36C25518R0074-00004000.docx

DOCX document 27 KB Posted

Attached to
Expand Parking Garage Project 589-401
Solicitation number
36C25518R0074
Issued by

About this file

36C25518R0074 00004 36C25518R0074 00004.docx

View the file

Other files

File Type Posted
36C25518R0074-00003001.pdf PDF
36C25518R0074-00003000.docx DOCX document
36C25518R0074-00002000.docx DOCX document
36C25518R0074-00002001.pdf PDF
36C25518R0074-00002002.pdf PDF
36C25518R0074-00001011.pdf PDF
36C25518R0074-00001013.pdf PDF
36C25518R0074-00001008.pdf PDF
36C25518R0074-00001009.pdf PDF
36C25518R0074-00001014.pdf PDF
36C25518R0074-00001006.pdf PDF
36C25518R0074-00001000.docx DOCX document
36C25518R0074-00001010.pdf PDF
36C25518R0074-00001007.pdf PDF
36C25518R0074-00001003.pdf PDF
36C25518R0074-00001002.pdf PDF
36C25518R0074-00001012.pdf PDF
36C25518R0074-00001001.pdf PDF
36C25518R0074-00001005.pdf PDF
36C25518R0074-00001004.pdf PDF
36C25518R0074-009.pdf PDF
36C25518R0074-006.pdf PDF
36C25518R0074-002.docx DOCX document
36C25518R0074-004.pdf PDF
36C25518R0074-005.pdf PDF
36C25518R0074-008.pdf PDF
36C25518R0074-007.pdf PDF
36C25518R0074-003.pdf PDF
36C25518R0074-001.docx DOCX document
36C25518R0074-000.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Project No. 589-401 04-07-18

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 04-24-2018 589-401 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25518R0074 03-16-2018

X X X April 30, 2018 by 1400 pm This Amendment for Expand Parking Garage, 589-401 completes the following:

a. All references within the Solicitation, provisions and clauses that reference 238120 Structural Steel and Precast Contractors with a size standard of $15 Million is hereby changed to NAICS Code 236220 with a size standard of $36.5 Million.

b. This Amendment adds the following Specification: 10 81 00 Bird Control Devices

c. This Amendment revises the Davis Bacon Wage Rates new posted rates MO180036 04/06/2018.

d. All other terms and conditions remain unchanged.

CONTINUATION PAGE

General Decision Number: MO180036 04/06/2018 MO36

Superseded General Decision Number: MO20170036

State: Missouri

Construction Type: Building

County: Boone County in Missouri.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 02/23/2018 2 03/16/2018 3 04/06/2018

ASBE0001-005 10/05/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 38.36 21.41

BOIL0083-005 01/01/2017

Rates Fringes

BOILERMAKER......................$ 36.56 28.11

BRMO0011-002 03/01/2017

Rates Fringes

BRICKLAYER.......................$ 29.76 17.39

TILE SETTER......................$ 29.76 17.39

CARP0010-009 05/01/2017

Rates Fringes

CARPENTER (Including Drywall Hanging, Form Work & Metal Stud Installation)...............$ 25.34 16.85

ELEC0257-001 03/01/2017

Rates Fringes

ELECTRICIAN......................$ 32.00 14.28

ENGI0513-002 05/01/2017

Rates Fringes

Power equipment operators:

Backhoe/Excavator...........$ 29.06 26.00 Bobcat/Skid Loader..........$ 29.06 26.00 Crane.......................$ 29.06 26.00 Forklift....................$ 29.06 26.00 Grader/Blade................$ 29.06 26.00 Loader......................$ 29.06 26.00 Paver.......................$ 29.06 26.00 Roller......................$ 29.06 26.00

IRON0396-005 08/02/2017

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 29.46 25.11

LABO0955-006 03/01/2018

Rates Fringes

LABORER

Asbestos Abatement from Floors, Walls & Ceilings....$ 25.01 13.49 Brick & Cement/Concrete Mason Tender................$ 25.71 13.79 Common or General; Asphalt Shoveler; Pipelayer.........$ 23.71 13.79

PAIN0002-004 04/01/2017

Rates Fringes

Painters:

Brush and Roller............$ 23.69 12.13 Drywall Finishing/Taping....$ 23.69 12.13

PAIN0513-002 11/01/2011

Rates Fringes

GLAZIER..........................$ 27.35 17.17

* PLAS0518-013 03/01/2018

Rates Fringes

PLASTERER........................$ 27.02 12.92

* PLAS0518-014 03/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.53 12.87

PLUM0562-001 07/01/2017

Rates Fringes

PIPEFITTER, Excludes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & over.........$ 39.25 27.18 Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 37.91 21.69 PLUMBER, Includes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & over.........$ 39.25 27.18 Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 37.91 21.69

ROOF0020-012 09/19/2016

Rates Fringes

ROOFER...........................$ 29.30 15.19

SFMO0669-001 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 34.79 15.84

SHEE0036-002 07/01/2017

Rates Fringes

SHEET METAL WORKER, Includes HVAC Duct and Unit Installation.....................$ 48.57 16.41

SUMO2010-035 06/14/2010

Rates Fringes

OPERATOR: Hoist.................$ 26.02 13.01

PAINTER: Spray..................$ 17.78 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

A.1 text goes here

SECTION 10 81 00

BIRD CONTROL DEVICES

GENERAL

1.1 SUMMARY

A. Section Includes:

1. Spike strip for mounting on building ledges or projections to deter birds from roosting and nesting.

1.2 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size and location for spike strip mounting.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

3. MSDS for any adhesive used in the installation

1.3 QUALITY ASSURANCE

A. Product source:

a. Obtain all materials from one manufacturer.

B. Product design: Provide product to match materials, design and color of existing spike strip.

1.4 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Protect spike strip from damage before, during and after installation.

1.5 WARRANTY

A. Construction Warranty: FAR clause 52.24621, "Warranty of Construction."

PRODUCTS

1.6 SYSTEM PERFORMANCE

A. Spike strip: Anti-landing spike strip designed to prevent birds from roosting and nesting on ledges and projections of buildings B. Construction: Stainless steel base with stainless steel spikes welded to base.

1.7 MATERIALS

A. Stainless Steel: ASTM A240/A240M, Type 304.

1.8 FABRICATION

A. Spikes: Protrude upward and outward, 4 inch min. height, from base with open end spacing to deter bird landing.

1. Weld spikes to base at 1.5 inches o.c..

2. Provide strips in multiple widths up to 8 inches.

B. Base: Stainless steel, of stock design as indicated on drawings.

C. Finish: Natural stainless steel.

1.9 ACCESSORIES

A. Adhesive: Manufacturer recommended and appropriate for mounting surface.

B. Mounting Hardware: Manufacturer’s standard mounting hardware and fasteners an appropriate to the substrate.

EXECUTION

1.10 PREPARATION

A. Visually inspect all installation surfaces. Make sure all surfaces are clean, dry and free from peeling paint, rust, bird droppings or other debris. Remove bird droppings in a safe and sanitary manner.

1.11 INSTALLATION

A. Install products according to manufacturer's instructions and approved submittal drawings.

B. Follow manufacturer’s recommended installation instructions.

C. Observe all clearances, spacing and setbacks.

1.12 INSPECTION

A. Visually inspect bird spike installation for poor adherence to mounting surfaces, or other problems related to poor installation or surface preparation.

B. Repair as necessary.

- E N D - 10 81 00 - 3

File details come from the government source that posted it.