 1/2" FIRE
LINE TO
FHV @
BASEMENT
S-2A
S-2
S-2
8" STORM
UP
DN TO SE
- 3 & 4
6" SAN
DN
DN TO
SE -
3 & 4
DS S-3
2A S
1 1/2"
1 1/2"
1 1/2"
S-2A
6"
S-2
4"4"3" 3"
1 1/2" S-2A
1 1/2"1 1/2"
S-2A
1 1/2" S-2A
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F i l e
P a t h
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD101
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA A
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA A
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 01 00 00 GENERAL
REQUIREMENT AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
H. DEMOLITION OF ALL 1-1/2” AND 2” PIPING ON THIS SHEET SHALL BE
INCLUDED IN DEDUCT ALTERNATE 2. IF ACCEPTED, LEAVE SAID
PIPING EXISTING TO REMAIN.
POINT OF DEMOLITION TO VARIOUS PIPING THROUGHOUT AREA.
REFER TO SPEC SECTION 02 41 00 DEMOLITION FOR EXACT
REQUIREMENTS.
CONTRACTOR SHALL DEMO RISER PIPING AS CLOSE AS POSSIBLE TO
ABOVE FLOOR PENETRATION.
P l a n
N o r t h
T r r t h
R
Q
P
M
N
14 13.9 13 12.5 12 11.5 11 10 9.5 9 8.18.5 8
ATV
S S
S S
S S
S S
F S
S S
S S
S
SS
4" HD
6"
6"
3/4"
4" 3/4"
DR. LN.
S S
4"
6" 4"1 1/2"
4"
3/4"
DR LN
3/4" CW UP
10" SD 6"
SD
15"
15"
12"
WASTE LINE
3"
4"
3"
4"
6" 4" 1 1/2"
3/4"
3"
6"
4"
3" 3"
3/4"
8" SAN
4" CONCRETE
PAD
GENERAL CAT
TRANSFORMER
BB-310
VERTICAL
STAIR
ZBB02
SUMP
PIT
VERTICAL
STAIR
ZBB03
GENERAL CAT
VESTIBULE
BB-308
UNEXCAVATEDUNEXCAVATED
SERVICE DRIVE
ZBB01
4" CONCRETE
PAD
GENERAL CAT
TRANSFORMER
BB-306
MECHANICAL BAY-2
UTILITY TUNNEL
BB-308A
4" CONCRETE
PAD
WIDE
SCREEN
AREAWAY
VERTICAL
SHAFT
ZBB04
SERVICE
MECHANICAL
ROOM
BB-308A
VERTICAL
STAIR
ZBB05
DS
DS
S-3 S-3 S-3
S-2 S-3
S-2A
4" UP
TO FD
S-3
4" UP
TO FD
S-2 S-2S-2
F
S-2
S-2A
S-2A
P
F
FF
DROP & SPILL OVER HD
2" DRAIN RISER UP
2"1 1/2"
1 1/2"
2"
S-2A
S-2A2"
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD102
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA B
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA B
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 01 00 00 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
POINT OF DEMOLITION TO VARIOUS PIPING THROUGHOUT AREA.
REFER TO SPEC SECTION 02 41 00 DEMOLITION FOR EXACT
REQUIREMENTS.
CONTRACTOR SHALL DEMO RISER PIPING AS CLOSE AS POSSIBLE TO
ABOVE FLOOR PENETRATION.
DEMO EXTENTS SHOWN FOR MAIN RUNS ARE MINIMUMS ONLY. REFER
TO DETAIL 003 ON P-501.
P l a n
N o r t h
T r r t
R
Q
P
M
N
2020.1 19 18.9 18 17 1516 14 13.9
4" CONCRETE
PAD
GENERAL CAT
TRANSFORMER
BC-406
SUMP
PIT
VESTIBULE
BC-404
UNEXCAVATED
UNEXCAVATED
SERVICE DRIVE
ZBCB01
4" CONCRETE
PAD
GENERAL CAT
TRANSFORMER
BC-402
MECHANICAL BAY-3
UTILITY TUNNEL
BC-404A
4" CONCRETE
PAD
WIDE
SCREEN
AREAWAY
ZBC07
GENERAL CAT
AREAWAY
ZBC07
SERVICE
MECHANICAL
ROOM
BC-404A
VERTICAL
STAIR
ZBC05
VERTICAL
STAIR
ST-4
GENERAL CAT
BC-408
ELEVATOR
MACHINE
BC-408
SUMP
PITS TRASH
COMPACTOR
TRASH
COMPACTOR
TRASH
COMPACTOR
GENERAL
CAT
TRASH
DOCK
ZBC02
TRASH DOCK
VERTICAL
STAIR
ZBC03
4" CONCRETE
PAD
VERTICAL
STAIR
ZBC04
DINING COURT
FOUNTAIN
EQUIPMENT
GENERAL CAT
VESTIBULE
BC-404
ZBC06
FILLER INLETS
FOR TANKS AR
LAUNDRY
LIQUID
SUPPLY
BC-400
GENERAL CAT
LAUNDRY LIQUID
SUPPLY
BC-400
SD
8"
4"
SD
SZCV
S
S
12"
4" 4"
4"P-802
3"
3"
3"
4"
6" 3/4"
3/4"
3/4" CW - UP TO P-810
4" UP TO FD
4"
4" DR LINE
4" 4"
S
