About this file

36C25218B0935 0002 S06 36C25218B0935 A002_Att2 DWG AD001.Rev1.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 676-18-201 Build Whole Health Complex Tomah VA Medical Center - Tomah, WI, newest first.
File Type Posted
36C25218B0935-048.docx DOCX document
36C25218B0935-0006000.docx DOCX document
36C25218B0935-0005000.docx DOCX document
36C25218B0935-0004000.docx DOCX document
36C25218B0935-0003000.docx DOCX document
36C25218B0935-0003002.pdf PDF
36C25218B0935-0003001.pdf PDF
36C25218B0935-0002000.docx DOCX document
36C25218B0935-0002003.pdf PDF
36C25218B0935-0002001.pdf PDF
36C25218B0935-0001002.pdf PDF
36C25218B0935-0001000.docx DOCX document
36C25218B0935-0001001.pdf PDF
36C25218B0935-045.pdf PDF
36C25218B0935-041.pdf PDF
36C25218B0935-042.pdf PDF
36C25218B0935-043.pdf PDF
36C25218B0935-046.pdf PDF
36C25218B0935-040.docx DOCX document
36C25218B0935-047.pdf PDF
36C25218B0935-044.pdf PDF
36C25218B0935-000.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5/02/2018

Whole Health Clinic Alteration

Tomah, WI AD001Thomas

Ostergaard Brett J.

Luecke , AIA

SECOND FLOOR DEMOLITION

PLAN13100 watertown plank road suite 200 Elm Grove, WI 53122

Nagel Architects Project Number: 17058

CONSTRUCTION

DOCUMENTS

676-18-201

B407

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BI

M

S er ve r:

N ag el B

IM

S er ve r V

BI

M S er ve r 2 1/

To m ah -B

7-

8/

/2

8, 2:

P

M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

D

N

DN

D

N

U P

U P

SCALE: 1/8'' = 1' - 0''

F2 SECOND FLOOR DEMOLITION PLAN

0 4' 8' 16'

1 2

2.1

4 4.1

5 6 8 10

11.1

11.1

11.2 12.1 13.1

B

AA

B.1

C

C.1

D D.1

EE

F

G.1

H

I

H.1

H.2

J

K

L

M

N

6'-8"

8"

8"

8" 1'-10 1/2"

1'-6 1/4"

4"

1' -0

1'

-5

13 13

22222

9 9

WAITING

20743

TLT

20743A

STAIR

S5

LOBBY

ELEVATOR

7C25

CONFERENCE

20742

TLT

20762A

TLT

2748B

CORRIDOR

7C23

CORR

7C27

CORR

7C29

CORR

7C28

CORR

7C26

SOILED

20739

STO

20745

COPIER ROOM

20747

OFFICE-1

20749 TLT

OFFICE-1

20761

CLASS ROOM SUITE

20755

WELLNESS

CIH

20762

WELLNESS

CIH

20763

WELLNESS

CIH

20765

WELLNESS

CIH

20766

OFFICE-2

20769

WELLNESS

CIH

20770

ELECT

20771

STAIR

S4

STAFF

2785A

BREAK

20783

HEALING SPACE SUITE

20775

SUITE

WELLNESS

20781

HOUSEKEEPING

20782

OFFICE-1

20784

WOMEN'S

20790

SUITE

WELLNESS

20799

ELEVATOR

RECEPTION

20743B

F9 GENERAL & KEYNOTES

DEMOLITION KEY NOTES

EXISTING PLUMBING FIXTURE TO BE REMOVED & SALVAGED. CAP LINES

BEHIND WALL AT RISER. SEE PLUMBING DWGS. PATCH WALL/FLOOR TO

RECEIVE NEW FINISHES. BID DEDUCT 1 - SALVAGE & REUSE ALL

INDICATED FIXTURES.

EXISTING HAND RAIL TO BE REMOVED & DISPOSED OF. PATCH WALL TO

RECEIVE NEW FINISHES.

EXISTING FIXTURE TO BE REMOVED & DISPOSED OF. PATCH WALL/FLOOR

TO RECEIVE NEW FINISHES. BID DEDUCT 1 - SALVAGE & REUSE ALL

INDICATED FIXTURES.

REMOVE EXISTING ACOUSTICAL CEILING TILE THIS ROOM

REMOVE EXISTING WALL COVERING AND/OR WAINSCOTTING THIS ROOM

REMOVE EXISTING CARPET & VINYL BASE THIS ROOM

REMOVE EXISTING CEILING TRACK THIS ROOM

EXISTING SHELVING TO REMAIN. PREP TO RECEIVE NEW PAINT.

REMOVE EXISTING VINYL BASE THIS ROOM

REMOVE EXISTING CABINET. PATCH WALL TO RECEIVE NEW FINISHES

WHERE NECESSARY.

REMOVE EXISTING ROBE HOOKS. PATCH WALL TO RECEIVE NEW

FINISHES WHERE NECESSARY.

SALVAGE EXISTING COAT RACK & RETURN TO OWNER. PATCH WALL TO

RECEIVE NEW FINISHES WHERE NECESSARY.

