Project No. 586-16-102 "Upgrade Chiller Plant"
Solicitation number
36C25618B0674
Issued by

About this file

36C25618B0674 0003 A0003 Attch 2 Contract Dwgs.pdf

View the file

Other files

File Type Posted
36C25618C0128-000.docx DOCX document
36C25618B0674-0006000.docx DOCX document
36C25618B0674-0005000.docx DOCX document
36C25618B0674-0005001.pdf PDF
36C25618B0674-0004000.docx DOCX document
36C25618B0674-0004001.pdf PDF
36C25618B0674-0003009.docx DOCX document
36C25618B0674-0003001.docx DOCX document
36C25618B0674-0003007.pdf PDF
36C25618B0674-0003000.docx DOCX document
36C25618B0674-0003006.pdf PDF
36C25618B0674-0003005.pdf PDF
36C25618B0674-0003002.pdf PDF
36C25618B0674-0003008.pdf PDF
36C25618B0674-0003004.jpg JPG image
36C25618B0674-0002000.docx DOCX document
36C25618B0674-0001000.docx DOCX document
36C25618B0674-0001002.pdf PDF
36C25618B0674-0001001.pdf PDF
36C25618B0674-001.docx DOCX document
36C25618B0674-005.pdf PDF
36C25618B0674-002.pdf PDF
36C25618B0674-003.pdf PDF
36C25618B0674-006.pdf PDF
36C25618B0674-004.pdf PDF
36C25618B0674-000.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

C a n n o n

D e s ig n

A ll ri g h ts r e s e rv e d N o p a rt o f th is d o c u m e n t m a y b e r e p ro d u c e d o r u ti liz e d i n a n y f o rm w it h o u t p ri o r w ri tt e n a u th o ri z a ti o n b y T h e C a n n o n C o rp o ra ti o n

Consultants:

BOSTON NEW YORK BALTIMORE WASHINGTON DC BUFFALO TORONTO MONTREAL PITTSBURGH

CHICAGO ST. LOUIS VANCOUVER SAN FRANCISCO LOS ANGELES PHOENIX MUMBAI ABU DHABI

/1

/2

:5

:1

P

M

Chiller Plant Upgrade Jackson, MS VA Medical Center

CannonDesign Project Number: 003640.62 Project Status: 100% SUBMISSION Issue Date: SEPTEMBER 13, 2017

U.S. Department of Veteran Affairs

VA PROJECT NO: 586-16-102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102DRAWING INDEX

G0001 Checker Author

DRAWING INDEX

SHEET NUMBER SHEET NAME R

E

V

IS

IO

N

GENERAL

G0000 COVER SHEET

G0001 DRAWING INDEX

ARCHITECTURAL

A0001 SYMBOLS & ABBREVIATIONS

A0101 FLOOR PLAN AND DETAILS

10 DEMOLITION

D0601 HVAC DEMOLITION PLAN

ED0101 ELECTRICAL DEMOLITION PLAN

70 MECHANICAL

M0001 LEGENDS, SYMBOLS, & GENERAL NOTES

M0101 HVAC EQUIPMENT PLAN AND SCHEDULES

M0201 HVAC DUCTWORK AND PIPING PLAN - GROUND FLOOR

M0202 HVAC DUCTWORK AND PIPING PLAN - ROOF

M0301 ENLARGED PLANS AND SECTIONS

M0601 CHILLED WATER SYSTEM FLOW AND CONTROL DIAGRAM

M0603 CHILLED WATER SYSTEM SEQUENCE OF OPERATIONS

M0701 DETAILS AND CONTROL DIAGRAMS

80 ELECTRICAL

E0001 NOTES, LEGENDS, SYMBOLS AND ABBREVIATIONS

E0050 ELECTRICAL SITE PLAN

EL0101 LIGHTING PLAN

EP0101 POWER PLAN

EP0201 ONE LINE DIAGRAMS

EP0301 SCHEDULES

EP0302 DETAILS

FA0101 FIRE ALARM PLAN

C

D

PARTITION PARTITION TYPE

INTERIOR DOOR

ASSEMBLY

SUFFIX ADDED IF

MULTIPLE DOORS

SERVE SAME ROOM

EXTERIOR

GLAZED

OPENINGS

LOUVER

ROOM NAME

AND NUMBER 1125

ROOM NAME

ROOM NUMBER

SHEET NOTE

DEMOLITION

CONSTRUCTION

KEYNOTE

SPECIFICATION

SECTION

SPECIFIED ITEM

1125A

OFFICE

EXTERIOR DOOR

ASSEMBLY

BORROWED

LIGHT

ROOM NUMBER

EQUIPMENT

EQUIPMENT IDENTIFIER

ROOM NUMBER

SERVED BY DOOR

NUMBERED

SEQUENTIALLY

DENOTES

EXTERIOR DOOR

SUFFIX ADDED IF

MULTIPLE OPENINGS

SERVE SAME ROOM

NUMBERED

SEQUENTIALLY

DENOTES

EXTERIOR OPENING

042000 - UNIT MASONRY

ROOF ASSEMBLY TAG

SOFFIT ASSEMBLY TAG

EXTERIOR WALL

ASSEMBLY TAG

WALL SECTION

DETAIL/ SECTION

NUMBER

SHEET NUMBER

BUILDING SECTION

EXTERIOR ELEVATION

SHEET NUMBER

ELEVATION NUMBER

INTERIOR ELEVATION

ELEVATION NUMBER

SHEET NUMBER

LARGE SCALE BLOWUP

OF PLAN OR DETAIL

PLAN OR DETAIL

NUMBER

SHEET NUMBER

LEVEL REFERENCE

LEVEL DESCRIPTION

LEVEL ELEVATION

NEW

STRUCTURAL GRID

GRID REFERENCE

GRID LINE

EXISTING

STRUCTURAL GRID

EXISTING GRID

REFERENCE

EXISTING GRID LINE

MATCH LINE

SHEET NUMBER

SHEET NUMBER

MATCH LINE

REVISION

REVISION NUMBER

(SHEET SPECIFIC)

CLOUDED AREA

OF REVISION

NORTH ARROW

SIMILAR INDICATION

DETAIL SECTION

R

DETAIL / SECTION

NUMBER

SHEET NUMBER

DETAIL NUMBER

SHEET NUMBER

SPOT ELEVATION

REFERENCE TYPE,

AS NEEDED:

TYP OR SIM

REFERENCE SYMBOLS (ALL DISCIPLINES)__________ REFERENCE SYMBOLS (ARCHITECTURAL)_______

CEILING HEIGHT

HEIGHT OF

CEILING ABOVE

FINISHED FLOOR

LAY IN PANEL

SURFACE OR

RECESSED

LUMINAIRE

SPRINKLER HEAD

AIR DEVICE -

RETURN

OCCUPANCY SENSOR

SMOKE DETECTOR

HEAT DETECTOR

SPEAKER

FIRE ALARM SPEAKER F

AIR DEVICE -

SUPPLY

AIR DEVICE -

EXHAUST

DAYLIGHT SENSOR

RADIANT PANEL

ACCESS DOOR

PENDANT HUNG

LUMINAIRE

AIR DEVICE -

LINEAR SUPPLY

MOTION / SECURITY

DETECTOR

CAMERA

CLOCK

M

P

H

S

S

REFLECTED CEILING PLAN SYMBOLS)_________________________________

AC AIR CONDITIONING

ACC ACCESSIBLE

ACM ASBESTOS CONTAINING MATERIAL

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AGF ARCHITECTURAL GLASS FLOORING

AHU AIR HANDLING UNIT

ALUM ALUMINUM

ALT ALTERNATE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASN ABRASIVE STAIR NOSING

ATC ACOUSTICAL TILE CEILING

AUTO AUTOMATIC

AWP ACOUSTICAL WALL PANEL

BLDG BUILDING

BLKG BLOCKING

BRG BEARING

BSMT BASEMENT

C COURSE

CB SELF-COVE BASE

CFCI CONTRACTOR FURNISHED - CONTRACTOR INSTALLED

CF CONDUCTIVE FLOORING

CFMF COLD-FORMED METAL FRAMING

CG CORNER GUARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLO CLOSET

CLR CLEAR(ANCE)

CLRM CLASSROOM

CMT CERAMIC MOSAIC TILE

CMTB CERAMIC MOSAIC TILE BASE

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CONTR CONTRACT(OR)

CORR CORRIDOR

CPT CARPET(ING)

CR CRASH RAIL

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CUH CABINET UNIT HEATER

CW CASEWORK

DEMO DEMOLISH / DEMOLITION

DEPT DEPARTMENT

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DN DOWN

DS DOWNSPOUT

EA EACH

EIFS EXTERIOR INSULATION FINISH SYSTEM

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

EL ELEVATION

ELEV ELEVATOR

EM ENTRANCE MATS

EMB ELECTRONIC MARKER BOARD

EMER EMERGENCY

EOS EDGE OF SLAB

EQ EQUAL

EQUIP EQUIPMENT

ER EPOXY RESIN

EST ESTIMATE(D)

