580-18-113 Project Drawings - Civil.pdf

PDF 17 MB Posted

Attached to
Y1NZ--CON NRM Project# 580-18-113 - Construct New 12kV Underground Feeder
Solicitation number
36C25621R0132
Issued by

About this file

This pre-solicitation notice describes an upcoming federal contract opportunity to construct a new 12kV underground feeder at the Michael E. DeBakey VA Medical Center campus in Houston, Texas. The project involves building a new 12kV utility line to provide power redundancy and allow the replacement of an existing line past its life expectancy, relocating telecommunications, fire alarm, and fiber optic cables out of a condemned building into a permanent structure, and coordinating utility shutdowns across multiple construction phases to minimize disruptions to facility operations. Interested service-disabled veteran-owned small businesses will be able to view the full solicitation and specifications on or after July 14, 2021. The solicitation response period will be 90 days, and performance and payment bonds will be required from the successful offeror. The contract value is estimated between $2 million and $5 million, and work must be completed within 365 calendar days of the notice to proceed.

View the file

Other files

File Type Posted
Site Visit Attendees - 12kV.xlsx XLSX spreadsheet
Clarifications dated 8-17-2021.docx DOCX document
36C25621R0132 0002.docx DOCX document
36C25621R0132 0001.pdf PDF
SF24 - BID BOND.pdf PDF
36C25621R0132_1.docx DOCX document
DOL Wage Determinations TX20210031 dated 5-7-21.pdf PDF
580-18-113 Project Specifications.pdf PDF
580-18-113 Statement of Work.docx DOCX document
DOL Wage Determinations TX20210253 dated 5-7-21.pdf PDF
580-18-113 Project Drawings.pdf PDF
580-18-113 Site Visit Instructions.docx DOCX document
36C25621R0132.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A B

C D

E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

JULY 15, 2021 KMGJAV

Foresite Group, Inc.

1999 Bryan Street .

Suite 8890 Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.fg-inc.net

PROJECT LOCATION

G-001 1 1

COVER SHEET

1 VICINITY MAP

NTS

INSTALL NEW 12KV UNDERGROUND

DISTRIBUTION FEEDER

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD, HOUSTON, TX 77030

VA PROJECT #: 580-18-113

BID DEDUCT ALTERNATES

BID DEDUCT ALTERNATE 1

ALL WORK IN CONTRACT EXCEPT ELIMINATE ALL NON-OIT FIBER (SECURITY, CCTV, HVAC, AND FIRE ALARM) FROM THE PROJECT. THIS WORK IS SCHEMATICALLY SHOWN IN DETAILS 1/T-502, 2/T-502, 3/T-502 & 4/T-502.

BID DEDUCT ALTERNATE 2

ALL WORK IN CONTRACT EXCEPT DEDUCT 1 AND ELIMINATE WORK ASSOCIATED WITH ALL REMAINING

TECHNOLOGY SHEETS.

DocuSign Envelope ID: 91890EBE-BAC4-4BA2-8B95-07A5A2B479F6

7/15/2021

RESERVE "A", BLOCK 1

BAYLOR COLLEGE OF MEDICINE

F.C. No. 619157, H.C.M.R.

UNITED STATES OF AMERICA

REMAINDER OF

CALLED 118.831 ACRES

VOL. 1297, PG. 87, H.C.D.R.

VOL. 20, PG. 33, H.C.M.R.

MICHAEL E. DeBAKEY

VA MEDICAL CENTER

2002 HOLCOMBE BLVD.

HOUSTON, TX 77030

UNITED STATES OF AMERICA

CALLED 0.078 ACRE

VOL. 1381, PG. 17, H.C.D.R.

OVERHANG

C

E

N

T

E

R

P

O

I N

T

E

E

R

G

Y

E

L

E

C

T

R

I C

A

S

E

M

E

N

T

C

A

L

L

D

R

E

S

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

H

C

C

F

N o

V

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

H

C

C

F

N o

V

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG/E UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

GAS

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GA

S

GA

S

GAS

GAS

GAS

GAS

GAS

GA

S

GA

S

GA

S

GAS

GAS

GAS

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

C

I

Y

O

F

H

U

S

T

O

N

R

O

W

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C o

C

I

U

S

T

O

N

R

O

W

E

A

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

Y

POW

POW

E

POW

POW

E

PO

W

PO

W

E

POW

POW

E

E

POW

POW

E

POW

POW

E

PO

W PO

W

E

PO

W

PO

W

E

POW

POW

E

POW

POW

E

POW

POW

E

GAS

WYNDALE STREET

60' R.O.W.

C A

M B

R

ID

G E

S T

R E

E T

R .O

.W . W

ID

T

H V

A R

IE

S

12" PINE

12" OAK

12" PINE

14" PINE

10" PINE

16" PINE

8" OAK

14" OAK

10" PINE

4" PINE

12" OAK

28" OAK

28" OAK

16" OAK

16" OAK

16" OAK

16" OAK

PO

W

POW

POW

POW

POW

POW

POW

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

PO

W

#10030

#10212

#12877

#12947

#12950

#16985

#12842

#12858

#12876

#13179

#13358

#17105

#10123

#25000

#17041

#12737

#12878

#13286

#16173

#16566

#16567

UG ELEC. LINE

NG=44.8'

COVER=1'9"

UG ELEC. LINE

CN=43.4'

COVER=2'4"

COVER=3'0"

UG ELEC. LINE

NG=49.2'

COVER=3'6"

UG ELEC. LINE

CN=49.5'

COVER=4'3"

UG ELEC. LINE

NG=49.4'

COVER=5'0"

UG ELEC. LINE

NG=45.2'

COVER=1'1"

UG ELEC. LINE

NG=44.9'

COVER=1'2"

UG GAS LINE

NG=45.0'

COVER=1'6"

UG GAS LINE

NG=45.3'

COVER=1'5"

UG ELEC. LINE

NG=45.3'

COVER=1'6"

UG ELEC. LINE

NG=45.0'

COVER=1'1"

UG GAS LINE

NG=44.8'

COVER=1'10"

UG ELEC. LINE

NG=44.6'

COVER=1'0"

UG ELEC. LINE

NG=45.0'

COVER=1'9"

UG GAS LINE

NG=45.0'

COVER=2'1"

UG GAS LINE

NG=45.6'

COVER=1'7"

UG ELEC. LINE

NG=46.0'

COVER=1'6"

UG ELEC. LINE

NG=46.1'

COVER=1'8"

UG ELEC. LINE

NG=46.1'

COVER=2'0"

UG ELEC. LINE

NG=45.8'

COVER=2'0"

UG ELEC. LINE

NG=45.4'

COVER=1'4"

UG ELEC. LINE

NG=45.4'

COVER=1'8"

UG ELEC. LINE

NG=45.6'

COVER=1'10"

UG ELEC. LINE

NG=45.4'

COVER=2'1"

U

G

L

E

C

L

I N

E

N

G

C

O

V

E

R

UG ELEC. LINE

CN=44.3'

COVER=5'8"

E

C

L

I N

E

C

N

C

O

V

E

R

UG ELEC. LINE

NG=45.3'

COVER=1'9"

UG ELEC.

LINE

CN=45.0'

COVER=2'6"

UG ELEC.

LINE

CN=44.9'

COVER=2'7"

UG ELEC.

LINE

NG=44.8'

COVER=6'10"

UG ELEC. LINE

CN=44.0'

COVER=5'2"

UG ELEC. LINE

CN=44.8'

COVER=3'2"

UG ELEC. LINE

CN=43.1'

COVER=1'8"

UG ELEC. LINE

CN=43.1'

COVER=1'8"

UG ELEC. LINE

CN=44.9'

COVER=2'4"

UG GAS LINE

CN=44.2'

COVER=2'7"

UG GAS LINE

CN=44.3'

COVER=3'0"

UG GAS LINE

CN=44.4'

COVER=2'9"

UG GAS LINE

CN=44.3'

COVER=1'9"

S

N

E

N

G

C

O

V

E

R

UG GAS LINE

NG=45.5'

COVER=3'3"

UG GAS LINE

CN=44.4'

COVER=1'10"

UG GAS LINE

NG=44.5'

COVER=2'2"

UG ELEC. LINE

NG=42.7'

COVER=2'2"

UG ELEC. LINE

NG=42.7'

COVER=2'2"

UG ELEC. LINE

NG=42.7'

COVER=2'9"

UG ELEC. LINE

NG=43.0'

COVER=2'1"

UG ELEC. LINE

CN=43.1'

COVER=2'2"

UG ELEC. LINE

CN=43.1'

COVER=2'1"

UG ELEC. LINE

CN=42.4'

COVER=2'1"

UG ELEC. LINE

NG=42.3'

COVER=2'0"

UG ELEC. LINE

NG=42.7'

COVER=2'2"

UG ELEC. LINE

CN=44.0'

COVER=2'7"

UG ELEC. LINE

CN=44.0'

COVER=2'7"

UG ELEC. LINE

CN=44.3'

COVER=2'8"

UG ELEC. LINE

NG=43.6'

COVER=2'3"

UG ELEC. LINE

NG=43.8'

COVER=2'3"

UG ELEC. LINE

NG=45.4'

COVER=1'8"

UG ELEC. LINE

CN=44.8'

COVER=1'8"

E

C

L

I N

EC

N

C

O

V

E

R

UG ELEC. LINE

NG=44.2'

COVER=2'6"

UG ELEC. LINE

NG=45.0'

COVER=1'6"

UG ELEC. LINE

CN=44.4'

COVER=3'6"

UG ELEC. LINE

NG=45.1'

COVER=2'5"

UG ELEC. LINE

CN=45.1'

COVER=1'8"

UG ELEC. LINE

CN=45.9'

COVER=2'0"

UG ELEC. LINE

NG=44.6'

COVER=3'9"

UG ELEC. LINE

NG=44.6'

COVER=3'9"

UG ELEC. LINE

NG=44.8'

COVER=2'9"

TANK

SPOIL

PILE

A

C

U

N

I T

S

A

C

U

N

I T

S

PIPE

ASSEMBLY

(TYP.)

TRANSFORMER

ON CONC. PAD

(TYP.)

B

U

S

H

4" GAS

PIPE

2" GAS

PIPE

6" GAS

PIPE

CONDUIT(S)

S

H

E

D

2-STORY

STUCCO BUILDING

E

E

E

E

E

E

E

E

E

T

N

S72°51'06"E 30.00'

C

C

#12737

#12878

#13286

#16173

#16566

#16567

#16628

G

G

M

M

M

M

M

M

M

E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/EU

G/ E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

BUILDING

BUILDING

BUILDING

BUILDING

104A

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LO

C

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

F

O

F

O

T

E

L

T

E

L

T

E

L

AREA OF

WORK

KEY PLAN

N

GENERAL NOTES:

1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL

BE INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.

2) REMOVE SHRUBS AND TREES AS NOTED. GRUB OUT ROOTS

AND STUMPS AND LEGALLY DISPOSE OF DEBRIS.

DEMOLITION NOTES:

1) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY

WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND

UTILITY INSTALLATION CODES.

2) ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT

ACCORDANCE WITH, AND CONFORM TO, THE PROJECT

SPECIFICATIONS.

3) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON

THESE PLANS. THE COR ASSUMES NO RESPONSIBILITY FOR

LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL

UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY

THE OWNER IN CASE OF DISCREPANCIES THAT AFFECT THE

CONSTRUCTION PROJECT.

4) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY

OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY

EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT

ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR

OR REPLACE SUCH DAMAGED PROPERTY TO THE PROPERTY

OWNER'S SATISFACTION AT NO COST TO THE OWNER.

5) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS

AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT

OF THE COR.

6) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VA AND

ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL

UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE. THE

CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR

RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING

UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.

7) THE CONTRACTOR SHALL SEQUENCE THE WORK AND

PROVIDE TEMPORARY MEASURES AS NECESSARY TO MAINTAIN

ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES

DURING CONSTRUCTION. TEMPORARY PROVISIONS MAY

INCLUDE, BUT ARE NOT LIMITED TO: BARRICADES, FLASHING

LIGHTS, FLAGMAN, TEMPORARY PAVEMENT, AND DIRECTIONAL

SIGNAGE AS NECESSARY TO ACCOMPLISH THE WORK.

8) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS

OF CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS

DURING DEMOLITION ACTIVITY.

9) CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN

COUNTY, CITY OR STATE RIGHT-OF-WAY, AND MUST BE STORED

WITHIN SITE.

10) COORDINATE WITH VA CODES ENFORCEMENT DIVISION AS

REQUIRED DURING ALL DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES.

11) ALL BUFFERS AND SAVE AREAS SHALL BE CLEARLY

IDENTIFIED BY FLAGGING AND/OR FENCING PRIOR TO

COMMENCEMENT OF ANY LAND DISTURBANCE.

12) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS

MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE

LOCAL, STATE, AND FEDERAL LAWS.

13) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY

DISPOSED OF, OFF SITE.

14) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER

PRIOR TO ANY EXCAVATION.

15) 24/7 ACCESS SHALL BE MAINTAINED TO ALL EXISTING GAS

VALVES WITHIN THE PROJECT.

16) IRRIGATION LINES AND HEADS SHALL BE REPLACED OR

RELOCATED WHEN NECESSARY DUE TO SCOPE OF WORK.

CONTRACTOR TO REPAIR ANY IRRIGATION LINES OR HEADS

THAT ARE BROKEN OR DAMAGED DURING CONSTRUCTION.

Foresite Group, LLC

1999 Bryan Street

Suite 8890

Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.foresitegroup.net

MARCH 31, 2021 PABFM

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

TBPE Firm No. F-12878

D/B/A Foresite Consulting Group of Texas LLC

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

1" = 40'

SCALE IN FEET

40 20 40 80

DEMOLITION PLAN

MATCH LINE (SHEET C101)

C100

SHEET KEY NOTES:

MATCHLINE

MATCHLINE

LEGEND

UTILITIES, FENCE, AND/OR WALL TO BE REMOVED

AND/OR RELOCATED

CONCRETE TO BE REMOVED

CURB TO BE REMOVED

EXISTING FENCE

PROPERTY LINE

LIMITS OF CONSTRUCTION

TREE PROTECTION FENCE

FIELD RUN SURVEY LIMITS

EXISTING TREE TO BE REMOVED

EXISTING CONTOURS

LOC LOC LOC

EROSION CONTROL NOTES

1) CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEVELOPMENT

OF THE STORMWATER POLLUTION PREVENTION PLAN IN

ACCORDANCE WITH TCEQ GENERAL PERMIT TXR150000.

2) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO

ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE

MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT

GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.

3) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL

PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION DURING

CONSTRUCTION.

4) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY

THE COR OR OTHER INSPECTORS AS DETERMINED BY FIELD

CONDITIONS.

5) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE

PROTECTED FROM SEDIMENTATION.

XXXX

SHEET NOTES:

P

A

R

K

I

N

G

S

P

A

C

E

S

CAMBRIDGE COMMONS

FC No. 641035, H.C.M.R.

TERRA SURVEYING

PROJECT No. 1600-9304

CALLED 7.6639 ACRES

TERRA SURVEYING

PROJECT No. 1600-9304

UNITED STATES OF AMERICA

REMAINDER OF

CALLED 118.831 ACRES

VOL. 1297, PG. 87, H.C.D.R.

VOL. 20, PG. 33, H.C.M.R.

MICHAEL E. DeBAKEY

VA MEDICAL CENTER

2002 HOLCOMBE BLVD.

HOUSTON, TX 77030

UNITED STATES OF AMERICA

CALLED 0.078 ACRE

VOL. 1381, PG. 17, H.C.D.R.

DEVONSHIRE PLACE

VOL. 7, PG. 38, H.C.M.R.

DEVONSHIRE PLACE

VOL. 7, PG. 38,

H.C.M.R.

DEVONSHIRE PLACE

VOL. 7, PG. 38,

H.C.M.R.

O

F

F

I

R

E

S

O

L

U

T

I O

N

M

A

N

A

G

E

M

E

N

T

M

U

L

T

I

S

T

O

R

Y

S

T

U

C

B

I L

D

I N

G

1-STORY

STUCCO BUILDING

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

D.W.C. HARRIS SURVEY, A-325

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG

/E

UG/E UG/E

UG/E UG/E UG/E UG/E

UG/E

UG

/E

UG/E

UG/E UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

T

T

T

T T

T T

T

T

T

T T

T

T

T

T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

R

K

I N

G

S

P

A

C

E

S

GAS

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GAS

GAS

GAS

GAS

GA

S

GA

S

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GAS

GAS

GAS

GAS

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

C

I

U

S

T

O

N

R

O

W

E

A

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

Y

POW

POW

POW

POW

E

E

C A

M B

R

ID

G E

S T

R E

E T

R .O

.W . W

ID

T

H V

A R

IE

S

CANTERBURYSTREET60' R.O.W.

LAUDERDALE STREET

60' R.O.W.

WOODBURY BLVD.

70' R.O.W.

R

IN

G N

E

SS

A V

E

PR

IV

A T

E R

O A

D

MIXON AVE.

PRIVATE ROAD

14" OAK

18" OAK

12" OAK

6" OAK

6" OAK

N

E

30" OAK

24" OAK

8" OAK

8" OAK

14" PINE

12" PINE

10" OAK

12" OAK

6" OAK

8" OAK

8" OAK

8" OAK

16" OAK

12" OAK

12" OAK

8" CRM

20" OAK

12" TREE

12" OAK

10" OAK

16" OAK

36" OAK

36" OAK

20"

OAK

6" OAK

22" OAK

18" OAK

18" OAK

18" OAK

18" CRM

18" CRM

18" CRM

18" CRM

18" CRM

18" CRM

18" CRM

12" CRM

12" CRM

16" OAK

16" OAK

20" OAK

18" OAK

18" CRM

18" CRM

24" OAK

18" CRM

18" CRM

16" OAK

12" OAK

18" OAK

14" OAK

12" OAK

16" OAK

16" OAK

18" OAK

PO

W

PO

W

PO

W

POWPOWPOWPOW

#12309

#10285

#10426

#10671

#10693

#12087

#12165

#12395

#12570

#16352

#10335

2"PVC

FL=41.93

#11588

#12623

#12624

#15313

#16080

#21001

#21059 #10765

4"PVC

FL=43.14

1' PIPE1' PIPE

NG=42.9'

COVER=1'2"

UG ELEC. LINE

NG=41.0'

COVER=2'3"

UG ELEC. LINE

NG=43.0'

COVER=0'8"

UG ELEC. LINE

NG=44.0'

COVER=1'8"

UG ELEC. LINE

CN=43.3'

COVER=1'4"

COVER=2'4"

UG ELEC. LINE

NG=43.6'

COVER=1'9"

UG ELEC. LINE

CN=43.0'

COVER=2'1"

COVER=1'4"

UG ELEC. LINE

CN=44.2'

COVER=6'1"

UG ELEC. LINE

CN=44.7'

COVER=6'0"

UG ELEC. LINE

CN=42.3'

COVER=1'7"

UG ELEC. LINE

NG=42.6'

COVER=2'4"

UG ELEC. LINE

CN=43.3'

COVER=1'6"

UG ELEC. LINE

CN=42.3'

COVER=6'1"

UG ELEC. LINE

NG=44.0'

COVER=1'10"

UG ELEC. LINE

NG=44.6'

COVER=1'9"

UG GAS LINE

NG=44.8'

COVER=2'4"

UG GAS LINE

NG=44.3'

COVER=2'3"

UG ELEC. LINE

CN=43.7'

COVER=1'5"

UG ELEC. LINE

NG=44.4'

COVER=1'8"

UG ELEC. LINE

NG=45.3'

COVER=5'0"

UG ELEC. LINE

NG=44.9'

COVER=1'7"

UG ELEC. LINE

CN=43.9'

COVER=1'8"

UG ELEC. LINE

NG=44.7'

COVER=1'4"

UG ELEC. LINE

CN=44.5'

COVER=3'0"

UG ELEC. LINE

NG=44.3'

COVER=2'2"

UG ELEC. LINE

NG=44.8'

COVER=3'7"

UG ELEC. LINE

NG=45.1'

COVER=1'5"

UG ELEC. LINE

NG=44.5'

COVER=1'5"

UG ELEC. LINE

NG=46.3'

COVER=4'6"

UG ELEC. LINE

NG=46.8'

COVER=4'4"

UG ELEC. LINE

CN=47.6'

COVER=3'8"

UG ELEC. LINE

NG=48.3'

COVER=3'8"

UG ELEC. LINE

NG=44.8'

COVER=1'3"

UG GAS LINE

NG=44.3'

COVER=2'3"

UG ELEC. LINE

NG=44.6'

COVER=1'8"

UG ELEC. LINE

NG=44.7'

COVER=1'10"

UG ELEC. LINE

NG=44.8'

COVER=0'10"

UG GAS LINE

NG=44.8'

COVER=2'1"

UG ELEC. LINE

NG=44.4'

COVER=1'11"

UG ELEC. LINE

NG=45.1'

COVER=1'4"

UG GAS LINE

NG=45.1'

COVER=1'1"

UG ELEC. LINE

CN=45.1'

COVER=1'7"

UG ELEC. LINE

NG=45.2'

COVER=1'10"

UG ELEC. LINE

CN=42.8'

COVER=1'8"

UG ELEC. LINE

NG=42.9'

COVER=2'3"

UG ELEC. LINE

NG=42.8'

COVER=1'3"

UG ELEC. LINE

NG=40.5'

COVER=2'3"

UG ELEC. LINE

NG=44.1'

COVER=3'4"

UG ELEC. LINE

NG=44.8'

COVER=3'6"

UG ELEC. LINE

CN=44.2'

COVER=2'5"

UG ELEC. LINE

CN=44.4'

COVER=2'2"

UG ELEC. LINE

CN=44.4'

COVER=1'7"

UG ELEC. LINE

NG=44.3'

COVER=1'10"

UG ELEC. LINE

CN=44.5'

COVER=2'0"

UG ELEC. LINE

CN=44.2'

COVER=1'9"

UG ELEC. LINE

CN=43.8'

COVER=1'9"

UG ELEC. LINE

NG=45.5'

COVER=2'9"

UG ELEC. LINE

NG=45.5'

COVER=5'0"

UG GAS LINE

NG=45.4'

COVER=3'6"

UG ELEC. LINE

CN=43.1'

COVER=1'7"

E

C

L

I N

E

C

N

C

O

V

E

R

N

E

N

G

C

O

V

E

R

UG ELEC. LINE

CN=43.9'

COVER=5'0"

S

L

I N

E

C

N

C

O

V

E

R

UG ELEC. LINE

NG=44.6'

COVER=3'6"

UG GAS LINE

NG=45.1'

COVER=2'2"

UG GAS LINE

NG=44.5'

COVER=2'1"

UG GAS LINE

NG=45.3'

COVER=2'3"

UG GAS LINE

NG=45.3'

COVER=2'6"

UG GAS LINE

NG=45.0'

COVER=1'10"

UG GAS LINE

NG=45.1'

COVER=2'9"

UG ELEC. LINE

NG=44.5'

COVER=1'5"

UG GAS LINE

NG=45.1'

UG ELEC. LINE

NG=42.5'

COVER=2'6"

UG ELEC. LINE

CN=42.1'

COVER=2'5"

UG ELEC. LINE

NG=45.4'

COVER=3'0"

UG ELEC. LINE

NG=45.2'

COVER=1'8"

UG ELEC. LINE

NG=45.3'

COVER=1'8"

UG ELEC. LINE

NG=47.7'

COVER=4'0"

UG ELEC. LINE

CN=47.5'

COVER=5'4"

UG ELEC. LINE

CN=47.8'

COVER=4'9"

UG ELEC. LINE

NG=48.6'

COVER=5'6"

UG ELEC. LINE

NG=49.1'

A/C

PIPE

RACK

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

C

O

N

C

H

E

A

D

W

A

L

L

W

H

A

N

D

R

A

I L

C

O

N

C

H

E

A

D

W

A

L

L

W

H

A

N

D

R

A

I L

B

U

S

H

PLANTER

BUSH

BENCH (TYP.)

GAZEBO

R

K

I N

G

S

P

A

C

E

S

D

I T

C

H

E

L

E

C

P

A

N

E

L

GAZEBO

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

POW

POW

T

T

T

T

T

T

FF=48.86'

F

F

N

C

C

#11588

#12623

#12624

#15313

#16080

#21001

#21059

CO

#10765

UG GAS LINE

NG=44.9'

COVER=1'7"

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

R

K

I N

G

S

P

A

C

E

S

MH 109

MH 108

MH 113

MH 107

UG GAS LINE

NG=45.0'

COVER=2'1"

GAZEBO

EX MH 105

UG ELEC. LINE

NG=44.9'

COVER=3'0"

BUILDING 109

BUILDING

BUILDING

T

T

T

COM MH-107

EX-MH-106

FISHER

BUILDING #1

BUILDING 108

GASGASGAS

GAS

GAS

GAS

GAS

GAS

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LOC LO

C

LOC

LO

C

LO

C

LO

C

LO

CLO

C

LOCLO

CLOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LO

C

LO

C

LOC LO

C

LOC

LO

C

LOC

LOC

LO

C LOC

LOC

LOC

LO

C

LO

C

LOC

LO

C LOC

LOC

LOC

LO

CLOC

LO

C

LOC

LO

C

Foresite Group, LLC

1999 Bryan Street

Suite 8890

Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.foresitegroup.net

MARCH 31, 2021 PABFM

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

TBPE Firm No. F-12878

D/B/A Foresite Consulting Group of Texas LLC

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

LEGEND

UTILITIES, FENCE, AND/OR WALL TO BE REMOVED

AND/OR RELOCATED

CONCRETE TO BE REMOVED

CURB TO BE REMOVED

EXISTING FENCE

PROPERTY LINE

LIMITS OF CONSTRUCTION

TREE PROTECTION FENCE

FIELD RUN SURVEY LIMITS

EXISTING TREE TO BE REMOVED

EXISTING CONTOURS

LOC LOC LOC

MATCH LINE (SHEET C100)

DEMOLITION PLAN

C101

1" = 40'

SCALE IN FEET

40 20 40 80

SHEET KEY NOTES:

MATCH LINE (SHEET C102)

XXXX

EROSION CONTROL NOTES

1) CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEVELOPMENT

OF THE STORMWATER POLLUTION PREVENTION PLAN IN

ACCORDANCE WITH TCEQ GENERAL PERMIT TXR150000.

2) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO

ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE

MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT

GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.

3) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL

PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION DURING

CONSTRUCTION.

4) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY

THE COR OR OTHER INSPECTORS AS DETERMINED BY FIELD

CONDITIONS.

5) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE

PROTECTED FROM SEDIMENTATION.

GENERAL NOTES:

1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE

INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.

2) REMOVE SHRUBS AND TREES AS NOTED. GRUB OUT ROOTS

AND STUMPS AND LEGALLY DISPOSE OF DEBRIS.

DEMOLITION NOTES:

1) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH

APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND UTILITY

INSTALLATION CODES.

2) ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT

ACCORDANCE WITH, AND CONFORM TO, THE PROJECT

SPECIFICATIONS.

3) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE

PLANS. THE COR ASSUMES NO RESPONSIBILITY FOR LOCATIONS

SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL UTILITIES

WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY THE OWNER

IN CASE OF DISCREPANCIES THAT AFFECT THE CONSTRUCTION

PROJECT.

4) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY

OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY

EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT ARE

DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR OR

REPLACE SUCH DAMAGED PROPERTY TO THE PROPERTY OWNER'S

SATISFACTION AT NO COST TO THE OWNER.

5) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS

AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF

THE COR.

6) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VA AND ALL

EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL UTILITIES

FROM THEIR EXISTING LOCATION ON THE SITE. THE CONTRACTOR

SHALL PERFORM ALL UTILITY DEMOLITION OR RELOCATION

ACTIVITIES IN ACCORDANCE WITH THE EXISTING UTILITIES

SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.

7) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE

TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO

THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING

CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE

NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,

TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS

NECESSARY TO ACCOMPLISH THE WORK.

8) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF

CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS DURING

DEMOLITION ACTIVITY.

9) CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN COUNTY,

CITY OR STATE RIGHT-OF-WAY, AND MUST BE STORED WITHIN SITE.

10) COORDINATE WITH VA CODES ENFORCEMENT DIVISION AS

REQUIRED DURING ALL DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES.

11) ALL BUFFERS AND SAVE AREAS SHALL BE CLEARLY IDENTIFIED

BY FLAGGING AND/OR FENCING PRIOR TO COMMENCEMENT OF ANY

LAND DISTURBANCE.

12) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS

MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,

STATE, AND FEDERAL LAWS.

13) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY

DISPOSED OF, OFF SITE.

14) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER

PRIOR TO ANY EXCAVATION.

15) 24/7 ACCESS SHALL BE MAINTAINED TO ALL EXISTING GAS

VALVES WITHIN THE PROJECT.

16) IRRIGATION LINES AND HEADS SHALL BE REPLACED OR

RELOCATED WHEN NECESSARY DUE TO SCOPE OF WORK.

CONTRACTOR TO REPAIR ANY IRRIGATION LINES OR HEADS THAT

ARE BROKEN OR DAMAGED DURING CONSTRUCTION.

F

O

F

O

T

E

L

T

E

L

T

E

L

AREA OF

WORK

KEY PLAN

N

SHEET NOTES:

MATCHLINE

UNRESTRICTED RESERVE "A"

HOLCOMBE CAMBRIDGE APTS

F.C. No. 668130, H.C.M.R.

CALLED 2.0921 ACRES

SPIRES/BAYOU BEND, INC.

H.C.C.F. No. M338357

DEVONSHIRE PARK

CALLED 0.4345 ACRES

H.C.C.F. No. S283476

DEVONSHIRE PARK

CALLED 94,091 SQ. FT.

H.C.C.F. No. S283476

CALLED 0.4495 ACRES

SPIRES/BAYOU BEND, INC.

H.C.C.F. No. M338357

UNRESTRICTED RESERVE "A"

HOLCOMBE CAMBRIDGE APTS

F.C. No. 668130, H.C.M.R.

EMPLOYEE

PARKING GARAGE

NEW ADMIN

BUILDING

4-STORY

CONCRETE BUILDING

1-STORY

STUCCO BUILDING

1-STORY STUCCO

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

D.W.C. HARRIS

SURVEY, A-325

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS SS

UG/E

UG

/E

UG/E UG/E UG/E

UG/E

UG/E

UG/E UG/E UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/EUG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E UG/E UG/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E UG/E UG/E UG/E UG/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

T

T

T

T

T T T

T

T

T

T

T

T

T

T

T

T T T

T

T

T T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T T

T

T

T

T

T

T

T

T

T

T T

T T

T T

T T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

R

K

I N

G

S

P

A

C

E

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

C

I

U

S

T

O

N

R

O

S

E

M

E

N

T

C

A

L

L

R

E

V

O

C

D

R

C

I

U

S

T

O

N

R

O

W

E

A

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

Y

PO

WPO

W E

HOLCOMBE BOULEVARD

R.O.W. W

IDTH VARIES

C A

M B

R

ID

G E

S T

R E

E T

R .O

.W . W

ID

T

H V

A R

IE

S

8" OAK

14" OAK

10" OAK

12" OAK

10" OAK

6" OAK

8" OAK

6" OAK

10" OAK

24" OAK

18" OAK

2" TREE

3" TREE

18" OAK

12" OAK

6" TREE

28" OAK

3" TREE

34" OAK

16" OAK

20" OAK

20" OAK

12" CRM

18" CRM

8" OAK

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC

FOC FO

C

FO

C

FO

C

FO

C

STORM VAULT

TOP=44.78'

12"RCP(SE)=36.88'

#11066

#11300

#11664

#10489

#10847

#11015

#11018

#11048

#11145

#11147

#11150

#11275

#11286

#11465

#11574

#11650

#11651

#11674

#11755

#11822

#11899

#11903

#11905

#10506

#11120

#11677

#11747

#11906

#11904

#11737

#11312

#10850

12" CPP

FL=34.73

#11649

#12032

#15192

WATER

TEST

STATION

UG ELEC. LINE

NG=42.9'

COVER=2'9"

UG ELEC. LINE

NG=42.8'

COVER=2'5"

UG ELEC. LINE

NG=44.5'

COVER=3'0"

UG ELEC. LINE

NG=44.2'

COVER=3'10"

UG ELEC. LINE

CN=43.4'

COVER=4'11"

UG ELEC. LINE

CN=43.9'

COVER=3'0"

UG ELEC. LINE

NG=43.9'

COVER=3'0"

UG ELEC. LINE

CN=43.7'

COVER=2'3"

UG ELEC. LINE

CN=43.7'

COVER=2'5"

UG ELEC. LINE

NG=43.6'

COVER=2'2"

UG ELEC. LINE

CN=44.02'

COVER=1'10"

UG ELEC. LINE

AS=43.3'

COVER=1'5"

UG ELEC. LINE

AS=43.1'

COVER=0'10"

UG ELEC. LINE

NG=42.7'

COVER=1'4"

UG ELEC. LINE

NG=42.2'

COVER=4'8"

UG ELEC. LINE

CN=41.7'

COVER=4'1"

UG ELEC. LINE

NG=41.4'

COVER=4'1"

UG ELEC. LINE

NG=41.5'

COVER=1'8"

UG ELEC. LINE

NG=41.4'

COVER=2'4"

E

C

L

I N

E

C

N

C

O

V

E

R

(2)UG ELEC.

LINES

NG=43.3'

COVER=1'7"

UG ELEC. LINE

NG=38.5'

COVER=1'9"

UG ELEC. LINE

NG=38.7'

COVER=2'3"

UG ELEC. LINE

NG=38.9'

COVER=1'7"

UG ELEC. LINE

NG=43.6'

COVER=1'10"

UG ELEC. LINE

CN=42.1'

COVER=8'0"

UG COMM.

LINE

NG=43.2'

COVER=2'1"

UG ELEC. LINE

NG=41.7'

COVER=2'3"

UG ELEC. LINE

NG=41.4'

COVER=2'3"

UG ELEC. LINE

NG=42.7'

COVER=1'10"

UG ELEC. LINE

NG=41.4'

COVER=2'6"

UG ELEC. LINE

NG=42.3'

COVER=1'10"

UG ELEC. LINE

NG=43.4'

COVER=3'11"

UG ELEC. LINE

NG=42.6'

COVER=3'9"

UG ELEC. LINE

NG=43.3'

COVER=5'2"

UG COMM.

LINE

NG=43.5'

COVER=2'3"

M

M

L

I N

E N

G

C

O

V

E

R

UG COMM.

LINE

NG=42.1'

COVER=4'8"

UG ELEC. LINE

CN=41.6'

COVER=2'1"

UG ELEC. LINE

CN=43.7'

COVER=6'0"

UG ELEC. LINE

NG=41.4'

COVER=2'2"

UG ELEC. LINE

NG=41.4'

COVER=2'2"

UG ELEC. LINE

NG=41.4'

COVER=6'0"

UG ELEC. LINE

NG=41.3'

COVER=2'6"

UG ELEC. LINE

NG=41.3'

COVER=2'6"

UG ELEC. LINE

NG=41.3'

COVER=2'4"

UG ELEC. LINE

NG=41.4'

COVER=2'4"

UG COMM.

LINE

NG=41.5'

COVER=5'8"

UG ELEC. LINE

NG=40.3'

COVER=2'2"

UG ELEC. LINE

NG=41.3'

COVER=0'9"

UG ELEC. LINE

CN=42.0'

COVER=1'8"

UG ELEC. LINE

CN=43.3'

COVER=1'4"

UG ELEC. LINE

NG=43.2'

COVER=1'10"

UG ELEC. LINE

NG=41.9'

COVER=1'1"

UG ELEC. LINE

NG=40.8'

COVER=1'7"

UG ELEC. LINE

NG=42.8'

COVER=1'1"

UG ELEC. LINE

NG=41.1'

COVER=2'7"

UG ELEC. LINE

NG=42.9'

UG ELEC.

LINE

NG=43.7'

COVER=1'8"

UG ELEC. LINE

UG ELEC. LINE

CN=42.6'

COVER=2'4"

UG ELEC. LINE

CN=41.9'

COVER=2'7"

UG ELEC. LINE

UG ELEC. LINE

NG=42.7'

COVER=1'10"

UG ELEC.

LINE

NG=42.7'

COVER=1'4"

UG ELEC.

LINE

NG=42.5'

COVER=2'1"

UG ELEC. LINE

NG=39.9'

COVER=1'6"

UG ELEC.

LINE

CN=41.7'

COVER=1'3"

T

M

4" VERTICAL

PVC

TRANSFORMER

STORM

VAULT

TRANSFORMER

R

K

I N

G

S

P

A

C

E

S

HEADWALL

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

PO

W PO

W

E

E

E

E

E

E

E

E

E

E

E

T

T

T

T

T

T

FF=46.86'

FF=46.62'

FF=44.86'

L=920.55'

R=1101.00'

D=47°54'19"

CHB=N84°18'58"E

CHD=893.97'

N

G

G

C

C

C

C

C

C

C

C

#11649

#12032

#15192

C

O

CO

CO

BUILDING 122

BUILDING 124

BUILDING

UG/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

TRANSFORMER

E

UG/E

UG/E

EX-MH-112

EX-COM

MH-112

EX-MH-111

EX-COM

MH-111

EX-MH-110

EX-COM

MH-110

LO

C

LOC

LO

C

LOC

LO

C LO

C

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC LOC

LOC

LOC

LOC LOC

LOC

LOC

LOC

LO

C

LOC

LO

C

LO

C

LO

C

LOC

LOC

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LOC

LO

C

LO

C

LO

C

LOC

T

T

T

T

T

T

T

T

MATCH LINE (SHEET C101)

DEMOLITION PLAN

C102

1" = 40'

SCALE IN FEET

40 20 40 80

SHEET KEY NOTES:

LEGEND

UTILITIES, FENCE, AND/OR WALL TO BE REMOVED

AND/OR RELOCATED

CONCRETE TO BE REMOVED

CURB TO BE REMOVED

EXISTING FENCE

PROPERTY LINE

LIMITS OF CONSTRUCTION

TREE PROTECTION FENCE

FIELD RUN SURVEY LIMITS

EXISTING TREE TO BE REMOVED

EXISTING CONTOURS

LOC LOC LOC

XXXX

EROSION CONTROL NOTES

1) CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEVELOPMENT

OF THE STORMWATER POLLUTION PREVENTION PLAN IN

ACCORDANCE WITH TCEQ GENERAL PERMIT TXR150000.

2) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO

ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE

MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT

GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.

3) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL

PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION DURING

CONSTRUCTION.

4) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY

THE COR OR OTHER INSPECTORS AS DETERMINED BY FIELD

CONDITIONS.

5) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE

PROTECTED FROM SEDIMENTATION.

GENERAL NOTES:

1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL

BE INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.

2) REMOVE SHRUBS AND TREES AS NOTED. GRUB OUT ROOTS

AND STUMPS AND LEGALLY DISPOSE OF DEBRIS.

DEMOLITION NOTES:

1) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY

WITH APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND

UTILITY INSTALLATION CODES.

2) ALL WORK ON-SITE SHALL BE CONSTRUCTED IN STRICT

ACCORDANCE WITH, AND CONFORM TO, THE PROJECT

SPECIFICATIONS.

3) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON

THESE PLANS. THE COR ASSUMES NO RESPONSIBILITY FOR

LOCATIONS SHOWN, AND IT SHALL BE THE RESPONSIBILITY OF

THE CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL

UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND TO NOTIFY

THE OWNER IN CASE OF DISCREPANCIES THAT AFFECT THE

CONSTRUCTION PROJECT.

4) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY

OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY

EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT

ARE DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR

OR REPLACE SUCH DAMAGED PROPERTY TO THE PROPERTY

OWNER'S SATISFACTION AT NO COST TO THE OWNER.

5) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS

AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT

OF THE COR.

6) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VA AND

ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING ANY/ALL

UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE. THE

CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR

RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING

UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.

7) THE CONTRACTOR SHALL SEQUENCE THE WORK AND

PROVIDE TEMPORARY MEASURES AS NECESSARY TO MAINTAIN

ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES

DURING CONSTRUCTION. TEMPORARY PROVISIONS MAY

INCLUDE, BUT ARE NOT LIMITED TO: BARRICADES, FLASHING

LIGHTS, FLAGMAN, TEMPORARY PAVEMENT, AND DIRECTIONAL

SIGNAGE AS NECESSARY TO ACCOMPLISH THE WORK.

8) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS

OF CRANES AND CONSTRUCTION EQUIPMENT OPERATIONS

DURING DEMOLITION ACTIVITY.

9) CONTRACTOR EQUIPMENT SHALL NOT BE PARKED IN

COUNTY, CITY OR STATE RIGHT-OF-WAY, AND MUST BE STORED

WITHIN SITE.

10) COORDINATE WITH VA CODES ENFORCEMENT DIVISION AS

REQUIRED DURING ALL DEMOLITION AND NEW CONSTRUCTION

ACTIVITIES.

11) ALL BUFFERS AND SAVE AREAS SHALL BE CLEARLY

IDENTIFIED BY FLAGGING AND/OR FENCING PRIOR TO

COMMENCEMENT OF ANY LAND DISTURBANCE.

12) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS

MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE

LOCAL, STATE, AND FEDERAL LAWS.

13) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY

DISPOSED OF, OFF SITE.

14) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER

PRIOR TO ANY EXCAVATION.

15) 24/7 ACCESS SHALL BE MAINTAINED TO ALL EXISTING GAS

VALVES WITHIN THE PROJECT.

16) IRRIGATION LINES AND HEADS SHALL BE REPLACED OR

RELOCATED WHEN NECESSARY DUE TO SCOPE OF WORK.

CONTRACTOR TO REPAIR ANY IRRIGATION LINES OR HEADS

THAT ARE BROKEN OR DAMAGED DURING CONSTRUCTION.

F

O

F

O

T

E

L

T

E

L

T

E

L

AREA OF

WORK

KEY PLAN

N

MATCHLINE

MATCHLINE

SHEET NOTES:

Foresite Group, LLC

1999 Bryan Street

Suite 8890

Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.foresitegroup.net

MARCH 31, 2021 PABFM

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

TBPE Firm No. F-12878

D/B/A Foresite Consulting Group of Texas LLC

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

RESERVE "A", BLOCK 1

BAYLOR COLLEGE OF MEDICINE

F.C. No. 619157, H.C.M.R.

UNITED STATES OF AMERICA

REMAINDER OF

CALLED 118.831 ACRES

VOL. 1297, PG. 87, H.C.D.R.

VOL. 20, PG. 33, H.C.M.R.

MICHAEL E. DeBAKEY

VA MEDICAL CENTER

2002 HOLCOMBE BLVD.

HOUSTON, TX 77030

UNITED STATES OF AMERICA

CALLED 0.078 ACRE

VOL. 1381, PG. 17, H.C.D.R.

OVERHANG

C

A

L

L

R

E

S

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

H

C

C

F

N o

V

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

H

C

C

F

N o

V

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/EUG/EUG

/EUG

/E

UG

/E

UG

/E

UG/EUG/E

UG

/E

UG

/E

UG

/E

UG

/E

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

T

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GA

S

GAS

GAS

GA

S

GA

S

GAS

W

W

W

W

W

W

W

W

W

W W

W W

WW

WW

W

W

WW

W

W

W

W

W

W

W

W

W

W

W W

W W

WW

WW

W

W

WW

W

C

I

U

S

T

O

N

R

O

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

C

I

U

S

T

O

N

R

O

W

E

A

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

Y

E

E

PO

W

PO

WE

E

E

E

E

E

E

E

E

E

WYNDALE STREET

60' R.O.W.

C A

M B

R

ID

G E

S T

R E

E T

R .O

.W . W

ID

T

H V

A R

IE

S

12" PINE

12" OAK

12" PINE

14" PINE

10" PINE

16" PINE

8" OAK

14" OAK

10" PINE

4" PINE

12" OAK

28" OAK

28" OAK

16" OAK

16" OAK

16" OAK

16" OAK

PO

W

PO

W

PO

W

PO

W

PO

W

#10030

#10212

#12877

#12947

#12950

#16985

#12842

#12858

#12876

#13179

#13358

#17105

#10123

#25000

#17041

#12737

#12878

#13286

#16173

#16566

#16567

UG ELEC. LINE

NG=44.8'

COVER=1'9"

UG ELEC. LINE

CN=43.4'

COVER=2'4"

COVER=3'0"

UG ELEC. LINE

NG=49.2'

COVER=3'6"

UG ELEC. LINE

CN=49.5'

COVER=4'3"

UG ELEC. LINE

NG=49.4'

COVER=5'0"

UG ELEC. LINE

NG=45.2'

COVER=1'1"

UG ELEC. LINE

NG=44.9'

COVER=1'2"

UG GAS LINE

NG=45.0'

COVER=1'6"

UG GAS LINE

NG=45.3'

COVER=1'5"

UG ELEC. LINE

NG=45.3'

COVER=1'6"

UG ELEC. LINE

NG=45.0'

COVER=1'1"

UG GAS LINE

NG=44.8'

COVER=1'10"

UG ELEC. LINE

NG=44.6'

COVER=1'0"

UG ELEC. LINE

NG=45.0'

COVER=1'9"

UG GAS LINE

NG=45.0'

COVER=2'1"

UG GAS LINE

NG=45.6'

COVER=1'7"

UG ELEC. LINE

NG=46.0'

COVER=1'6"

UG ELEC. LINE

NG=46.1'

COVER=1'8"

UG ELEC. LINE

NG=46.1'

COVER=2'0"

UG ELEC. LINE

NG=45.8'

COVER=2'0"

UG ELEC. LINE

NG=45.4'

COVER=1'4"

UG ELEC. LINE

NG=45.4'

COVER=1'8"

UG ELEC. LINE

NG=45.6'

COVER=1'10"

UG ELEC. LINE

NG=45.4'

COVER=2'1"

E

C

L

I N

E

N

G

C

O

V

E

R

UG ELEC. LINE

CN=44.3'

COVER=5'8"

E

C

L

I N

E

C

N

C

O

V

E

R

UG ELEC. LINE

NG=45.3'

COVER=1'9"

UG ELEC.

LINE

CN=45.0'

COVER=2'6"

UG ELEC.

LINE

CN=44.9'

COVER=2'7"

UG ELEC.

LINE

NG=44.8'

COVER=6'10"

UG ELEC. LINE

CN=44.0'

COVER=5'2"

UG ELEC. LINE

CN=44.8'

COVER=3'2"

UG ELEC. LINE

CN=43.1'

COVER=1'8"

UG ELEC. LINE

CN=43.1'

COVER=1'8"

UG ELEC. LINE

CN=44.9'

COVER=2'4"

UG GAS LINE

CN=44.2'

COVER=2'7"

UG GAS LINE

CN=44.3'

COVER=3'0"

UG GAS LINE

CN=44.4'

COVER=2'9"

UG GAS LINE

CN=44.3'

COVER=1'9"

N

E

N

G

C

O

V

E

R

UG GAS LINE

NG=45.5'

COVER=3'3"

UG GAS LINE

CN=44.4'

COVER=1'10"

UG GAS LINE

NG=44.5'

COVER=2'2"

UG ELEC. LINE

NG=42.7'

COVER=2'2"

UG ELEC. LINE

NG=42.7'

COVER=2'2"

UG ELEC. LINE

NG=42.7'

COVER=2'9"

UG ELEC. LINE

NG=43.0'

COVER=2'1"

UG ELEC. LINE

CN=43.1'

COVER=2'2"

UG ELEC. LINE

CN=43.1'

COVER=2'1"

UG ELEC. LINE

CN=42.4'

COVER=2'1"

UG ELEC. LINE

NG=42.3'

COVER=2'0"

UG ELEC. LINE

NG=42.7'

COVER=2'2"

UG ELEC. LINE

CN=44.0'

COVER=2'7"

UG ELEC. LINE

CN=44.0'

COVER=2'7"

UG ELEC. LINE

CN=44.3'

COVER=2'8"

UG ELEC. LINE

NG=43.6'

COVER=2'3"

UG ELEC. LINE

NG=43.8'

COVER=2'3"

UG ELEC. LINE

NG=45.4'

COVER=1'8"

UG ELEC. LINE

CN=44.8'

COVER=1'8"

E

C

L

I N

EC

N

C

O

V

E

R

UG ELEC. LINE

CN=44.4'

COVER=3'6"

UG ELEC. LINE

NG=45.1'

COVER=2'5"

UG ELEC. LINE

CN=45.1'

COVER=1'8"

UG ELEC. LINE

CN=45.9'

COVER=2'0"

UG ELEC. LINE

NG=44.6'

COVER=3'9"

UG ELEC. LINE

NG=44.6'

COVER=3'9"

UG ELEC. LINE

NG=44.8'

COVER=2'9"

TANK

SPOIL

PILE

A

C

U

N

I T

S

A

C

U

N

I T

S

PIPE

ASSEMBLY

(TYP.)

TRANSFORMER

ON CONC. PAD

(TYP.)

B

U

S

H

4" GAS

PIPE

2" GAS

PIPE

6" GAS

PIPE

CONDUIT(S)

S

H

E

D

2-STORY

STUCCO BUILDING

E

E

E

E

E

E

E

E

E

T

N

S72°51'06"E 30.00'

C

C

#12737

#12878

#13286

#16173

#16566

#16567

#16628

G

G

M

M

M

M

M

M

M

E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

BUILDING

BUILDING

BUILDING

BUILDING

104A

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LO

C

LO

C

LO

C

LOC

LO

C

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

UG/E

Foresite Group, LLC

1999 Bryan Street

Suite 8890

Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.foresitegroup.net

F

O

AREA OF

WORK

KEY PLAN

N

MARCH 31, 2021 PABFM

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

TBPE Firm No. F-12878

D/B/A Foresite Consulting Group of Texas LLC

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

SHEET NOTES:

1" = 40'

SCALE IN FEET

40 20 40 80

SITE AND PAVING PLAN

MATCH LINE (SHEET C201)

C200

SHEET KEY NOTES:

LEGEND

STANDARD DUTY CONCRETE PAVING

HEAVY DUTY CONCRETE PAVING

CONCRETE SIDEWALK PAVEMENT

PROPOSED FENCE

LIMITS OF CONSTRUCTION

TREE PROTECTION FENCE

NEW 12kV FEEDER DUCT BANK

(SEE ELECTRICAL PLANS FOR DETAILS)

TECHNOLOGY DUCT BANK

FIELD RUN SURVEY LIMITS

LOC

UG/E

GENERAL NOTES:

1) ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC

LAYOUT OF THE PARKING LOT ARE SHOWN AT THE FACE OF CURB.

ALL CURB RADII ARE GIVEN AT THE FACE OF CURB.

2) CONTRACTOR SHALL NOTIFY COR OF ANY DISCREPANCIES

BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE

SURVEY SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY

NEW CONSTRUCTION.

3) CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT

HORIZONTAL AND VERTICAL ALIGNMENT OF ALL TIES BETWEEN

PROPOSED AND EXISTING PAVEMENTS, CURB AND GUTTER,

SIDEWALKS, WALLS, AND UTILITIES.

SITE NOTES:

1) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS

SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR FENCING

PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE.

2) ALL CONSTRUCTION RELATED PERMITS DURING THE

CONSTRUCTION PHASE OF THIS PROJECT ARE THE

RESPONSIBILITY OF THE CONTRACTOR.

3) CONSTRUCTION TRAILERS ARE TO BE PERMITTED THROUGH

THE VA.

4) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION

MEASURES SHALL BE INSTALLED PRIOR TO ANY GRADING.

5) MAXIMUM CUT OR FILL SLOPE=3H:IV

T

BENCHMARKS:

1) TEMPORARY BENCHMARK (TBM) "A":

BEING AN "X" CUT ON TOP OF A CURB LOCATED SOUTHWEST OF

THE CENTERLINE INTERSECTION OF LE CAPTAIN AVE. AND CATE

TERRACE. TO REACH THE BENCHMARK, START FROM THE

CENTERLINE INTERSECTION OF CAMBRIDGE ST. AND CATE

TERRACE. TRAVEL EAST ALONG CATE TERRACE APPROXIMATELY

370 FEET TO THE SIDEWALK RAMP LOCATED SOUTHWEST OF THE

INTERSECTION OF LE CAPTAIN AVE. AND CATE TERRACE.

BENCHMARK IS ALSO LOCATED +/- 13 FEET NORTH EAST OF THE

NORTHEASTERLY CURB PI OF THE PARKING LOT NORTH OF THE

OFFICE OF RESOLUTION MANAGEMENT.

ELEVATION = 42.71' NAVD88, 2001 ADJUSTMENT

2) TEMPORARY BENCHMARK (TBM) "B":

BEING AN "X" CUT ON TOP OF A CURB INLET LOCATED NORTHEAST

OF THE CENTERLINE INTERSECTION OF OLD SPANISH TRAIL AND

CAMBRIDGE ST. TO REACH THE BENCHMARK, START FROM THE

CENTERLINE INTERSECTION OF CAMBRIDGE ST. AND OLD SPANISH

TRAIL. TRAVEL NORTH ALONG CAMBRIDGE ST. APPROXIMATELY 80

FEET TO THE CURB INLET ON THE EAST SIDE OF CAMBRIDGE ST.

BENCHMARK IS LOCATED +/- 13 FEET NORTHWEST OF THE MOST

SOUTHWESTERLY CORNER OF A 6 FOOT TALL WROUGHT-IRON

FENCE.

ELEVATION = 45.60' NAVD88, 2001 ADJUSTMENT

P

A

R

K

I

N

G

S

P

A

C

E

S

CAMBRIDGE COMMONS

FC No. 641035, H.C.M.R.

TERRA SURVEYING

PROJECT No. 1600-9304

CALLED 7.6639 ACRES

TERRA SURVEYING

PROJECT No. 1600-9304

UNITED STATES OF AMERICA

REMAINDER OF

CALLED 118.831 ACRES

VOL. 1297, PG. 87, H.C.D.R.

VOL. 20, PG. 33, H.C.M.R.

MICHAEL E. DeBAKEY

VA MEDICAL CENTER

2002 HOLCOMBE BLVD.

HOUSTON, TX 77030

UNITED STATES OF AMERICA

CALLED 0.078 ACRE

VOL. 1381, PG. 17, H.C.D.R.

DEVONSHIRE PLACE

VOL. 7, PG. 38, H.C.M.R.

DEVONSHIRE PLACE

VOL. 7, PG. 38,

H.C.M.R.

DEVONSHIRE PLACE

VOL. 7, PG. 38,

H.C.M.R.

O

F

F

I

R

E

S

O

L

U

T

I O

N

M

A

N

A

G

E

M

E

N

T

M

U

L

T

I

S

T

O

R

Y

S

T

U

C

I L

D

I N

G

1-STORY

STUCCO BUILDING

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

C

E

N

T

E

R

P

O

I

E

R

G

Y

E

L

E

C

T

R

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

D.W.C. HARRIS SURVEY, A-325

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG/E

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

T

T T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

R

K

I N

G

S

P

A

C

E

S

GA

S

GA

S

GA

S

GA

S

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GA

S

GAS

GAS

W

W

W

W

W

W

W

W

W

W

C

I

U

S

T

O

N

R

O

W

E

A

S

E

M

E

N

T

C

A

L

L

R

E

S

H

C

C

F

N o

Y

E

E

C A

M B

R

ID

G E

S T

R E

E T

R .O

.W . W

ID

T

H V

A R

IE

S

CANTERBURYSTREET60' R.O.W.

LAUDERDALE STREET

60' R.O.W.

WOODBURY BLVD.

70' R.O.W.

R

IN

G N

E

SS

A V

E

PR

IV

A T

E R

O A

D

MIXON AVE.

PRIVATE ROAD

14" OAK

18" OAK

12" OAK

6" OAK

6" OAK

N

E

30" OAK

24" OAK

8" OAK

8" OAK

14" PINE

12" PINE

10" OAK

12" OAK

6" OAK

8" OAK

8" OAK

8" OAK

16" OAK

12" OAK

12" OAK

8" CRM

20" OAK

12" TREE

12" OAK

10" OAK

16" OAK

36" OAK

36" OAK

20"

OAK

6" OAK

22" OAK

18" OAK

18" OAK

18" OAK

18" CRM

18" CRM

18" CRM

18" CRM

18" CRM

18" CRM

18" CRM

12" CRM

12" CRM

16" OAK

16" OAK

20" OAK

18" OAK

18" CRM

18" CRM

24" OAK

18" CRM

18" CRM

16" OAK

12" OAK

18" OAK

14" OAK

12" OAK

16" OAK

16" OAK

18" OAK

PO

W

PO

W

#12309

#10285

#10426

#10671

#10693

#12087

#12165

#12395

#12570

#16352

#10335

2"PVC

FL=41.93

#11588

#12623

#12624

#15313

#16080

#21001

#21059 #10765

4"PVC

FL=43.14

1' PIPE1' PIPE

NG=42.9'

COVER=1'2"

UG ELEC. LINE

NG=41.0'

COVER=2'3"

UG ELEC. LINE

NG=43.0'

COVER=0'8"

UG ELEC. LINE

NG=44.0'

COVER=1'8"

UG ELEC. LINE

CN=43.3'

COVER=1'4"

COVER=2'4"

UG ELEC. LINE

NG=43.6'

COVER=1'9"

UG ELEC. LINE

CN=43.0'

COVER=2'1"

COVER=1'4"

UG ELEC. LINE

CN=44.2'

COVER=6'1"

UG ELEC. LINE

CN=44.7'

COVER=6'0"

UG ELEC. LINE

CN=42.3'

COVER=1'7"

UG ELEC. LINE

NG=42.6'

COVER=2'4"

UG ELEC. LINE

CN=43.3'

COVER=1'6"

UG ELEC. LINE

CN=42.3'

COVER=6'1"

UG ELEC. LINE

NG=44.0'

COVER=1'10"

UG ELEC. LINE

NG=44.6'

COVER=1'9"

UG GAS LINE

NG=44.8'

COVER=2'4"

UG GAS LINE

NG=44.3'

COVER=2'3"

UG ELEC. LINE

CN=43.7'

COVER=1'5"

UG ELEC. LINE

NG=44.4'

COVER=1'8"

UG ELEC. LINE

NG=45.3'

COVER=5'0"

UG ELEC. LINE

NG=44.9'

COVER=1'7"

UG ELEC. LINE

CN=43.9'

COVER=1'8"

UG ELEC. LINE

NG=44.7'

COVER=1'4"

UG ELEC. LINE

CN=44.5'

COVER=3'0"

UG ELEC. LINE

NG=44.3'

COVER=2'2"

UG ELEC. LINE

NG=44.8'

COVER=3'7"

UG ELEC. LINE

NG=45.1'

COVER=1'5"

UG ELEC. LINE

NG=44.5'

COVER=1'5"

UG ELEC. LINE

NG=46.3'

COVER=4'6"

UG ELEC. LINE

NG=46.8'

COVER=4'4"

UG ELEC. LINE

CN=47.6'

COVER=3'8"

UG ELEC. LINE

NG=48.3'

COVER=3'8"

UG ELEC. LINE

NG=44.8'

COVER=1'3"

UG GAS LINE

NG=44.3'

COVER=2'3"

UG ELEC. LINE

NG=44.6'

COVER=1'8"

UG ELEC. LINE

NG=44.7'

COVER=1'10"

UG ELEC. LINE

NG=44.8'

COVER=0'10"

UG GAS LINE

NG=44.8'

COVER=2'1"

UG ELEC. LINE

NG=44.4'

COVER=1'11"

UG ELEC. LINE

NG=45.1'

COVER=1'4"

UG GAS LINE

NG=45.1'

COVER=1'1"

UG ELEC. LINE

CN=45.1'

COVER=1'7"

UG ELEC. LINE

NG=45.2'

COVER=1'10"

UG ELEC. LINE

CN=42.8'

COVER=1'8"

UG ELEC. LINE

NG=42.9'

COVER=2'3"

UG ELEC. LINE

NG=42.8'

COVER=1'3"

UG ELEC. LINE

NG=40.5'

COVER=2'3"

UG ELEC. LINE

NG=44.1'

COVER=3'4"

UG ELEC. LINE

NG=44.8'

COVER=3'6"

UG ELEC. LINE

CN=44.2'

COVER=2'5"

UG ELEC. LINE

CN=44.4'

COVER=2'2"

UG ELEC. LINE

CN=44.4'

COVER=1'7"

UG ELEC. LINE

NG=44.3'

COVER=1'10"

UG ELEC. LINE

CN=44.5'

COVER=2'0"

UG ELEC. LINE

CN=44.2'

COVER=1'9"

UG ELEC. LINE

CN=43.8'

COVER=1'9"

UG ELEC. LINE

NG=45.5'

COVER=2'9"

UG ELEC. LINE

NG=45.5'

COVER=5'0"

UG GAS LINE

NG=45.4'

COVER=3'6"

UG ELEC. LINE

CN=43.1'

COVER=1'7"

E

C

L

I N

E

C

N

C

O

V

E

R

N

E

N

G

C

O

V

E

R

UG ELEC. LINE

CN=43.9'

COVER=5'0"

S

L

I N

E

C

N

C

O

V

E

R

UG ELEC. LINE

NG=44.6'

COVER=3'6"

UG GAS LINE

NG=45.1'

COVER=2'2"

UG GAS LINE

NG=44.5'

COVER=2'1"

UG GAS LINE

NG=45.3'

COVER=2'3"

UG GAS LINE

NG=45.3'

COVER=2'6"

UG GAS LINE

NG=45.0'

COVER=1'10"

UG GAS LINE

NG=45.1'

COVER=2'9"

UG ELEC. LINE

NG=44.5'

COVER=1'5"

UG GAS LINE

NG=45.1'

UG ELEC. LINE

NG=42.5'

COVER=2'6"

UG ELEC. LINE

CN=42.1'

COVER=2'5"

UG ELEC. LINE

NG=45.4'

COVER=3'0"

UG ELEC. LINE

NG=45.2'

COVER=1'8"

UG ELEC. LINE

NG=45.3'

COVER=1'8"

UG ELEC. LINE

NG=47.7'

COVER=4'0"

UG ELEC. LINE

CN=47.5'

COVER=5'4"

UG ELEC. LINE

CN=47.8'

COVER=4'9"

UG ELEC. LINE

NG=48.6'

COVER=5'6"

UG ELEC. LINE

NG=49.1'

A/C

PIPE

RACK

OHPOHP

C

O

N

C

H

E

A

D

W

A

L

L

W

H

A

N

D

R

A

I L

C

O

N

C

H

E

A

D

W

A

L

L

W

H

A

N

D

R

A

I L

B

U

S

H

PLANTER

BUSH

BENCH (TYP.)

GAZEBO

R

K

I N

G

S

P

A

C

E

S

D

I T

C

H

E

L

E

C

P

A

N

E

L

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

T

T

T

T

T

T

FF=48.86'

F

F

N

C

C

#11588

#12623

#12624

#15313

#16080

#21001

#21059

CO

#10765

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG GAS LINE

NG=44.9'

COVER=1'7"

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

S

R

K

I N

G

S

P

A

C

E

R

K

I N

G

S

P

A

C

E

S

MH 109

MH 108

MH 113

MH 107

UG GAS LINE

NG=45.0'

COVER=2'1"

GAZEBO

EX MH 105

UG/E

UG/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG

/E

UG/E

UG ELEC. LINE

NG=44.9'

COVER=3'0"

UG

/E

BUILDING 109

BUILDING

BUILDING

T T

T T

T T

T T

T T

T

T

TUG/E

T

T

T

COM MH-107

EX-MH-106

FISHER

BUILDING #1

BUILDING 108

UG/E

UG/E

GASGAS

GAS

GAS

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C LOC

LOC LOC

LO

C

LO

C

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LO

C

LOC

T T

LO

C

LOC

LOC

LOC

LO

C

LO

C

LO

C

SHEET KEY NOTES:

Foresite Group, LLC

1999 Bryan Street

Suite 8890

Dallas, TX 75201 o | 214.939.7123 f | 888.765.8135 w | www.foresitegroup.net

F

O

AREA OF

WORK

KEY PLAN

N

MARCH 31, 2021 PABFM

INSTALL NEW 12KV

UNDERGROUND

DISTRIBUTION FEEDER

580-18-113

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD,

HOUSTON, TX 77030

19-259

100% CONSTRUCTION DOCUMENTS

TBPE Firm No. F-12878

D/B/A Foresite Consulting Group of Texas LLC

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects

SHEET NOTES:

MATCH LINE (SHEET C200)

SITE AND PAVING PLAN

C201

1" = 40'

SCALE IN FEET

40 20 40 80

MATCH LINE (SHEET C202)

LEGEND

STANDARD DUTY CONCRETE PAVING

HEAVY DUTY CONCRETE PAVING

CONCRETE SIDEWALK PAVEMENT

PROPOSED FENCE

LIMITS OF CONSTRUCTION

NEW 12kV FEEDER DUCT BANK

(SEE ELECTRICAL PLANS FOR DETAILS)

TECHNOLOGY DUCT BANK

FIELD RUN SURVEY LIMITS

LOC

UG/E

T

BENCHMARKS:

1) TEMPORARY BENCHMARK (TBM) "A":

BEING AN "X" CUT ON TOP OF A CURB LOCATED SOUTHWEST OF

THE CENTERLINE INTERSECTION OF LE CAPTAIN AVE. AND CATE

TERRACE. TO REACH THE BENCHMARK, START FROM THE

CENTERLINE INTERSECTION OF CAMBRIDGE ST. AND CATE

TERRACE. TRAVEL EAST ALONG CATE TERRACE APPROXIMATELY

370 FEET TO THE SIDEWALK RAMP LOCATED SOUTHWEST OF THE

INTERSECTION OF LE CAPTAIN AVE. AND CATE TERRACE.

BENCHMARK IS ALSO LOCATED +/- 13 FEET NORTH EAST OF THE

NORTHEASTERLY CURB PI OF THE PARKING LOT NORTH OF THE

OFFICE OF RESOLUTION MANAGEMENT.

ELEVATION = 42.71' NAVD88, 2001 ADJUSTMENT

2) TEMPORARY BENCHMARK (TBM) "B":

BEING AN "X" CUT ON TOP OF A CURB INLET LOCATED NORTHEAST

OF THE CENTERLINE INTERSECTION OF OLD SPANISH TRAIL AND

CAMBRIDGE ST. TO REACH THE BENCHMARK, START FROM THE

CENTERLINE INTERSECTION OF CAMBRIDGE ST. AND OLD SPANISH

TRAIL. TRAVEL NORTH ALONG CAMBRIDGE ST. APPROXIMATELY 80

FEET TO THE CURB INLET ON THE EAST SIDE OF CAMBRIDGE ST.

BENCHMARK IS LOCATED +/- 13 FEET NORTHWEST OF THE MOST

SOUTHWESTERLY CORNER OF A 6 FOOT TALL WROUGHT-IRON

FENCE.

ELEVATION = 45.60' NAVD88, 2001 ADJUSTMENT

GENERAL NOTES:

1) ALL PROPOSED DIMENSIONS USED TO SHOW THE GEOMETRIC

LAYOUT OF THE PARKING LOT ARE SHOWN AT THE FACE OF CURB.

ALL CURB RADII ARE GIVEN AT THE FACE OF CURB.

2) CONTRACTOR SHALL NOTIFY COR OF ANY DISCREPANCIES

BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE

SURVEY SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY

NEW CONSTRUCTION.

3) CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT

HORIZONTAL AND VERTICAL ALIGNMENT OF ALL TIES BETWEEN

PROPOSED AND EXISTING…