REMOVE EXISTING TACKBOARD. PATCH WALL TO RECEIVE NEW FINISHES

WHERE NECESSARY.

REMOVE EXISTING MIRROR. PATCH WALL TO RECEIVE NEW FINISHES

WHERE NECESSARY.

REMOVE EXISTING CLOCK. PATCH WALL TO RECEIVE NEW FINISHES

WHERE NECESSARY.

REMOVE EXISTING DRYER VENT. PATCH WALL TO RECEIVE NEW FINISHES

WHERE NECESSARY.

REMOVE WINDOW - BID DEDUCT 4 EXISTING TO REMAIN

EXISTING SHELVING TO BE REMOVED & DISPOSED OF. PATCH WALL TO

RECEIVE NEW FINISHES WHERE NECESSARY.

REMOVE EXISTING TILE FLOOR THIS ROOM

REMOVE EXISTING EPOXY FLOOR THIS ROOM

DEMOLITION NOTES - GENERAL

A. EXISTING BUILDING PLANS HAVE BEEN SHOWN ACCORDING TO

ORIGINAL BUILDING PLANS AND FIELD NOTES AND MEASUREMENTS.

EXISTING CONDITIONS AND DIMENSIONS SHALL BE FIELD VERIFIED BY

CONTRACTORS AND DISCREPANCIES REPORTED TO THE ARCHITECT

PRIOR TO FRAMING.

B. CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING

BUILDING AMENITIES NOT SLATED FOR DEMOLITION OR REMODELING.

EXISTING WALLS, PARTITIONS, FLOOR LINES AND DOORS AND FRAMES

THAT REMAIN ARE SHOWN IN CONTINUOUS LINE WEIGHT. THESE AND

EXISTING FLOOR AND WALL FINISHES THAT ARE SCHEDULED TO REMAIN

SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION AND

CONSTRUCTION. ANY SUCH EXISTING CONDITIONS WHICH ARE

DAMAGED OR BECOME UNSTABLE DUE TO OTHER DEMOLITION SHALL BE

REPLACED AT NO COST TO OWNER WITH NEW CONSTRUCTION TO

MATCH.

C. ALL EXISTING WALLS, PATCH FLUSH TO REPAIR EXISTING HOLES,

DAMAGED AREAS AND WHERE WALLS WERE PREVIOUSLY REMOVED, OR

UTILITY MODIFICATIONS WERE PERFORMED. PROVIDE NEW FINISHES

PER SCHEDULE. PATCH AND REPAIR EXISTING WALLS TO REMAIN TO

PROVIDE A SUITABLE SURFACE FOR NEW FINISHES.

D. GC SHALL PROVIDE AND MAINTAIN APPROPRIATE BARRICADES AND

SAFETY MEASURES IN AREAS OF CONSTRUCTION AT ALL TIMES.

E. ALL CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF EACH

SUBCONTRACTOR UNLESS OTHERWISE STIPULATED BY OR ARRANGED

WITH THE GC.

F. PROVIDE GYPSUM BOARD CONTROL JOINTS AT ALL LOCATIONS

WHERE NEW WALL SURFACE MEETS EXISTING TO REMAIN.

G. ALL DIMENSIONS NOTED TO BE VERIFIED SHALL BE VERIFIED ON SITE

BY THE CONTRACTOR AND REPORTED TO THE ARCHITECT FOR

CONFIRMATION PRIOR TO FRAMING OF WALLS.

H. DIMENSIONS NOTED AS CLEAR OR CL'R ARE FINAL FINISHED WALL

SURFACE TO FINAL FINISHED WALL SURFACE, SEE FINISH SCHEDULE AND

VERIFY FINAL FINISH OF WALL PRIOR TO FRAMING.

I. REMOVE EXISTING FLOOR FINISHES SLATED FOR DEMOLITION TO SUB

FLOOR AND PREPARE FOR NEW FINISHES.

J. SALVAGE EXISTING LIFE SAFETY EQUIPMENT, FIRE EXTINGUISHERS,

EXIT SIGNS, ETC. FOR REUSE, RETURN EXCESS EQUIPMENT TO OWNER.

K. SALVAGE EXISTING DOOR HANDLE HARDWARE & LOCKS & RETURN TO

OWNER.

M. REMOVE & DISPOSE OF ALL INTERIOR SIGNAGE, VINYL BASE &

WINDOW TREATMENTS.

N. REMOVE SHARPS CONTAINERS, FEMININE NAPKIN DISPOSALS, PAPER

TOWEL DISPENSERS, SOAP DISPENSERS, ROBE HOOKS & CUP HOLDERS.

O. SALVAGE ALL MIRRORS FOR REUSE.

1 DOOR DEMOLITION 16 AUG 2018

WHOLE HEALTH CLINIC ALTERATION - AD001 - REVISION 1
Whole Health Clinic
AD0 DEMOLITION
AD001 SECOND FLOOR DEMOLITION PLAN

File details come from the government source that posted it.