580-18-113 Project Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- 36C25621R0132
About this file
This pre-solicitation notice describes an upcoming federal contract opportunity to construct a new 12kV underground feeder at the Michael E. DeBakey VA Medical Center campus in Houston, Texas. The project scope includes installing a new redundant 12kV utility line to provide power reliability, relocating telecommunications and alarm cables from a condemned building, and coordinating utility shutdowns across multiple buildings. The solicitation will be set aside exclusively for Service-Disabled Veteran-Owned Small Businesses and require at least 25% of labor costs be spent on veteran-owned businesses. Offerors must register on various websites by the anticipated July 2021 solicitation date. The period of performance is 365 calendar days with a $2-5 million construction magnitude under NAICS code 236220.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Attendees - 12kV.xlsx | XLSX spreadsheet | |
| Clarifications dated 8-17-2021.docx | DOCX document | |
| 36C25621R0132 0002.docx | DOCX document | |
| 580-18-113 Project Drawings - Civil.pdf | ||
| 36C25621R0132 0001.pdf | ||
| SF24 - BID BOND.pdf | ||
| 36C25621R0132_1.docx | DOCX document | |
| DOL Wage Determinations TX20210031 dated 5-7-21.pdf | ||
| 580-18-113 Project Specifications.pdf | ||
| 580-18-113 Statement of Work.docx | DOCX document | |
| DOL Wage Determinations TX20210253 dated 5-7-21.pdf | ||
| 580-18-113 Site Visit Instructions.docx | DOCX document | |
| 36C25621R0132.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A B
C D
E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
PROJECT LOCATION
G-001 1 1
COVER SHEET
1 VICINITY MAP
NTS
INSTALL NEW 12KV UNDERGROUND
DISTRIBUTION FEEDER
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD, HOUSTON, TX 77030
VA PROJECT #: 580-18-113
BID DEDUCT ALTERNATES
BID DEDUCT ALTERNATE 1
ALL WORK IN CONTRACT EXCEPT ELIMINATE ALL NON-OIT FIBER (SECURITY, CCTV, HVAC, AND FIRE ALARM) FROM THE PROJECT. THIS WORK IS SCHEMATICALLY SHOWN IN DETAILS 1/T-502, 2/T-502, 3/T-502 & 4/T-502.
BID DEDUCT ALTERNATE 2
ALL WORK IN CONTRACT EXCEPT DEDUCT 1 AND ELIMINATE WORK ASSOCIATED WITH ALL REMAINING
TECHNOLOGY SHEETS.
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
3 = THREE WAY
GFI = GROUND FAULT CIRCUIT INTERRUPTER
WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT
120V QUAD RECEPTACLE, MOUNTED 18" AFF UNO
4 = FOUR WAY
JUNCTION BOX
SINGLE POLE SWITCH, MOUNTED 44" AFF UNO
MODIFIERS FOR SWITCHES:
HOMERUN - 120V OR 277V
HOMERUN - 208V OR 480V
BRANCH OR FEEDER CIRCUIT HOMERUN TO
PANELBOARD, SWITCHBOARD, OR MOTOR
CONTROL CENTER. SUBSCRIPT DENOTES
PANELBOARD, SWITCHBOARD, OR MOTOR
CONTROL CENTER AND OVERCURRENT
PROTECTION DEVICE NUMBER.
120V DUPLEX RECEPTACLE,
MOUNTED 18" AFF UNO MODIFIERS
FOR RECEPTACLES:
TELCO OUTLET MOUNTED 18" AFF UNO
WP = WEATHERPROOF
DM = DIMMER SWITCH
FUSED DISCONNECT
UNFUSED DISCONNECT
DATA/TELCO OUTLET MOUNTED 18" AFF UNO
120V SIMPLEX RECEPTACLE, MOUNTED 18" AFF UNO
220V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
WIRING SYSTEM-SWITCHED BRANCH OR FEEDER CIRCUIT
OS = OCCUPANT SENSOR
S
T = DIGITAL TIMER SWITCH WITH OVERRIDE
ON CAPABILITY THAT MEETS NEC 110.26 (D).S
M MOTOR RATED SWITCH
1P
1PH
2/C 2W
3PH
A
AAP
AC
ACC
ACLG
ADO
A/E
AF
AFC
AFF
AFG
AFI
AJH
AHU
AIC
AL
ALT
AMP
APPROX
ARCH
AT
ATS
AUTO
AUX
AV
AWG
BAS
BATT
BC
BD
BFF
BLDG
BMS
BYP
C
CAB
CALC
CAP
CAT
CATV
CB
CCR
CCTV
cd
CD
CF
CKT
CLG
COAX
COMM
CONN
CONST
CONT
CONTR
COORD
CPT
CRI
CT
CTV
CTR
CU
CU FT
dB
DB
DC
DCP
DEG C
DEG F
DEMO
DEPT
DIA
DISC
DIST
DLC
DO
DN
DS
DT
DVR
DWG
EC
EEB
EG
ELEC
ELEV
EM
EMI
EMS
EMT
EPO
EQUIP
ES
ESMT
EWC
EWH
EX
EXP
FA
FAAP
FACP
FC
FCU
FIXT
FLR
FLUOR
FO
FU
FUDS
GAL
GALV
GC
GEC
GEN
GFI
GND
GRS
GYP BD
HID
HOA
HP
HT
HTR
HV
HVAC
IES
IG
IMC
IR
IT
I/W
IWH
J-BOX
KV
KVA
KVAR
KW
KWH
LED
LF
LM
LRA
LT
LTG
LTNG
LV
MATV
MAX
MBJ
MC
MCA
MCB
MCC
MDP
MECH
MFR
MFS
MH
MIC
MIN
MISC
MLO
MOA
MM
MSBD
MT
MTS
MTR
NA
NAC
NC
NEC
NEMA
NFDS
NIC
NL
NO
NTS
NVR
OC
OD
OH
OIT
OL
PA
PACS
PAMN
PB
PCB
PC
PDU
PED
PEND
PF
PH
PIV
PNL
PoE
PR
PRI
PROJ
PRV
PT
PVC
PWR
QTY
RCP
RCPT
REQD
REX
RGS
RM
RMS
RTLS
RTU
SC
SE
SEC
SEP
SF
SHT
SI
SIM
SM
S/N
SPEC
SPKR
SP
SPD
SR
SS
SSW
S/S
STD
SURF
SW
SWBD
SYM
SYS
TC
TEL
TEL/DATA
TERM
TGB
TMGB
TP
TPS
TR
TR
T-STAT
TTB
TTC
TV
TYP
UC
UE
UG
UH
UL
UPS
UT
UTP
UTIL
UV
V
VA
VERT
VFD
VOL
W W/
WAP
WH
W/O
WM
WP
XFMR
XFR
Ø C P L L
ELECTRICAL ABBREVIATIONS LIST
TIMECLOCK
TELEPHONE
TELEPHONE/DATA
TERMINAL
TELECOMM GROUND BUS BAR
TELECOMM MAIN GROUND BUS
BAR
TWISTED PAIR
TWISTED PAIR SHIELDED
TAMPER RESISTANT OR
TELECOM ROOM
THERMOSTAT
TELEPHONE TERMINAL BOARD
TELEPHONE TERMINAL CABINET
TELEVISION
TYPICAL
UNDER COUNTER
UNDERGROUND ELECTRICAL
UNDERGROUND
UNIT HEATER
UNDERWRITER'S LABORATORY
UNINTERRUPTIBLE POWER
SUPPLY
UNDERGROUND TELEPHONE
UNSHIELDED TWISTED PAIR
UTILITY
UNIT VENTILATOR OR
ULTRAVIOLET
VOLT
VOLT-AMPERES
VERTICAL
VARIABLE FREQUENCY DRIVE
VOLUME
WATT
WITH
WIRELESS ACCESS POINT
WATER HEATER
WITHOUT
WIRE MANAGEMENT
WEATHERPROOF
TRANSFORMER
TRANSFER
ANGLE
AT
DELTA
FEET
INCHES
NUMBER
PHASE
CENTER LINE
PLATE
PUBLIC ADDRESS
PHYSICAL ACCESS CONTROL
SYSTEM
PUBLIC ADDRESS AND MASS
NOTIFICATION SYSTEM
PULL BOX OR PUSHBUTTON
POLYCHLORINATED BIPHENYL
PHOTOELECTRIC CELL
RACK POWER DISTRIBUTION
UNITS
PEDESTAL
PENDANT
POWER FACTOR
PHASE
POST INDICATING VALVE
PANEL
POWER-OVER-ETHERNET
PAIR
PRIMARY
PROJECTION
POWER ROOF VENTILATOR
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE
(CONDUIT)
POWER
QUANTITY
REFLECTED CEILING PLAN
RECEPTACLE
REQUIRED
REQUEST TO EXIT
RIGID GALVANIZED STEEL
ROOM
ROOT MEAN SQUARE
REAL TIME LOCATION SYSTEM
ROOF TOP UNIT
SURFACE CONDUIT
SERVICE ENTRANCE
SECONDARY
SERVICE ENTRANCE
PROTECTION
SQUARE FEET/FOOT
SHEET
INTERNATIONAL SYSTEM OF
UNITS
SIMILAR
SINGLE MODE FIBER
SOLID NEUTRAL
SPECIFICATION
SPEAKER
SPARE
SURGE PROTECTION DEVICE
SURFACE RACEWAY
STAINLESS STEEL
SELECTOR SWITCH
STOP/START PUSHBUTTONS
STANDARD
SURFACE MOUNTED
SWITCH
SWITCHBOARD
SYMMETRICAL
SYSTEM
1 POLE (2P, 3P, 4P, ETC.)
1 PHASE
TWO-CONDUCTOR (3/C, 4/C, ETC.)
TWO-WIRE (3W, 4W, ETC.)
3 PHASE
AMPERE
ALARM ANNUMCIATOR PANEL
ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACCESSIBLE
ABOVE CEILING
AUTOMATIC DOOR OPENER
ARCHITECH/ENGINEER
AMP FRAME
AVAILABLE FAULT CURRENT
(KILOAMPS)
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ARC FAULT CIRCUIT
INTERRUPTER
AUTHORITY HAVING JURISDICTION
AIR HANDLING UNIT
AMPERE INTERRUPTING CAPACITY
ALUMINUM
ALTERNATE
AMPERE
APPROXIMATELY
ARCHITECT, ARCHITECTURAL
AMP TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AMERICAN WIRE GAUGE
BUILDING AUTOMATION SYSTEM
BATTERY
BARE COPPER
BOARD
BELOW FINISHED FLOOR
BUILDING
BUILDING MANAGEMENT SYSTEM
BYPASS
CONDUIT
CABINET
CALCULATED
CAPACITY
CATALOG, CATEGORY
COMMUNITY ANTENNA TELEVISION
CIRCUIT BREAKER
CONTROL CONTACTOR
CLOSED CIRCUIT TELEVISION
CANDELA
CONTRUCTION DOCUMENTS
CONTRACTOR-FURNISHED
CIRCUIT
CEILING
COAXIAL CABLE
COMMUNICATION
CONNECTION
CONSTRUCTION
CONTINUATION OR CONTINUOUS
CONTRACTOR
COORDINATE
CONTROL POWER TRANSFORMER
COLOR RENDERING INDEX
CURRENT TRANSFORMER
CABLE TELEVISION
CENTER
COPPER
CUBIC FEET
DECIBEL
DIRECT BURIAL
DIRECT CURRENT OR
DOOR CONTACT SWITCH
DIMMER CONTROL PANEL
DEGREES CELSIUS
DEGREES FAHRENHEIT
DEMOLISH/DEMOLITION
DEPARTMENT
DIAMETER
DISCONNECT
DISTRIBUTION
DESIGN LIGHTS CONSORTIUM
DOOR OPERATOR
DOWN
SAFETY DISCONNECT SWITCH
DOUBLE THROW
DIGITAL VIDEO RECORDER
DRAWING
ELECTRICAL CONTRACTOR
EMERGENCY EXIT BUTTON
EQUIPMENT GROUND
ELECTRIC, ELECTRICAL
ELEVATOR
EMERGENCY
ELECTROMAGNETIC
INTERFERENCE
ENERGY MANAGEMENT SYSTEM
ELECTRICAL METALLIC TUBING
EMERGENCY POWER OFF
EQUIPMENT
ELECTRICAL STRIKE
EASMENT
ELECTRIC WATER COOLER
ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EXISTING
EXPLOSION PROOF
FIRE ALARM
FIRE ALARM ANNUNCIATOR
PANEL
FIRE ALARM CONTROL PANEL
FOOTCANDLE
FAN COIL UNIT
FIXTURE
FLOOR
FLUORESCENT
FIBER OPTIC
FUSE
FUSED SAFETY DISCONNECT
SWITCH
GALLON
GALVANIZED
GENERAL CONTRACTOR
GROUNDING ELECTRODE
CONDUCTOR
GENERATOR
GROUND FAULT CIRCUIT
INTERRUPTER
GROUND
GALVANIZED RIGID STEEL
(CONDUIT)
GYPSUM BOARD
HIGH-INTENSITY DISCHARGE
HAND-OFF-AUTOMATIC
HORSEPOWER
HEIGHT
HEATER
HIGH VOLTAGE
HEATING, VENTILATING AND
AIR CONDITIONING
ILLUMINATION ENGINEERING
SOCIETY
ISOLATED GROUND
INTERMEDIATE METAL CONDUIT
INFRARED
INTERCOMMUNICATION ROOM
INTERLOCK WITH
INSTANTEOUS WATER HEATER
JUNCTION BOX
KILOVOLT
KILOVOLT-AMPERE
KILOVOLT-AMPERE REACTIVE
KILOWATT
KILOWATT HOUR
LIGHT-EMITTING DIODE
LINEAR FEET/FOOT
LUMEN
LOCKED ROTOR AMPS
LIGHT
LIGHTING
LIGHTNING
LOW VOLTAGE
MASTER ANTENNA TELEVISION
SYSTEM
MAXIMUM
MAIN BONDING JUMPER
MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MINIMUM CIRCUIT AMPACITY
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN DISTRIBUTION PANEL
MECHANICAL
MANUFACTURER
MAIN FUSED DISCONNECT
SWITCH
MANHOLE
MICROPHONE
MINIMUM
MISCELLANEOUS
MAIN LUGS ONLY
MULTIOUTLET ASSEMBLY
MULTI MODE FIBER
MAIN SWITCHBOARD
MOUNT
MANUAL TRANSFER SWITCH
MOTOR, MOTORIZED
NOT APPLICABLE
NETWORK APPLIANCES
CONTROL PANEL
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL
MANUFACTURER'S
ASSOCIATION
NON-FUSED SAFETY
DISCONNECT SWITCH
NOT IN CONTRACT
NIGHT LIGHT
NORMALLY OPEN
NOT TO SCALE
NETWORK VIDEO RECORDER
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
OFFICE OF INTEGRATED
TECHNOLOGY
OVERLOAD
GENERAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S
RECOMMENDED INSTALLATION PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES,
AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL
ELECTRICAL CODE.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS
WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN
ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING
REQUIREMENT AND THE APPLICABLE BUILDING CODES. REFER TO THE ARCHITECTURAL
DRAWINGS AND THE OWNER'S EXISTING AS-BUILT/RECORD DRAWINGS, VERIFY
CONSTRUCTION RATINGS AND PROVIDE PENETRATION ASSEMBLIES SUITABLE FOR THE
PARTICULAR CONSTRUCTION.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL
REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM.
6. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS
TO AVOID CONFLICT DURING CONSTRUCTION.
7. ALL PANELS SHALL HAVE TYPED COMPLETED DIRECTORIES INDICATING EQUIPMENT
SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF
EQUIPMENT LOCATION, OR SPARE, OR SPACE. SEE SPECIFICATIONS 260511 (1.9G).
CONTRACTOR SHALL UPDATE EXISTING ARC FLASH STUDY AND PROVIDE NEW ARC FLASH
LABELS FOR RELATED NEW ELECTRICAL ASSEMBLIES.
8. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO
INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A
PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE
DESIGNER WILL BE ACCEPTED.
9. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR
PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
10. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED
ON THE DEVICE'S SCREW TERMINALS.
11. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR
EQUIPMENT UNLESS NOTED OTHERWISE.
12. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
13. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
14. ALL CONDUIT SHALL BE GRS OR EMT UNLESS OTHERWISE NOTED.
15. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL
LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY.
16. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
17. PROVIDE ARC FLASH CALCULATIONS AND RESPECTIVE LABELING AT ALL RESPECTIVE
ELECTRICAL EQUIPMENT REVISED OR MODIFIED BY THIS RENOVATION. SEE
SPECIFICATIONS 260573.
18. SEE SPECIFICATIONS 013526 SAFETY REQUIREMENTS FOR LOCK OUT TAG OUT
PROCEDURES, AND ELECTRICAL SAFETY REQUIREMENTS. ELECTRICAL SHUTDOWNS NEED
TO BE SCHEDULED WITH COR WITH AT LEAST TWO WEEKS MINIMUM NOTICE. SEE
SPECIFICATIONS 260511 1.9C.
19. OBTAIN CONFINED SPACE ENTRY PERMIT BEFORE ENTERING ANY MANHOLES.
20. CLEAN MANHOLES FROM WATER, DIRT, RUBBISH, AND MUD.
21. CORE EXISTING MANHOLES, HANDHOLES AND VAULTS TO RECEIVE NEW CONDUITS.
22. SEAL ALL CONDUITS ENTERING AND LEAVING MANHOLES & HANDHOLES.
23. ALL CABLES IN MANHOLES SHALL BE SUPPORTED WITH CORROSION RESISTANT AND
WEATHERPROOF HANGERS.
24. ALL CABLES IN MANHOLES SHALL BE LABELED WITH WEATHERPROOF MATERIAL. EXAMPLE:
a. TYPE OF CABLE
b. BUILDING FED FROM
c. BUILDING SERVICING
d. DATE INSTALLED
25. REMOVE ALL UNUSED CABLES AFTER NEW CABLES ARE INSTALLED AND TESTED.
26. PROVIDE MEANS TO:
a. FURNISH MATERIALS
b. INSTALL ALL FURNISHED MATERIALS
c. TERMINATE ALL FURNISHED MATERIALS
d. TEST ALL FURNISHED MATERIALS
27. PRIOR TO COMMENCING ANY NEW WORK, ON-SITE CONTRACTOR IS TO ESTABLISH PULL
STRINGS IN ALL EXISTING OPEN CONDUITS ON THIS JOB TO BE UTILIZED FOR NEW CABLES.
MANDREL CONDUITS TO VERIFY THEY ARE CLEAN & CLEAR OF OBSTRUCTIONS OR DEBRIS.
ELECTRICAL LEGEND
EM = EMERGENCY
ETR EXISTING TO REMAIN
COR CONTRACTING OFFICER
REPRESENTATIVE
WALL MOUNTED ELECTRICAL PANEL
J
EQUIPMENT CONNECTION BOXE
EQUIPMENT - MOTOR
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
ELECTRICAL GENERAL NOTES,
SYMBOL LEGENDS, AND
ABBREVIATIONS
E-001
ELECTRICAL DUCTBANK
1 ES101
2 ES101
U G
E U
G E
U G
E
UGE
UGE
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
UGE
U G
E
U G
E
MH A4-1
MH A4-2
MH A4-3
MH A4-4
MH A4-5
1 ES101
1 ES103
(EX)
(EX)2-4"C
(EX)
MH-105
(EX)
MH-106
(EX)
MH-107
(EX)
MH 108
(EX)
MH-113
1 ES101
2 ES101
2 ES101
1 ES102
2 ES102
1 ES102
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E U
G E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
(EX)
MH-109
(EX)
MH-110
(EX)
MH-111
MH A4-6
UGE
UGE
MH A4-9
U G
E
U G
E
UG
E
UG
E
MH A4-7
(EX) COM
MH-110
(EX) COM
MH-109
(EX)
COM
MH-107
(EX)
COM
MH-108
(EX) COM
MH-111
(EX) COM
VAULT
(EX) COM
MH-113
MH A4-8
SSW-8
SSW-9B
SSW-9A
SSW-10
SSW-14
PT-120
PT-9A
PT-9B
(EX)
PT-8
ES101
PARTIAL ELECTRICAL SITE PLANS
(SOUTHWEST, WEST)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
FO
TE
L
AREA OF
WORK
KEY PLAN
N
1. SEE PARTIAL RISER DIAGRAM SHEET E-601.
EXISTING ELECTRICAL SERVICE TO BLDG 121
FROM LOCAL UTILITY PROVIDER SHALL BE
DISCONNECTED AND REMOVED. COORDINATE
WITH VA FACILITIES AND ENGINEERING. NEW
PAD MOUNTED TRANSFORMER AND
DISTRIBUTION PANEL TO BE PROVIDED. SEE
E-601.
2. 3-1/C 4/0 AWG 15KV, 1-1/0 AWG EG IN 4"C TO
EACH SELECTOR SWITCH'S INCOMING LINE
TERMINALS (B1, A4). SEE E-601. 3-1/C 2 AWG
15KV, 1-1/0 AWG EG IN 4"C FROM LOAD SIDE
TERMINALS OF SELECTOR SWITCH TO EXISTING
PAD MOUNTED TRANSFORMER VIA MANHOLE.
3. DISCONNECT AND REMOVE EXISTING 15KV
CONDUCTORS IN 4'C ( FEED TO TRANSFORMER
FROM MANHOLE). USE EXISTING 4"C FOR NEW
FEED TO TRANSFORMER FROM SELECTOR
SWITCH LOAD SIDE. SEE KEYNOTE #2.
