36C25618B0674-005.pdf
PDF 523 KB Posted
- Attached to
- Project No. 586-16-102 "Upgrade Chiller Plant"
- Solicitation number
- 36C25618B0674
About this file
36C25618B0674 Attch 4 Revised drawing M0201 - HVAC DUCTWORK AND PIPING PLAN - GROUND FLOOR.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618C0128-000.docx | DOCX document | |
| 36C25618B0674-0006000.docx | DOCX document | |
| 36C25618B0674-0005000.docx | DOCX document | |
| 36C25618B0674-0005001.pdf | ||
| 36C25618B0674-0004000.docx | DOCX document | |
| 36C25618B0674-0004001.pdf | ||
| 36C25618B0674-0003009.docx | DOCX document | |
| 36C25618B0674-0003003.pdf | ||
| 36C25618B0674-0003001.docx | DOCX document | |
| 36C25618B0674-0003007.pdf | ||
| 36C25618B0674-0003000.docx | DOCX document | |
| 36C25618B0674-0003006.pdf | ||
| 36C25618B0674-0003005.pdf | ||
| 36C25618B0674-0003002.pdf | ||
| 36C25618B0674-0003008.pdf | ||
| 36C25618B0674-0003004.jpg | JPG image | |
| 36C25618B0674-0002000.docx | DOCX document | |
| 36C25618B0674-0001000.docx | DOCX document | |
| 36C25618B0674-0001002.pdf | ||
| 36C25618B0674-0001001.pdf | ||
| 36C25618B0674-001.docx | DOCX document | |
| 36C25618B0674-002.pdf | ||
| 36C25618B0674-003.pdf | ||
| 36C25618B0674-006.pdf | ||
| 36C25618B0674-004.pdf | ||
| 36C25618B0674-000.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
CONDENSER WATER
HEADERS TO
COOLING TOWERS
CH-1
CH-2
CH-3
CH-4
CH-6
(FUTURE)
C H
W P
-1
C H
W P
-2
C H
W P
-6 (F
U T
U R
E
C H
W P
-5 (F
U T
U R
E
C H
W P
-4
VFD VFDVFD
CH-5
(FUTURE)
C H
W P
-3
VFD
M0301
M0301
M0201
M0301
24" CWR
C H
W S
C H
W R
C W
R
C W
S
C H
W S 1
C H
W R
C W
R
C W
S
24" CWS
24" CHWS
12" CHWR
C W
S
C W
R
C H
W R
C H
W S
C W
S
C W
R
C H
W S
C H
W R
8" CHWS/R TO BUILDING
(EXISTING)
AS-1
AS-2
C H
W R
FCU-2
ET-1
4 4
M0201
C H
W R
14" CHWS
12" CHWS
16" CWS20" CWS
20" CHWS
24" CWS
16" CWR 12" CWR
16" CHWR 20" CHWR
14" CHWR
C W
S
C H
W S
24" CHWR
20" CHWR
8"
8"
REFRIGERANT
LEAK
DETECTION
PANEL
WITH
HORN
AND
STROBE
1"
24" CHWR
14" CHWS
8" CHWS
x
E
A
20" CWR
3 3
3 3
M0201
VFD
(FUTURE)
VFD
(FUTURE)
400-15 12X12
500-15 12X12
500-15 12X12
400-15 12X12
18x16
FCU-1
x
(TYP 2)
(TYP 2)
1 1/2" CHWS
1 1/2" CHWR
500-15 12X12
400-15 12X12
/2
C H
W S
/2
C H
W R
10 10
20" CHWS
Level 1
ROOF
BOTTOM OF
STRUCTURE
20" CHWS
FUTURE CHILLED
WATER CONNECTION
POINT. PROVIDE
WITH BUTTERFLY
ISOLATION VALVE
AND BLANK OFF
PLATE (TYP)
14" CHWS/R TO
BUILDING (EXISTING)
Level 1
ROOF
24" CHWR
20" CHWR 16" CHWR 12" CHWR
V F
D -C
H W
P -3
V F
D -C
H W
P -4
V F
D (F
U T
U R
E
V F
D (F
U T
U R
E
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
C H
W R
CHWP-1 CHWP-2 CHWP-3 CHWP-4
CHWP-5
(FUTURE)
CHWP-6
(FUTURE)
V F
D -C
H W
P -1
V F
D -C
H W
P -2
Level 1
ROOF
24" CWS
24" CWR
12" CWR
12" CWS
(TYP 2)
(TYP 2)
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.62
© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation
SEPT 13, 2017
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA CHILLER PLANT
586-16-102
ADDENDUM 01 04/11/2018
HVAC DUCTWORK AND PIPING PLAN -
GROUND FLOOR
M0201
MEM ARO
1/4" = 1'-0"
CHILLER PLANT PIPING & DUCTWORK PLAN
KEYED NOTES:
1. 24"x24" EA UP TO EF-1 ON ROOF ABOVE.
2. FUTURE PIPING SHOWN WITH DASHED LINES.
3. PROVIDE BLIND FLANGE DOWNSTREAM OF VALVE FOR FUTURE
CONNECTION.
4. PROVIDE SPARE TEE, ISOLATION VALVE AND BLIND FLANGE FOR
FUTURE CONNECTION.
5. 2" RELIEF VENT UP THROUGH ROOF (TYP EACH CHILLER). COMPLY
WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.
6. 1" RELIEF VENT UP THROUGH ROOF (TYP EACH CHILLER). COMPLY
WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.
7. MOUNT 24"x24" GRILLE 18" AFF.
8. TEMPORARY CHILLED WATER PIPING CONNECTION TO REMAIN.
PROVIDE WITH BLIND FLANGE DOWNSTREAM OF ISOLATION
VALVE AFTER COMPLETION OF NEW WORK.
9. PROVIDE 1" COPPER CONDENSATE PIPING FROM FAN COIL UNIT
TO NEAREST FLOOR DRAIN. ALL CONDENSATE DRAIN PIPING
SHALL BE INSULATED WITH MINIMUM 1/2" FOIL FACED FIBERGLASS
INSULATION INSTALLED WITH PVC JACKET.
10. INSTALL DRAIN PAN UNDER CHWS PIPING INSTALLED ABOVE
ELECTRICAL SWITCHGEAR IN AREA SHOWN.
1/4" = 1'-0"
FUTURE CONNECTION SECTION VIEW
1/4" = 1'-0"
PUMP SECTION VIEW
24" CWR BELOW
1/4" = 1'-0"
CONDENSER WATER CONNECTION
| Sheets |
| M0101 - HVAC EQUIPMENT PLAN AND SCHEDULES |
| M0201 - HVAC DUCTWORK AND PIPING PLAN - GROUND FLOOR |
File details come from the government source that posted it.