S06 - RFI Log Amendment 3 - Replace HVAC Equipment B404.pdf
PDF 108 KB Posted
- Attached to
- Z2DZ--Replace HVAC B404 (C) 676-16-102
- Solicitation number
- 36C25221B0011
About this file
This document contains a pre-solicitation notice and request for information related to replacing HVAC equipment at a Veterans Affairs medical center. The Tomah VA Medical Center is seeking to replace HVAC equipment in Building 404 with a project price range between $2 million and $5 million. The NAICS code for this procurement is 238220 for plumbing, heating, and air conditioning contractors. The period of performance is 406 calendar days after notice to proceed. This opportunity is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Interested parties must be registered in the System for Award Management and have a current ORCA registration. The full solicitation is planned for publication the week of April 19, 2021 with a site visit. Point of contact information is provided.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions 585-18-118 Upgrade Entrances
RFI # RFI - Description REQUESTED BY Status/Comments 014 What percent of SDVOSB labor is required? Progressive Construction Services LLC 25% as this is a Construction Special Trade NAICS see
FAR 19.1308 (b) (4) 032 Section 22 11 00 indicates welder certification is required. Is weld testing required, and if so is UT testing an acceptable method? RHI, LLC Weld testing is not required for plumbing systems (division 22). Submission of welding certificates is required when welding of plumbing systems, plumbing support systems, accessories or any associated products or equipment is planned by the contractor. Anything the contractor is welding in a shop, in the field or a plumbing contractor sub‐ contractor then submit the welding certificates.
035 The following question on page four (4) of the solicitation states:
(1) Past Performance Point of Contact (within your company), include name and email address:
Please clarify if these points of contact are in regard to previous projects or previous employees.
AFCI
For the Past Performance Point of Contact on Page 4 of the solicitation. We are looking for the Name and email address of the contact signature authority. This is normally the Owner/President/Vice President or another Senior Executive of the business.
040 Could you please confirm the file size limit for receipt of attachments? American First Contracting, Inc. File size limitation is 10MB per email
041 Can proposals be submitted via email? The Povolny Group, Inc. Yes bids can be submitted by email.
Tomah VAMC Replace HVAC Equipment B404 VA Project # 676-16-102
File details come from the government source that posted it. Updated .