4. CONTRACTOR TO COORDINATE PLACEMENT OF
MANHOLE SUCH THAT MANHOLE OPENING IS
NOT AT LOWEST POINT OF TERRAIN.
1 PARTIAL ELECTRICAL SITE PLAN (SW)
1" = 60'-0"2 PARTIAL ELECTRICAL SITE PLAN (W)
1" = 60'-0"
BUILDING TO
BE REPLACED
NORTH
NORTH
30' 60' 120'0 0 30' 60' 120'0
DETAIL 1
DETAIL 2
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
STEAM PLANT
AutoCAD SHX Text
ENERGY CONTROL
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E-401
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
CAMBRIDGE
AutoCAD SHX Text
FISHER HOUSE 2
AutoCAD SHX Text
AutoCAD SHX Text
FISHER HOUSE 1
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text E-401
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
MATCH LINE
AutoCAD SHX Text
SHEET 1
AutoCAD SHX Text
SHEET 2
AutoCAD SHX Text G
AutoCAD SHX Text T
(EX)
MH-107
(EX)
MH 108
(EX)
MH-113
2 ES101
1 ES102
2 ES102
1 ES102
U G
E
U G
E
U G
E
U G
E
(EX)
MH-109
(EX)
MH-110
(EX)
MH-111
(EX)
MH-112
UGE
UGE
MH A4-9
(EX) COM
MH-110
(EX) COM
MH-109
(EX)
COM
MH-107
(EX)
COM
MH-108
(EX) COM
MH-111
(EX) COM
VAULT
(EX) COM
VAULT
ADMIN
PARKING
(EX) COM
MH-113
COM
MH-114
SSW-9B
SSW-9A
SSW-10
SSW-15
PT-9A
PT-9B
PT-12
SSW-12
NEW 15KV
JUNCTION BOX4
(EX)
MH-104
(EX)
MH-105
(EX)
MH-106
(EX)
MH-107
(EX)
MH 108
(EX)
MH-113
2 ES102
1 ES102
(EX)
MH-103
1 ES103
2 ES102
UGE
(EX)
COM
MH-107
(EX)
COM
MH-108 3
(EX) COM
MH-113
SSW-8
SSW-9B
SSW-9A
PT-9A
PT-9B
(EX)
PT-8
ES102
PARTIAL ELECTRICAL SITE PLANS
(NORTHWEST, SOUTHEAST)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
FO
TE
L
AREA OF
WORK
KEY PLAN
N
1 PARTIAL ELECTRICAL SITE PLAN (NW)
1" = 60'-0"2 PARTIAL ELECTRICAL SITE PLAN (SE)
1" = 60'-0" NORTHNORTH
1. NOT USED.
2. 3-1/C 4/0 AWG 15KV, 1-1/0 AWG EG IN 4"C TO
EACH SELECTOR SWITCH'S INCOMING LINE
TERMINALS (B1, A4). SEE E-601. 3-1/C 2 AWG
15KV, 1-1/0 AWG EG IN 4"C FROM LOAD SIDE
TERMINALS OF SELECTOR SWITCH TO EXISTING
PAD MOUNTED TRANSFORMER VIA MANHOLE.
3. DISCONNECT AND REMOVE EXISTING 15KV
CONDUCTORS IN 4'C ( FEED TO TRANSFORMER
FROM MANHOLE). USE EXISTING 4"C FOR NEW
FEED TO TRANSFORMER FROM SELECTOR
SWITCH LOAD SIDE. SEE KEYNOTE #2.
4. REMOVE EXISTING PULL BOX ATTACHED TO
TRANSFORMER 'PT-12' AND REPLACE WITH 15KV
JUNCTION BOX WITH 2 WAY TERMINATIONS
USING LOAD BREAK ELBOWS. HOLE LEFT ON
THE SIDE OF TRANSFORMER OF 'PT-12' FROM
THE REMOVAL OF THE PULL BOX SHALL BE
PROVIDED WITH WEATHERPROOF BLANK
COVER.
0 30' 60' 120'0 0 30' 60' 120'0
DETAIL 2
DETAIL 1
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
AutoCAD SHX Text ENTRANCE (Locked)
AutoCAD SHX Text
FISHER HOUSE 2
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text E-401
AutoCAD SHX Text
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text 108A
AutoCAD SHX Text
AutoCAD SHX Text
FISHER HOUSE 1
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text E-401
AutoCAD SHX Text
AutoCAD SHX Text
SS
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
MATCH LINE
AutoCAD SHX Text
SHEET 1
AutoCAD SHX Text
SHEET 2
AutoCAD SHX Text G
MH-104
U G
E U
G E
U G
E
UGE
U G
E
U G
E
U G
E
U G
E
UGE
U G
E
U G
E
MH A4-1
MH A4-2
MH A4-3
MH A4-4
(EX)
MH-103
1 ES103
2 ES102
1 ES101
1 ES103
(EX)
(EX)
(EX)
(EX)2-4"C
(EX)2-4"C
ES103
PARTIAL ELECTRICAL SITE PLANS (SOUTH)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
FO
TE
L
AREA OF
WORK
KEY PLAN
N
1 PARTIAL ELECTRICAL SITE PLAN (SOUTH)
1" = 60'-0"
1. EXISTING B1 IS ROUTED FROM BUILDING 104
THROUGH THE STEAM/ACCESS TUNNELS TO
THE MAIN HOSPITAL (BLDG 100). ONE ACTIVE
AND ONE SPARE RACEWAY (EXISTING).
EXISTING 15KV CABLING ( 3/C 2/0 AWG 15KV
EPR) IS TO BE REPLACED WITH 3-1/C 4/0 AWG
15KV, 1-1/0 AWG EG. SPARE RACEWAY WILL
ALLOW INSTALLATION OF NEW CABLING WITH
THE OLDER (AGED) CABLING REMOVED
AFTER REACTIVATION OF CIRCUIT B1 WITH
NEW.
NORTH
0 30' 60' 120'0
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
AutoCAD SHX Text
STEAM PLANT
AutoCAD SHX Text
ENERGY CONTROL
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
MOTOR-
AutoCAD SHX Text
CYCLE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text H
AutoCAD SHX Text 108A
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E-401
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
MATCH LINE
AutoCAD SHX Text
SHEET 1
AutoCAD SHX Text
SHEET 2
AutoCAD SHX Text G
CBSG
(E X)
M H
2A
(E X)
M H
2B
O
PE
N T
O
TU
N N
EL
BE
LO
W
O
PE
N T
O
TU
N N
EL
BE
LO
W
'A' SECTION
'A2' 'A1' 'RB' 'RA'
'A3' 'A4'
'CB/A'
'C/B'
'CB/B'
'B1'
'B2' 'B3'
'B4'
'B' SECTION
(2) 4" C
ROUTED OVERHEAD.
COORDINATE WITH
EXISTING CONDITIONS.
SEE SINGLE LINE DIAGRAM
SEE SHEET
ES101
(EX)
12,470V
DISTB
MAIN SWITCHGEAR 'MSG'
(15KV)
(EX)
12,470V
DISTB
EXTEND EXISTING 4" C
OVERHEAD TO MAIN
SWITCHGEAR. COORDINATE
WITH EXISTING CONDITIONS.
SEE SHEET ES-103 FOR ROUTING
BETWEEN BUILDING 100/104. SEE
SHEET E-402 FOR ROUTING AND
DETAILS AT BUILDING 100
BASEMENT INTERSTITIAL LEVEL.
NEW 1200A (15KV)
VACUBREAK SWITCH
(SF6) TO MATCH EXISTING.
SQUARE D DRAW OUT BREAKER
1200 AMP 500 MVA
APPROX.
15' AFF
(EX)
PT-9B
1000KVA
(EX)
PT-9A
1000KVA
SSW-9B SSW-9A
E-401
ELECTRICAL PARTIAL PLANS & DETAILS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
FO
TE
L
U G
E
AREA OF
WORK
KEY PLAN
N
1 BUILDING 104 ELECTRICAL PARTIAL PLAN
1/8" = 1' 0"2 BUILDING 109 PARTIAL ELECTRICAL PLAN
1/8" = 1' 0"
NORTH
0 4 8 16 0
NORTH
0 4 8 16
1. 3-1/C 4/0 AWG 15KV, 1-1/0 AWG EG IN 4"C TO
EACH SELECTOR SWITCH'S INCOMING LINE
TERMINALS (B1, A4). SEE E-601. 3-1/C 2 AWG
15KV IN 4"C FROM LOAD SIDE TERMINALS OF
SELECTOR SWITCH TO EXISTING PAD MOUNTED
TRANSFORMER VIA MANHOLE.
2. DISCONNECT AND REMOVE EXISTING 15KV
CONDUCTORS IN 4'C ( FEED TO TRANSFORMER
FROM MANHOLE). USE EXISTING 4"C FOR NEW
FEED TO TRANSFORMER FROM SELECTOR
SWITCH LOAD SIDE. SEE KEYNOTE #1.
3. 36"L X 36"H X 12"D STAINLESS STEEL, NEMA 4X
RATED JUNCTION BOX FOR TRANSITION FROM
FOUR CONDUITS TO TWO.
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text Q
AutoCAD SHX Text
CONC.PAVING
AutoCAD SHX Text
CONC.PAVING
AutoCAD SHX Text
CONC.PAVING
AutoCAD SHX Text
DN
AutoCAD SHX Text
GARAGE DR.
AutoCAD SHX Text
STAIR-2
AutoCAD SHX Text
ELEC.RM.
AutoCAD SHX Text
ENSENAT
AutoCAD SHX Text
AutoCAD SHX Text
TULIS
AutoCAD SHX Text X
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
MATCH LINE
AutoCAD SHX Text
SHEET 1
AutoCAD SHX Text
SHEET 2
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
E
SWITCHGEAR
'MBSG'
E-402
ELECTRICAL PARTIAL PLANS & DETAILS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
FO
TE
L
U G
E
AREA OF
WORK
KEY PLAN
N
1 BUILDING 100 PARTIAL BASEMENT (INTERSTITAL LEVEL) ELECTRICAL PLAN
1/32" = 1' 0"
1. (EX) 2-4"C TO CAMPUS 15KV DISTRIBUTION
SYSTEMS. SEE SHEETS ES-101 THRU ES-103 FOR
MANHOLE LOCATIONS.
2. COORDINATE WITH EXISTING 15KV SWITCHGEAR
(ISOLATION SWITCH) AND EXISTING CIRCUIT B1
SWITCH. UTILIZE SPARE SWITCH POSITION FOR
REPLACEMENT FEEDER, UPDATE LABELING AT
SWITCHGEAR. SEE SHEET E-601.
3. EXISTING 4"C THROUGH TUNNEL TO BUILDING 104
PRIMARY SWITCHGEAR. SEE SHEET E-401 FOR
PARTIAL PLAN AT BUILDING 104. SEE SHEET ES-103
FOR TUNNEL/ROUTING BETWEEN BUILDING 100
(MAIN HOSPITAL) AND BUILDING 104.
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
AutoCAD SHX Text X
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
MATCH LINE
AutoCAD SHX Text
SHEET 1
AutoCAD SHX Text
SHEET 2
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
E
DUCT BANK NOTES:
1. CONCRETE SHALL BE 2000 P.S.I. @ 28 DAYS, OR AS SPECIFIED.
2. PROVIDE REINFORCING RODS ON TOP AND BOTTOM OF
DUCTS. PROVIDE (4) RODS PER DUCTBANK
3. MINIMUM COVER TOP OF ENVELOPE SHALL BE 24".
4. INNERDUCT QUANTITY AND SIZE AS INDICATED ON PLANS.
CONCRETE
ENVELOPE
DUCT
MANHOLE
WALL
DUCT BELL END
#4 BAR
(TYPICAL)
(4) CONCRETE BRICKS
(2"x8"x16")
CONDUIT(S) WITH BELL
ENDS (TYP). SIZE,
QUANTITY AND WIRING
AS INDICATED ON PLANS
CLEAN (3/4") CRUSHED
ROCK
FINISHED PAVING
PULLBOX (SEE
SPECIFICATIONS)
LINE SIDES OF
EXCAVATION WITH
30 LBS. FELT PAPER
(4) CONCRETE BRICKS
(2"x8"x16")
CONDUIT(S) WITH BELL
ENDS (TYP). SIZE,
QUANTITY AND WIRING
AS INDICATED ON PLANS
CLEAN (3/4")
CRUSHED ROCK
GRADE. FEATHER & TAMP
BACKFILL TO CREATE
FLUSH INSTALLATION AND
POSITIVE DRAINAGE
AWAY FROM BOX
PULLBOX (SEE
SPECIFICATIONS)
LINE SIDES OF
EXCAVATION WITH 30 LBS.
FELT PAPER
" M
IN
IM
U M
" M
AX
IM
U M
12"
NOTE: TYPICAL SPACING FOR
ALL UNDERGROUND CONDUITS.
MATCH FINISHED GRADE
3"
WARNING TAPE
3" CONCRETE COVER
CONCRETE BASE
MIN 30-DAY STRENGTH 3000 PSI
EXTEND 4" BEYOND PAD MOUNTED TRANSFORMER AND LOAD BANK ON ALL SIDES
MAINTAIN REBAR MIN 3" CLEAR FROM SURFACE OF CONCRETE
SURFACE SHALL BE LEVEL WITH BROOM FINISH
CHAMFER EDGE 3/4"
6" BASE COMPACTED
CRUSHED STONE
SOIL BENEATH PAD SHALL BE UNDISTURBED SOIL OR COMPACTED FILL FREE FROM ROOTS
AND OTHER ORGANIC MATERIAL
#4 REBAR
12" OC HORIZONTALLY
6"
12"
CONNECTING PLUG CABLE RACK
WITH INSULATOR
CABLE ADAPTER
HEAT SHRINK
TUBING
15KV CABLE
600A
MODULAR
T-SPLICE
CONNECTION
END PLUG WITH
CAPACITIVE
TEST PORT
E-501
ELECTRICAL DETAILS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
2 DUCT BANK DETAIL
N.T.S.
1 CONDUIT DUCT TERMINATIONS AT MANHOLES/HANDHOLES
N.T.S.
4 UNDERGROUND CONCRETE PULLBOX - PAVED AREAS
N.T.S.
3 UNDERGROUND CONCRETE PULLBOX - TURF AREAS
N.T.S.
5 UTILITY TRENCH DETIAL
N.T.S.
6 EQUIPMENT PAD DETAIL
N.T.S.
7 15KV MODULAR T-SPLICE DETAIL
N.T.S.
GROUND
ROD
CONC.
ENVELOPE
FINISHED
GRADE
GRADE RINGS AS REQ'D TO MATCH
CIVIL FINISHED GRADE ELEVATION
CABLE STANCHION
SECTION "A-A"
TOP VIEW
SECTION "B-B"
PULLING
IRON
GROUND
ROD
SLEEVE
CABLE
STANCHION
A
A
VA
RI
ES
3"
8"
8"
9'
- 4
8'
- 0
8"
8"5' - 0"
6' - 4"
6' - 4"
3' - 2" 3' - 2"
" M
IN
6"
B 5' - 0"
8"
7'
- 4
B
8"
ELECTRICAL
9'
- 4
5'
- 6
3'
- 1
0"PULLING
IRON
MANHOLE NOTES:
1. VAULT LOADING: H-20 BRIDGE SPECIFICATIONS, NO
OVERBURDEN.
2. MINIMUM ROOF AND WALL THICKNESS IS 6" EXCEPT FOR
KNOCKOUT WINDOWS.
3. GROUND ROD HOLES-1" DIAMETER-1 REQUIRED.
4. PROVIDE FOUR PULLING IRONS MADE FROM 7/8"
GALVANIZED STEEL BAR. REFER TO DETAIL 3/E-502.
5. PROVIDE 6" SUB-BASE LAYER OF WELL-TAMPED 1"
CRUSHED BLUESTONE BENEATH EACH VAULT.
6. VAULTS SHALL BE INSTALLED ON A 12" LEVEL BED OF 90%
COMPACTED GRANULAR FILL, WELL GRADED FROM THE 1"
SIEVE TO THE NO. 4 SIEVE. GRANULAR FILL SHALL BE
COMPACTED WITH A MINIMUM OF FOUR PASSES WITH A
PLATE COMPACTOR.
7. VAULT LID SHALL BE EFFECTIVELY BONDED TO VAULT
GROUND SYSTEM PER NEC.
8. INCLUDE ALUMINUM LADDER (NOT SHOWN FOR CLARITY).
9. FOR SIGNAL MANHOLE LID SHALL HAVE 'TELEPHONE'
ENGRAVED ON IT.
MANHOLE COVER FRAME
GROUND CONNECTION
CABLE SPLICES
SEE DETAIL 7
ON SHEET E-501
6 AWG STRANDED BARE
CU CABLE (TYP)
DUCT BANK
CABLE PULLING
IRONS
3/0 AWG STRANDED BARE CU
COMPLETE RING
EXOTHERMIC WELD
CONNECTION
3/4" X 10' GROUND ROD
SUMP
FRAME
DRILL AND
TAP
GROUND
CONNECTION
CABLE
CLIP (TYP)
EXOTHERMIC
WELD
CONNECTION
(TYP)
BRAIDED SHIELD
DRAIN WIRES (TYP)
EMBED
CHANNEL OR
CABLE RACK
(TYP)
EQUIPMENT GROUND
CONDUCTOR
E-502
ELECTRICAL DETAILS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
1 POWER MANHOLE DETAIL
N.T.S.
2 MANHOLE /VAULT GROUNDING
N.T.S.
A TO:
C- TO:
B
TO
D T
O
SOUTH
BLDG 100
EA
ST
NORTH
MH 104
W
ES
T
A
A
A = EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS
(CKT B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
A TO:
C- TO:
B
TO
D T
O
SOUTH
MH 103
EA
ST
NORTH
MH 105
W
ES
T
A
A
A = EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS
(CKT B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
A TO:
C- TO:
B
TO
D T
O
SOUTH
MH 104
EA
ST
NORTH
MH 106
W
ES
T
A B
A E
B = EXISTING 4"C (SPARE) TO
BE UTILIZED FOR NEW
CABLING (CKT A4). INSTALL
NEW 3-1/C 4/0 AWG 15KV &
1-1/0 AWG EG
CONDUCTORS.
A
D = NEW 3-1/C 4/0 AWG 15KV,
1-1/0 AWG EG
CONDUCTORS IN NEW 4"C
TO SSW-8. PROVIDE NEW
PENETRATIONS. (SEE
PHASING NOTES)
C
D
E
= EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS (CKT
B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
E = NEW 3-1/C 2 AWG 15KV,
1-1/0 AWG EG
CONDUCTORS FROM
SSW-8 LOAD SIDE TO
EXISTING TRANSFORMER.
PROVIDE NEW
PENETRATION. (SEE
PHASING NOTES)
C
A TO:
C- TO:
B
TO
D T
O
SOUTH
MH 105
EA
ST
NORTH
W
ES
T M
H
A B
A
B
B = EXISTING 4"C (SPARE) TO
BE UTILIZED FOR NEW
CABLING (CKT A4). INSTALL
NEW 3-1/C 4/0 AWG 15KV,
1-1/0 AWG EG
CONDUCTORS.
A
= EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS (CKT
B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
A TO:
C- TO:
B
TO
D T
O
SOUTH
EA
ST
M H
NORTH
BLDG 109
W
ES
T M
H
A
B
B C
B
A
A
SEE ES-101
B = NEW 3-1/C 4/0 AWG 15KV,
1-1/0 AWG EG (CKT A4) IN
EXISTING 4"C.
A = EXISTING 1-3/C 2/0 AWG
15KV, (CKT B1) IN 4"C TO
BE REPLACED WITH 3-1/C
4/0 AWG 15KV, 1-1/0 AWG
EG.
C1D1
B
D
A
NEW 3-1/C 2 AWG 15KV,
1-1/0 AWG EG
(D - IN NEW 4"C TO SSW-9B)
(D1 - IN EXISTING 4"C TO
XFMR PT-9B)
NEW 3-1/C 4/0 AWG
15KV,1-1/0 AWG EG IN
4"C TO SSW-9B.
(PROVIDE NEW
PENETRATIONS)
NEW 3-1/C 2 AWG 15KV,
1-1/0 AWG EG
(C - IN NEW 4"C TO
SSW-9A)
(C1 - IN EXISTING 4"C TO
XFMR PT-9A)
NEW 3-1/C 4/0 AWG 15KV,
1-1/0 AWG EG IN 4"C TO
SSW-9A (PROVIDE NEW
PENETRATIONS)
A TO:
C- TO:
B
TO
D T
O
SOUTH
EA
ST
M H
NORTH
BLDG 109
W
ES
T M
H
B = NEW 3-1/C 4/0 AWG 15KV,
1-1/0 AWG EG (CKT A4) IN
EXISTING 4"C.
A = EXISTING 1-3/C 2/0 AWG
15KV, (CKT B1) IN 4"C TO
BE REPLACED WITH 3-1/C
4/0 AWG 15KV, 1-1/0 AWG
EG.
A B
A
B
A
B
A TO:
C- TO:
B
TO
D T
O
SOUTH
MH 108
EA
ST
NORTH
MH 110
W
ES
T
A B
A B
A B = EXISTING 4"C (SPARE)
TO BE UTILIZED FOR
NEW CABLING (CKT A4).
INSTALL NEW 3-1/C 4/0
AWG 15KV, 1-1/0 AWG EG
CONDUCTORS.
= EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS
(CKT B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
A TO:
C- TO:
B
TO
D T
O
SOUTH
MH 109
EA
ST
NORTH
MH 111
W
ES
T
A B
A B
A B = EXISTING 4"C (SPARE)
TO BE UTILIZED FOR
NEW CABLING (CKT A4).
INSTALL NEW 3-1/C 4/0
AWG 15KV, 1-1/0 AWG EG
CONDUCTORS.
1 2
= EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS
(CKT B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
A TO:
C- TO:
B
TO
D T
O
SOUTH
EA
ST
M H
NORTH
MH 112
W
ES
T
A B
A
B
C
A
B = EXISTING 4"C (SPARE)
TO BE UTILIZED FOR
NEW CABLING (CKT A4).
INSTALL NEW 3-1/C 4/0
AWG 15KV, 1-1/0 AWG EG
CONDUCTORS.
= EXISTING 4"C (SPARE)C
1 2
= EXISTING 1-3/C 2/0 AWG
15KV CONDUCTORS
(CKT B1) IN 4"C TO BE
REPLACED WITH 3-1/C
4/0 AWG 15KV AND 1-1/0
AWG EG CONDUCTORS.
(SEE PHASING NOTES).
E-503
EXISTING MANHOLE CONDUIT LAYOUTS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
1 MH 103 CONDUIT LAYOUT
N.T.S.
2 MH 104 CONDUIT LAYOUT
N.T.S.
3 MH 105 CONDUIT LAYOUT
N.T.S.
4 MH 106 CONDUIT LAYOUT
N.T.S.
5 MH 107 CONDUIT LAYOUT
N.T.S.
6 MH 108 CONDUIT LAYOUT
N.T.S.
1. EXISTING T-BODY CONNECTIONS AT
MANHOLE TO BE REMOVED. COORDINATE
WITH CABLE REMOVAL/ DEMOLITION.
2. NEW 15KV CABLING - (3-1/C 4/0 AWG) TO BE
INSTALLED IN NEW CABLE SUPPORT/RACK.
PROVIDE SIX (6) SETS OF CABLE
SUPPORTS/RACKS TO EXISTING MANHOLE
STRUCTURE.
3. CABLES SHALL BE LOOPED INSIDE FOR
FUTURE SPLICING/TERMINATIONS.
A. WHEN NOTED AT EXISTING MANHOLES REPLACE
EXISTING CABLE SUPPORTS/ RACKS WITH NEW
TO ACCOMMODATE REMOVAL AND
REPLACEMENT OF PRIMARY CABLING.
B. WHEN NOTED AT EXISTING MANHOLES REPAIR
OR REPLACE GROUNDING CABLE AND
CONNECTIONS. SEE MANHOLE DETAILS SHEET
E-502.
C. SEE SHEETS ES101 THRU ES103 FOR MANHOLE
LOCATIONS.
D. PROVIDE NEW T-CONNECTIONS FOR ALL
SPLICES IN EXISTING AND NEW MANHOLES.
WHERE SPLICES OCCUR, CABLES SHALL HAVE
ENOUGH SLACK FOR TERMINATIONS.
7 MH 109 CONDUIT LAYOUT
N.T.S.
8 MH 110 CONDUIT LAYOUT
N.T.S.
9 MH 111 CONDUIT LAYOUT
N.T.S.
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
X
C- TO:
B
TO
D T
O
SOUTH
MH 111
EA
ST
NORTH
W
ES
T G
AR
AG
E
A B
C1
A = NEW 3-1/C 4/0 AWG
15KV, 1-1/0 AWG EG IN
4"C TO SSW-12
(PROVIDE NEW
PENETRATIONS).
B = EXISTING 4"C (SPARE)
TO BE UTILIZED FOR
NEW CABLING (CKT A4).
INSTALL NEW 3-1/C 4/0
AWG 15KV, 1-4/0AWG EG
CONDUCTORS IN
EXISTING RACEWAY.
C1 = NEW 3-1/C 2 AWG 15KV,
1-1/0 AWG EG IN
EXISTING 4"C FROM
SSW-12 TO PT-12.
B CA
NEW 3-1/C 4/0 AWG
15KV, 1-1/0 AWG EG
IN 4"C TO SSW-12
(PROVIDE NEW
PENETRATIONS).
NEW 3-1/C 2 AWG 15KV,
1-1/0 AWG EG IN 4"C TO
SSW-12.
A TO:
C- TO:
B
TO
D T
O
SOUTH
EA
ST
M H
NORTH
PT-10
W
ES
T M
H A
4-
A
B
A B
B
A
C
SEE ES-101
B = EXISTING 4"C (SPARE) TO
BE UTILIZED FOR NEW
CABLING (CKT A4). INSTALL
NEW 3-1/C 4/0 AWG 15KV,
1-4/0 EG CONDUCTORS IN
EXISTING RACEWAY.
A = EXISTING 1-3/C 2/0 AWG
15KV, (CKT B1) IN 4"C TO
BE REPLACED WITH 3-1/C
4/0 AWG 15KV, 1-1/0 AWG
EG CONDUCTORS. SEE
PHASING NOTES.
C1
NEW 3-1/C 2 AWG 15KV,
1-1/0 AWG EG
(C - IN NEW 4"C TO SSW-10)
(C1 - IN EXISTING 4"C TO
XFMR PT-10)
TO SSW-10
S
S
A TO:
C- TO:
B
TO
D T
O
SOUTH
EA
ST
BL
D
G
NORTH
MH A4-2
W
ES
T
A S
SS
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
S A
SS
A TO:
MH: A4-2
C- TO:
B
TO
D T
O
SOUTH
MH A4-1
EA
ST
NORTH
W
ES
T M
H A
4-
A S
SS
S S
SA
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
A TO:
MH: A4-3
C- TO:
B
TO
D T
O
SOUTH
EA
ST
M H
A 4-
NORTH
MH A4-4
W
ES
T
A S
SS
S A
SS
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
A TO:
MH: A4-4
C- TO:
B
TO
D T
O
SOUTH
MH A4-3
EA
ST
NORTH
W
ES
T M
H A
4-
A S
SS
S S
SA
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
A TO:
MH: A4-5
C- TO:
B
TO
D T
O
SOUTH
EA
ST
M H
A 4-
NORTH
MH A4-6
W
ES
T
A S
SS
S A
SS
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
A TO:
MH: A4-6
C- TO:
B
TO
D T
O
SOUTH
MH A4-5
EA
ST
NORTH
W
ES
T M
H A
4-
A S
SS
S S
SA
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
E-504
EXISTING MANHOLE CONDUIT LAYOUTS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
1 MH 112 CONDUIT LAYOUT
N.T.S.
2 MH 113 CONDUIT LAYOUT
N.T.S.
3 MH A4-1 CONDUIT LAYOUT
N.T.S.
4 MH A4-2 CONDUIT LAYOUT
N.T.S.
5 MH A4-3 CONDUIT LAYOUT
N.T.S.
6 MH A4-4 CONDUIT LAYOUT
N.T.S.
7 MH A4-5 CONDUIT LAYOUT
N.T.S.
8 MH A4-6 CONDUIT LAYOUT
N.T.S.
1. EXISTING T-BODY CONNECTIONS AT
MANHOLE TO BE REMOVED. COORDINATE
WITH CABLE REMOVAL/ DEMOLITION.
2. NEW 15KV CABLING - (3-1/C 4/0 AWG) TO BE
INSTALLED IN NEW CABLE SUPPORT/RACK.
PROVIDE SIX (6) SETS OF CABLE
SUPPORTS/RACKS TO NEW AND EXISTING
MANHOLE STRUCTURE.
A. WHEN NOTED AT EXISTING MANHOLES REPLACE
EXISTING CABLE SUPPORTS/ RACKS WITH NEW
TO ACCOMMODATE REMOVAL AND
REPLACEMENT OF PRIMARY CABLING.
B. WHEN NOTED AT EXISTING MANHOLES REPAIR
OR REPLACE GROUNDING CABLE AND
CONNECTIONS. SEE MANHOLE DETAILS SHEET
E-502.
C. SEE SHEETS ES101 THRU ES103 FOR MANHOLE
LOCATIONS.
D. PROVIDE NEW T-CONNECTIONS FOR ALL
SPLICES IN EXISTING AND NEW MANHOLES.
WHERE SPLICES OCCUR, CABLES SHALL HAVE
ENOUGH SLACK FOR TERMINATIONS.
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
MH: A4-7
C- TO:
B
TO
D T
O
SOUTH
MH A4-6
EA
ST
NORTH
MH A4-8
W
ES
T
A B
SS
A B
SS A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
B
A
TO SSW-14
A TO:
MH: A4-8
C- TO:
B
TO
D T
O
SOUTH
MH A4-7
EA
ST
NORTH
MH A4-9
W
ES
T
A B
SS
S A
SS
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
A B
SS
A TO:
MH: A4-9
C- TO:
B
TO
D T
O
SOUTH
MH A4-8
EA
ST
M H
NORTH
W
ES
T
A B
SS
S A
BS
A
S
= 3-1/C 4/0AWG 15KV,
1-1/0 AWG EG IN 4"C.
= SPARE 4"C
E-505
EXISTING MANHOLE CONDUIT LAYOUTS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
INSTALL NEW 12KV
UNDERGROUND
DISTRIBUTION FEEDER
580-18-113
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD,
HOUSTON, TX 77030
19-259
100% CONSTRUCTION DOCUMENTS
JULY 15, 2021 KMGJAV
Foresite Group, Inc.
1999 Bryan Street .
Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net
1 MH A4-7 CONDUIT LAYOUT
N.T.S.
2 MH A4-8 CONDUIT LAYOUT
N.T.S.
1. NEW 15KV CABLING - (3-1/C 4/0 AWG) TO BE
INSTALLED IN NEW CABLE SUPPORT/RACK.
PROVIDE SIX (6) SETS OF CABLE
SUPPORTS/RACKS TO NEW MANHOLE
STRUCTURE.
3 MH A4-9 CONDUIT LAYOUT
N.T.S.
A. WHEN NOTED AT EXISTING MANHOLES REPLACE
EXISTING CABLE SUPPORTS/ RACKS WITH NEW
TO ACCOMMODATE REMOVAL AND
REPLACEMENT OF PRIMARY CABLING.
B. WHEN NOTED AT EXISTING MANHOLES REPAIR
OR REPLACE GROUNDING CABLE AND
CONNECTIONS. SEE MANHOLE DETAILS SHEET
E-502.
C. SEE SHEETS ES101 THRU ES103 FOR MANHOLE
LOCATIONS.
D. PROVIDE NEW T-CONNECTIONS FOR ALL
SPLICES IN EXISTING AND NEW MANHOLES.
WHERE SPLICES OCCUR, CABLES SHALL HAVE
ENOUGH SLACK FOR TERMINATIONS.
DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6
7/15/2021
SS
SSW-9B
SELECTOR
SWITCH,
600A, 15KV
(EX)
PT-9B
1000KVA
12.47KV/480-277V
SSW-9A
SELECTOR
SWITCH,
600A, 15KV
(EX)
PT-9A
1000KVA
12.47KV/480-277V
(EX)
MH107
(EX)
MH108
(EX)
MH113
S
SSW-10
SELECTOR
SWITCH,
600A, 15KV
BLDG 110
(NEW)
MHA4-9
S
SSW-14
SELECTOR
SWITCH,
600A, 15KV
(NEW)
PT-120
1500KVA
12.47KV/480-277V
3PH
(EX)
MH106
S
SSW-8
SELECTOR
SWITCH,
600A, 15KV
(EX)
PT-8
500KVA
12.47KV/480-277V
BLDG 108 BLDG 109
(EX)
MH109
(EX)
MH110
(EX)
MH111
(EX)
MH112
(NEW)
MHA4-8
(NEW)
MHA4-7
(EX)
PT-10
500KVA
12.47KV/480-277V
S
SSW-12
SELECTOR
SWITCH,
600A, 15KV
BLDG 124
(PARKING GARAGE)
(EX)
PT-12
750KVA
12.47KV/480-277V
(EX)
MH105
BLDG 121
B1 A1 RA B2 RB
SPARE SPARE
MAIN MECH. RM.
USS-8
750 KVA
SERVICE BAY 8
USS-9
1500 KVA
SERVICE BAY 10
USS-11
1500 KVA
SERVICE BAY 11
USS-10
1500 KVA
SERVICE BAY 12
USS-12
800 KVA
SERVICE BAY 9
USS-13
300 KVA
SERVICE BAY 7
USS-14
750 KVA
SERVICE BAY 4
USS-2
1000 KVA
SERVICE BAY 3
USS-3
750 KVA
ADJACENT TO
USS-4 & USS-5
USS-L
500 KVA
SERVICE BAY 6
USS-4
1500 KVA
SERVICE BAY 5
USS-5
2000 KVA
SERVICE BAY 2
USS-6
750 KVA
SERVICE BAY 1
USS-7
1000 KVA
RBB2
RA
A1
RA RB A1 A2 A3 A4 B1 B2 B3 B4
86 K
K
K
A1 A2 RA RB B1 B2
3000KVA 3750KVA 3000KVA
#1 #2 #3 #4 #5 #6
#1 #2 #4 #5 #3
A MAIN B MAIN
BUILDING 100
MAIN HOSPITAL
FEEDER - A1
(ETR)
OUTLYING
BUILDINGS
FEEDER - B1
BUILDING 100
MAIN HOSPITAL
FEEDER - RA
(ETR)
(EX) EMPTY 4" CONDUITS
BUILDING 100
MAIN HOSPITAL
FEEDER - B2
(ETR)
BUILDING 100
MAIN HOSPITAL
FEEDER - RB
(ETR)
BUILDING NO.100
SWITCHGEAR "MBSG"
(EX) BUILDING NO.104
MAIN 15KV SWITCHGEAR "MSG"
(EX) SERVICE ENTRANCE
SWITCHGEAR "SESG"
(EX) H.L.&P. 35KV, CIRCUIT A
POLE TOP
TIE SWITCH (EX) H.L.&P. 35KV, CIRCUIT B
(EX) H.L.&P. 35KV VACUUM
BREAKERS (TYPICAL)
(EX) H.L.&P. 35KV/15KV
TRANSFORMER (TYPICAL)
SERVES NORTHWEST
AREA EXTERIOR LIGHTING
SERVES NORTH AREA
EXTERIOR…