RFI LPA response.docx
DOCX document 24 KB Posted
- Attached to
- C1DA--Prepare Site for PET-CT 539-CSI-204
- Solicitation number
- 36C25020B0056
About this file
This notice provides details for a forthcoming solicitation for a Prepare Site for PET-CT project at the Department of Veterans Affairs Cincinnati VA Medical Center. The project magnitude is between $500,000 to $1,000,000 and will be issued as a 100% set-aside for small businesses with a preference for service-disabled veteran-owned small businesses. Offerors must be registered and verified in the Vendor Information Pages and System for Award Management databases. The project duration shall not exceed 180 calendar days from receipt of the notice to proceed. Bonds in the form of offer, payment, and performance will be required. Interested parties should register in the interested vendors section to receive the full solicitation when released on or about July 29, 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PreBid meeting minutes for Prep Site for PET CT.pdf | ||
| 36C25020B0056 0004.docx | DOCX document | |
| Site Visit Sign in.pdf | ||
| CLARIFICATION OF BID SUBMISSIONS.docx | DOCX document | |
| 36C25020B0056 0003.docx | DOCX document | |
| 539-CSI-204 DRAWINGS ADDENDUM 1.pdf | ||
| 36C25020B0056 0002.docx | DOCX document | |
| Wage Determinations General Decision Number OH20200082.pdf | ||
| 36C25020B0056 0001.docx | DOCX document | |
| 539-CSI-204 SPECIFICATION 2020 0127.pdf | ||
| 539-CSI-204 CD DRAWINGS 0127-2020.pdf | ||
| Contractor Certification Regarding EMR 02.docx | DOCX document | |
| Contractor Certification Regarding EMR.docx | DOCX document | |
| RFI Form.docx | DOCX document | |
| 36C25020B0056_1.docx | DOCX document | |
| WAGE DETERMINATIONS.6.23.20.docx | DOCX document | |
| 539-CSI-204_Brand Name Justification Honeywell Fire Alarm -1851.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI) 36C25019B0022
| PROJECT NUMBER: |
| 539-CSI-204 |
| Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner. |
| PROJECT TITLE: |
| Prepare Site for PET-CT |
| PROJECT LOCATION: |
| Department of Veterans Affairs |
Cincinnati VA Medical Center 3200 Vine Street Cincinnati, OH 45220
| SUBMITTED BY: |
| Steve Burcham - Calvary Contracting, Inc. |
| City/State: |
| Tipp City, Ohio |
| PHONE NO.: |
| 937-506-7309 |
TO: Contract Specialist Patrice Scott (email: Patrice.Richardson-Scott@va.gov)
| RFI NO.: 1 |
| DATE: 8/18/2020 |
| REFERENCE: No Division 8 specs |
REPLY NEEDED BY:
INFORMATION NEEDED:
1. New Control Window. Need the specs for lead lined hollow metal frame and the radiation shielding leaded glass
2. Do we need specs for the relocating the existing sprinkler head?
3. The solicitation calls out for the work to be done in 180 days. The statement of work in the specs calls for the work to done in 90 days. Please clarify which is correct.
REPLY:
1. Requirements for the lead line hollow metal frame are as follow:
Frames shall be manufactured from cold rolled steel per ASTM A568 and ASTM A366 in 16 gauge.
Lead lining: Refer to Section 13 49 00, RADIATION PROTECTION Glass - refer to forthcoming Addendum #1 – VP from LPA
2. Relocation of sprinkler heads is not anticipated as part of this project – existing sprinkler heads shall remain in place and be protected throughout construction. Regarding potential relocation of existing sprinkler piping to accommodate new AC unit (Note 30 on Sheet 1-M102), spec section 21 13 13 Wet Pipe Sprinkler Systems is being added to the project – refer to forthcoming Addendum #1. – JC from STAN Engineers
3. 180 days is the correct duration for the project.
| REPLY FROM: |
| DATE: |
| ATTACHMENTS: |