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXPD EXPOSED

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FG FOOT GRILLE

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FLR FLOOR

FT FOOT/FEET

FTG FOOTING

FURN FURNISH(ED) / FURNISHINGS

FWP FABRIC WRAPPED PANEL

GA GAUGE / GAGE

GALV GALVANIZED

GFRC GLASS FIBER REINF CONCRETE

GFRG GLASS FIBER REINF GYPSUM

GL GLASS

GLMT GLASS MOSAIC TILE

GLMU GLASS MASONRY UNIT

GLT GLASS TILE

GST GLASS STAIR TREAD

GWB GYPSUM WALL BOARD

GWB P GYPSUM WALL BOARD PAINTED

GWP EP GYPSUM WALL BOARD EPOXY PAINTED

GYP GYPSUM

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH POINT

HPC HIGH PERFORMANCE COATING

HPL HIGH PRESSURE DECORATIVE LAMINATE

HR HANDRAIL

HSS HOLLOW STRUCTURAL SECTION

HT HEIGHT

HVAC HEATING-VENTILATING-AIR CONDITIONING

HWB HEAT WELDING BEAD

ID INSIDE DIAMETER

INST INSTALL(ED)

INSUL INSULATION / INSULATED

INT INTERIOR

JAN JANITOR

JT JOINT

KIT KITCHEN

LAB LABORATORY

LAM LAMINATE(D)

LAV LAVATORY

LGT LENGTH

LH LEFT HAND

LIN LINOLEUM

LP LOW POINT

LT LIGHT

LTWT LIGHTWEIGHT

LVT LUXURY VINYL TILE

MACH MACHINE

MARB MARBLE

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MCM METAL COMPOSITE MATERIAL

MECH MECHANICAL

MES METAL EDGE STRIP

MEZZ MEZZANINE

MFR MANUFACTURER / MANUFACTURED

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MPC METAL PANEL CEILING

MSS METAL SUSPENSION SYSTEM

MTL METAL

MW MILLWORK

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NSMF NON-STRUCTURAL METAL FRAMING

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED - CONTRACTOR INSTALLED

OFF OFFICE

OFOI OWNER FURNISHED - OWNER INSTALLED

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCONC POLISHED CONCRETE

PERF PERFORATE(D)

PL PLATE

PLP PLASTIC PANEL

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PREFAB PREFABRICATED

PREFIN PREFINISHED

PRT POLY RESIN TILE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PLSHD POLISHED

PMT PORCELAIN MOSAIC TILE

PNT PAINT(ED)

PT PORCELAIN TILE

PTB PORCELAIN TILE BASE

QT QUARRY TILE

QTB QUARRY TILE BASE

QTY QUANTITY

R RISER

RAD RADIUS

RAF RESILIENT ATHLETIC FLOORING

RBF RUBBER FLOORING

RBRT RUBBER TILE

RCP REFLECTED CLG PLAN

RD ROOF DRAIN

REF REFER TO / REFERENCE TO

REFG REFRIGERATOR

REINF REINFORCED / REINFORCING

REQD REQUIRED

RES RESILIENT

RESB RESILIENT BASE

REV REVISE / REVISION

RF RESINOUS FLOORING

RFG ROOFING

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RSN RESILIENT STAIR NOSING

RST RESILIENT STAIR TREAD

RT RESILIENT TILE

RTU ROOF TOP UNIT

RV RIGID VINYL

S SEALED

SDF STATIC DISSIPATIVE FLOORING

SECT SECTION

SGT STRUCTURAL GLAZED TILE

SHR SHOWER

SHT SHEET

SIM SIMILAR

SM SPECIALIZED METAL

SOG SLAB-ON-GRADE

SP SAFETY PAD

SPEC SPECIFY / SPECIFICATION

SQ SQUARE

SS SOLID SURFACE / SURFACING

SST STAINLESS STEEL

ST STONE

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURE / STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SVT SOLID VINYL TILE

SWC SPECIAL WALL COATING

SWP SHEET WALL PROTECTION

T TREAD

TB TACK BOARD

TBD TO BE DETERMINED

TEMP TEMPORARY

TER TERRAZZO

TERB TERRAZZO BASE

TEXT TEXTURE

THK THICK(NESS)

TLT TOILET

TOS TOP OF STEEL

TOW TOP OF WALL

TP TANGENT POINT

TS TACKABLE SURFACE

TRSLT TRANSLUCENT

TYP TYPICAL

T&G TONGUE & GROOVE

UC UNDERCOUNTER

UPH UPHOLSTERY

UNO UNLESS NOTED OTHERWISE

VAC VACUUM

VCT VINYL COMPOSITION TILE

VEST VESTIBULE

VET VINYL ENHANCED TILE

VIF VERIFY IN FIELD

VNL VINYL

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

WAF WOOD ATHLETIC FLOORING

WC WATER CLOSET

WCV WALL COVERING

WD WOOD

WDWTR WINDOW TREATMENT

WP WORK POINT

WPC WOOD PANEL CEILING

WT WEIGHT

GENERAL NOTES_____________________________________________

1. ENCLOSE ALL EXPOSED DUCTS, PIPES, CONDUITS, ETC. IN FINISHED SPACE WITH CONSTRUCTION

AND FINISH TO MATCH ADJACENT CONSTRUCTION UNO.

2. PROVIDE ACCESS DOORS OF APPROPRIATE SIZE, TYPE AND FIRE RATING FOR ALL CONCEALED ITEMS THAT REQUIRE ADJUSTMENT, MAINTENANCE, MONITORING, ETC. COORDINATE LOCATIONS

WITH ARCHITECT.

3. DO NOT DETERMINE DIMENSIONS AND SIZE OF THE GRAPHIC REPRESENTATIONS SHOWN ON THE DRAWINGS BY USING MEASURING DEVICES (DO NOT "SCALE"). RELY ON THE NUMERIC DIMENSIONS

SHOWN ON THE DRAWINGS FOR MEASUREMENT.

4. DIMENSIONS ARE TAKEN FROM CENTERLINE OF STRUCTURE, FACE OF CONCRETE OR FINISHED

FACE OF PARTITIONS UNO. SEE PARTITION TYPES SHEETS (A1000 SERIES) FOR PARTITION

THICKNESS AND MATERIALS.

5. CENTER ITEMS IN CEILING PANELS UNO.

6. REFER TO FINISH LEGEND FOR FINISH PLAN SYMBOLS.

ABBREVIATIONS______________________________________________

A101

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

NEW CONSTRUCTION

PLAN SYMBOLS_____________________________________________________

INTERIOR ELEVATION KEY TO MATERIAL

SIM

50S

IM

50 S

IM

A0402

SIM

A1

E101

E45

1125A

L10

RA-1

SA-1

WA-1

A0401

SIM

A0401

SIM

A0401

SIM

1/A101

SIM

LEVEL 02

118'-6"

9 '- 0"

TYPE MARK

STC TAG STC-45

N

1 / A101

1 / A101

SIM

A0401

SIM

DESCRIPTION

EQ-1

EQUIPMENT DESCRIPTION

ADA

HANDICAPPED

CLEARANCES

FINISH TAG

P-3WALL FINISH TAG

C

CEILNG MICROPHONE M

WIRELESS AP

UNDER CABINET

LUMINAIRE

A/V PROJECTOR

PROJECTOR SCREEN

F

B

W

C

LCENTERLINE

INDICATES AREAS NOT IN CONTRACT

EXIT LUMINAIRE

SPRINKLER HEAD

TRACK LIGHT

NURSE CALL DOME

LIGHT

IV / CURTAIN TRACK

N

WALL WASH

LUMINAIRE

STRIP LUMINAIRE

COVE LUMINAIRE

SURGICAL LIGHT/

EQUIPMENT BOOM

PENDANT

WALL MOUNT STRIP

WALL MOUNT STRIP

EARTH

GRAVEL OR

POROUS FILL

CONCRETE

MASONRY UNIT

BRICK STONE

CONCRETE OR

PRECAST

RIGID INSULATION

PLASTER AND

GYPSUM BOARD

FINISHED WOOD

WOOD BLOCKING

OR SHIMPLYWOOD

STEEL OR IRONALUMINUM

SPRAY INSULATION

CORE MATERIAL

SPRAY

FIREPROOFING

ACOUSTICAL

CEILING

WOOD FRAMING

FIBERGLASS/

SOLID SURFACE

MATERIAL

COMPRESSIBLE

FILLER

TERRAZZO

FIBROUS BLANKET

INSULATION

(GLASS FIBER AND

MINERAL WOOL)

HORIZONTAL VERTICAL

FIBROUS BOARD

INSULATION

(GLASS FIBER AND

MINERAL WOOL)

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102SYMBOLS & ABBREVIATIONS

A0001 Checker Author

MATERIALS

A0101

6N03

N

X01

X

1. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO

PROPOSE A PHASING PLAN TO MEET THE REQUIREMENTS OF

THE CONSTRUCTION CONTRACT.

