36C25218B0935-0003002.pdf
PDF 1 MB Posted
- Attached to
- 676-18-201 Build Whole Health Complex Tomah VA Medical Center - Tomah, WI Federal contract opportunity
- Solicitation number
- 36C25218B0935
About this file
36C25218B0935 0003 S06 A0003_Att2 DWG AD01.1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25218B0935-048.docx | DOCX document | |
| 36C25218B0935-0006000.docx | DOCX document | |
| 36C25218B0935-0005000.docx | DOCX document | |
| 36C25218B0935-0004000.docx | DOCX document | |
| 36C25218B0935-0003001.pdf | ||
| 36C25218B0935-0003000.docx | DOCX document | |
| 36C25218B0935-0002001.pdf | ||
| 36C25218B0935-0002000.docx | DOCX document | |
| 36C25218B0935-0002002.pdf | ||
| 36C25218B0935-0002003.pdf | ||
| 36C25218B0935-0001002.pdf | ||
| 36C25218B0935-0001000.docx | DOCX document | |
| 36C25218B0935-0001001.pdf | ||
| 36C25218B0935-043.pdf | ||
| 36C25218B0935-046.pdf | ||
| 36C25218B0935-040.docx | DOCX document | |
| 36C25218B0935-047.pdf | ||
| 36C25218B0935-044.pdf | ||
| 36C25218B0935-045.pdf | ||
| 36C25218B0935-041.pdf | ||
| 36C25218B0935-042.pdf | ||
| 36C25218B0935-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2018 Nagel Architects + Engineers
8/
/2
:2
PM
B
IM
S er ve r:
N ag el
B
IM
S er ve r V
BI
M
S er ve r 2
1/ To m ah
-B
7-
AD01.01
PROJECT:
TITLE:
SCALE:
DATE:
DRAWN BY:
PROJECT NO.:
COPYRIGHT
SHEET
All rights reserved.
Whole Health Clinic
BALLET BARRE DETAILS
17058
Thomas Ostergaard
AS NOTED
8/17/2018 architects + engineers 13100 watertown plank road suite 200 elm grove, wi 53122 262.641.0746
SCALE: 3'' = 1' - 0''
1 BALLET BARRE DETAIL
0 3'' 6'' 9''
3" MIN
EXISTING WALL
EXPANSION
ANCHOR
1. BARRES TO BE SOLID MAPLE W/ LOW VOC
POLYURETHANE FINISH.
2. BRACKETS & EXTENSION STUDS TO BE STAINLESS
STEEL WITH CHROME FINISH.
3. MOUNT BRACKETS TO WALL SUCH THAT ANY POINT
ON THE BARRE CAN RECEIVE 200 LBS OF FORCE
WITHOUT COMING LOOSE FROM WALL.
4. MOUNT BRACKETS EVERY 60" OC MAX AND WITHIN 12"
OF ENDS OF BARRES.
brettl Typewritten Text
OR MOUNT PER BRACKET MANUFACTURER'S MOUNTING INSTRUCTIONS
| WHOLE HEALTH CLINIC ALTERATION - AD01.1 |
| Whole Health Clinic |
| AD01 ADDENDUM NO 01 |
| AD01.01 BALLET BARRE DETAILS |
File details come from the government source that posted it.