36C25218B0935-0006000.docx
DOCX document 29 KB Posted
- Attached to
- 676-18-201 Build Whole Health Complex Tomah VA Medical Center - Tomah, WI Federal contract opportunity
- Solicitation number
- 36C25218B0935
About this file
36C25218B0935 0006 36C25218B0935 0006.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25218B0935-048.docx | DOCX document | |
| 36C25218B0935-0005000.docx | DOCX document | |
| 36C25218B0935-0004000.docx | DOCX document | |
| 36C25218B0935-0003000.docx | DOCX document | |
| 36C25218B0935-0003002.pdf | ||
| 36C25218B0935-0003001.pdf | ||
| 36C25218B0935-0002000.docx | DOCX document | |
| 36C25218B0935-0002002.pdf | ||
| 36C25218B0935-0002003.pdf | ||
| 36C25218B0935-0002001.pdf | ||
| 36C25218B0935-0001002.pdf | ||
| 36C25218B0935-0001000.docx | DOCX document | |
| 36C25218B0935-0001001.pdf | ||
| 36C25218B0935-045.pdf | ||
| 36C25218B0935-041.pdf | ||
| 36C25218B0935-043.pdf | ||
| 36C25218B0935-046.pdf | ||
| 36C25218B0935-040.docx | DOCX document | |
| 36C25218B0935-042.pdf | ||
| 36C25218B0935-047.pdf | ||
| 36C25218B0935-044.pdf | ||
| 36C25218B0935-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-23-2018 676-18-3-6919-0019 676-18-201 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25218B0935 07-20-2018
X X X
676-3680162-6919-854200-3220 23NR8MA45
X Amendment A00006: See Continuation Page for specific details
** HOUR & DATE for Receipt of Offers is Monday, April 27, 2018 at 1:30 p.m. CST
All bid envelopes shall be addressed to Kristi Kluck AND Scott Cole.
Kristi Kluck Contracting Officer
SOLICITATION 36C25218B0935
AMENDMENT 00006
08/23/2018
| PROJECT: | 676-18-201 Build Whole Health | |
| LOCATION: | Tomah VA Medical Center in Tomah, WI |
Amendment 00006 hereby incorporates the following change(s)/clarifications into the solicitation package:
A.) VENDOR QUESTION(S), 8/22/2018
1. Plan page M-501 indicates the new Self-Contained Vertical Unit Ventilators are to be connected to the existing LPS & LPR piping from removed convectors. Is the existing pipe size adequate in each location to supply the new units or will connections need to be made back at the mains somewhere? I'm being told these three Vertical Unit Ventilators have a lead time of 10-16 weeks. I cannot find a manufacturer that will provide them with a steam coil. I would have to retrofit them with a steam coil.
VA REPLY: Tie into the steam lines from the removed steam unit. Extending the steam to the main should not be necessary.
The basis of design for the ventilator unit is manufactured by Modine/Airedale and they provide a steam coil in the plenum (a local supplier representative indicated “that the steam coils need to be mounted in the plenum that sits on top of the units. [The supplier] has both the coils and plenums as options available from the factory. So, this would be a slight amount of field assembly, but not too much.” The factory stated that these units will fit under a 9’1” ceiling (they are 9’0” with the steam coil and the free blow plenum).”
B.) VENDOR QUESTION(S), 8/22/2018
1. In Spec section 10 21 13 toilet compartments, it mentions 3 different styles of materials metal, stainless steel, and phenolic? Which material should I be quoting on this project?
VA REPLY: Stainless Steel.
C.) VENDOR QUESTION(S), 8/22/2018
1. In The grout that is spec for whole health is an industrial grade grout and the company does not recommend it for any tile over the size of 6"x6". This grout is used for commercial kitchens. Laticrete did not recommend using this grout in this situation. They make a regular epoxy for these situations.
VA REPLY: Contractor shall utilize regular epoxy grout.
Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
The date for the public bid opening has NOT been extended; bids are due no later than Monday, August 27, 2018 at 1:30 p.m. CST. Bid shall be addressed to Kristi Kluck AND Scott Cole.
The location for the public bid opening has NOT changed; bid opening is being held at the Honey Creek Business Park - 115 S. 84th Street - Suite 101, Milwaukee, WI 53214-1476.