6" 4"
1 1/2" 3"
3/4"
3" UP TO FD
4" 4"
3"
3" 3"
4"
6" 4"
1 1/2" 3/4"
15"
15"
SD
SD
8"
3"
3"
4" FD-B
6" FD -T
3" FD-B
6" FD-T
3" FD-B
4" SAN UP
3" W UP
4"
4" 4"
3" 3"
3" W UP
3" W UP
3" W UP
4" SAN UP
4"
4"
3" W UP
3" 3"
6" 6" 4"
4"
4" SAN UP
SD
6"
6" 6" 4"
15"
SD
SD
10"
10"
4"
CO
6"
4"
4" UP TO-U
SD 3"
3" UP TO FD-U
UP TO FCO
CO
SD
4" UP TO FD-U 4"
4"
4"
6"
6"4"4" UP TO FD-U
4"
UP TO FCO 4"
4"
4" 6"
4"
6" 4"4" SAN. UP
4"
4"
6"
SDSD
15"
12"
6"
15" STORM
SEWER (21180Ø)RISE & SPILL
ON GRADE
15"
3/4"
4" UP TO FD-U
4" UP TO FD-U
6" SD
CO
6"
8" SD - DN
4"
SUMP PUMP
SP-5 & 6
4"
3"
4" SAN UP
4" VENT UP
3" UP TO
FD-C
SD
4" FD-B
4" SAN UP
4" SAN UP
4" VENT UP
3"
4"
4"
4" S
AN
UP
15" STORM
SEWER
DS
SD
3/4" SCW - DN TO
CAUSTIC SILICATE
PUMP ASSEMBLY
DS
3/4" CW
DN TO P
- 805
3/4" UP
TO P-810
4"
SAN
2 1/2" FIRE
LINE DN TO
FHV AT
BASEMENT
S-2
CONNECT
TO
SPRINKLER
SYSTEM
S-2A
S-2S-2A
F
3" FD-A
(90Ø)
4" UP
TO FD
4" UP
TO FD
S-2
P
S-2A
DS
CRP
S-2A
S-2
1 1/2"
1 1/2"
1 1/2"
2"
2"
1 1/2"
2" V UP
2" V DN
2"
1 1/2"
2"
2"
1 1/2" W UP
2"2"1 1/2" W UP
2"
2" VENT UP
2"
1 1/2" W UP
2"
2"
1 1/2" W UP
2" VENT
2" 2"
2"1 1/2" W UP
2"
1 1/2" W UP
2"
2" W UP
1 1/2" W UP
2"
1 1/2" W UP
2" VENT
2" W UP
S-2AS-2A
2" DRAIN RISER
DOWN TO 4" HD
AT BASEMENT
S-2A
1 1/2"
W-UP
2"
W-UP
P
P
2 2
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD103
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA C
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA C
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 01 00 00 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
POINT OF DEMOLITION TO VARIOUS PIPING THROUGHOUT AREA.
REFER TO SPEC SECTION 02 41 00 DEMOLITION FOR EXACT
REQUIREMENTS.
CONTRACTOR SHALL DEMO RISER PIPING AS CLOSE AS POSSIBLE TO
ABOVE FLOOR PENETRATION.
DEMO EXTENTS SHOWN FOR MAIN RUNS ARE MINIMUMS ONLY. REFER
TO DETAIL 003 ON P-501.
P l a n
N o r t h
T r r t
R
Q
P
M
N
GENERAL CAT
TRANSFORMER
BC-412
SUMP
PIT
VESTIBULE
BC-410
UNEXCAVATEDUNEXCAVATED
SERVICE DRIVE
ZBD01
MECHANICAL BAY-4
UTILITY TUNNEL
BC-410A
4" CONCRETE
PAD
WIDE
SCREEN
AREAWAY
ZBD04
GENERAL CAT
AREAWAY CC
ZBD04
SERVICE
MECHANICAL
ROOM
BC-410A
VERTICAL
STAIR
ZBD02
TRENCH
DRAIN
4" CONCRETE
PAD
VERTICAL
STAIR
ZBD03
GENERAL CAT
VESTIBULE
BC-410
GREASE
INTERCEPTOR
2526 25.2 24 23 22 21.5 21 2020.5 20.1
STRM
12"
S S
S S
S S
S S
4"
S S
S S
SS SS SS
S S
SS
S S
S S
6" 4"
1 1/2"
6"
8"
3"3"
8"
6"
3/4"
6"
6"
6"
3"
6"4" 1 1/2"
STORM LINE
6"
4" 4"
3"3"
3"
3"
3"4" 10"
4" UP TO FD
4"
3" UP TO FD
3" 4"
4"
3"
FD ABOVE
6"
4"
FD ABOVE
3/4" CW UP 3/4"
6"
4"
F6"
DS
S-2AS-2A
S-2 S-2
S-2A
S-2S-2
4" UP
TO FD
P
DS
1 1/2"
1 1/2"
1 1/2"
2"
S-2A
1 1/2" S-2A
1 1/2" S-2A
1 1/2" S-2A
1 1/2"S-2A
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD104
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA D
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA D
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 01 00 00 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
POINT OF DEMOLITION TO VARIOUS PIPING THROUGHOUT AREA.
REFER TO SPEC SECTION 02 41 00 DEMOLITION FOR EXACT
REQUIREMENTS.
CONTRACTOR SHALL DEMO RISER PIPING AS CLOSE AS POSSIBLE TO
ABOVE FLOOR PENETRATION.
DEMO EXTENTS SHOWN FOR MAIN RUNS ARE MINIMUMS ONLY. REFER
TO DETAIL 003 ON P-501.
P l a n
N o r t h
T r r t
2345678 3.5 2.5 1.88.1 6.98.2
JUNCTION BOX
H
J
K
L
H.5
J.5
G.2
M
SUMP
PIT
SAND
PIT
ZBE02
SUMP PIT
ELEVATOR
MACHINE
BB-130
POWER SHELVING
ZBE01E
4" CONCRETE
PAD
GENERAL CAT
AREAWAY
ZBE04
SERVICE ELEVATOR
LOBBY
CBB-100
VERTICAL
STAIR
ST-12
VERTICAL
STAIR
ST-6
GENERAL CAT
WAREHOUSE
BB-100
4"
CONCRETE
PAD
SERVICE
MECHANICAL
BAY-7
BB-102
ZBE03
OXYGEN
STORAGE
BB-120
NON-FLAM
GAS STORAGE
BB-110
OFFICE
STORAGE
BB-100C
GENERAL CAT
FLAMMABLE
STORAGE
BB-100B
GENERAL CAT
STORKEEPER
BB-100A
GENERAL CAT CORRIDOR CBB-300 CORRIDOR CBB-300
ZBE08
ZBE08
VERTICAL
ELEVATOR
ZBE09
VERTICAL
ELEVATOR
ZBE10
VERTICAL
ELEVATOR
ZBE11
ZBE07
PL-1
PA
NE
L R M
CB
B-
0A
GENERAL CAT
PANEL ROOM
CBB-100A
VERTICAL
STAIR
ZBE06
VERTICAL
ELEVATOR
ZBE05
VERTICAL
ELEVATOR
S-5
VERTICAL
ELEVATOR
S-5
VERTICAL
ELEVATOR
S-1
VERTICAL
ELEVATOR
S-2
VERTICAL
ELEVATOR
S-3 RAMP
DOWN
ZBE13
TRASH
CONTAINER
TRASH
COMPACTOR
ZBE12
FAC
TOILET
BB-100E GENERAL
CAT
DOCK 7
BB-100L
GENERAL CAT
DOCK 6
BB-100K
GENERAL CAT
DOCK 5
BB-100J
GENERAL CAT
DOCK 4
BB-100H
GENERAL CAT
DOCK 3
BB-100G
GENERAL CAT
DOCK 2
BB-100F GENERAL CAT
DOCK 1
BB-100E
SUPPLY SERVICE WAREHOUSE - 291
6"
3/4"3/4"
3/4"
CR
P
4"
4" 4"
4"
6"
6"
4"
6"
4"
2"4"4"
3"
2"
15"
3/4"
1 1/2" 2" 1/2"
1/2"
1 1/2"
4"
4"
2"
3/4"
3/4 " U
P
TO
P -8
6" 4"1 1/2"
8"4"
2"
4"
3"
1 1/2"
3/4"
4"4"
4"4"4"
4"3" 3"
3"
4"
1 1/2"
2" 3/4"
2"
S-3
8"
4"
4"
3"
4"
8"
4"STORM
(920Ø)
4"STORM
(920Ø)
4"STORM LINE UP
4" STORM LINE UP
4" SAN
4" VENT
3"
4" SAN
4" VENT
4"
2"V.UP
15"
SD
8"
3/4"
3" 3"
SA
4"
3"
1 1/2"
8"6"
4"
4"
1 1/2"
SA
4" HD
1 1/2" W DN - 1 1/2" V.UP
1/2" H & CW UP
3/4" H & CW UP
6"
F
8" F
8"
F8"
6"
8"
6"
F
6" 2 1/2" FIRE DN
SZCV
F
6"
F
F
2 1/2"
8"
SZCV
6"FIRE DN
6"FIRE UP
6"FIRE UP
BACKFLOW PREVENTER
6"FIRE UP
FHV
2 1/2" FIRE UP
FHC
6"
6"
8"
1 1/2"
2"
SA
SA
3"
FHV 4" HD
6" FIRE UP
4" HD
2" DRAIN RISER
CRP
DS
CAP EXIST.
6" S.D.
SUMP PUMP
SP-13 & 14
6" PIPE TO JUNCTION BOX
SLOPE PIPE TO JUNCTION BOX
P
F
2" DRAIN
RISER
F
S-2A S-2 S-2
S-2A
S-2A
S-2A
S-2
S-2
2 1/2" FIRE
LINE DN
2" DRAIN
RISER DN
S-2A
S-2
S-2A S-2A
S-2 S-2
S-2
S-2S-2
S-2A
S-2A
S-3
S-2 S-2
S-2A
P
S-2A
S-2A
S-2
CONNECT TO
SPRINKLER
SYSTEM
F
F
S-2
S-2A
S-2A
S-2A
S-2
S-2A
S-2A
S-5S-5
S-2A
S-2A
S-2
S-2S-2 P
S-2A S-2
S-2 S-3
S-3
4" W DN -2" V UP;
1 1/2" V UP
FLOW
REGULATOR
SET @
.5 GPM
2 1/2" FIRE
LINE UPCONNECT
TO
SPRINKLER
SYSTEM
S-2
S-3
S-3
S-2A
S-2
S-2
2" 2"
2"
2" 1 1/2"2"
1 1/2"
1 1/2"
1 1/2"
1 1/2" 1 1/2"
1 1/2"
1 1/2" 1 1/2"
2"2"
2"2"
2"
1 1/2"
1 1/2"
2"
2"
2"
1 1/2" 1 1/2"
1 1/2"
1 1/2"
1 1/2"
2" DRAIN UP
2"
S-2A
S-2A
S-2A
S-2
S-2A
S-2A 1 1/2"
S-2A
S-2 S-2
S-2
S-
S-2A
S-2A
S-2
S-2A
S-2A
S-2A
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD105
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA E
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA E
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 01 00 00 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
G. REFER TO SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR
INFECTION CONTROL REQUIREMENTS BEFORE STARTING WORK.
H. DEMOLITION OF ALL 1-1/2” AND 2” PIPING ON THIS SHEET SHALL BE
INCLUDED IN DEDUCT ALTERNATE 2. IF ACCEPTED, LEAVE SAID
PIPING EXISTING TO REMAIN.
POINT OF DEMOLITION TO VARIOUS PIPING THROUGHOUT AREA.
REFER TO SPEC SECTION 02 41 00 DEMOLITION FOR EXACT
REQUIREMENTS.
CONTRACTOR SHALL DEMO RISER PIPING AS CLOSE AS POSSIBLE TO
ABOVE FLOOR PENETRATION.
P l a n
N o r t h
T r r t
FS FS
SS SS SS
SS
SA
SS
S S
SS
SSSSSSSSSS
S S
SS
SS SS SS
SSSSSS
SSSSSSSS
S S
SSSS
SS SS
15"
4" 4"
4"
4"
4" 4"
4"
3" 3"
4"
6"
6"
4" 3"3"
2"
3" 1 1/2"
1 1/2"
1/2"
3/4"
3/4"
1 1/2"
1 1/2"
8" 6"
1 1/2"
4"
2 1/2" 2 1/2"
4" 3"
1 1/2"
4"
2"
1 1/2"
2 1/2"
8" 6"
2 1/2" 2"
SA1 1/2"
1 1/2"3/4"
1/2"
2"1 1/2"
1/2" 1/2"
2" 3/4"
3/4"
1 1/2"
1/2 3/4"
3/4"
1 1/2"2"2"
2"
1"
3/4"
3/4"1 1/2"
2"
3/4"
3/4"
1" 2" 2"
2" 2"
1/2" 1/2"
4" 1/2"
2"
3/4"
2"
2 1/2" 2 1/2"
3"
4"
4"
3/4"
2 1/2" 1 1/2"
3/4"
3/4"
2"
3/4"
SA
1/2"
3"
3/4" 3"
SA
2 1/2"
2"
1 1/2" 3/4"
SS 4"
4" 3"
3"
3/4"
3/4" 1/2"
1/2"
1 1/2" 4"
1/2"1/2"
3/4"
3/4"
3/4
1 1/2"
3/4"2"
3/4"
3/4"1 1/2" 1 1/2"
1 1/2" 3/4"
2"
SSSS
3/4" 3/4"
2" 1 1/4"
3/4" 1/2"
1 1/2"1/2"
3/4" 1 1/2"
3/4"
1"2" 1 1/2" 3/4"
2"
3/4"
2"1 1/2"
3/4"
1 1/2"
1 1/2"
1 1/2"
1/2"
1 1/2"2"
3/4
SA
3/4" 4" 3"
3"
2"
1 1/4" 4"
2"
4" O
HD
SA
3"
FCO
FCO
2 1/2"
3/4"
3/4
3/4"
1 1/2"
3/4"
F
SZCV
F
6" UP
6"
F
6" 6"
8" 8" 3"
8'
F
3"
3"
3"
2"
S S
SA
2 1/2"
SA
8"
1 1/2" 6"
VS-210VS-210
VS-210
3/4"
2"
3/4"
3/4"
3/4"
SSSS
ELEVATOR
P-14
FA
C
BC
-3
B
MECH
ROOM
BC-350C
UNIFORM
ISSUE
BC-352
STAIR-13
BTY MAINT
BB-291
GENERAL CAT
BTY MAINT
BB-291
FIRE
STAIR
ST-8-B
VERT STAIR
ST-8-B
SERVICE
MECHANICAL ROOM
BAY-5
BB-281
GENERAL CAT
MBS STORAGE
BB-231
BUILDING
MANAGEMENT
CORRIDOR
CBC-300
GENERAL CAT
CORRIDOR CBC-300 GENERAL CAT CORRIDOR XCBC-300 CORRIDOR XCBB-300
VEST
BB-271
GENERAL
CAT
MALE
LOCKER
BB-271A
SERVICE
MEN'S
RESTROOM
BB-271
SERVICE
WHEEL
CHAIR
BB-261
GENERAL CAT
ROOLENT STATION
BB-251
GENERAL
CAT
VESTIBULE
BB-241
SERVICE
WOMEN'S
RESTROOM
BB-241B
GENERAL
CAT
FEMALE
LOCKER
BB-241A
OFFICE
STORAGE
BB-221
CART STORAGE/
MAINTENANCE EQ
BB-211
AGV PAINT
BB-201
GENERAL CAT
CART STORAGE
BB-211
PARTS STORAGE
BB-201A
VERTICAL
ELEVATOR PIT
P-4/5 & FUT
GENERAL CAT
UNAS
BB-175
VERTICAL
ELEVATOR PIT
P-1/2/3
GENERAL CAT
ATS CONT
BB-290
SERVICE
MECHANICAL
ROOM
BC-350F
T-6
GENERAL CAT
RECEIVING
BB-250 BB-248A
CHIEF
BB-248A
CLERK
BB-248B
GENERAL CAT
ASSISTANT CHIEF
BB-248B
OFFICE
BB-248CGENERAL
CAT
CLERK
BB-248
GENERAL CAT
VOL & TRNG
BB-246
DISTRIBUTION
BB-260
GENERAL CAT
LNG
BB-244
VESTIBULE
BB-242
GENERAL CAT
PASSAGE
CBB-204
SERVICE WOMEN'S
RESTROOM BB-242B
GENERAL
CAT
FEMALE
LOCKER
BB-242A
GENERAL CAT
CORRIDOR
CBB-203
GENERAL CAT
LNG
BB-230
GENERAL CAT
MALE LOCKER
BB-240B
SERVICE MEN'S
RESTROOM
BB-240A
VESTIBULE
BB-240
FORMS STORAGE
BB-100
SUPPLY SERVICE
WAREHOUSE
GENERAL CAT
FORMS STORAGE
BB-100
GENERAL CAT
FEMALE LOCKER
BB-230D
SERVICE WOMEN'S
RESTROOM BB-230E
GENERAL
CAT
FEMALE
LOCKER
BB-202
SERVICE WOMEN'S
RESTROOM BB-202B
SERVICE MEN'S
RESTROOM BB-200A
GENERAL CAT
MALE LOCKER
BB-200
GENERAL CAT
CORRIDOR
CBB-202
HAC
BB-100D
S-11
ELEVATOR
MACHINE
ROOM
BB-130
OXYGEN
STORAGE
BB-120
4" CONCRETE PAD
LBA18 (2)
3" FD-B
3" FD-C-1
4" CONCRETE PAD4" CONCRETE PAD
3" FD-X
3" FD-B 3" FD-B
3" FD-X
3" FD-C
3" FD-C
3" FD-C
3" FD-C
3" FD-C
3" FD-V
3" FD-G 3" FD-O 3" FD-O 3" FD-O
3" FD-O 3" FD-O 4" FD-O
3" FD-C
3" FD-O
GENERAL CAT
EQ STOR
AND TEST
BB-260A
GENERAL
CAT
FEMALE
LOCKER
BB-230E
EQ
WASH
BB-220B T-5
GENERAL CAT
AREATOR
BB-220D
AR
EA
TO
R
BB
-2
D
MACHINE
ROOM
BB-230C
SUPPLY PROCESSING & DISTRIBUTION
GENERAL CAT
DISTRIBUTION
BB-260
GENERAL
CAT
HAC
BB-220C
SERVICE MEN'S
RESTROOM
BB-230B
GENERAL CAT
MALE LOCKER
BB-230A
GENERAL CAT
DECONTAMINATION
BB-220
GENERAL CAT
STER CLOSET
BB-210A
GENERAL CAT
STER CLOSET
BB-210A
GENERAL CAT
CART WASH
BB-220A
2" FD-V
PREP ASSM & STER
BB-210
SUP STOR
BB-100
GENERAL CAT
CORRIDOR
BB-204
FLOW
REGULATOR
SET @
1 GPM
S-2A 1 1
1 1
F
S-4
S-4
S-4
S-5
REDUCED
PRESSURE
BACKFLOW
PREVENT 8
CRP
S-3S-3
REDUCED PRESSURE
BACKFLOW PREVENT
S-2A
S-5
S-
S-4
S-2A
S-4 S-4
S-5 S-5 S-5
S-4
S-4 S-4
S-5 S-5
S-5 S-5
PRESSURE REDUCING VALVE.
INLET PRESSURE 70 PSI +
OUTLET PRESSURE 35 PSI
S-4
S-4S-4
FLOW REGULATOR
SET @ 1 GPM
S-2S-2
S-5
S-5
S-2
DS
S-2AS-2A
P
S-2A
S-5
S-2A
S-2
S-2 S-3S-3
S-4
S-2A
S-2A
S-2A
F
CONNECT
TO
SPRINKLER
SYSTEM
S-3
S-4 S-4
6"8"
4"
S-5S-5
S-5
S-5
S-5
S-5
2"
S-2
S-2 FHV IN CAB S-3
S-2A
S-2A
S-5 S-5
S-5
S-2
S-2A
S-2A
S-4
S-4 17 P
S-3
S-2
S-5
FLOW
REGULATOR
SET @
.5 GPM FLOW
REGULATOR
SET @
.5 GPM
2 1/2" FIRE
LINE DOWN
2"
1 1/2" 1 1/2"
2"
1 1/2"
2"
2"
1 1/2" 2"
1 1/2"1 1/2"
1 1/2" 2" 2" 2" 1 1/2"
1 1/2" 1 1/2"
1 1/2"
2"
1 1/2" 1 1/2"
1 1/2"
1 1/2"
2"
1 1/2"
2"
1 1/2"
2"
1 1/2"
S-2A
1 1/2"
S-2A
S-2A
S-2A
S-2A
1 1/2" S-2A
S-2A
S-4
S-2A
2 2
L
K
J
H
M
13 12 11 10 9 8.1 814 13.9 8.2
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD106
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA F
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA F
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E. CONTRACTOR SHALL INSTALL TEMPORARY BYPASS PIPING TO MINIMIZE
SYSTEM SHUTDOWN. SEE SPEC SECTION 01 00 00 GENERAL
REQUIREMENTS AND DETAIL 3/P-501.
F. THIS SECTION IS A CLASS IV INFECTION CONTROL AREA. REFER TO SPEC
SECTION 01 35 26 SAFETY REQUIREMENTS FOR INFECTION CONTROL
REQUIREMENTS BEFORE STARTING WORK.
POINT OF DEMOLITION TO VARIOUS PIPING THROUGHOUT AREA.
REFER TO SPEC SECTION 02 41 00 DEMOLITION FOR EXACT
REQUIREMENTS.
CONTRACTOR SHALL DEMO RISER PIPING AS CLOSE AS POSSIBLE TO
ABOVE FLOOR PENETRATION.
P l a n
N o r t h
T r r t
UP
21 20.1 20 19 18.8 18 17 16 15.8 15 14.818.9
GENERAL CAT
FRZ
BC-250H
GENERAL CAT
MEAT REFR.
BC-250G
GENERAL CAT
FRZ
BC-250P
GENERAL
CAT
BR/EGG
REF
BC-250J
GENERAL CAT
COMP
BC-270J
GENERAL CAT
BUDGET
BC-270H
GENERAL CAT
STORE RM
BC-270G
GENERAL CAT
STUDY
BC-270F
GENERAL CAT
SU T.&CLKS
BC-270
GENERAL CAT
CONF/CLRM
BC-270E
GENERAL
CAT DIET
ADM P
BC-270D
GENERAL CAT
CHPROGMGMT
XBC-270D
GENERAL CAT
REFRIG # 5
BC-250M
GENERAL CAT
ICE CREAM
BC-250N
GENERAL CAT VEG
REFR
BC-250K
GENERAL CAT
DAIRY REFR
BC-250L
GENERAL CAT
COLD FD/PR
BC-250R
GENERAL CAT
TIME KP OF
BC-270B
GENERAL CAT
CHFOODPROD
BC-272
GENERAL CAT
REFRIG # 6
BC-250T
REFRIG # 7
BC-250V
CORR
CBC-209
GENERAL CAT TIME
KP OF
BC-270A
GENERAL
CAT
LNG
BC-266 SERV
WOMENS RR
BC-264B
GENERAL CAT SANI
SUP S
BC-260
FOOD
PROC
BC-250X
SERV
WHEEL CH B
BA-150
GENERAL CAT
HAC
BA-173
FEMALE
LOCKER
BC-264A
VEST.
BC-264
GENERAL CAT
CORRIDOR
CBC-210
MALE LOCKER
BC-262A
SERV
MEN'S R.R.
BC-262B
HAC
BC-300B
VERT
ELEV PIT
S-12
GENERAL CAT
BLOWER RM.
BA-199
PTS
PANEL
SERV
MECH RM
BC-300A
VESTIBULE
BC-262
GENERAL CAT
PAT C& L S
BA-201
GENERAL CAT
PAT C& L S
BA-203
ZBG05
VERT
ELEVATOR
P-16
VERT
ELEVATOR
P-15
GENERAL CAT
PAS EL LOB
CBA-200
GENERAL CAT
GENERAL CAT
GENERAL CAT
REP REPRO
BC-350A
RCVG
CBC-206
GENERAL CAT NON
FOOD S
BC-250F
GENERAL CAT
PROS STOR
BC-200
GENERAL CAT EMS SUPERI
BC-210
GENERAL CAT
CANT. HOLD
BC-220
GENERAL CAT
CORRIDOR CBC-300
ZBG06
DEIT COM C
BC-220B
REFIRC
# 1
BC-220A
GENERAL CAT
FOOD STOR
BC-250E
GENERAL CAT
INGRD CONT
BC-250D
CLEAN
WARE
CBC-208
CLEAN WARE
CBC-208
GENERAL CAT
SOIL.W.&C.
BC-230
GENERAL CAT
SPCL DIET
BC-240
SOIL WARE
BC-230A
HOLD RM
BC-252-C
ZBG04
ALCOVE
BC-250U
GENERAL
CAT
FOOD STOR
BC-250B
FOOD
PROC
BC-250X
FREEZER #8
BC-252A
HOLD RM
BC-252
FREEZER #4
BC-252B
GENERAL CAT
S L T CARF
XBC-310A
ELEC. PANEL
GENERAL CAT
T C H/RTHR
BC-250A
GENERAL CAT
F&LIN HOLD
BC-350
STOR
BC-209
VERT
ELEVATOR
S-8
VERT
ELEVATOR
S-7
VERT
ELEVATOR
S-6
GENERAL CAT
SERV ELEV LOBBY
CBC-201
VERT
STAIR
ST-9
VERT
ELEVATOR
T-3
VERT
ELEVATOR
T-4
GENERAL CAT
ATS TERMINAL
CBC-200
GENERAL CAT
UPS SYS BTY
BC-271
VERT
ELEV PIT
P-6/7/8
GENERAL CAT
TEL MAIN F
BC-275
GENERAL CAT
SOILED
LINEN
TEXTILE
CARE
XBC-310A GENERAL CAT
NEW LIN ST
BC-310
GENERAL CAT
MEDIA STOR
BC-325
GENERAL
CAT
CORRIDOR
CEC-303
GENERAL CAT
TRNG
BC-337
CORR CBC-300
SERV MR & LKR BC-320B
FT & HSR BC-322B
CO
RR
ID
OR
CB
C-
GENERAL CAT
MALE LOCKER
BC-320A
VESTIBULE
BC-320
CORRIDOR
CBC-302
VESTIBULE
BC-322
GENERAL CAT
FEMALE LOCKER
BC-322A
CORR
CBC-302
GENERAL CAT
LUNCH
BC-324
OFFICE
BC-350E
GENERAL CAT
MGR&SECY
BC-350D
DS-14
CR-9
SS SS
SS
S S
SS
SS
SS
S S
S S
SS SS SS SS SS
SS
SS SS
SS
SS
S S
SS SS
SS
SS
3" V UP
3"
3" UP TO FD-M
SS
3"
3" UP TO FD-G
3"
3"
4"
GW
3"
UP TO FCO
2" W UP
3" TD-1
3" UP TO TD
3" TD-1
3" UP TO TD 3" TD-1 3" TD-1
4" GW
SS
S S
3" UP TO FD-C
3"
3" V UP 3"
3"
3" UP TO FD-G
3" TD-13" UP TO TD 3" TD-1
2" W UP
4"
10"
4"
GWGW
4"
4"
10"
GW
8"
8"
3"
2" V UP
2" W UP
3"
1 1/2" W UP
3"
3" UP TO FD-C
1 1/2" W UP
1 1/2"
3"
3"
3" UP TO FD
3"
U P
TO
F
D- R
3" 2"
4" W UP
2" V UP 6" 4"
6"
6"
3" UP TO FD-G
6"
4"
4"
4" UP TO HD
3" UP TO FD-M
3" UP TO FD-G
GWSS
3" TD-1
3" UP TO FD-R
UP TO FCO
3" UP TO FD-R
6"
6" 3"
2" V UP
3" W UP
UP TO FCO
3" UP TO FD-G
3" 3" UP TO FD-G
2" V UP
4" 3"
3"
3" UP TO FD-G
3" UP TO FD-G
S S
S S
UP TO FCO
3"
GW
3" TD-1
3" UP TO TD
3" UP TO FD-G
2" V UP
3" TD-1
3" UP TO TD
3" V UP
UP TO FCO
4"
3" UP TO FD-B
3" UP TO FD-M
3" UP TO FD-B
4" UP TO FD-R
3" UP TO FD-C
4" 4"
UP TO FCO
3" UP TO FD-C
4"
3" UP TO FD-C
4"
4"
3" 2"
1 1/2" W UP
3" UP TO FD-C
3" UP TO FD
4"
2"
SS
1 1/2" W UP
1 1/2" W UP
10" W UP
10" RUNNING TRAP
W (2) FCO
6"
6" V UP
CO
10"
3"
3" U
P
TO
F D-
B
3"
10"3"
4"
3"
4" 3" V UP
UP TO FCO
3"V UP
UP TO FCO4"
3" UP TO FD-G
3"V UPUP TO FCO
4"
3"V UP
S S
3" UP TO FD-G
3"
4"
3" UP TO FD-O
4" 3" V UP
4"
GW
4" 4"
4" UP TO HD
4"
3"
1 1/2"
3" UP TO FD-O
3" UP TO FD-G
SR
SA
SR
SA SA SA
S S
SS SS SS SS SS
S S
S S
SSSS
S
S
SS
S S
S S
S S
S S
SS SS SS
S S
S S
S S
S S
SSSSSS
S
SS SS
S S
SS
SS
SS
SS
S S
S S
S S
SSSS
SS SS
SS
SS SS
SS
SS
SS SS SS
S S
SS
S S
S S
S S
S S
SS
3"
1 1/2" V UP
1 1/2"
3/4" 1/2"
3/4"
1 1/2" CW UP
1 1/2"
4"
S 3"
1 1/2" 6" 8"
2"
2"
6" 4"
SASR
1 1/2"
6" V UP
6"
SA
SS
SS
SS
SS
SS
2"
S S
S S
S S
SS
SSSS
SS
SSSS
SS
SS SS
S S
S S
SS
S S
SS SS SS SS
S S
6"
1" 1 1/4" 6"
1 1/2"
1/2"
2"
3"
1 1/2"
3/4"
2" 2"
1 1/2"
3/4"
3/4" 1/2"
1/2" 1 1/2"
3/4"3/4"2" 2"
2" 3/4"1 1/2"1 1/2"2"
3/4"
S S
GW
6"
3"
3" 1/2"
3"
3/4"
3" 3" 3"
4" 3"
3"3" 1/2"
3"
3/4"
1" 1" S
3" 3"
S S
1 1/4"
4"
FLOW REGULATOR
SET @ 1 GPM
3/4" 1 1/4"3/4"
3/4"
ABOVE THE
MONORAIL
3/4"
3"3" 3"
1 1/4"
1"
3/4" 3"
1" 3"
3/4" 4"
SLEEVE IN BEAM 1/2"
3"
3"
3"
1/2"
3"
3/4"
4" 3"
S
1/2"1/2" 2"
S
3/4" 1 1/4"
1"
1" 3/4" 2"
4"
3"
3/4"
3/4" 1/2"1 1/2"
1 1/2"
1/2"
3/4"
3/4"
3/4" 1 1/2"
2"
1 1/2"1/2"
3/4"
3" s 3"4"
3/4"4"
2" s 2" s
4"
3/4" s
4" ss
4" 2"
2"
3/4"3/4"
4"
4"
4"
6" 3"
6"
3"
6" 3"
3"
3/4"
3/4"
3/4" 6"
3/4"
3" 3/4"
3/4"3/4" 1" 3/4"
6"
4" CRPSSSS
1/2"
1/2"
2 1/2"
1 1/2"
1/2"
3/4"
3" UP TO FD-O
S-2
3/4" 1"
3/4" 3/4"
3/4" 3"
3"
3/4"
1/2"
1/2"
3" 2 1/2" 1 1/2"
1/2" 3/4"1/2"
3/4" 2"
3/4" 2" 2"
1 1/4"
3/4" 2" 2"
2"
1 1/2"
3/4"
2"
3/4"
2"
3/4"3/4"
1 1/2"
3/4"
2" 3/4"
2"
3/4"
2 1/2"2"
4"
1/2"
1 1/2"
1 1/2" 3/4"
3/4"
3/4"1 1/2"2"
1/2"
1 1/2"
2 1/2" 3/4"
4" SAN DN
3/4"
1"
3"
3/4"
3/4" 1/2" 1/2"
3/4" 1/2"
3"
3"
4"
S S
3"
4"
4" 4"
1/2"
1 1/2"
1 1/2"
1/2"
2" 3/4" 3/4"
3/4" 1/2" 1/2"
3/4" 2"
3/4"
3/4"
1" 1 1/2"
4"
1 1/4" 2"3/4"
1/2" 3/4"
1 1/2"
3" W UP
2"
2 1/2" 3/4"
1 1/2" 3/4"
2" 3/4"
1" 3/4"
3/4"
1/2" 1 1/2"
3/4" 3/4"
2" 3/4"
1/2"
1 1/2"
4"3"
4"
3/4"
1 1/2"1 1/4"
3/4" 3/4"
1 1/2"
3"
3/4" 4"
4"
4" 1 1/2"
3/4" 3/4"
2"
3/4"
1 1/4" 1"
3/4" 3/4"
1"
2"
3/4"
3/4"
4"
6"
3" CRP UP
2"
3" FD-C
3" TD-1 3" TD-1
3" TD-14" HD
3" FD-M
4"
3" FD-B
3" FD-B
2" FD-C 2" FD-C
2" FD-C 2"FD-C
3" FD-B
4" HD
S S
S S
S S
S S
1/2" 3" ROSD
3" UP TO FD-A
3"
6" 6"
6" UP TO FD-C
6" 6"
6" 4" UP TO FD-C
SD4" 3"
4"
3" UP TO FDA
3"
3/4"
3/4"
8" 6"
3/4"
4"
F F
6"
SZCV
F
6"
6"
FHV IN FHVEC
3"
3" FD-B
3" FD-B
CO 1" 2"
S S
F
8"
6"
1"
S S
6" V
4"
S S
1 1/2" W UP
3"
4"
FHV IN CAB
SS
4" SAN UP
1 1/2"
2" FD-C
3/4" H & CW UP
3/4" H & CW UP
3/4" H & CW UP
4"
3" UP TO FD-C
IN TRENCH
3" UP TO FD-G
3" UP TO FD-M
3" UP TO FD-G
3" FD-G
3" FD-M
3" FD-G
3" FD-G
3" FD-G
3" FD-G
3" FD-R
3" FD-R
3" FD-M
3" FD-O
3" FD-C 3" FD-C 3" FD-C 3" FD-C
3" FD-G
3" FD-G
3" FD-G
3" FD-G
3" FD-M
3" FD-R
3" FD-G
3" FD-G
3" FD-G 3" FD-G 3" FD-G
3" FD-M
3" FD-G
3" FD-G 3" FD-G
3" FD-M
3" FD-G
3" FD-G
3" FD-G
3" FD-G 3" FD-G
3" FD-G
W/FUNNEL
3" FD-G
W/FUNNEL
3/4"
4" HD
S S
S S
S S
S S
S S
S S
S S
S S
4"
1/2"
SS
SS
SS SS
S S
S S
SS SS SS SS
SS
S S
S S
SS SS
PIT
PAD
4" HIGH CONC
4" CONC. PAD
DIETETIC SERVICE - 224
LAUNDRY - 408
FLOW REGULATOR SET @ 1 GPM3" UP
TO TD
3" UP
TO FD-M
3" UP
TO FD-R
3/4" H &
CW UP
3" UP
TO
FD-C
1 1/2"
W UP
RISE TO CLEAR
THE RAIL
ABOVE THE
MONORAIL
3" UP
TO TD
3" UP
TO FD-G
FLOW
REGULATOR
SET @ 1 GPM
UP
TO
FCO
1 1/2"
W UP
3" UP
TO FD-G
3" UP
TO
FD-G
3" UP
TO FD-G
P
3"
FD-G
1 1/2"
W UP
FLOW REGULATOR
SET @ .5 GPM
FCONNECT TO
SPRINKLER
SYSTEM
3" UP
TO TD
4" CONC
CURB
3" UP
TO
FD-B
3" UP
TO
FD-B
P
6" GREASE
WASTE
RISE UP & DN MONORAIL TO CLEAR
SPECIAL
CONC
FLOOR
PAD
FLOW
REG
SET
@ 1
GPM
4" HIGH CONC3" UP TO FD-F
IN TRENCH
3" UP TO
FD-O
UP TO
FCO
3" UP TO FD-G
3" UP
TO FD-G
4"
FLOW REGULATOR
SET @ 1 GPM
UP TO
FCO
4" UP
TO HD
4" UP
TO HD
3" FD-G
3" UP
TO FD-O
4" UP
TO HD
3" UP
TO FD-G
P
3" UP
TO FD-G
TO BOOSTER
HEATER
REDUCED
PRESSURE
BACKFLOW
PREVENTER
3" UP
TO TD
FLOW REG
SET @
1 GPM
FLOW REG
SET @ 1 GPM
4" UP
TO HD
3/4" H &
CW UP
3" UP
TO FD-R
3" UP TO FD-0
4" UP
TO HD
4" UP
TO HD
3" UP
TO FD-C
3" UP
TO
FD-G
3" UP
TO FD-C
FLOW
REG
SET @
1 GPM
UP TO
FCO
FLOW
REGULATOR
SET @ 1 GPM
2" W
UP
3" UP
TO FD-M
3" UP
TO FD-G
S-5
S-5
S-4
S-5
S-4
S-5S-5
S-4
S-5
S-5 S-5
S-3 S-3 S-3
S-4
S-4
S-5S-5
S-5
S-5
S-5 S-4
S-5
S-5
S-5
S-5
S-5
S-4
S-4
3/4" H &
CW UP
S-5
S-5
S-4 S-4
S-5
S-2A
S-5
S-4
S-3
S-2
S-3
S-2A
S-4
S-2 S-2A
S-2A
S-2A S-2
3"3"
S-2A
S-2A
S-2A
S-5
S-3S-3
S-2AS-5
S-5 S-4
S-2A
S-5
S-5
S-2
S-5S-5
S-4
S-5
S-4
S-4
S-2
S-2A
S-2A
S-2
S-2A
S-2
S-4
S-5
S-5
S-2A
S-2A
S-2A S-2
S-2
S-3
DATA PROCESSING
- 298
S-3
S-3
S-3 S-3
S-3
REDUCED
PRESSURE
BACK FLOW
PREVENTER
BFP DRAIN TO
BELOW RAISED
FLOOR, ROUTE
TO DRAIN
20 MICRON
WATER FILTER
REDUCED
PRESSURE
3" UP
TO
FD-B
S-4
4" UP
TO FDU
S-4
S-5 S-5
S-3
2"
2" 2"
1 1/2" 2"
3/4"
2"
2"1 1/2"
2"
1 1/2"
1 1/2"
1 1/2"
2"
1 1/2"
1 1/2"
2"
2"
2"
1 1/2"
1 1/2" 1 1/2"
1 1/2"
1 1/2" 2" 1 1/2"
2"
1 1/2"
2"
1 1/2"
S-2A
S-2A
S-2A
S-2A
S-2A
S-2A
S-2A
S-2A
1 1
S-2A
3" UP
TO FD-G
H.5
L
K
J.5
J
H
G
F.8
VEG 20.20
580-20-103
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
A/E DESIGN SERVICES TO
REPLACE SANITARY SEWER
LINES AT B100
KEY PLAN
100-22
100-18100-19 D C
100-23 H G
100-26 L
100-17 B
100-27
100-21
100-25 K
F
100-24
N
J
100-16 A
100-20 E
P l a n
N o r t h
T r r t h
KEYNOTES
GENERAL NOTES
07/09/2021 MB RL
PD107
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA G
SCALE:
2' 4' 8' 16' 32'
1/8" = 1'-0"
PLUMBING DEMOLITION PLAN
BASEMENT LEVEL - AREA G
A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ALL DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
C. ALL PIPING OFFSETS, VALVES, AND OTHER ACCESSORIES MAY NOT BE
SHOWN ON THE FLOOR PLANS. REFER TO SPECIFICATIONS, RISER
DIAGRAMS, AND TYPICAL DETAILS FOR FURTHER REQUIREMENTS.
D. BOLD LINES REPRESENT PIPING BEING REMOVED. LIGHT LINES
REPRESENT EXISTING PIPING TO REMAIN AND ARE FOR REFERENCE
ONLY.
E.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .