580-18-113 Project Drawings.pdf

PDF 11 MB Posted

Attached to
Y1NZ--CON NRM Project# 580-18-113 - Construct New 12kV Underground Feeder
Solicitation number
36C25621R0132
Issued by

About this file

This pre-solicitation notice describes an upcoming federal contract opportunity to construct a new 12kV underground feeder at the Michael E. DeBakey VA Medical Center campus in Houston, Texas. The project scope includes installing a new redundant 12kV utility line to provide power reliability, relocating telecommunications and alarm cables from a condemned building, and coordinating utility shutdowns across multiple buildings. The solicitation will be set aside exclusively for Service-Disabled Veteran-Owned Small Businesses and require at least 25% of labor costs be spent on veteran-owned businesses. Offerors must register on various websites by the anticipated July 2021 solicitation date. The period of performance is 365 calendar days with a $2-5 million construction magnitude under NAICS code 236220.

View the file

Other files

File Type Posted
Site Visit Attendees - 12kV.xlsx XLSX spreadsheet
Clarifications dated 8-17-2021.docx DOCX document
36C25621R0132 0002.docx DOCX document
580-18-113 Project Drawings - Civil.pdf PDF
36C25621R0132 0001.pdf PDF
SF24 - BID BOND.pdf PDF
36C25621R0132_1.docx DOCX document
DOL Wage Determinations TX20210031 dated 5-7-21.pdf PDF
580-18-113 Project Specifications.pdf PDF
580-18-113 Statement of Work.docx DOCX document
DOL Wage Determinations TX20210253 dated 5-7-21.pdf PDF
580-18-113 Site Visit Instructions.docx DOCX document
36C25621R0132.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A B

C D

E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

PROJECT LOCATION

G-001 1 1

COVER SHEET

1 VICINITY MAP

NTS

INSTALL NEW 12KV UNDERGROUND

DISTRIBUTION FEEDER

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

VA PROJECT #: 580-18-113

BID DEDUCT ALTERNATES

BID DEDUCT ALTERNATE 1

ALL WORK IN CONTRACT EXCEPT ELIMINATE ALL NON-OIT FIBER (SECURITY, CCTV, HVAC, AND FIRE ALARM) FROM THE PROJECT. THIS WORK IS SCHEMATICALLY SHOWN IN DETAILS 1/T-502, 2/T-502, 3/T-502 & 4/T-502.

BID DEDUCT ALTERNATE 2

ALL WORK IN CONTRACT EXCEPT DEDUCT 1 AND ELIMINATE WORK ASSOCIATED WITH ALL REMAINING

TECHNOLOGY SHEETS.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

3 = THREE WAY

GFI = GROUND FAULT CIRCUIT INTERRUPTER

WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT

120V QUAD RECEPTACLE, MOUNTED 18" AFF UNO

4 = FOUR WAY

JUNCTION BOX

SINGLE POLE SWITCH, MOUNTED 44" AFF UNO

MODIFIERS FOR SWITCHES:

HOMERUN - 120V OR 277V

HOMERUN - 208V OR 480V

BRANCH OR FEEDER CIRCUIT HOMERUN TO

PANELBOARD, SWITCHBOARD, OR MOTOR

CONTROL CENTER. SUBSCRIPT DENOTES

PANELBOARD, SWITCHBOARD, OR MOTOR

CONTROL CENTER AND OVERCURRENT

PROTECTION DEVICE NUMBER.

120V DUPLEX RECEPTACLE,

MOUNTED 18" AFF UNO MODIFIERS

FOR RECEPTACLES:

TELCO OUTLET MOUNTED 18" AFF UNO

WP = WEATHERPROOF

DM = DIMMER SWITCH

FUSED DISCONNECT

UNFUSED DISCONNECT

DATA/TELCO OUTLET MOUNTED 18" AFF UNO

120V SIMPLEX RECEPTACLE, MOUNTED 18" AFF UNO

220V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO

WIRING SYSTEM-SWITCHED BRANCH OR FEEDER CIRCUIT

OS = OCCUPANT SENSOR

S

T = DIGITAL TIMER SWITCH WITH OVERRIDE

ON CAPABILITY THAT MEETS NEC 110.26 (D).S

M MOTOR RATED SWITCH

1P

1PH

2/C 2W

3PH

A

AAP

AC

ACC

ACLG

ADO

A/E

AF

AFC

AFF

AFG

AFI

AJH

AHU

AIC

AL

ALT

AMP

APPROX

ARCH

AT

ATS

AUTO

AUX

AV

AWG

BAS

BATT

BC

BD

BFF

BLDG

BMS

BYP

C

CAB

CALC

CAP

CAT

CATV

CB

CCR

CCTV

cd

CD

CF

CKT

CLG

COAX

COMM

CONN

CONST

CONT

CONTR

COORD

CPT

CRI

CT

CTV

CTR

CU

CU FT

dB

DB

DC

DCP

DEG C

DEG F

DEMO

DEPT

DIA

DISC

DIST

DLC

DO

DN

DS

DT

DVR

DWG

EC

EEB

EG

ELEC

ELEV

EM

EMI

EMS

EMT

EPO

EQUIP

ES

ESMT

EWC

EWH

EX

EXP

FA

FAAP

FACP

FC

FCU

FIXT

FLR

FLUOR

FO

FU

FUDS

GAL

GALV

GC

GEC

GEN

GFI

GND

GRS

GYP BD

HID

HOA

HP

HT

HTR

HV

HVAC

IES

IG

IMC

IR

IT

I/W

IWH

J-BOX

KV

KVA

KVAR

KW

KWH

LED

LF

LM

LRA

LT

LTG

LTNG

LV

MATV

MAX

MBJ

MC

MCA

MCB

MCC

MDP

MECH

MFR

MFS

MH

MIC

MIN

MISC

MLO

MOA

MM

MSBD

MT

MTS

MTR

NA

NAC

NC

NEC

NEMA

NFDS

NIC

NL

NO

NTS

NVR

OC

OD

OH

OIT

OL

PA

PACS

PAMN

PB

PCB

PC

PDU

PED

PEND

PF

PH

PIV

PNL

PoE

PR

PRI

PROJ

PRV

PT

PVC

PWR

QTY

RCP

RCPT

REQD

REX

RGS

RM

RMS

RTLS

RTU

SC

SE

SEC

SEP

SF

SHT

SI

SIM

SM

S/N

SPEC

SPKR

SP

SPD

SR

SS

SSW

S/S

STD

SURF

SW

SWBD

SYM

SYS

TC

TEL

TEL/DATA

TERM

TGB

TMGB

TP

TPS

TR

TR

T-STAT

TTB

TTC

TV

TYP

UC

UE

UG

UH

UL

UPS

UT

UTP

UTIL

UV

V

VA

VERT

VFD

VOL

W W/

WAP

WH

W/O

WM

WP

XFMR

XFR

Ø C P L L

ELECTRICAL ABBREVIATIONS LIST

TIMECLOCK

TELEPHONE

TELEPHONE/DATA

TERMINAL

TELECOMM GROUND BUS BAR

TELECOMM MAIN GROUND BUS

BAR

TWISTED PAIR

TWISTED PAIR SHIELDED

TAMPER RESISTANT OR

TELECOM ROOM

THERMOSTAT

TELEPHONE TERMINAL BOARD

TELEPHONE TERMINAL CABINET

TELEVISION

TYPICAL

UNDER COUNTER

UNDERGROUND ELECTRICAL

UNDERGROUND

UNIT HEATER

UNDERWRITER'S LABORATORY

UNINTERRUPTIBLE POWER

SUPPLY

UNDERGROUND TELEPHONE

UNSHIELDED TWISTED PAIR

UTILITY

UNIT VENTILATOR OR

ULTRAVIOLET

VOLT

VOLT-AMPERES

VERTICAL

VARIABLE FREQUENCY DRIVE

VOLUME

WATT

WITH

WIRELESS ACCESS POINT

WATER HEATER

WITHOUT

WIRE MANAGEMENT

WEATHERPROOF

TRANSFORMER

TRANSFER

ANGLE

AT

DELTA

FEET

INCHES

NUMBER

PHASE

CENTER LINE

PLATE

PUBLIC ADDRESS

PHYSICAL ACCESS CONTROL

SYSTEM

PUBLIC ADDRESS AND MASS

NOTIFICATION SYSTEM

PULL BOX OR PUSHBUTTON

POLYCHLORINATED BIPHENYL

PHOTOELECTRIC CELL

RACK POWER DISTRIBUTION

UNITS

PEDESTAL

PENDANT

POWER FACTOR

PHASE

POST INDICATING VALVE

PANEL

POWER-OVER-ETHERNET

PAIR

PRIMARY

PROJECTION

POWER ROOF VENTILATOR

POTENTIAL TRANSFORMER

POLYVINYL CHLORIDE

(CONDUIT)

POWER

QUANTITY

REFLECTED CEILING PLAN

RECEPTACLE

REQUIRED

REQUEST TO EXIT

RIGID GALVANIZED STEEL

ROOM

ROOT MEAN SQUARE

REAL TIME LOCATION SYSTEM

ROOF TOP UNIT

SURFACE CONDUIT

SERVICE ENTRANCE

SECONDARY

SERVICE ENTRANCE

PROTECTION

SQUARE FEET/FOOT

SHEET

INTERNATIONAL SYSTEM OF

UNITS

SIMILAR

SINGLE MODE FIBER

SOLID NEUTRAL

SPECIFICATION

SPEAKER

SPARE

SURGE PROTECTION DEVICE

SURFACE RACEWAY

STAINLESS STEEL

SELECTOR SWITCH

STOP/START PUSHBUTTONS

STANDARD

SURFACE MOUNTED

SWITCH

SWITCHBOARD

SYMMETRICAL

SYSTEM

1 POLE (2P, 3P, 4P, ETC.)

1 PHASE

TWO-CONDUCTOR (3/C, 4/C, ETC.)

TWO-WIRE (3W, 4W, ETC.)

3 PHASE

AMPERE

ALARM ANNUMCIATOR PANEL

ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACCESSIBLE

ABOVE CEILING

AUTOMATIC DOOR OPENER

ARCHITECH/ENGINEER

AMP FRAME

AVAILABLE FAULT CURRENT

(KILOAMPS)

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ARC FAULT CIRCUIT

INTERRUPTER

AUTHORITY HAVING JURISDICTION

AIR HANDLING UNIT

AMPERE INTERRUPTING CAPACITY

ALUMINUM

ALTERNATE

AMPERE

APPROXIMATELY

ARCHITECT, ARCHITECTURAL

AMP TRIP

AUTOMATIC TRANSFER SWITCH

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AMERICAN WIRE GAUGE

BUILDING AUTOMATION SYSTEM

BATTERY

BARE COPPER

BOARD

BELOW FINISHED FLOOR

BUILDING

BUILDING MANAGEMENT SYSTEM

BYPASS

CONDUIT

CABINET

CALCULATED

CAPACITY

CATALOG, CATEGORY

COMMUNITY ANTENNA TELEVISION

CIRCUIT BREAKER

CONTROL CONTACTOR

CLOSED CIRCUIT TELEVISION

CANDELA

CONTRUCTION DOCUMENTS

CONTRACTOR-FURNISHED

CIRCUIT

CEILING

COAXIAL CABLE

COMMUNICATION

CONNECTION

CONSTRUCTION

CONTINUATION OR CONTINUOUS

CONTRACTOR

COORDINATE

CONTROL POWER TRANSFORMER

COLOR RENDERING INDEX

CURRENT TRANSFORMER

CABLE TELEVISION

CENTER

COPPER

CUBIC FEET

DECIBEL

DIRECT BURIAL

DIRECT CURRENT OR

DOOR CONTACT SWITCH

DIMMER CONTROL PANEL

DEGREES CELSIUS

DEGREES FAHRENHEIT

DEMOLISH/DEMOLITION

DEPARTMENT

DIAMETER

DISCONNECT

DISTRIBUTION

DESIGN LIGHTS CONSORTIUM

DOOR OPERATOR

DOWN

SAFETY DISCONNECT SWITCH

DOUBLE THROW

DIGITAL VIDEO RECORDER

DRAWING

ELECTRICAL CONTRACTOR

EMERGENCY EXIT BUTTON

EQUIPMENT GROUND

ELECTRIC, ELECTRICAL

ELEVATOR

EMERGENCY

ELECTROMAGNETIC

INTERFERENCE

ENERGY MANAGEMENT SYSTEM

ELECTRICAL METALLIC TUBING

EMERGENCY POWER OFF

EQUIPMENT

ELECTRICAL STRIKE

EASMENT

ELECTRIC WATER COOLER

ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EXISTING

EXPLOSION PROOF

FIRE ALARM

FIRE ALARM ANNUNCIATOR

PANEL

FIRE ALARM CONTROL PANEL

FOOTCANDLE

FAN COIL UNIT

FIXTURE

FLOOR

FLUORESCENT

FIBER OPTIC

FUSE

FUSED SAFETY DISCONNECT

SWITCH

GALLON

GALVANIZED

GENERAL CONTRACTOR

GROUNDING ELECTRODE

CONDUCTOR

GENERATOR

GROUND FAULT CIRCUIT

INTERRUPTER

GROUND

GALVANIZED RIGID STEEL

(CONDUIT)

GYPSUM BOARD

HIGH-INTENSITY DISCHARGE

HAND-OFF-AUTOMATIC

HORSEPOWER

HEIGHT

HEATER

HIGH VOLTAGE

HEATING, VENTILATING AND

AIR CONDITIONING

ILLUMINATION ENGINEERING

SOCIETY

ISOLATED GROUND

INTERMEDIATE METAL CONDUIT

INFRARED

INTERCOMMUNICATION ROOM

INTERLOCK WITH

INSTANTEOUS WATER HEATER

JUNCTION BOX

KILOVOLT

KILOVOLT-AMPERE

KILOVOLT-AMPERE REACTIVE

KILOWATT

KILOWATT HOUR

LIGHT-EMITTING DIODE

LINEAR FEET/FOOT

LUMEN

LOCKED ROTOR AMPS

LIGHT

LIGHTING

LIGHTNING

LOW VOLTAGE

MASTER ANTENNA TELEVISION

SYSTEM

MAXIMUM

MAIN BONDING JUMPER

MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MINIMUM CIRCUIT AMPACITY

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MAIN DISTRIBUTION PANEL

MECHANICAL

MANUFACTURER

MAIN FUSED DISCONNECT

SWITCH

MANHOLE

MICROPHONE

MINIMUM

MISCELLANEOUS

MAIN LUGS ONLY

MULTIOUTLET ASSEMBLY

MULTI MODE FIBER

MAIN SWITCHBOARD

MOUNT

MANUAL TRANSFER SWITCH

MOTOR, MOTORIZED

NOT APPLICABLE

NETWORK APPLIANCES

CONTROL PANEL

NORMALLY CLOSED

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL

MANUFACTURER'S

ASSOCIATION

NON-FUSED SAFETY

DISCONNECT SWITCH

NOT IN CONTRACT

NIGHT LIGHT

NORMALLY OPEN

NOT TO SCALE

NETWORK VIDEO RECORDER

ON CENTER

OUTSIDE DIAMETER

OVERHEAD

OFFICE OF INTEGRATED

TECHNOLOGY

OVERLOAD

GENERAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S

RECOMMENDED INSTALLATION PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES,

AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL

ELECTRICAL CODE.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS

WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL

PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN

ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING

REQUIREMENT AND THE APPLICABLE BUILDING CODES. REFER TO THE ARCHITECTURAL

DRAWINGS AND THE OWNER'S EXISTING AS-BUILT/RECORD DRAWINGS, VERIFY

CONSTRUCTION RATINGS AND PROVIDE PENETRATION ASSEMBLIES SUITABLE FOR THE

PARTICULAR CONSTRUCTION.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL

REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM.

6. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS

TO AVOID CONFLICT DURING CONSTRUCTION.

7. ALL PANELS SHALL HAVE TYPED COMPLETED DIRECTORIES INDICATING EQUIPMENT

SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF

EQUIPMENT LOCATION, OR SPARE, OR SPACE. SEE SPECIFICATIONS 260511 (1.9G).

CONTRACTOR SHALL UPDATE EXISTING ARC FLASH STUDY AND PROVIDE NEW ARC FLASH

LABELS FOR RELATED NEW ELECTRICAL ASSEMBLIES.

8. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO

INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A

PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE

DESIGNER WILL BE ACCEPTED.

9. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR

PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.

10. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED

ON THE DEVICE'S SCREW TERMINALS.

11. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR

EQUIPMENT UNLESS NOTED OTHERWISE.

12. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

13. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

14. ALL CONDUIT SHALL BE GRS OR EMT UNLESS OTHERWISE NOTED.

15. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL

LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY.

16. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

17. PROVIDE ARC FLASH CALCULATIONS AND RESPECTIVE LABELING AT ALL RESPECTIVE

ELECTRICAL EQUIPMENT REVISED OR MODIFIED BY THIS RENOVATION. SEE

SPECIFICATIONS 260573.

18. SEE SPECIFICATIONS 013526 SAFETY REQUIREMENTS FOR LOCK OUT TAG OUT

PROCEDURES, AND ELECTRICAL SAFETY REQUIREMENTS. ELECTRICAL SHUTDOWNS NEED

TO BE SCHEDULED WITH COR WITH AT LEAST TWO WEEKS MINIMUM NOTICE. SEE

SPECIFICATIONS 260511 1.9C.

19. OBTAIN CONFINED SPACE ENTRY PERMIT BEFORE ENTERING ANY MANHOLES.

20. CLEAN MANHOLES FROM WATER, DIRT, RUBBISH, AND MUD.

21. CORE EXISTING MANHOLES, HANDHOLES AND VAULTS TO RECEIVE NEW CONDUITS.

22. SEAL ALL CONDUITS ENTERING AND LEAVING MANHOLES & HANDHOLES.

23. ALL CABLES IN MANHOLES SHALL BE SUPPORTED WITH CORROSION RESISTANT AND

WEATHERPROOF HANGERS.

24. ALL CABLES IN MANHOLES SHALL BE LABELED WITH WEATHERPROOF MATERIAL. EXAMPLE:

a. TYPE OF CABLE

b. BUILDING FED FROM

c. BUILDING SERVICING

d. DATE INSTALLED

25. REMOVE ALL UNUSED CABLES AFTER NEW CABLES ARE INSTALLED AND TESTED.

26. PROVIDE MEANS TO:

a. FURNISH MATERIALS

b. INSTALL ALL FURNISHED MATERIALS

c. TERMINATE ALL FURNISHED MATERIALS

d. TEST ALL FURNISHED MATERIALS

27. PRIOR TO COMMENCING ANY NEW WORK, ON-SITE CONTRACTOR IS TO ESTABLISH PULL

STRINGS IN ALL EXISTING OPEN CONDUITS ON THIS JOB TO BE UTILIZED FOR NEW CABLES.

MANDREL CONDUITS TO VERIFY THEY ARE CLEAN & CLEAR OF OBSTRUCTIONS OR DEBRIS.

ELECTRICAL LEGEND

EM = EMERGENCY

ETR EXISTING TO REMAIN

COR CONTRACTING OFFICER

REPRESENTATIVE

WALL MOUNTED ELECTRICAL PANEL

J

EQUIPMENT CONNECTION BOXE

EQUIPMENT - MOTOR

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

ELECTRICAL GENERAL NOTES,

SYMBOL LEGENDS, AND

ABBREVIATIONS

E-001

ELECTRICAL DUCTBANK

1 ES101

2 ES101

U G

E U

G E

U G

E

UGE

UGE

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

UGE

U G

E

U G

E

MH A4-1

MH A4-2

MH A4-3

MH A4-4

MH A4-5

1 ES101

1 ES103

(EX)

(EX)2-4"C

(EX)

MH-105

(EX)

MH-106

(EX)

MH-107

(EX)

MH 108

(EX)

MH-113

1 ES101

2 ES101

2 ES101

1 ES102

2 ES102

1 ES102

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E U

G E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

(EX)

MH-109

(EX)

MH-110

(EX)

MH-111

MH A4-6

UGE

UGE

MH A4-9

U G

E

U G

E

UG

E

UG

E

MH A4-7

(EX) COM

MH-110

(EX) COM

MH-109

(EX)

COM

MH-107

(EX)

COM

MH-108

(EX) COM

MH-111

(EX) COM

VAULT

(EX) COM

MH-113

MH A4-8

SSW-8

SSW-9B

SSW-9A

SSW-10

SSW-14

PT-120

PT-9A

PT-9B

(EX)

PT-8

ES101

PARTIAL ELECTRICAL SITE PLANS

(SOUTHWEST, WEST)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

FO

TE

L

AREA OF

WORK

KEY PLAN

N

1. SEE PARTIAL RISER DIAGRAM SHEET E-601.

EXISTING ELECTRICAL SERVICE TO BLDG 121

FROM LOCAL UTILITY PROVIDER SHALL BE

DISCONNECTED AND REMOVED. COORDINATE

WITH VA FACILITIES AND ENGINEERING. NEW

PAD MOUNTED TRANSFORMER AND

DISTRIBUTION PANEL TO BE PROVIDED. SEE

E-601.

2. 3-1/C 4/0 AWG 15KV, 1-1/0 AWG EG IN 4"C TO

EACH SELECTOR SWITCH'S INCOMING LINE

TERMINALS (B1, A4). SEE E-601. 3-1/C 2 AWG

15KV, 1-1/0 AWG EG IN 4"C FROM LOAD SIDE

TERMINALS OF SELECTOR SWITCH TO EXISTING

PAD MOUNTED TRANSFORMER VIA MANHOLE.

3. DISCONNECT AND REMOVE EXISTING 15KV

CONDUCTORS IN 4'C ( FEED TO TRANSFORMER

FROM MANHOLE). USE EXISTING 4"C FOR NEW

FEED TO TRANSFORMER FROM SELECTOR

SWITCH LOAD SIDE. SEE KEYNOTE #2.

4. CONTRACTOR TO COORDINATE PLACEMENT OF

MANHOLE SUCH THAT MANHOLE OPENING IS

NOT AT LOWEST POINT OF TERRAIN.

1 PARTIAL ELECTRICAL SITE PLAN (SW)

1" = 60'-0"2 PARTIAL ELECTRICAL SITE PLAN (W)

1" = 60'-0"

BUILDING TO

BE REPLACED

NORTH

NORTH

30' 60' 120'0 0 30' 60' 120'0

DETAIL 1

DETAIL 2

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

AutoCAD SHX Text

ENGINEERING

AutoCAD SHX Text

STEAM PLANT

AutoCAD SHX Text

ENERGY CONTROL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

NO PARKING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E-401

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

CAMBRIDGE

AutoCAD SHX Text

FISHER HOUSE 2

AutoCAD SHX Text

AutoCAD SHX Text

FISHER HOUSE 1

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text E-401

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

SHEET 1

AutoCAD SHX Text

SHEET 2

AutoCAD SHX Text G

AutoCAD SHX Text T

(EX)

MH-107

(EX)

MH 108

(EX)

MH-113

2 ES101

1 ES102

2 ES102

1 ES102

U G

E

U G

E

U G

E

U G

E

(EX)

MH-109

(EX)

MH-110

(EX)

MH-111

(EX)

MH-112

UGE

UGE

MH A4-9

(EX) COM

MH-110

(EX) COM

MH-109

(EX)

COM

MH-107

(EX)

COM

MH-108

(EX) COM

MH-111

(EX) COM

VAULT

(EX) COM

VAULT

ADMIN

PARKING

(EX) COM

MH-113

COM

MH-114

SSW-9B

SSW-9A

SSW-10

SSW-15

PT-9A

PT-9B

PT-12

SSW-12

NEW 15KV

JUNCTION BOX4

(EX)

MH-104

(EX)

MH-105

(EX)

MH-106

(EX)

MH-107

(EX)

MH 108

(EX)

MH-113

2 ES102

1 ES102

(EX)

MH-103

1 ES103

2 ES102

UGE

(EX)

COM

MH-107

(EX)

COM

MH-108 3

(EX) COM

MH-113

SSW-8

SSW-9B

SSW-9A

PT-9A

PT-9B

(EX)

PT-8

ES102

PARTIAL ELECTRICAL SITE PLANS

(NORTHWEST, SOUTHEAST)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

FO

TE

L

AREA OF

WORK

KEY PLAN

N

1 PARTIAL ELECTRICAL SITE PLAN (NW)

1" = 60'-0"2 PARTIAL ELECTRICAL SITE PLAN (SE)

1" = 60'-0" NORTHNORTH

1. NOT USED.

2. 3-1/C 4/0 AWG 15KV, 1-1/0 AWG EG IN 4"C TO

EACH SELECTOR SWITCH'S INCOMING LINE

TERMINALS (B1, A4). SEE E-601. 3-1/C 2 AWG

15KV, 1-1/0 AWG EG IN 4"C FROM LOAD SIDE

TERMINALS OF SELECTOR SWITCH TO EXISTING

PAD MOUNTED TRANSFORMER VIA MANHOLE.

3. DISCONNECT AND REMOVE EXISTING 15KV

CONDUCTORS IN 4'C ( FEED TO TRANSFORMER

FROM MANHOLE). USE EXISTING 4"C FOR NEW

FEED TO TRANSFORMER FROM SELECTOR

SWITCH LOAD SIDE. SEE KEYNOTE #2.

4. REMOVE EXISTING PULL BOX ATTACHED TO

TRANSFORMER 'PT-12' AND REPLACE WITH 15KV

JUNCTION BOX WITH 2 WAY TERMINATIONS

USING LOAD BREAK ELBOWS. HOLE LEFT ON

THE SIDE OF TRANSFORMER OF 'PT-12' FROM

THE REMOVAL OF THE PULL BOX SHALL BE

PROVIDED WITH WEATHERPROOF BLANK

COVER.

0 30' 60' 120'0 0 30' 60' 120'0

DETAIL 2

DETAIL 1

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

AutoCAD SHX Text ENTRANCE (Locked)

AutoCAD SHX Text

FISHER HOUSE 2

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text E-401

AutoCAD SHX Text

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text 108A

AutoCAD SHX Text

AutoCAD SHX Text

FISHER HOUSE 1

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

SS

AutoCAD SHX Text

SS

AutoCAD SHX Text E-401

AutoCAD SHX Text

AutoCAD SHX Text

SS

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

SHEET 1

AutoCAD SHX Text

SHEET 2

AutoCAD SHX Text G

MH-104

U G

E U

G E

U G

E

UGE

U G

E

U G

E

U G

E

U G

E

UGE

U G

E

U G

E

MH A4-1

MH A4-2

MH A4-3

MH A4-4

(EX)

MH-103

1 ES103

2 ES102

1 ES101

1 ES103

(EX)

(EX)

(EX)

(EX)2-4"C

(EX)2-4"C

ES103

PARTIAL ELECTRICAL SITE PLANS (SOUTH)

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

FO

TE

L

AREA OF

WORK

KEY PLAN

N

1 PARTIAL ELECTRICAL SITE PLAN (SOUTH)

1" = 60'-0"

1. EXISTING B1 IS ROUTED FROM BUILDING 104

THROUGH THE STEAM/ACCESS TUNNELS TO

THE MAIN HOSPITAL (BLDG 100). ONE ACTIVE

AND ONE SPARE RACEWAY (EXISTING).

EXISTING 15KV CABLING ( 3/C 2/0 AWG 15KV

EPR) IS TO BE REPLACED WITH 3-1/C 4/0 AWG

15KV, 1-1/0 AWG EG. SPARE RACEWAY WILL

ALLOW INSTALLATION OF NEW CABLING WITH

THE OLDER (AGED) CABLING REMOVED

AFTER REACTIVATION OF CIRCUIT B1 WITH

NEW.

NORTH

0 30' 60' 120'0

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

AutoCAD SHX Text

STEAM PLANT

AutoCAD SHX Text

ENERGY CONTROL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

MOTOR-

AutoCAD SHX Text

CYCLE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

TRAILER

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text H

AutoCAD SHX Text 108A

AutoCAD SHX Text

NO PARKING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E-401

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

SHEET 1

AutoCAD SHX Text

SHEET 2

AutoCAD SHX Text G

CBSG

(E X)

M H

2A

(E X)

M H

2B

O

PE

N T

O

TU

N N

EL

BE

LO

W

O

PE

N T

O

TU

N N

EL

BE

LO

W

'A' SECTION

'A2' 'A1' 'RB' 'RA'

'A3' 'A4'

'CB/A'

'C/B'

'CB/B'

'B1'

'B2' 'B3'

'B4'

'B' SECTION

(2) 4" C

ROUTED OVERHEAD.

