Project No. 586-16-102 "Upgrade Chiller Plant"
Solicitation number
36C25618B0674
Issued by

About this file

36C25618B0674 Attch 2 Revised Drawing EP0101 - POWER PLAN.pdf

View the file

Other files

File Type Posted
36C25618C0128-000.docx DOCX document
36C25618B0674-0006000.docx DOCX document
36C25618B0674-0005000.docx DOCX document
36C25618B0674-0005001.pdf PDF
36C25618B0674-0004000.docx DOCX document
36C25618B0674-0004001.pdf PDF
36C25618B0674-0003009.docx DOCX document
36C25618B0674-0003003.pdf PDF
36C25618B0674-0003001.docx DOCX document
36C25618B0674-0003007.pdf PDF
36C25618B0674-0003000.docx DOCX document
36C25618B0674-0003006.pdf PDF
36C25618B0674-0003005.pdf PDF
36C25618B0674-0003002.pdf PDF
36C25618B0674-0003008.pdf PDF
36C25618B0674-0003004.jpg JPG image
36C25618B0674-0002000.docx DOCX document
36C25618B0674-0001000.docx DOCX document
36C25618B0674-0001002.pdf PDF
36C25618B0674-0001001.pdf PDF
36C25618B0674-001.docx DOCX document
36C25618B0674-005.pdf PDF
36C25618B0674-002.pdf PDF
36C25618B0674-006.pdf PDF
36C25618B0674-004.pdf PDF
36C25618B0674-000.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A T

O M ain

1-1 T

IE

2-1

M A

IN

N1-2N2-2 MAIN MAIN

G R

O U

N D

N2-2 N1-2

J J

J

CH1DPNH1CH1DPNH2

CH1LNH1

CH1T1

CH1LNL1

CH1SWBDN1CH1SWBDN2

CH-1 CH-2

CH-6

FUTURE

CH-4CH-3

CH-5

FUTURE

CHWP-1 CHWP-2 CHWP-3 CHWP-4

CHWP-5

FUTURE

CHWP-6

FUTURE

EX

TRANSFORMER 2

E X

S P

E C

T R

A S

E R

IE

S

S W

IT

C

H B

O A

R D

CT XFMR

CT DISCONNECT

LIGHTING

CONTROL

PANEL

CHR1

CHILLED WATER PUMP

VFD LOCATIONS

CT

CTL

FCU-1

EF-1

SUMP

PUMP

SEWAGE

PUMP

SUMP

PUMP

2 SEWAGE

PUMP

JOCKY

PUMP FIRE

PUMP

FCU-2

R&E SEC. WATER PUMP

P1&P2

AIR

COMPRESSOR

AIR

DRYER

5 7

REFRIGERANT LEAK

DETECTION PANEL BAS PANEL

LIGHTING CONTROL

PANEL

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102

ADDENDUM 01 04/11/2018

POWER PLAN

EP0101

TZ JMS

1. EXTEND BRANCH CIRCUITS IN THIS AREA TO THE FOLLOWING BRANCH PANELBOARDS, UNLESS OTHERWISE NOTED:

120 / 208V PANELBOARDS

CH1LNL1 - NORMAL POWER

277 / 480V PANELBOARDS

CH1LNH1 - NORMAL POWER

2. REFER TO EQUIPMENT CONNECTION / MOTOR CONTROLLER SCHEDULE FOR ALL OTHER LOADS.

BRANCH CIRCUIT NOTES :

1/4" = 1'-0"

POWER PLAN

1 2

A. CONDUIT ROUTING SHOWN AS ACCURATELY AS POSSIBLE FINAL COORDINATION SHALL BE DONE IN FIELD.

B. ALL NEW RECEPTACLES IN THE CHILLER PLANT SHALL BE GFCI.

GENERAL NOTES:

1. INTERCEPT EXISTING PULLBOX AT EXTERIOR AND UTILIZE EXISTING UNDERGROUND PATHWAY TO THE COOLING

TOWER PANELS.

2. THIS EXISTING PULL BOX WILL BE UTILIZED TO SPLICE THE NEW FEEDER FROM CH1SWBDN2 TO THE EXISTING FEEDER

THAT GOES OUT TO THE COOLING TOWER ELECTRICAL ROOM.

3. INSTALL NEW GROUND BAR AND TIE IT INTO THE THE EXISTING GROUNDING ELECTRODE SYSTEM REFER TO DETAILS

1/EP0302.

4. EXAUST FAN AND SERVICE RECEPTACLE ARE LOCATED ON THE ROOF.

5. EXACT LOCATION OF THE PUMP SHALL BE FIELD VERIFIED.

6. THE WALL SHALL BE CUT AND ROXTEC SEALS SHALL BE ADDED TO THE OPENING REFER TO DETAIL 5/EP0302 FOR

MORE INFORMATION.

7. SWITCHGREAR SHALL BE GE SPECTRA SERIES TO MEET THE WORKING SPACE AND DEDICATED SPACE CLEARENCES.

KEYED NOTES :

Sheets
EP0101 - POWER PLAN

File details come from the government source that posted it.