2. SEAL OFF EXISTING DOOR TO HOSPITAL AND COMMENCE ALL

WORK FROM EXTERIOR ACCESS.

3. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES

APPROPRIATELY AS SOON AS DETECTED.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

5. EXTERIOR SPACE ON-SITE WILL BE PROVIDED FOR

STORAGE OF CONSTRUCTION RELATED MATERIALS

AND EQUIPMENT.

SPRAY-FOAM INSULATION, 1-1/2" NOM.

4" RESILIENT BASE, TYP.

EXISTING EXTERIOR WALL ASSEMBLY

6 1/2"

5/8" GWB ABOVE 8'

MOVEMENT ASSEMBLY AT ROOF DECK

COPE AND SEAL GWB AT ROOF DECK

RE: 3/A0101 FOR HEAD DETAIL AT

STEEL ROOF JOISTS

5/8" IMPACT-RESISTANT GWB BELOW 8'

4" METAL STUD FRAMING

6"

M

IN1/4

M

IN1/4

/8

5/8" GWB, ATTACH TO VERTICAL STUDS ONLY

DEFLECTION TRACK

PROVIDE 1/4" GAP WITH FIRE SEALANT ALL

INTERSECTIONS OF GWB WITH STEEL JOIST

4" METAL FRAMING

5/8" GWB, ATTACH TO ANGLE ONLY

1-1/2" METAL FRAMING ANGLE, SECURE TO STRAPS

2"W 20GA STEEL STRAPS AT 12" O.C.

MINERAL WOOL INSULATION

FOAM INSULATION

EXISTING CMU EXTERIOR WALL

STEEL JOIST

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102FLOOR PLAN AND DETAILS

A0101 Checker Author

1/8" = 1'-0"

FIRST FLOOR

KEYED NOTES:

NUMBER DESCRIPTION

1 DEMOLISH CMU WALL ENTIRELY, INCLUDING OH AND MAN DOORS.

2 ALTERNATE: NEW INSULATION & INTERIOR COVER PARTITION AT

EXTERIOR CMU WALLS - RE: 2/A0101

3 ALTERNATE: RETURN GWB BACK TO DOOR FRAME AT EXISTING

DOORS, TYP.

4 ALTERNATE: SPACE TO RECEIVE NEW FINISHES, RE: GENERAL NOTES

5 INSTALL BLANK-OFF PANEL ON INTERIOR FACE OF EXISTING LOUVER

FOR PORTIONS UNUSED (RE: MECH DWGS). FABRICATE OF 1 INCH

THICK URETHANE INSUL CORE W/ .032 IN THICK ALUM FACE SHEET EA

SIDE & .080 IN EXTRUDED ALUM FRAME

6 DELETE EXISTING DOOR AND FRAME AND INSTALL NEW DOOR AND

FRAME IN EXISTING OPENING.

CONSTRUCTION GENERAL NOTES

GENERAL NOTES

1. IN SPACES INDICATED AS RECEIVING NEW FINISHES ALL

INTERIOR WALL SURFACES, ROOF JOISTS, AND ROOF

DECK WILL BE CLEANED, PRIMED, AND PAINTED.

2. IN SPACES INDICATED AS RECEIVING NEW FINISHES,

EXISTING CONCRETE FLOORS TO BE CLEANED AND

PREPPED AND INSTALL EPOXY FLOOR COATING.

3. IN SPACES INDICATED AS RECEIVING NEW FINISHES,

INSTALL NEW 4" HIGH RUBBER BASE.

1" = 1'-0"

WALL SECTION

3" = 1'-0"

PARTITION HEAD DETAILS

DOOR SCHEDULE

OPENING

NUMBER

DOOR FRAME

SCHEDULE

FIRE RATING COMMENTSMATERIAL

MATERIAL &

TYPE

N03 HM HM-00 45 MIN REPLACE EXISTING DOOR AND FRAME IN GWB OPENING.

PROVIDE NEW MORTISE LEVERSET WITH STORAGE

FUNCTION AND DEADBOLT

N04 HM HM-00 45 MIN REPLACE EXISTING DOOR AND FRAME IN GWB OPENING.

PROVIDE NEW MORTISE LEVERSET WITH STORAGE

FUNCTION AND DEADBOLT

X01 HM HM-00 - REPLACE EXISTING DOOR AND FRAME IN MASONRY

OPENING. GROUT FRAME SOLID. PROVIDE NEW MORTISE

LEVERSET WITH STORAGE FUNCTION AND DEADBOLT,

WEATHERSEALS AND THRESHOLD

X02 HM HM-00 - REPLACE EXISTING DOOR AND FRAME IN MASONRY

OPENING. GROUT FRAME SOLID. PROVIDE NEW MORTISE

LEVERSET WITH STORAGE FUNCTION AND DEADBOLT,

WEATHERSEALS AND THRESHOLD

1. THE CHILLED WATER PLANT SHALL REMAIN OPERATIONAL DURING DEMOLITION AND CONSTRUCTION.

2. PROVIDE HOT TAP OF TEMPORARY CHILLER CONNECTION LOCATIONS DURING OPERATION OF THE EXISTING CHILLED WATER EQUIPMENT PRIOR TO ANY

DEMOLITION WORK TO ENSURE CONTINUOUS OPERATION OF THE CHILLED WATER SYSTEM. COORDINATE HOT TAP INSTALLATION WITH THE OWNER'S

OPERATIONAL REQUIREMENTS. TERMINATE WITH ISOLATION VALVES.

3. COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, SAFETY RULES AND REGULATIONS, OSHA STANDARDS, VA DESIGN AND CONSTRUCTION STANDARDS, AND

OTHER GOVERNING BODIES HAVING JURISDICTION.

4. PROTECT DUCTWORK, PIPING, EQUIPMENT, ETC. REMAINING IN PLACE FOR REUSE. REPAIR OR REPLACE EQUIPMENT AND SYSTEMS TO BE REUSED WHICH ARE INADVERTENTLY DAMAGED DURING THE DEMOLITION PROCESS AT NO ADDITIONAL COST TO THE OWNER.

5. DISPOSITION OF THE MATERIAL ASSOCIATED WITH THE DEMOLITION PACKAGE WILL BE APPROVED IN WRITING BY THE OWNER. DO NOT REMOVE DEMOLISHED

MATERIALS FROM THE WORK SITE WITHOUT PRIOR APPROVAL OF OWNER.

6. PROVIDE AND INSTALL CLOSURE DEVICES FOR REMAINING SYSTEMS AND EQUIPMENT. VERIFY THAT THE CLOSURE DEVICES HAVE BEEN INSTALLED PRIOR TO RE-ENERGIZING SYSTEMS. COMPLY WITH OWNER AND SITE LOCK-OUT/TAG-OUT PROCEDURES WHERE APPLICABLE.

7. DO NOT REUSE REMOVED PIPING, DUCTWORK, VALVES, ETC., UNLESS SPECIFICALLY INDICATED OTHERWISE.

8. PATCH AND REPAIR ALL FINISHES AND PENETRATIONS CAUSED BY OR EXPOSED BY THE REMOVAL OF MATERIAL AND EQUIPMENT.

9. COORDINATE SHUTDOWN OF MECHANICAL EQUIPMENT WITH OWNER'S OPERATIONAL REQUIREMENTS.

10. DEMOLISH AND REMOVE EXISTING MOP SINK IN CHILLER PLANT. CUT AND CAP DOMESTIC HOT AND COLD WATER SUPPLIES AT HEADER, AND PLUG DRAIN.

11. PLUG AND FILL ALL EXISTING FLOOR DRAINS IN CONFLICT WITH NEW EQUIPMENT INSTALLATION LOCATIONS.

12. PATCH AND REPAIR PENETRATIONS FROM ANY ROOF MOUNTED EQUIPMENT WITH EXISTING ROOFING SYSTEM TO MAINTAIN WARRANTY.

13. CONTRACTOR IS RESPONSIBLE FOR PROVIDING CONTINUOUS SECURITY FOR CONSTRUCTION SITE, TEMPORARY FACILITY, AND TEMPORARY CHILLER PLANT.

14. PRIOR TO COMMENCEMENT OF DEMOLITION WORK:

FIELD VERIFY THE SIZES AND LOCATION OF EQUIPMENT AND SYSTEMS TO BE REMOVED.

A. RECORD ALL CHILLED WATER AND CONDENSER WATER FLOW RATES AND SETPOINTS FOR USE AFTER INSTALLATION OF NEW PIPING AND EQUIPMENT.