COORDINATE WITH

EXISTING CONDITIONS.

SEE SINGLE LINE DIAGRAM

SEE SHEET

ES101

(EX)

12,470V

DISTB

MAIN SWITCHGEAR 'MSG'

(15KV)

(EX)

12,470V

DISTB

EXTEND EXISTING 4" C

OVERHEAD TO MAIN

SWITCHGEAR. COORDINATE

WITH EXISTING CONDITIONS.

SEE SHEET ES-103 FOR ROUTING

BETWEEN BUILDING 100/104. SEE

SHEET E-402 FOR ROUTING AND

DETAILS AT BUILDING 100

BASEMENT INTERSTITIAL LEVEL.

NEW 1200A (15KV)

VACUBREAK SWITCH

(SF6) TO MATCH EXISTING.

SQUARE D DRAW OUT BREAKER

1200 AMP 500 MVA

APPROX.

15' AFF

(EX)

PT-9B

1000KVA

(EX)

PT-9A

1000KVA

SSW-9B SSW-9A

E-401

ELECTRICAL PARTIAL PLANS & DETAILS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

FO

TE

L

U G

E

AREA OF

WORK

KEY PLAN

N

1 BUILDING 104 ELECTRICAL PARTIAL PLAN

1/8" = 1' 0"2 BUILDING 109 PARTIAL ELECTRICAL PLAN

1/8" = 1' 0"

NORTH

0 4 8 16 0

NORTH

0 4 8 16

1. 3-1/C 4/0 AWG 15KV, 1-1/0 AWG EG IN 4"C TO

EACH SELECTOR SWITCH'S INCOMING LINE

TERMINALS (B1, A4). SEE E-601. 3-1/C 2 AWG

15KV IN 4"C FROM LOAD SIDE TERMINALS OF

SELECTOR SWITCH TO EXISTING PAD MOUNTED

TRANSFORMER VIA MANHOLE.

2. DISCONNECT AND REMOVE EXISTING 15KV

CONDUCTORS IN 4'C ( FEED TO TRANSFORMER

FROM MANHOLE). USE EXISTING 4"C FOR NEW

FEED TO TRANSFORMER FROM SELECTOR

SWITCH LOAD SIDE. SEE KEYNOTE #1.

3. 36"L X 36"H X 12"D STAINLESS STEEL, NEMA 4X

RATED JUNCTION BOX FOR TRANSITION FROM

FOUR CONDUITS TO TWO.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

AutoCAD SHX Text T

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Q

AutoCAD SHX Text

CONC.PAVING

AutoCAD SHX Text

CONC.PAVING

AutoCAD SHX Text

CONC.PAVING

AutoCAD SHX Text

DN

AutoCAD SHX Text

GARAGE DR.

AutoCAD SHX Text

STAIR-2

AutoCAD SHX Text

ELEC.RM.

AutoCAD SHX Text

ENSENAT

AutoCAD SHX Text

AutoCAD SHX Text

TULIS

AutoCAD SHX Text X

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

SHEET 1

AutoCAD SHX Text

SHEET 2

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

E

SWITCHGEAR

'MBSG'

E-402

ELECTRICAL PARTIAL PLANS & DETAILS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

FO

TE

L

U G

E

AREA OF

WORK

KEY PLAN

N

1 BUILDING 100 PARTIAL BASEMENT (INTERSTITAL LEVEL) ELECTRICAL PLAN

1/32" = 1' 0"

1. (EX) 2-4"C TO CAMPUS 15KV DISTRIBUTION

SYSTEMS. SEE SHEETS ES-101 THRU ES-103 FOR

MANHOLE LOCATIONS.

2. COORDINATE WITH EXISTING 15KV SWITCHGEAR

(ISOLATION SWITCH) AND EXISTING CIRCUIT B1

SWITCH. UTILIZE SPARE SWITCH POSITION FOR

REPLACEMENT FEEDER, UPDATE LABELING AT

SWITCHGEAR. SEE SHEET E-601.

3. EXISTING 4"C THROUGH TUNNEL TO BUILDING 104

PRIMARY SWITCHGEAR. SEE SHEET E-401 FOR

PARTIAL PLAN AT BUILDING 104. SEE SHEET ES-103

FOR TUNNEL/ROUTING BETWEEN BUILDING 100

(MAIN HOSPITAL) AND BUILDING 104.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

AutoCAD SHX Text X

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

SHEET 1

AutoCAD SHX Text

SHEET 2

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text T

E

DUCT BANK NOTES:

1. CONCRETE SHALL BE 2000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.

2. PROVIDE REINFORCING RODS ON TOP AND BOTTOM OF

DUCTS. PROVIDE (4) RODS PER DUCTBANK

3. MINIMUM COVER TOP OF ENVELOPE SHALL BE 24".

4. INNERDUCT QUANTITY AND SIZE AS INDICATED ON PLANS.

CONCRETE

ENVELOPE

DUCT

MANHOLE

WALL

DUCT BELL END

#4 BAR

(TYPICAL)

(4) CONCRETE BRICKS

(2"x8"x16")

CONDUIT(S) WITH BELL

ENDS (TYP). SIZE,

QUANTITY AND WIRING

AS INDICATED ON PLANS

CLEAN (3/4") CRUSHED

ROCK

FINISHED PAVING

PULLBOX (SEE

SPECIFICATIONS)

LINE SIDES OF

EXCAVATION WITH

30 LBS. FELT PAPER

(4) CONCRETE BRICKS

(2"x8"x16")

CONDUIT(S) WITH BELL

ENDS (TYP). SIZE,

QUANTITY AND WIRING

AS INDICATED ON PLANS

CLEAN (3/4")

CRUSHED ROCK

GRADE. FEATHER & TAMP

BACKFILL TO CREATE

FLUSH INSTALLATION AND

POSITIVE DRAINAGE

AWAY FROM BOX

PULLBOX (SEE

SPECIFICATIONS)

LINE SIDES OF

EXCAVATION WITH 30 LBS.

FELT PAPER

" M

IN

IM

U M

" M

AX

IM

U M

12"

NOTE: TYPICAL SPACING FOR

ALL UNDERGROUND CONDUITS.

MATCH FINISHED GRADE

3"

WARNING TAPE

3" CONCRETE COVER

CONCRETE BASE

MIN 30-DAY STRENGTH 3000 PSI

EXTEND 4" BEYOND PAD MOUNTED TRANSFORMER AND LOAD BANK ON ALL SIDES

MAINTAIN REBAR MIN 3" CLEAR FROM SURFACE OF CONCRETE

SURFACE SHALL BE LEVEL WITH BROOM FINISH

CHAMFER EDGE 3/4"

6" BASE COMPACTED

CRUSHED STONE

SOIL BENEATH PAD SHALL BE UNDISTURBED SOIL OR COMPACTED FILL FREE FROM ROOTS

AND OTHER ORGANIC MATERIAL

#4 REBAR

12" OC HORIZONTALLY

6"

12"

CONNECTING PLUG CABLE RACK

WITH INSULATOR

CABLE ADAPTER

HEAT SHRINK

TUBING

15KV CABLE

600A

MODULAR

T-SPLICE

CONNECTION

END PLUG WITH

CAPACITIVE

TEST PORT

E-501

ELECTRICAL DETAILS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

2 DUCT BANK DETAIL

N.T.S.

1 CONDUIT DUCT TERMINATIONS AT MANHOLES/HANDHOLES

N.T.S.

4 UNDERGROUND CONCRETE PULLBOX - PAVED AREAS

N.T.S.

3 UNDERGROUND CONCRETE PULLBOX - TURF AREAS

N.T.S.

5 UTILITY TRENCH DETIAL

N.T.S.

6 EQUIPMENT PAD DETAIL

N.T.S.

7 15KV MODULAR T-SPLICE DETAIL

N.T.S.

GROUND

ROD

CONC.

ENVELOPE

FINISHED

GRADE

GRADE RINGS AS REQ'D TO MATCH

CIVIL FINISHED GRADE ELEVATION

CABLE STANCHION

SECTION "A-A"

TOP VIEW

SECTION "B-B"

PULLING

IRON

GROUND

ROD

SLEEVE

CABLE

STANCHION

A

A

VA

RI

ES

3"

8"

8"

9'

- 4

8'

- 0

8"

8"5' - 0"

6' - 4"

6' - 4"

3' - 2" 3' - 2"

" M

IN

6"

B 5' - 0"

8"

7'

- 4

B

8"

ELECTRICAL

9'

- 4

5'

- 6

3'

- 1

0"PULLING

IRON

MANHOLE NOTES:

1. VAULT LOADING: H-20 BRIDGE SPECIFICATIONS, NO

OVERBURDEN.

2. MINIMUM ROOF AND WALL THICKNESS IS 6" EXCEPT FOR

KNOCKOUT WINDOWS.

3. GROUND ROD HOLES-1" DIAMETER-1 REQUIRED.

4. PROVIDE FOUR PULLING IRONS MADE FROM 7/8"

GALVANIZED STEEL BAR. REFER TO DETAIL 3/E-502.

5. PROVIDE 6" SUB-BASE LAYER OF WELL-TAMPED 1"

CRUSHED BLUESTONE BENEATH EACH VAULT.

6. VAULTS SHALL BE INSTALLED ON A 12" LEVEL BED OF 90%

COMPACTED GRANULAR FILL, WELL GRADED FROM THE 1"

SIEVE TO THE NO. 4 SIEVE. GRANULAR FILL SHALL BE

COMPACTED WITH A MINIMUM OF FOUR PASSES WITH A

PLATE COMPACTOR.

7. VAULT LID SHALL BE EFFECTIVELY BONDED TO VAULT

GROUND SYSTEM PER NEC.

8. INCLUDE ALUMINUM LADDER (NOT SHOWN FOR CLARITY).

9. FOR SIGNAL MANHOLE LID SHALL HAVE 'TELEPHONE'

ENGRAVED ON IT.

MANHOLE COVER FRAME

GROUND CONNECTION

CABLE SPLICES

SEE DETAIL 7

ON SHEET E-501

6 AWG STRANDED BARE

CU CABLE (TYP)

DUCT BANK

CABLE PULLING

IRONS

3/0 AWG STRANDED BARE CU

COMPLETE RING

EXOTHERMIC WELD

CONNECTION

3/4" X 10' GROUND ROD

SUMP

FRAME

DRILL AND

TAP

GROUND

CONNECTION

CABLE

CLIP (TYP)

EXOTHERMIC

WELD

CONNECTION

(TYP)

BRAIDED SHIELD

DRAIN WIRES (TYP)

EMBED

CHANNEL OR

CABLE RACK

(TYP)

EQUIPMENT GROUND

CONDUCTOR

E-502

ELECTRICAL DETAILS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

1 POWER MANHOLE DETAIL

N.T.S.

2 MANHOLE /VAULT GROUNDING

N.T.S.

A TO:

C- TO:

B

TO

D T

O

SOUTH

BLDG 100

EA

ST

NORTH

MH 104

W

ES

T

A

A

A = EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS

(CKT B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

A TO:

C- TO:

B

TO

D T

O

SOUTH

MH 103

EA

ST

NORTH

MH 105

W

ES

T

A

A

A = EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS

(CKT B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

A TO:

C- TO:

B

TO

D T

O

SOUTH

MH 104

EA

ST

NORTH

MH 106

W

ES

T

A B

A E

B = EXISTING 4"C (SPARE) TO

BE UTILIZED FOR NEW

CABLING (CKT A4). INSTALL

NEW 3-1/C 4/0 AWG 15KV &

1-1/0 AWG EG

CONDUCTORS.

A

D = NEW 3-1/C 4/0 AWG 15KV,

1-1/0 AWG EG

CONDUCTORS IN NEW 4"C

TO SSW-8. PROVIDE NEW

PENETRATIONS. (SEE

PHASING NOTES)

C

D

E

= EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS (CKT

B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

E = NEW 3-1/C 2 AWG 15KV,

1-1/0 AWG EG

CONDUCTORS FROM

SSW-8 LOAD SIDE TO

EXISTING TRANSFORMER.

PROVIDE NEW

PENETRATION. (SEE

PHASING NOTES)

C

A TO:

C- TO:

B

TO

D T

O

SOUTH

MH 105

EA

ST

NORTH

W

ES

T M

H

A B

A

B

B = EXISTING 4"C (SPARE) TO

BE UTILIZED FOR NEW

CABLING (CKT A4). INSTALL

NEW 3-1/C 4/0 AWG 15KV,

1-1/0 AWG EG

CONDUCTORS.

A

= EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS (CKT

B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

A TO:

C- TO:

B

TO

D T

O

SOUTH

EA

ST

M H

NORTH

BLDG 109

W

ES

T M

H

A

B

B C

B

A

A

SEE ES-101

B = NEW 3-1/C 4/0 AWG 15KV,

1-1/0 AWG EG (CKT A4) IN

EXISTING 4"C.

A = EXISTING 1-3/C 2/0 AWG

15KV, (CKT B1) IN 4"C TO

BE REPLACED WITH 3-1/C

4/0 AWG 15KV, 1-1/0 AWG

EG.

C1D1

B

D

A

NEW 3-1/C 2 AWG 15KV,

1-1/0 AWG EG

(D - IN NEW 4"C TO SSW-9B)

(D1 - IN EXISTING 4"C TO

XFMR PT-9B)

NEW 3-1/C 4/0 AWG

15KV,1-1/0 AWG EG IN

4"C TO SSW-9B.

(PROVIDE NEW

PENETRATIONS)

NEW 3-1/C 2 AWG 15KV,

1-1/0 AWG EG

(C - IN NEW 4"C TO

SSW-9A)

(C1 - IN EXISTING 4"C TO

XFMR PT-9A)

NEW 3-1/C 4/0 AWG 15KV,

1-1/0 AWG EG IN 4"C TO

SSW-9A (PROVIDE NEW

PENETRATIONS)

A TO:

C- TO:

B

TO

D T

O

SOUTH

EA

ST

M H

NORTH

BLDG 109

W

ES

T M

H

B = NEW 3-1/C 4/0 AWG 15KV,

1-1/0 AWG EG (CKT A4) IN

EXISTING 4"C.

A = EXISTING 1-3/C 2/0 AWG

15KV, (CKT B1) IN 4"C TO

BE REPLACED WITH 3-1/C

4/0 AWG 15KV, 1-1/0 AWG

EG.

A B

A

B

A

B

A TO:

C- TO:

B

TO

D T

O

SOUTH

MH 108

EA

ST

NORTH

MH 110

W

ES

T

A B

A B

A B = EXISTING 4"C (SPARE)

TO BE UTILIZED FOR

NEW CABLING (CKT A4).

INSTALL NEW 3-1/C 4/0

AWG 15KV, 1-1/0 AWG EG

CONDUCTORS.

= EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS

(CKT B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

A TO:

C- TO:

B

TO

D T

O

SOUTH

MH 109

EA

ST

NORTH

MH 111

W

ES

T

A B

A B

A B = EXISTING 4"C (SPARE)

TO BE UTILIZED FOR

NEW CABLING (CKT A4).

INSTALL NEW 3-1/C 4/0

AWG 15KV, 1-1/0 AWG EG

CONDUCTORS.

1 2

= EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS

(CKT B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

A TO:

C- TO:

B

TO

D T

O

SOUTH

EA

ST

M H

NORTH

MH 112

W

ES

T

A B

A

B

C

A

B = EXISTING 4"C (SPARE)

TO BE UTILIZED FOR

NEW CABLING (CKT A4).

INSTALL NEW 3-1/C 4/0

AWG 15KV, 1-1/0 AWG EG

CONDUCTORS.

= EXISTING 4"C (SPARE)C

1 2

= EXISTING 1-3/C 2/0 AWG

15KV CONDUCTORS

(CKT B1) IN 4"C TO BE

REPLACED WITH 3-1/C

4/0 AWG 15KV AND 1-1/0

AWG EG CONDUCTORS.

(SEE PHASING NOTES).

E-503

EXISTING MANHOLE CONDUIT LAYOUTS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

1 MH 103 CONDUIT LAYOUT

N.T.S.

2 MH 104 CONDUIT LAYOUT

N.T.S.

3 MH 105 CONDUIT LAYOUT

N.T.S.

4 MH 106 CONDUIT LAYOUT

N.T.S.

5 MH 107 CONDUIT LAYOUT

N.T.S.

6 MH 108 CONDUIT LAYOUT

N.T.S.

1. EXISTING T-BODY CONNECTIONS AT

MANHOLE TO BE REMOVED. COORDINATE

WITH CABLE REMOVAL/ DEMOLITION.

2. NEW 15KV CABLING - (3-1/C 4/0 AWG) TO BE

INSTALLED IN NEW CABLE SUPPORT/RACK.

PROVIDE SIX (6) SETS OF CABLE

SUPPORTS/RACKS TO EXISTING MANHOLE

STRUCTURE.

3. CABLES SHALL BE LOOPED INSIDE FOR

FUTURE SPLICING/TERMINATIONS.

A. WHEN NOTED AT EXISTING MANHOLES REPLACE

EXISTING CABLE SUPPORTS/ RACKS WITH NEW

TO ACCOMMODATE REMOVAL AND

REPLACEMENT OF PRIMARY CABLING.

B. WHEN NOTED AT EXISTING MANHOLES REPAIR

OR REPLACE GROUNDING CABLE AND

CONNECTIONS. SEE MANHOLE DETAILS SHEET

E-502.

C. SEE SHEETS ES101 THRU ES103 FOR MANHOLE

LOCATIONS.

D. PROVIDE NEW T-CONNECTIONS FOR ALL

SPLICES IN EXISTING AND NEW MANHOLES.

WHERE SPLICES OCCUR, CABLES SHALL HAVE

ENOUGH SLACK FOR TERMINATIONS.

7 MH 109 CONDUIT LAYOUT

N.T.S.

8 MH 110 CONDUIT LAYOUT

N.T.S.

9 MH 111 CONDUIT LAYOUT

N.T.S.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

X

C- TO:

B

TO

D T

O

SOUTH

MH 111

EA

ST

NORTH

W

ES

T G

AR

AG

E

A B

C1

A = NEW 3-1/C 4/0 AWG

15KV, 1-1/0 AWG EG IN

4"C TO SSW-12

(PROVIDE NEW

PENETRATIONS).

B = EXISTING 4"C (SPARE)

TO BE UTILIZED FOR

NEW CABLING (CKT A4).

INSTALL NEW 3-1/C 4/0

AWG 15KV, 1-4/0AWG EG

CONDUCTORS IN

EXISTING RACEWAY.

C1 = NEW 3-1/C 2 AWG 15KV,

1-1/0 AWG EG IN

EXISTING 4"C FROM

SSW-12 TO PT-12.

B CA

NEW 3-1/C 4/0 AWG

15KV, 1-1/0 AWG EG

IN 4"C TO SSW-12

(PROVIDE NEW

PENETRATIONS).

NEW 3-1/C 2 AWG 15KV,

1-1/0 AWG EG IN 4"C TO

SSW-12.

A TO:

C- TO:

B

TO

D T

O

SOUTH

EA

ST

M H

NORTH

PT-10

W

ES

T M

H A

4-

A

B

A B

B

A

C

SEE ES-101

B = EXISTING 4"C (SPARE) TO

BE UTILIZED FOR NEW

CABLING (CKT A4). INSTALL

NEW 3-1/C 4/0 AWG 15KV,

1-4/0 EG CONDUCTORS IN

EXISTING RACEWAY.

A = EXISTING 1-3/C 2/0 AWG

15KV, (CKT B1) IN 4"C TO

BE REPLACED WITH 3-1/C

4/0 AWG 15KV, 1-1/0 AWG

EG CONDUCTORS. SEE

PHASING NOTES.

C1

NEW 3-1/C 2 AWG 15KV,

1-1/0 AWG EG

(C - IN NEW 4"C TO SSW-10)

(C1 - IN EXISTING 4"C TO

XFMR PT-10)

TO SSW-10

S

S

A TO:

C- TO:

B

TO

D T

O

SOUTH

EA

ST

BL

D

G

NORTH

MH A4-2

W

ES

T

A S

SS

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

S A

SS

A TO:

MH: A4-2

C- TO:

B

TO

D T

O

SOUTH

MH A4-1

EA

ST

NORTH

W

ES

T M

H A

4-

A S

SS

S S

SA

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

A TO:

MH: A4-3

C- TO:

B

TO

D T

O

SOUTH

EA

ST

M H

A 4-

NORTH

MH A4-4

W

ES

T

A S

SS

S A

SS

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

A TO:

MH: A4-4

C- TO:

B

TO

D T

O

SOUTH

MH A4-3

EA

ST

NORTH

W

ES

T M

H A

4-

A S

SS

S S

SA

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

A TO:

MH: A4-5

C- TO:

B

TO

D T

O

SOUTH

EA

ST

M H

A 4-

NORTH

MH A4-6

W

ES

T

A S

SS

S A

SS

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

A TO:

MH: A4-6

C- TO:

B

TO

D T

O

SOUTH

MH A4-5

EA

ST

NORTH

W

ES

T M

H A

4-

A S

SS

S S

SA

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

E-504

EXISTING MANHOLE CONDUIT LAYOUTS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

1 MH 112 CONDUIT LAYOUT

N.T.S.

2 MH 113 CONDUIT LAYOUT

N.T.S.

3 MH A4-1 CONDUIT LAYOUT

N.T.S.

4 MH A4-2 CONDUIT LAYOUT

N.T.S.

5 MH A4-3 CONDUIT LAYOUT

N.T.S.

6 MH A4-4 CONDUIT LAYOUT

N.T.S.

7 MH A4-5 CONDUIT LAYOUT

N.T.S.

8 MH A4-6 CONDUIT LAYOUT

N.T.S.

1. EXISTING T-BODY CONNECTIONS AT

MANHOLE TO BE REMOVED. COORDINATE

WITH CABLE REMOVAL/ DEMOLITION.

2. NEW 15KV CABLING - (3-1/C 4/0 AWG) TO BE

INSTALLED IN NEW CABLE SUPPORT/RACK.

PROVIDE SIX (6) SETS OF CABLE

SUPPORTS/RACKS TO NEW AND EXISTING

MANHOLE STRUCTURE.

A. WHEN NOTED AT EXISTING MANHOLES REPLACE

EXISTING CABLE SUPPORTS/ RACKS WITH NEW

TO ACCOMMODATE REMOVAL AND

REPLACEMENT OF PRIMARY CABLING.

B. WHEN NOTED AT EXISTING MANHOLES REPAIR

OR REPLACE GROUNDING CABLE AND

CONNECTIONS. SEE MANHOLE DETAILS SHEET

E-502.

C. SEE SHEETS ES101 THRU ES103 FOR MANHOLE

LOCATIONS.

D. PROVIDE NEW T-CONNECTIONS FOR ALL

SPLICES IN EXISTING AND NEW MANHOLES.

WHERE SPLICES OCCUR, CABLES SHALL HAVE

ENOUGH SLACK FOR TERMINATIONS.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

MH: A4-7

C- TO:

B

TO

D T

O

SOUTH

MH A4-6

EA

ST

NORTH

MH A4-8

W

ES

T

A B

SS

A B

SS A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

B

A

TO SSW-14

A TO:

MH: A4-8

C- TO:

B

TO

D T

O

SOUTH

MH A4-7

EA

ST

NORTH

MH A4-9

W

ES

T

A B

SS

S A

SS

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

A B

SS

A TO:

MH: A4-9

C- TO:

B

TO

D T

O

SOUTH

MH A4-8

EA

ST

M H

NORTH

W

ES

T

A B

SS

S A

BS

A

S

= 3-1/C 4/0AWG 15KV,

1-1/0 AWG EG IN 4"C.

= SPARE 4"C

E-505

EXISTING MANHOLE CONDUIT LAYOUTS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

1 MH A4-7 CONDUIT LAYOUT

N.T.S.

2 MH A4-8 CONDUIT LAYOUT

N.T.S.

1. NEW 15KV CABLING - (3-1/C 4/0 AWG) TO BE

INSTALLED IN NEW CABLE SUPPORT/RACK.

PROVIDE SIX (6) SETS OF CABLE

SUPPORTS/RACKS TO NEW MANHOLE

STRUCTURE.

3 MH A4-9 CONDUIT LAYOUT

N.T.S.

A. WHEN NOTED AT EXISTING MANHOLES REPLACE

EXISTING CABLE SUPPORTS/ RACKS WITH NEW

TO ACCOMMODATE REMOVAL AND

REPLACEMENT OF PRIMARY CABLING.

B. WHEN NOTED AT EXISTING MANHOLES REPAIR

OR REPLACE GROUNDING CABLE AND

CONNECTIONS. SEE MANHOLE DETAILS SHEET

E-502.

C. SEE SHEETS ES101 THRU ES103 FOR MANHOLE

LOCATIONS.

D. PROVIDE NEW T-CONNECTIONS FOR ALL

SPLICES IN EXISTING AND NEW MANHOLES.

WHERE SPLICES OCCUR, CABLES SHALL HAVE

ENOUGH SLACK FOR TERMINATIONS.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

SS

SSW-9B

SELECTOR

SWITCH,

600A, 15KV

(EX)

PT-9B

1000KVA

12.47KV/480-277V

SSW-9A

SELECTOR

SWITCH,

600A, 15KV

(EX)

PT-9A

1000KVA

12.47KV/480-277V

(EX)

MH107

(EX)

MH108

(EX)

MH113

S

SSW-10

SELECTOR

SWITCH,

600A, 15KV

BLDG 110

(NEW)

MHA4-9

S

SSW-14

SELECTOR

SWITCH,

600A, 15KV

(NEW)

PT-120

1500KVA

12.47KV/480-277V

3PH

(EX)

MH106

S

SSW-8

SELECTOR

SWITCH,

600A, 15KV

(EX)

PT-8

500KVA

12.47KV/480-277V

BLDG 108 BLDG 109

(EX)

MH109

(EX)

MH110

(EX)

MH111

(EX)

MH112

(NEW)

MHA4-8

(NEW)

MHA4-7

(EX)

PT-10

500KVA

12.47KV/480-277V

S

SSW-12

SELECTOR

SWITCH,

600A, 15KV

BLDG 124

(PARKING GARAGE)

(EX)

PT-12

750KVA

12.47KV/480-277V

(EX)

MH105

BLDG 121

B1 A1 RA B2 RB

SPARE SPARE

MAIN MECH. RM.

USS-8

750 KVA

SERVICE BAY 8

USS-9

1500 KVA

SERVICE BAY 10

USS-11

1500 KVA

SERVICE BAY 11

USS-10

1500 KVA

SERVICE BAY 12

USS-12

800 KVA

SERVICE BAY 9

USS-13

300 KVA

SERVICE BAY 7

USS-14

750 KVA

SERVICE BAY 4

USS-2

1000 KVA

SERVICE BAY 3

USS-3

750 KVA

ADJACENT TO

USS-4 & USS-5

USS-L

500 KVA

SERVICE BAY 6

USS-4

1500 KVA

SERVICE BAY 5

USS-5

2000 KVA

SERVICE BAY 2

USS-6

750 KVA

SERVICE BAY 1

USS-7

1000 KVA

RBB2

RA

A1

RA RB A1 A2 A3 A4 B1 B2 B3 B4

86 K

K

K

A1 A2 RA RB B1 B2

3000KVA 3750KVA 3000KVA

#1 #2 #3 #4 #5 #6

#1 #2 #4 #5 #3

A MAIN B MAIN

BUILDING 100

MAIN HOSPITAL

FEEDER - A1

(ETR)

OUTLYING

BUILDINGS

FEEDER - B1

BUILDING 100

MAIN HOSPITAL

FEEDER - RA

(ETR)

(EX) EMPTY 4" CONDUITS

BUILDING 100

MAIN HOSPITAL

FEEDER - B2

(ETR)

BUILDING 100

MAIN HOSPITAL

FEEDER - RB

(ETR)

BUILDING NO.100

SWITCHGEAR "MBSG"

(EX) BUILDING NO.104

MAIN 15KV SWITCHGEAR "MSG"

(EX) SERVICE ENTRANCE

SWITCHGEAR "SESG"

(EX) H.L.&P. 35KV, CIRCUIT A

POLE TOP

TIE SWITCH (EX) H.L.&P. 35KV, CIRCUIT B

(EX) H.L.&P. 35KV VACUUM

BREAKERS (TYPICAL)

(EX) H.L.&P. 35KV/15KV

TRANSFORMER (TYPICAL)

SERVES NORTHWEST

AREA EXTERIOR LIGHTING

SERVES NORTH AREA

EXTERIOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .