36C25618B0674-004.pdf

PDF 496 KB Posted

Attached to
Project No. 586-16-102 "Upgrade Chiller Plant"
Solicitation number
36C25618B0674
Issued by

About this file

36C25618B0674 Attch 3 Revised Drawing M0101 - HVAC EQUIPMENT PLAN AND SCHEDULES.pdf

View the file

Other files

File Type Posted
36C25618C0128-000.docx DOCX document
36C25618B0674-0006000.docx DOCX document
36C25618B0674-0005000.docx DOCX document
36C25618B0674-0005001.pdf PDF
36C25618B0674-0004000.docx DOCX document
36C25618B0674-0004001.pdf PDF
36C25618B0674-0003009.docx DOCX document
36C25618B0674-0003003.pdf PDF
36C25618B0674-0003001.docx DOCX document
36C25618B0674-0003007.pdf PDF
36C25618B0674-0003000.docx DOCX document
36C25618B0674-0003006.pdf PDF
36C25618B0674-0003005.pdf PDF
36C25618B0674-0003002.pdf PDF
36C25618B0674-0003008.pdf PDF
36C25618B0674-0003004.jpg JPG image
36C25618B0674-0002000.docx DOCX document
36C25618B0674-0001000.docx DOCX document
36C25618B0674-0001002.pdf PDF
36C25618B0674-0001001.pdf PDF
36C25618B0674-001.docx DOCX document
36C25618B0674-005.pdf PDF
36C25618B0674-002.pdf PDF
36C25618B0674-003.pdf PDF
36C25618B0674-006.pdf PDF
36C25618B0674-000.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING ROLL

UP DOOR TO

OUTSIDE

EXISTING STAIRS

EXISTING FIRE PUMP TO REMAIN & ELECTRICAL EQUIPMENT

EXISTING STEAM

SYSTEM

TO REMAIN

MAINTENANCE

AISLE, KEEP CLEAR

9'-6" AFF

CH-1 CH-2

CH-3 CH-4

CH-6

(FUTURE)

CHWP-1 CHWP-2

CHWP-6

(FUTURE)

CHWP-5

(FUTURE)CHWP-4

VFD

VFD

(FUTURE)

VFD

(FUTURE)

VFDVFD

CH-5

(FUTURE)

CHWP-3

VFD

FCU-2

ET-1

REFRIGERANT

LEAK

DETECTION

PANEL

WITH

HORN

AND

STROBE

EXISTING VENTILATION

AIR INTAKE LOUVER. BLANK

OFF ENTIRE LOUVER.

EXISTING RELIEF

AIR LOUVER. PROVIDE 36"x36" MOTOR

OPERATED ISOLATION DAMPER (RUSKIN CD60

WITH LOW LEAKAGE BLADE SEALS OR EQUAL)

ON INTERIOR FACE OF LOUVER. BLANK OFF

UNUSED PORTION OF LOUVER.

4'-0"

FCU-1

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102

ADDENDUM 01 04/11/2018

HVAC EQUIPMENT PLAN AND

SCHEDULES

M0101

MEM ARO

KEYED NOTES:

1. REQUIRED EQUIPMENT MAINTENANCE ACCESS

SPACE SHOWN WITH DASHED LINES. THESE

CLEARANCES SHALL BE MAINTAINED.

2. LOCATE REFRIGERANT MONITOR STROBE ABOVE

DOOR OUTSIDE OF CHILLER PLANT.

1/4" = 1'-0"

CHILLER PLANT EQUIPMENT PLAN

WATER-COOLED LIQUID CHILLER SCHEDULE

UNIT

NO.

TYPE

CAPACITY

(TONS)

REFRIGERANT NPLV

EVAPORATOR CONDENSER ELECTRICAL

EMERGENCY

POWER

MAX. UNIT

DIMENSIONS

(LxWxH)

MAX.

OPERATING

WEIGHT (LBS)

BASIS OF DESIGN

REMARKSFLUID

TYPE

MIN/MAX

GPM

EWT (ºF) LWT (ºF)

MAX PRESS.

DROP (FT)

WATER

PASSES

FOULING

FACTOR

MAX GPM EWT (ºF) LWT (ºF)

MAX PRESS.

DROP (FT)

WATER

PASSES

FOULING

FACTOR

MAX POWER

INPUT (KW)

MCA FLA MOPD V/PH/HZ VSD MANUFACTURER MODEL

CH-1 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

CH-2 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

CH-3 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

CH-4 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

PUMP SCHEDULE

UNIT NO. SYSTEM TYPE

FLUID

TYPE

CAPACITY

(GPM)

IMPELLER

SIZE (IN)

HEAD

(FT)

EFFICIENCY

SUCTION (IN)

DISCHARGE

(IN)

MOTOR EMERGENCY

POWER

BASIS OF DESIGN

REMARKS

BHP HP RPM VSD V/PH/HZ MANUFACTURER MODEL

CHWP-1 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

CHWP-2 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

CHWP-3 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

CHWP-4 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

FAN SCHEDULE

MARK TYPE CFM

SP (IN.

WC)

FAN

RPM DRIVE

MOTOR EMERGENCY

POWER WEIGHT

BASIS OF DESIGN

REMARKSBHP HP RPM VSD V/PH/HZ MANUFACTURER MODEL

EF-1 CENTRIFUGAL 2250/4500 0.5 962 DIRECT 1.1 1.5 1725 NO 460/3/60 NO 129 GREENHECK CUBE-200-15 1, 2, 3, 4

TWO-PIPE FAN COIL UNIT SCHEDULE

MARK CONFIG.

AIRFLOW

(CFM)

ESP (IN WG)

CHILLED WATER COOILING COIL ELECTRICAL

EMERGENCY

POWER

FILTER BASIS OF DESIGN

REMARKSCAPACITY

(MBH)

MIN

ROWS

EAT (°F

DB/WB)

LAT (°F

DB/WB)

GPM EWT (°F) LWT (°F)

COOLING

COIL WPD (FT)

BHP HP FAN V/PH/HZ MERV

MANUFACTUR

ER

MODEL

FCU-1 HORIZONTAL 1800 0..5 56 4 78/65 55/54 11.2 43 53 3.6 0.6 1 460/3/60 NO 8 TRANE BCHD054G1**A3M04Z000000 1

FCU-2 HORIZONTAL 1800 0..5 56 4 78/65 55/54 11.2 43 53 3.6 0.6 1 460/3/60 NO 8 TRANE BCHD054G1**A3M04Z000000 1

EXPANSION TANK SCHEDULE

MARK TYPE FLUID TYPE

VOLUME

(GAL) ACCEPTANCE (GAL) PRE-CHARGE (PSI)

SIZE DIA x

LENGTH (IN x IN) MOUNTING

BASIS OF DESIGN

REMARKSMANUFACTURER MODEL

ET-1 DIAPHRAGM WATER 70 56.5 37.7 24"x46" FLOOR MOUNTED ARMSTRONG AX-120V 1

AIR SEPARATOR SCHEDULE

MARK SIZE (DIA. X LENGTH) GPM

BASIS OF DESIGN

REMARKS

MANUFACTURER MODEL

AS-1 32"x110" 3000 Spirotherm VDT1600 FA

AS-2 28"x98" 2500 Spirotherm VDT1400 FA

REMARKS:

1. PROVIDE WITH FULLY UNLOCKED CHILLER CONTROLLER.

2. PROVIDE WITH UNIT - MOUNTED VFD.

REMARKS:

1. PROVIDE WITH TEFC, PREMIUM EFFICIENCY MOTOR.

2. PROVIDE WITH SHAFT GROUND RINGS.

3. PROVIDE VFD WITH BYPASS AND IEEE 519 LINE REACTOR.

4. PROVIDE WITH YASKAWA VSD.

REMARKS:

1. PROVIDE WITH SIGHT GLASS.

REMARKS:

1. PROVIDE WITH 120V CONDENSATE PUMP

REMARKS

1. PROVIDE WITH PREMIUM EFFICIENCY MOTOR

2. PROVIDE WITH ROOF CURB.

3. PROVIDE WITH INTEGRAL STARTER & DISCONNECT.

4. PROVIDE 2 SPEED FAN WITH AIRFLOWS AS SCHEDULED.

Sheets
M0101 - HVAC EQUIPMENT PLAN AND SCHEDULES
M0201 - HVAC DUCTWORK AND PIPING PLAN - GROUND FLOOR

File details come from the government source that posted it.