SUBMIT RECORD TO OWNER AND ENGINEER FOR REVIEW.

B. VERIFY THAT THE DEMO AREA IS ACCESSIBLE AND THAT DEMO TRAFFIC ROUTES ARE FREE AND CLEAR.

C. VERIFY THAT EQUIPMENT AND SYSTEMS HAVE BEEN DE-ENERGIZED AND ARE SAFE TO DISMANTLE. COMPLY WITH OWNER AND CONSTRUCTION SITE

LOCK- OUT/TAG-OUT PROCEDURES.

D. IDENTIFY ELEMENTS OF RISK ASSOCIATED WITH THE DEMOLITION WORK, AND PROVIDE CONTINGENCY PLANS TO MINIMIZE THE RISK TO THE PROJECT

FOR APPROVAL BY OWNER.

E. PROVIDE A COMPREHENSIVE DEMOLITION AND PHASING PLANT OUTLINING THE SCHEDULE OF WORK ACTIVITIES REQUIRED TO EXECUTE THE WORK.

INCLUDE MILESTONE DATES, TEMPORARY CONNECTION POINTS, ELECTRICAL POWER FEED TO TEMPORARY EQUIPMENT, INSTALLATION LOCATION OF TEMPORARY EQUIPMENT, AND PROPOSED SCHEDULE OF TEMPORARY EQUIPMENT OPERATION FOR APPROVAL BY THE OWNER AND ENGINEER.

IDENTIFY ELEMENTS OF RISK ASSOCIATED WITH THIS SCOPE OF WORK AND PROPOSED PROVISIONS TO MITIGATE RISK.

DEMOLISH ALL CHILLED WATER, CONDENSER WATER, AND

EXHAUST SYSTEM DUCTWORK, PIPING, CONTROL PANELS

AND EQUIPMENT WITHIN PROJECT BOUNDARY, WITH THE

EXCEPTION OF PIPING SHOWN ON NEW WORK PLANS.

MECHANICAL EQUIPMENT DEMOLISHED:

CH-1, 2, 3, 4, 5, 6, 7, 8;

P-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13;

UH-1, 2.

EF-1, 2.

REFER TO DEMO AND TEMPORARY PLANT OPERATION

NOTES ON THIS SHEET.

14" CHWS

8" CHWS

8" CHWR

12" CWR

12" CWR

12" CWS

12" CWS

DEMOLISH CWS/CWR

PIPING TO VERTICAL

PIPING 3'0" AFF SHOWN

(TYP).

14" CHWR

1. IN ORDER TO MAINTAIN CHILLED WATER SUPPLY DURING RENOVATION OF THE BUILDING CHILLER PLANT, MECHANICAL CONTRACTOR SHALL SOURCE, FURNISH, AND INSTALL A TEMPORARY AIR COOLED CHILLER PLANT (CAPACITY: 1000 TONS) AND BUILDING CHILLED WATER PUMPS FOR USE DURING

CONSTRUCTION.

2. CONSTRUCTION SHALL BE PHASED SUCH THAT THE FACILITY IS USING THE TEMPORARY CHILLER PLANT ONLY BETWEEN THE MONTHS OF NOVEMBER - FEBRUARY. THE EXISTING AND/OR NEW CHILLER PLANT SHALL BE OPERATIONAL AND PROVIDING 2250 TONS OF CAPACITY MINIMUM OUTSIDE OF THIS TIME

PERIOD.

3. TEMPORARY CHILLER PLANT SHALL BE CONFIGURED TO PROVIDE AUTOMATIC OPERATION TO INCLUDE STAGING OF PUMPS AND CHILLERS. CONTRACTOR TO PROVIDE NECESSARY SERVICE AND SUPERVISION TO ENSURE CONTINUOUS, UNINTERRUPTED OPERATION 24/7.

4. TEMPORARY CONNECTION POINTS SHALL BE INSTALLED AS SHOWN ON THE DEMOLITION PLAN PRIOR TO SHUTDOWN OF EXISTING EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELATED TO POWER SUPPLY FOR TEMPORARY EQUIPMENT.

5. INSTALLATION LOCATION OF TEMPORARY CHILLER SHALL BE DETERMINED BY THE CONTRACTOR AND COORDINATED WITH THE OWNER.

6. ROUTING OF TEMPORARY PIPING SHALL BE COORDINATED WITH CONSTRUCTION ACTIVITIES TO PROVIDE CONTINUOUS OPERATION OF TEMPORARY CHILLERS

DURING CONSTRUCTION TO MAINTAIN BUILDING CHILLED WATER SYSTEM OPERATION.

7. TEMPORARY PUMPS SHALL HAVE A CONTROLS PACKAGE THAT PROVIDES AUTOMATIC ACTIVE/STANDBY CHILLER/PUMP ENABLE AND FLOOR CONTROLS THAT

MEET CHILLER MINIMUM FLOWRATES AND MODULATE TO MEET SYSTEM DIFFERENTIAL PRESSURE AS MEASURED BY EXISTING DIFFERENTIAL PRESSURE .

PROPOSED TEMPORARY

CHILLER (TC-1 & TC-2)

AND TEMPORARY PUMP

(TP-1 & TP-2) LOCATIONS

TEMPORARY AIR-COOLED CHILLER MINIMUM REQUIREMENTS

UNIT NO.

CAPACITY

(TONS)

TC-1 500

EVAPORATOR

EWT LWT

°F °F

53 43

ELECTRICAL

ESTIMATED MAX

POWER INPUT

(KW)

53 43

V/PH/HZ

480/3/60

ESTIMATED

MCA

REMARKS:

1. CONTRACTOR SHALL COORDINATE TEMPORARY AIR COOLED DESIGN DATA WITH RENTAL SELECTION.

2. COORDINATE ELECTRICAL POWER REQUIREMENTS WITH SELECTED RENTAL CHILLER.

3. COORDINATE LOCATION OF TEMPORARY AIR COOLED CHILLERS WITH OWNER'S OPERATIONAL REQUIREMENTS.

4. COORDINATE CONNECTION POINT OF TEMPORARY AIR COOLED CHILLERS WITH EXISTING PIPING DISTRIBUTION SYSTEM

PRIOR TO INSTALLATION.

REMARKS

1, 2, 3, 4

TC-2 500 53 43 53 43 480/3/60 1, 2, 3, 4

TEMPORARY PUMP MINIMUM REQUIREMENTS

UNIT NO.

FLOW

(GPM)

TP-1 1100

ELECTRICAL

ESTIMATED MAX

MOTOR HP

V/PH/HZ

480/3/60

REMARKS:

1. CONTRACTOR SHALL COORDINATE TEMPORARY PUMP DESIGN DATA WITH RENTAL CHILLER

SELECTION.

2. COORDINATE ELECTRICAL POWER REQUIREMENTS WITH SELECTED RENTAL PUMP.

3. COORDINATE LOCATION OF TEMPORARY PUMPS WITH OWNER'S OPERATIONAL REQUIREMENTS.

4. COORDINATE CONNECTION POINT OF TEMPORARY PUMPS WITH EXISTING PIPING DISTRIBUTION

SYSTEM PRIOR TO INSTALLATION.

5. PUMPS SHALL HAVE VARIABLE FREQUENCY DRIVES.

REMARKS

1, 2, 3, 4, 5

TP-2 1100 50 480/3/60 1, 2, 3, 4, 5

HEAD

(FT)

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102HVAC DEMOLITION PLAN

D0601

MEM ARO

DEMOLITION NOTES

1/4" = 1'-0"

CHILLER PLANT DEMOLITION PLAN

TEMPORARY PLANT OPERATION NOTES

NTS

TEMPORARY CHILLER SITE PLAN

KEYED NOTES:

1. 10" TEMPORARY CHILLED WATER CONNECTION

LOCATION. DEMO TEMPORARY CONNECTION PRIOR TO

INSTALLATION OF FINAL NEW WORK CONNECTION

SHOWN ON M0201. COORDINATE SHUTDOWN OF CHILLED

WATER SYSTEM TO MAKE FINAL CONNECTION WITH

OWNER.

2. 8" TEMPORARY CHILLED WATER CONNECTION LOCATION.

TEMPORARY CONNECTION POINTS TO REMAIN AFTER

INSTALLATION OF NEW WORK WITH BLANK OFF FLANGE.

A T

O M ain

1-1 T

IE

2-1

M A

IN

M C

B S

E C 1

S E

C 2

IMMCIMMC

MCC

IMC

MCC

IMC

MCC

IMC

MCC

IMC

MCC

IMC

MCC

IMC

MCC

IMC

S

SS

SS

S

S

DPMC

HA

LA

EX

TRANSFORMER 1

E X

S P

E C

T R

A S

E R

IE

S

S W

IT

C

H B

O A

R D

SQUARE D QED2

3 3

CT XFMR

CT DISCONNECT

CTL

CT

EX EX

EX

EXEX

EXEX

JOCKY

PUMP FIRE

PUMP

SUMP

PUMP

SEWAGE

PUMP

SUMP

PUMP

2 SEWAGE

PUMP

2 AIR

COMPRESSOR

AIR

DRYER

R&E SEC. WATER PUMP

P1&P2

ROOF

SUPPLY

PUMP

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102ELECTRICAL DEMOLITION PLAN

ED0101

TZ JMS

1. REMOVE ALL EXISTING DEVICES THIS ROOM UNLESS OTHERWISE NOTED.

2. REMOVE EXISTING LUMINAIRES THIS ROOM.

3. REMOVE EXISTING DISTRIBUTION EQUIPMENT AND ASSOCIATED FEEDERS AND CIRUITS BACK TO THE POINT OF ORIGIN. REFEED EQUIPMENT THAT REMAINS FROM NEW DISTRIBUTION EQUIPMENT AS REQUIRED. REFER TO THE EQUIPMENT CONNECTION/MOTOR CONTROL SCHEDULE FOR EQUIPMENT THAT IS TO BE REFED. IN ADDITION, ASSUME (4) 20AMP/1-POLE BRANCH CIRCUITS FROM BOTH PANELS "HA" AND "LA". FIELD VERIFY EXACT QUANTITIES OF EXISTING CIRCUITS TO BE REFED AND UPDATE AS-BUILTS ACCORDINGLY. EXTEND CIRCUITS TO NEW LOCATIONS AS REQUIRED.

4. EXACT LOCATION OF THE PUMP SHALL BE FIELD VERIFIED.

KEYED NOTES :

A. REMOVE ALL ELECTRICAL EQUIPMENT ON OR IN EXISTING WALLS, CEILINGS AND PARTITIONS WHICH ARE TO BE DEMOLISHED. REMOVE ALL EXPOSED PORTIONS OF BRANCH CIRCUIT AND CONTROL VOLTAGE WIRING AND CONDUIT.

B. STOCKPILE REMOVED LUMINAIRES, POWER AND COMMUNICATION DEVICES ON JOB SITE FOR REUSE UNTIL TIME OR PROJECT CLOSEOUT, THEN REMOVE THOSE FROM SITE THAT THE OWNER DOES NOT WISH TO SALVAGE.

C. EXISTING DEVICE LOCATIONS WERE INDENTIFIED AS COMPLETELY AS POSSIBLE BY A SITE SURVEY AND BY RECORD DOCUMENTS AS AVAILABLE. BE RESPONSIBLE FOR PROPER DEMOLITION AND REWORK OF DEVICES NOT SHOWN ON

DRAWINGS TO CONFORM WITH INTENT OF DOCUMENTS.

D. WHERE EQUIPMENT IS REQUIRED TO BE DEMOLISHED, REMOVE ALL WIRING, RACEWAYS, SUPPORTING EQUIPMENT, AND

ALL OTHER RELATED ELECTRICAL INSTALLATIONS BACK TO THE SOURCE.

GENERAL DEMOLITION NOTES:

1/4" = 1'-0"

ELECTRICAL DEMOLITION PLAN

A/C AIR CONDITIONING

A/E ARCHITECT/ENGINEER

AAV AUTOMATIC AIR VENT (VALVE)

ABV ABOVE

ACCU AIR-COOLED CONDENSING UNIT

ACH AIR CHANGES PER HOUR

ACU AIR CURTAIN

AD ACCESS DOOR

AF AIR FOIL FAN

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

APPROX APPROXIMATE

ARCH ARCHITECT/ARCHITECTURAL

AS AIR SEPARATOR

ATD AIR TRANSFER DUCT

AUTO AUTOMATIC

AVG AVERAGE

AWT AVERAGE WATER TEMPERATURE

AXF AXIAL FAN

BB BASEBOARD RADIATION

BDD BACK DRAFT DAMPER

BF BOILER FEED WATER

BG BOTTOM GRILLE (3"-12" ABOVE FLOOR)

BHP BRAKE HORSEPOWER

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BOD BOTTOM OF DUCT

BR BOTTOM REGISTER (3"-12" ABOVE FLOOR)

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CA COMPRESSED AIR

CAP CAPACITY

CC COOLING COIL

CCW COUNTER CLOCKWISE

CD CONDENSATE DRAIN

CENTRIF CENTRIFUGAL

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CH CABINET HEATER

CHR CHILLER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CL CENTER LINE

CLG COOLING

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS, CONTINUATION

CONTR CONTRACTOR

CONV CONVECTOR

CP CONTROL PANEL

CT COOLING TOWER

CU CONDENSING/ER UNIT

CU FT CUBIC FEET

CV CONSTANT VOLUME

CV CONSTANT VOLUME

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN OR DRYER

DB DECIBEL OR DRY BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROL

DEG.F DEGREE FAHRENHEIT

DEMO DEMOLISH

DG DOOR GRILLE

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DISCH DISCHARGE

DN DOWN

DP DIFFERENTIAL PRESSURE

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DTR DUAL TEMPERATURE RETURN

DTS DUAL TEMPERATURE SUPPLY

DWDI DOUBLE WIDTH, DOUBLE INLET

DWG DRAWING

DX DIRECT EXPANSION

E/P ELECTRIC-PNEUMATIC

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EBB ELECTRIC BASEBOARD HEATER

EC EXPANSION COMPENSATOR/JOINT

ECWR EQUIPMENT COOLING WATER RETURN

ECWS EQUIPMENT COOLING WATER SUPPLY

EDB ENTERING DRY BULB TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EHC ELECTRIC HEATING COIL

EL/ELEV ELEVATION

ELEC ELECTRIC/ELECTRICAL

ELEM ELEMENT

ELEV ELEVATOR

EMD END OF MAIN DRIP (STEAM)

EMER EMERGENCY

ENG ENGINEER

ENT ENTERING

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

EST ESTIMATE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EV EXHAUST AIR VALVE

EVAP EVAPORATOR

EVF FUME HOOD EXHAUST AIR VALVE

EVL LAB EXHAUST AIR VALVE

H HUMIDISTAT OR HUMIDIFIER

HC HEATING COIL

HEPA HIGH EFFICIENCY PARTICULATE AIR FILTER

HG HOT GAS

HL HIGH LIMIT

HORIZ HORIZONTAL

HP HORSEPOWER OR HEAT PUMP

HPR HIGH PRESSURE CONDENSATE RETURN

HPS HIGH PRESSURE STEAM

HR HOUR

HRC HEAT RECOVERY COIL

HT HEIGHT

HTG HEATING

HTWR HIGH TEMPERATURE WATER RETURN

HTWS HIGH TEMPERATURE WATER SUPPLY

HUM HUMIDIFIER

HVAC HEAT, VENTILATION, & AIR CONDITIONING

HVU HEATING & VENTILATING UNIT

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

ID INSIDE DIAMETER

IN OR " INCHES

IN W.C. INCHES WATER COLUMN

IN W.G. INCHES WATER GAUGE

INSUL INSULATION

INT INTERNAL

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LDB LEAVING DRY BULB TEMPERATURE

LF LINEAR FEET

LPG LIQUID PETROLEUM GAS

LPR LOW PRESSURE CONDENSATE RETURN

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPERES

LVG LEAVING

LVR LOUVER

LWB LEAVING WET BULB TEMPERATURE

LWT LEAVING WATER TEMPERATURE

M MOTOR OPERATOR

MAINT MAINTENANCE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MERV MINIMUM EFFICIENCY REPORTING VALUE

MEZZ MEZZANINE

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MPR MEDIUM PRESSURE CONDENSATE RETURN

MPS MEDIUM PRESSURE STEAM

MTD MOUNTED

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

NC NOISE CRITERIA

NIC NOT IN CONTRACT

NO. OR # NUMBER

NR NOT REQUIRED

NTS NOT TO SCALE

NV NATURAL VENTILATION

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OBD OPPOSED BLADE DAMPER

OED OPEN END DUCT

OFCI OWNER FURNISHED/CONTRACTOR INSTALLED

OFOI OWNER FURNISHED/OWNER INSTALLED

OH OVERHEAD

OPNG OPENING

∆P/DP DIFFERENTIAL PRESSURE

P PUMP

P/E PNEUMATIC-ELECTRIC SWITCH

PA PASCAL

PCD PUMPED CONDENSATE DISCHARGE/RETURN

PCF POUNDS PER CUBIC FOOT

PCWR PROCESSED CHILLED WATER RETURN

PCWS PROCESSED CHILLED WATER SUPPLY

PD PRESSURE DROP

PF PROPELLER FAN

PG PRESSURE GAUGE

PH PHASE

PLBG PLUMBING

PRESS PRESSURE

PROP PROPELLER

PRV PRESSURE REDUCING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE IN ABSOLUTE

PSIG POUNDS PER SQUARE IN GAUGE

QTY QUANTITY

R RETURN

RA RETURN AIR

RAD RADIATION

RAF RETURN AIR FAN

REBAL REBALANCE

REG REGISTER

REV REVISED

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RM ROOM

RO RELIEF OPENING

RP RADIANT PANEL

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV REFRIGERANT VENT OR RELIEF VALVE (VENT)

RV RETURN AIR VALVE

S/W SUMMER-WINTER

SA SUPPLY AIR OR SOUND ATTENUATOR

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SENS SENSIBLE LOAD

SF SMOKE-FIRE DAMPER

SHT SHEET

SM SMOKE DAMPER

SOL SOLENOID

SP STATIC PRESSURE

SQ SQUARE

SQ. FT. SQUARE FEET

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STM STEAM

STRUC STRUCTURE/STRUCTURAL

SV SUPPLY AIR VALVE

SWSI SINGLE WIDTH, SINGLE INLET

3SF 3 HOUR SMOKE FIRE DAMPER

TC TEMPERATURE CONTROL

TD TRANSFER DUCT

TEMP TEMPERATURE

TL TOTAL LOAD

TO TRANSFER OPENING

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TYP TYPICAL

UGRD UNDERGROUND

UH UNIT HEATER (HYDRONIC OR STEAM)

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UV UNIT VENTILATOR

V VOLT OR VENT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VEL VELOCITY

VERT VERTICAL

VI VIBRATION ISOLATION

VIF VERIFY IN FIELD

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VR VACUUM RETURN

VRV VARIABLE REFRIGERANT VOLUME

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WATT

W.G. WATER GAGE

W/ WITH

W/O WITHOUT

WB WET BULB TEMPERATURE

WC WATER COLUMN

WMS WIRE MESH SCREEN

WPD WATER PRESSURE DROP

WT WEIGHT

WTR WATER

EWB ENTERING WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EX EXISTING

EXIST EXISTING

EXT EXTERNAL

F FAHRENHEIT

F&T FLOAT & THERMOSTATIC STEAM TRAP

F.D. FLOOR DRAIN

FA FREE AREA

FC FORWARD CURVED

FCU FAN COIL UNIT

FD FIRE DAMPER

FF FINAL FILTER

FH FUME HOOD

FLA FULL LOAD AMPERES

FLEX FLEXIBLE

FLR FLOOR

FLT FLASH TANK

FM FLOW METER

FOG FUEL OIL GAUGE

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FP FIRE PROTECTION

FPB FAN POWERED TERMINAL UNIT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FINNED RADIATION

FSTAT FREEZESTAT

FT FEET

FV FACE VELOCITY

G NATURAL GAS

GA GAUGE

GAL GALLON

GCWR GEOTHERMAL CONDENSER WATER RETURN

GCWS GEOTHERMAL CONDENSER WATER SUPPLY

GD GRAVITY DAMPER

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GR GLYCOL RETURN

GRL GRILLE

GRV GRAVITY RELIEF VENT

GS GLYCOL SUPPLY

GV GRAVITY VENTILATOR OR NATURAL GAS VENT

TP

M0101

SUPPLY DUCT RISE

RETURN DUCT RISE

SECTION INDICATOR TOP

INDICATES SECTION NUMBER

BOTTOM INDICATES SHEET

NUMBER

VARIABLE SPEED DRIVE

EXHAUST DUCT RISE

OPPOSED BLADE VOLUME

DAMPERS

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE

CHECK VALVE (SHOWN W/FLOW)

CONTROL VALVE (3-WAY)

CONTROL VALVE (2-WAY)

BALANCING VALVE

SOLENOID VALVE

DIRECTION OF FLOW

UNION

PIPE ANCHOR

PIPE GUIDE

OR FLEXIBLE DUCT

SINGLE LINE DUCT RISE OR DROP

ELBOW WITH TURNING VANES

T

R

S

ELECTRICAL CONNECTION (BY DIVISION

23)

ROOM PRESSURIZATION MONITOR

FREEZESTAT

FLOW SWITCH

RELAY

SWITCH

STRAINER W/BLOWDOWN VALVE

SENSING ELEMENT - AIR STREAM

SENSING ELEMENT - LIQUID SEPARABLE WELL

FLEXIBLE CONNECTION

ROUND (DIAMETER)

TRAP

EXPANSION LOOP

EXPANSION JOINT

PIPING FLOW METER

ANALOG OUTPUT

DIGITAL OUTPUT

DIGITAL INPUT

ELECTRICAL CONNECTION (BY DIVISION

26)

ANALOG OUTPUT, PNEUMATIC

SMOKE

ANALOG INPUT, PRESSURE

ANALOG INPUT, TEMPERATURE

SMOKE DETECTOR

DUCT SMOKE DETECTOR

VOLUME DAMPER

CURRENT SENSOR

BACKDRAFT DAMPER

PUMP

FIRE, SMOKE/FIRE, OR SMOKE

DAMPER

SUPPLY DUCT DROP

RETURN DUCT DROP

EXHAUST DUCT DROP

CAPPED DUCTWORK

CAPPED PIPING OR SINGLE DUCTWORK

OR

FD,SF, OR SM

EXISTING ITEM TO BE REMOVED

VALVE

"Ø

DUCT OFF-SET DN (IN DIRECTION OF FLOW)

DUCT OFF-SET UP (IN DIRECTION OF FLOW)

RECTANGULAR DUCT DIMENSIONS

(SIZE IN INCHES, FIRST DIMENSION IS SHOWN)

ROUND DUCT DIMENSIONS (DIAMETER)

MOTORIZED DAMPER

T TEMPERATURE SENSOR (IN DUCT OR PIPE)

P PRESSURE GAGE

OR

PUSH BUTTONPB

200-14 10x8

SUPPLY/ RETURN/EXHAUST SIDEWALL GRILLE-

FIRST NO. CFM, SECOND NO. TYPE

BOTTOM NO. WIDTH BY HEIGHT OF GRILLE

(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)

VSD

RECTANGULAR WYE DUCT FITTING

AIR FLOW MEASURING STATION

EXISTING HVAC PIPE

NEW HVAC PIPE

EXISTING HVAC PIPE TO BE REMOVED

PIPE ELBOW DOWN

PIPE ELBOW UP

POINT OF CONNECTION (NEW TO EXISTING)

PIPE BOTTOM DROP

CLEANOUT (CO)

PIPE RISE OR DROP

ANALOG INPUT

TEMPERATURE SENSOR

OFF

ONAUTO

STARTER

HOSE DRAIN VALVE WITH CAP

MANUAL AIR VENT

PRESSURE/TEMPERATURE TEST PORT

ANALOG INPUT, FLOW

FIRE, SMOKE/FIRE, OR SMOKE DAMPER

IN RISER

FD,SF, OR SM

NEW EQUIPMENT

EXISTING EQUIPMENT

CALLOUT INDICATOR TOP

INDICATES NUMBER ON THE SHEET

BOTTOM INDICATES SHEET

NUMBER

NEW DUCT

EXISTING DUCT

DEMOED DUCT

TRIPLE DUTY VALVE

FM

AI

AIF

AIP

AIT

AO

AOP

BDD

M0101

CO

CS

DI

DO

24x12

24"Ø

DN

UP

D

E

EX-XXX

EXISTING

EQUIPMENT TYPE

OR

FM

FS

F

XXX-1

TYPE NO.

EQUIPMENT TYPE

1. THE CHILLED WATER PLANT SHALL REMAIN OPERATIONAL DURING CONSTRUCTION. MINIMUM CAPACITY NOVEMBER - FEBRUARY: 1000 TONS. MINIMUM CAPACITY MARCH - OCTOBER: 2250

TONS.

2. ALL SYSTEMS AND EQUIPMENT SHALL BE PROVIDED BY MANUFACTURERS WITH THE ABILITY TO PROVIDE SPARE PARTS AND SERVICE WITHIN 6 HOURS OF A REQUEST BY THE OWNER.

3. COMPLY WITH APPLICABLE LOCAL, STATE, FEDERAL, AND OWNER CODES AND STANDARDS DURING THE EXECUTION OF WORK DESCRIBED ON DRAWINGS AND OTHER CONTRACT

DOCUMENTS.

4. THE MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE AND ARE PROVIDED TO SHOW THE INTENT OF THE WORK. PROVIDE WORK AND EQUIPMENT NECESSARY TO COMPLETE THE INSTALLATION IN ACCORDANCE WITH APPLICABLE BUILDING CODES, STATE AND LOCAL BUILDING CODES, OWNERS INSURANCE UNDERWRITER(S), N.F.P.A., AND OTHER GOVERNING

AUTHORITIES HAVING JURISDICTION.

5. DUCTWORK, PIPING, AND EQUIPMENT CONNECTIONS SHOWN ON THE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE PROVIDED AS A GUIDE FOR THE INSTALLATION OF EQUIPMENT AND ASSOCIATED SYSTEMS. THE DRAWINGS ARE NOT INTENDED TO BE SCALED FOR ROUGHING IN MEASUREMENTS OR TO SERVE AS SHOP DRAWINGS. PROVIDE MINOR ADJUSTMENTS TO THE DUCTWORK AS REQUIRED TO SUIT FIELD CONDITIONS WITHOUT ADDITIONAL COST TO THE OWNER. MAJOR DEVIATIONS TO THE DESIGN REQUIRE PRIOR APPROVAL BEFORE STARTING WORK. CONTRACTOR SHALL COORDINATE WITH OTHER DISCIPLINES FROM LAYOUT THROUGH CONSTRUCTION AND RESOLVE ANY INTERFERENCES PRIOR TO INSTALLATION.

6. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR LOCATION OF WALL MOUNTED MECHANICAL ITEMS.

7. INSTALL ALL FLOOR MOUNTED HVAC EQUIPMENT, INCLUDING PUMPS, CHILLER, ETC. ON 4" CONCRETE PAD. SEE DETAIL ON SHEET M0701.

8. SUPPORTS, ROOF AND WALL OPENINGS, EQUIPMENT CONNECTIONS, EQUIPMENT ARRANGEMENT, AND ELECTRICAL POWER PROVISIONS FOR MECHANICAL EQUIPMENT ARE BASED ON PRELIMINARY INFORMATION FOR THE EQUIPMENT DESIGN BASIS SELECTION. PROVIDE AND INSTALL EQUIPMENT SUPPORTS, MAKE ROOF AND WALL OPENINGS, ADJUST CONNECTION SIZE AND TYPE, ADJUST EQUIPMENT SPACE ARRANGEMENT, AND PROVIDE ELECTRICAL BRANCH CIRCUIT AND DISTRIBUTION MODIFICATIONS BASED UPON CERTIFIED EQUIPMENT DRAWINGS, WITHOUT ADDITIONAL COST TO THE OWNER.

9. PREPARE AND SUBMIT DUCTWORK SHOP DRAWINGS FOR APPROVAL, PRIOR TO PERFORMING FABRICATION WORK. INCLUDE DUCTWORK PLANS, ELEVATIONS, AND SECTIONS, SHOWING

DUCT FITTINGS, EQUIPMENT CONNECTIONS, AND ACCESS REQUIREMENTS.

10. PROVIDE WORK IN STRICT ACCORDANCE WITH APPROVED SHOP DRAWINGS. THE OWNER OR OWNER'S REPRESENTATIVE RESERVES THE RIGHT TO REJECT WORK NOT IN ACCORDANCE

WITH THE APPROVED SHOP DRAWINGS.

11. FURNISH AND INSTALL THE NECESSARY APPURTENANCES AND MINOR AUXILIARIES REQUIRED TO MAKE EACH SYSTEM COMPLETE AND OPERABLE IN EVERY RESPECT. FURNISH AND INSTALL WORK DESCRIBED IN THE SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR VICE VERSA.

12. TEST AND ADJUST INSTALLED EQUIPMENT AND SYSTEMS IN ACCORDANCE WITH CONTRACT DOCUMENTS. CORRECT DEFECTS AND SYSTEM DEFICIENCIES DISCLOSED BY TESTING, WITHOUT

ADDITIONAL COST TO THE OWNER.

13. OPERATION OF THE EQUIPMENT, DUCTWORK, OR INSTALLED PIPING DOES NOT CONSTITUTE AN ACCEPTANCE OF THE WORK BY THE OWNER. FINAL ACCEPTANCE IS DEFINED IN THE

CONTRACT DOCUMENTS.

14. LOCATIONS SHOWN ON DRAWINGS FOR PANELS ARE APPROXIMATE. COORDINATE FINAL LOCATION TO SUIT FIELD CONDITIONS, OR AS DIRECTED BY OWNER.

15. INSTALL PIPING TO HVAC HEATING AND COOLING COIL(S) AND EQUIPMENT TO ALLOW CLEAR REMOVAL SPACE FOR THE COILS, AIR FILTERS, UNIT CONTROLS, FANS, AND MOTORS.

16. COIL PIPING SHALL NOT BLOCK FILTER OR MOTOR ACCESS.

17. RUN DUCTWORK AND PIPE INSULATION CONTINUOUSLY THROUGH FLOOR, ROOF, AND WALL PENETRATIONS.

18. PENETRATIONS NOT OTHERWISE NOTED SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR.

19. EQUIPMENT MAINTENANCE ACCESS SPACE SHOWN WITH DASHED LINES.

20. INSTALL 3/4" MANUAL HIGH POINT VENTS AND LOW POINT DRAINS IN ALL RELATIVE HIGH AND LOW POINTS IN HYDRONIC PIPE SYSTEMS TO PREVENT TRAPPING OF AIR DURING FILLING AND

TO FACILITATE COMPLETE DRAINAGE.

21. CONTRACTOR SHALL PROVIDE ALL HANGERS, SUPPORTS, AND ANCHORAGE OF SYSTEM COMPONENTS.

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102LEGENDS, SYMBOLS, & GENERAL

NOTES

M0001

MEM ARO

ABBREVIATIONS

SYMBOLS GENERAL NOTES

EXISTING ROLL

UP DOOR TO

OUTSIDE

EXISTING STAIRS

EXISTING FIRE PUMP TO REMAIN & ELECTRICAL EQUIPMENT

EXISTING STEAM

SYSTEM

TO REMAIN

MAINTENANCE

AISLE, KEEP CLEAR

9'-6" AFF

CH-1 CH-2

CH-3 CH-4

CH-6

(FUTURE)

CHWP-1 CHWP-2

CHWP-6

(FUTURE)

CHWP-5

(FUTURE)CHWP-4

VFD

VFD

(FUTURE)

VFD

(FUTURE)

VFDVFD

CH-5

(FUTURE)

CHWP-3

VFD

FCU-2

ET-1

REFRIGERANT

LEAK

DETECTION

PANEL

WITH

HORN

AND

STROBE

EXISTING VENTILATION

AIR INTAKE LOUVER. BLANK

OFF ENTIRE LOUVER.

EXISTING RELIEF

AIR LOUVER. PROVIDE 36"x36" MOTOR

OPERATED ISOLATION DAMPER (RUSKIN CD60

WITH LOW LEAKAGE BLADE SEALS OR EQUAL)

ON INTERIOR FACE OF LOUVER. BLANK OFF

UNUSED PORTION OF LOUVER.

4'-0"

FCU-1

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102HVAC EQUIPMENT PLAN AND

SCHEDULES

M0101

MEM ARO

KEYED NOTES:

1. REQUIRED EQUIPMENT MAINTENANCE ACCESS

SPACE SHOWN WITH DASHED LINES. THESE

CLEARANCES SHALL BE MAINTAINED.

2. LOCATE REFRIGERANT MONITOR STROBE ABOVE

DOOR OUTSIDE OF CHILLER PLANT.

1/4" = 1'-0"

CHILLER PLANT EQUIPMENT PLAN

WATER-COOLED LIQUID CHILLER SCHEDULE

UNIT

NO.

TYPE

CAPACITY

(TONS)

REFRIGERANT NPLV

EVAPORATOR CONDENSER ELECTRICAL

EMERGENCY

POWER

MAX. UNIT

DIMENSIONS

(LxWxH)

MAX.

OPERATING

WEIGHT (LBS)

BASIS OF DESIGN

REMARKSFLUID

TYPE

MIN/MAX

GPM

EWT (ºF) LWT (ºF)

MAX PRESS.

DROP (FT)

WATER

PASSES

FOULING

FACTOR

MAX GPM EWT (ºF) LWT (ºF)

MAX PRESS.

DROP (FT)

WATER

PASSES

FOULING

FACTOR

MAX POWER

INPUT (KW)

MCA FLA MOPD V/PH/HZ VSD MANUFACTURER MODEL

CH-1 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

CH-2 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

CH-3 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

CH-4 MAGNETIC BEARING 750 R-134A 0.338 WATER 810/1795 53 43 22 2 0.0001 2130 85 95 20 2 0.00025 450 741 592 1200 480/3/60 YES YES 184"x96"x108" 23830 YORK MC2 1,2

PUMP SCHEDULE

UNIT NO. SYSTEM TYPE

FLUID

TYPE

CAPACITY

(GPM)

IMPELLER

SIZE (IN)

HEAD

(FT)

EFFICIENCY

SUCTION (IN)

DISCHARGE

(IN)

MOTOR EMERGENCY

POWER

BASIS OF DESIGN

REMARKS

BHP HP RPM VSD V/PH/HZ MANUFACTURER MODEL

CHWP-1 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

CHWP-2 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

CHWP-3 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

CHWP-4 CHILLED WATER VERTICAL INLINE WATER 1800 12.45 140 85.0 8 8 74.7 100 1790 YES 480/3/60 YES ARMSTRONG SERIES 4300-8X8X13-100 HP 1, 2, 3, 4

FAN SCHEDULE

MARK TYPE CFM

SP (IN.

WC)

FAN

RPM DRIVE

MOTOR EMERGENCY

POWER WEIGHT

BASIS OF DESIGN

REMARKSBHP HP RPM VSD V/PH/HZ MANUFACTURER MODEL

EF-1 CENTRIFUGAL 2250/4500 0.5 962 DIRECT 1.1 1.5 1725 NO 460/3/60 NO 129 GREENHECK CUBE-200-15 1, 2, 3, 4

TWO-PIPE FAN COIL UNIT SCHEDULE

MARK CONFIG.

AIRFLOW

(CFM)

ESP (IN WG)

CHILLED WATER COOILING COIL ELECTRICAL

EMERGENCY

POWER

FILTER BASIS OF DESIGN

REMARKSCAPACITY

(MBH)

MIN

ROWS

EAT (°F

DB/WB)

LAT (°F

DB/WB)

GPM EWT (°F) LWT (°F)

COOLING

COIL WPD (FT)

BHP HP FAN V/PH/HZ MERV

MANUFACTUR

ER

MODEL

FCU-1 HORIZONTAL 1800 0..5 56 4 78/65 55/54 11.2 43 53 3.6 0.6 1 460/3/60 NO 8 TRANE BCHD054G1**A3M04Z000000 1

FCU-2 HORIZONTAL 1800 0..5 56 4 78/65 55/54 11.2 43 53 3.6 0.6 1 460/3/60 NO 8 TRANE BCHD054G1**A3M04Z000000 1

EXPANSION TANK SCHEDULE

MARK TYPE FLUID TYPE

VOLUME

(GAL) ACCEPTANCE (GAL) PRE-CHARGE (PSI)

SIZE DIA x

LENGTH (IN x IN) MOUNTING

BASIS OF DESIGN

REMARKSMANUFACTURER MODEL

ET-1 DIAPHRAGM WATER 70 56.5 37.7 24"x46" FLOOR MOUNTED ARMSTRONG AX-120V 1

AIR SEPARATOR SCHEDULE

MARK SIZE (DIA. X LENGTH) GPM

BASIS OF DESIGN

REMARKS

MANUFACTURER MODEL

AS-1 32"x110" 3000 Spirotherm VDT1600 FA

AS-2 28"x98" 2500 Spirotherm VDT1400 FA

REMARKS:

1. PROVIDE WITH FULLY UNLOCKED CHILLER CONTROLLER.

2. PROVIDE WITH UNIT - MOUNTED VFD.

REMARKS:

1. PROVIDE WITH TEFC, PREMIUM EFFICIENCY MOTOR.

2. PROVIDE WITH SHAFT GROUND RINGS.

3. PROVIDE VFD WITH BYPASS AND IEEE 519 LINE REACTOR.

4. PROVIDE WITH YASKAWA VSD.

REMARKS:

1. PROVIDE WITH SIGHT GLASS.

REMARKS:

1. PROVIDE WITH 120V CONDENSATE PUMP

REMARKS

1. PROVIDE WITH PREMIUM EFFICIENCY MOTOR

2. PROVIDE WITH ROOF CURB.

3. PROVIDE WITH INTEGRAL STARTER & DISCONNECT.

4. PROVIDE 2 SPEED FAN WITH AIRFLOWS AS SCHEDULED.

EXISTING

CONDENSER WATER

HEADERS TO

COOLING TOWERS

CH-1

CH-2

CH-3

CH-4

CH-6

(FUTURE)

C H

W P

-1

C H

W P

-2

C H

W P

-6 (F

U T

U R

E

C H

W P

-5 (F

U T

U R

E

C H

W P

-4

VFD-CHWP-1 VFDVFD

CH-5

(FUTURE)

C H

W P

-3

VFD-CHWP-2

M0301

M0301

M0201

M0301

24" CWR

C H

W S

C H

W R

C W

R

C W

S

C H

W S 1

C H

W R

C W

R

C W

S

24" CWS

24" CHWS

12" CHWR

C W

S

C W

R

C H

W R

C H

W S

C W

S

C W

R

C H

W S

C H

W R

8" CHWS/R TO BUILDING

(EXISTING)

AS-1

AS-2

C H

W R

FCU-2

ET-1

4 4

20" CHWS

M0201

C H

W R

14" CHWS

12" CHWS

16" CWS20" CWS

20" CHWS

24" CWS

16" CWR 12" CWR

16" CHWR 20" CHWR

14" CHWR

C W

S

C H

W S

24" CHWR

20" CHWR

8"

8"

REFRIGERANT

LEAK

DETECTION

PANEL

WITH

HORN

AND

STROBE

1"

24" CHWR

14" CHWS

8" CHWS

x

E

A

CH-1

20" CWR

3 3

3 3

M0201

VFD

(FUTURE)

VFD

(FUTURE)

400-15 12X12

500-15 12X12

500-15 12X12

400-15 12X12

18x16

FCU-1

x

(TYP 2)

(TYP 2)

1 1/2" CHWS

1 1/2" CHWR

500-15 12X12

400-15 12X12

/2

C H

W S

/2

C H

W R

Level 1

ROOF

BOTTOM OF

STRUCTURE

20" CHWS

FUTURE CHILLED

WATER CONNECTION

POINT. PROVIDE

WITH BUTTERFLY

ISOLATION VALVE

AND BLANK OFF

PLATE (TYP)

14" CHWS/R TO

BUILDING (EXISTING)

Level 1

ROOF

24" CHWR

20" CHWR 16" CHWR 12" CHWR

V F

D -C

H W

P -3

V F

D -C

H W

P -4

V F

D (F

U T

U R

E

V F

D (F

U T

U R

E

C H

W R

C H

W R

C H

W R

C H

W R

C H

W R

C H

W R

CHWP-1 CHWP-2 CHWP-3 CHWP-4

CHWP-5

(FUTURE)

CHWP-6

(FUTURE)

V F

D -C

H W

P -1

V F

D -C

H W

P -2

Level 1

ROOF

24" CWS

24" CWR

12" CWR

12" CWS

(TYP 2)

(TYP 2)

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102HVAC DUCTWORK AND PIPING PLAN -

GROUND FLOOR

M0201

MEM ARO

1/4" = 1'-0"

CHILLER PLANT PIPING & DUCTWORK PLAN

KEYED NOTES:

1. 24"x24" EA UP TO EF-1 ON ROOF ABOVE.

2. FUTURE PIPING SHOWN WITH DASHED LINES.

3. PROVIDE BLIND FLANGE DOWNSTREAM OF VALVE FOR FUTURE

CONNECTION.

4. PROVIDE SPARE TEE, ISOLATION VALVE AND BLIND FLANGE FOR

FUTURE CONNECTION.

5. 2" RELIEF VENT UP THROUGH ROOF (TYP EACH CHILLER). COMPLY

WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.

6. 1" RELIEF VENT UP THROUGH ROOF (TYP EACH CHILLER). COMPLY

WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.

7. MOUNT 24"x24" GRILLE 18" AFF.

8. TEMPORARY CHILLED WATER PIPING CONNECTION TO REMAIN.

PROVIDE WITH BLIND FLANGE DOWNSTREAM OF ISOLATION

VALVE AFTER COMPLETION OF NEW WORK.

9. PROVIDE 1" COPPER CONDENSATE PIPING FROM FAN COIL UNIT

TO NEAREST FLOOR DRAIN. ALL CONDENSATE DRAIN PIPING

SHALL BE INSULATED WITH MINIMUM 1/2" FOIL FACED FIBERGLASS

INSULATION INSTALLED WITH PVC JACKET.

1/4" = 1'-0"

FUTURE CONNECTION SECTION VIEW

1/4" = 1'-0"

PUMP SECTION VIEW

24" CWR BELOW

1/4" = 1'-0"

CONDENSER WATER CONNECTION

EF-1

2" RELIEF VENT

FROM BELOW.

TERMINATE IN

GOOSENECK

(TYP)

1" RELIEF VENT

FROM BELOW

TERMINATE IN

GOOSENECK

(TYP)

1" RELIEF VENT

FROM BELOW

2" RELIEF VENT

FROM BELOW

1" RELIEF VENT

FROM BELOW

2" RELIEF VENT

FROM BELOW

1" RELIEF VENT

FROM BELOW

2" RELIEF VENT

FROM BELOW

2 2

2 2

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.62

© CannonDesign 2017 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation

SEPT 13, 2017

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA CHILLER PLANT

586-16-102HVAC DUCTWORK AND PIPING PLAN -

ROOF

M0202

MEM ARO

1/4" = 1'-0"

CHILLER PLANT…