539-CSI-204 CD DRAWINGS 0127-2020.pdf
PDF 15 MB Posted
- Attached to
- C1DA--Prepare Site for PET-CT 539-CSI-204
- Solicitation number
- 36C25020B0056
About this file
This document provides details for a federal contract opportunity to prepare a site for a PET-CT scanner at the Veterans Administration Cincinnati Medical Center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 will issue solicitation number 36C25020B0056 for project number 539-CSI204, with a projected value between $500,000 and $1,000,000. The work must be completed within 180 calendar days of receipt of the notice to proceed. The North American Industry Classification System code is 236220 for commercial and institutional building construction, and the business size standard is $39.5 million or less to qualify as small. The solicitation will be set aside 100% for small businesses with a preference for service-disabled veteran-owned small businesses. Interested offerors must register on the Vendor Information Pages and System for Award Management websites. Offerors must demonstrate no more than three serious or one repeat or willful Occupational Safety and Health Administration or Environmental Protection Agency violations in the past three years, and an experience modification rate of 1.0 or less. Performance and payment bonds will be required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PreBid meeting minutes for Prep Site for PET CT.pdf | ||
| 36C25020B0056 0004.docx | DOCX document | |
| RFI LPA response.docx | DOCX document | |
| Site Visit Sign in.pdf | ||
| CLARIFICATION OF BID SUBMISSIONS.docx | DOCX document | |
| 36C25020B0056 0003.docx | DOCX document | |
| 539-CSI-204 DRAWINGS ADDENDUM 1.pdf | ||
| 36C25020B0056 0002.docx | DOCX document | |
| Wage Determinations General Decision Number OH20200082.pdf | ||
| 36C25020B0056 0001.docx | DOCX document | |
| 539-CSI-204 SPECIFICATION 2020 0127.pdf | ||
| Contractor Certification Regarding EMR 02.docx | DOCX document | |
| Contractor Certification Regarding EMR.docx | DOCX document | |
| RFI Form.docx | DOCX document | |
| 36C25020B0056_1.docx | DOCX document | |
| WAGE DETERMINATIONS.6.23.20.docx | DOCX document | |
| 539-CSI-204_Brand Name Justification Honeywell Fire Alarm -1851.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 - C1 - Cover Sheet 02 - C2 - Disclaimer - Site Readiness 03 - A1 - General Notes 04 - A2 - Equipment Layout 05 - A3 - Radiation Protection 06 - A4 - Equipment Dimensions (1) 07 - A5 - Equipment Dimensions (2) 08 - A6 - Delivery 09 - S1 - Structural Notes
SheetFormat
Concession
Scale DateFile Name
RevS.O. (GON)
A3
Cincinnati, Ohio
Christopher Walker
DISCOVERY MI PET/CT
APP
GE Healthcare
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings. /17PET-M146472-FIN-00-A.DWG
502 475 9859
Christopherwalker@ge.com
APP 5661740-1EN
USA
1/4"=1'-0"
4775174
29/OCT/2019
Cincinnati VA Medical Center
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning -
Drawn by Verified by PIM Manual
REV DATE MODIFICATIONS
A 29/OCT/2019 Final based on Request DC-203234
FINAL STUDY
10 - S2 - Structural Layout 11 - S3 - Structural Details (1)
12 - M1 - HVAC
13 - E1 - Electrical Notes 14 - E2 - Electrical Layout 15 - E3 - Electrical Elevations 16 - E4 - Power Requirements 17 - E5 - Details - Interconnections
GLOBAL SITE READINESS CHECKLIST (DI)
DOC1809666 Rev. 6
Customer Name: PMI Name:
GON/SO Number: Field Service Name:
Equipment: Country/City or City/State:
Site Visit Date for SRC: SRC Status:
Site Ready Checks at Installation
General Site Planning
Room dimensions, including ceiling height, for all Exam, Equipment/Technical & Control rooms meets GE specifications.
Ceiling support structure, if on the GE drawing, is at correct location and height according to the drawing specifications. Levelness and spacing has been measured. Overhead support Structure has been confirmed with contractor to meet GE criteria.
Rooms that will contain equipment, including staging areas if applicable, are construction debris free. Precautions must be taken to prevent debris from entering rooms containing equipment.
Finished ceiling is installed. If applicable ceiling tiles installed per PMI discretion.
Delivery route from truck to installation space has been reviewed, all communications have occurred, arrangements made for special handling (if needed). Floors along delivery route will support weight of the equipment, reinforcements arranged if needed.
System power & grounding (PDB/MDP) is available as per GE specifications, installed at point of final connection and ready to use. Lock Out Tag Out is available.
System power and grounded audit has been scheduled to be completed during installation of equipment. (If Required) GEHC PM to confirmed if needed.
Adequate room illumination installed and working.
Cableways (floor, wall, ceiling, etc.) ready for GE cables and are of correct length and diameter. Cableways routed per GE Final drawings and access openings installed as determined by GEHC PM. Surface floor duct installed at time of system installation.
HVAC systems Installed, and the site meets minimum environmental operational system requirements.
Network outlets installed and computer network available and working.
Hospital IT/connectivity contacts have been engaged and information has been added to Project management tool. (If Required)
Floor levelness/flatness is measured and within tolerance, and there are no visible defects per GEHC specifications. Floor Strength and thickness have been discussed with customer/contractor and they have confirmed GE requirements are met.
Customer supplied countertops where GE equipment will be installed are in place.
Specific for PET and Nuclear Medicine
Nuclear Medicine systems levelness measurement survey must be provided to GE prior the delivery.
Site has license for using/importing radioactive sources and a Hot Lab is available. Radioactive Sources should be available for system calibration during installation.
Doors and windows complete or scheduled to be installed. If applicable, radiation protection (shielding) finished & radioprotection regulatory approval for installation obtained.
PMI Signature:
Customer Signature:
FS Signatature: optional
GENERAL SPECIFICATIONS
GE is not responsible for the installation of developers and associated equipment, lighting, cassette trays and protective screens or derivatives not mentioned in the order.
The final study contains recommendations for the location of GE equipment and associated devices, electrical wiring and room arrangements. When preparing the study, every effort has been made to consider every aspect of the actual equipment expected to be installed.
The layout of the equipment offered by GE, the dimensions given for the premises, the details provided for the pre-installation work and electrical power supply are given according to the information noted during on-site study and the wishes expressed by the customer.
The room dimensions used to create the equipment layout may originate from a previous layout and may not be accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of information.
Dimensions apply to finished surfaces of the room.
Actual configuration may differ from options presented in some typical views or tables.
If this set of final drawings has been approved by the customer, any subsequent modification of the site must be subject to further investigation by GE about the feasibility of installing the equipment. Any reservations must be noted.
The equipment layout indicates the placement and interconnection of the indicated equipment components.
There may be local requirements that could impact the placement of these components. It remains the customer's responsibility to ensure that the site and final equipment placement complies with all applicable local requirements.
All work required to install GE equipment must be carried out in compliance with the building regulations and the safety standards of legal force in the country concerned.
These drawings are not to be used for actual construction purposes. The company cannot take responsibility for any damage resulting therefrom.
CUSTOMER RESPONSIBILITIES
It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final study. A detailed site readiness checklist is provided by GE. It is the responsibility of the customer to ensure all requirements are fulfilled and that the site conforms to all specifications defined in the checklist and final study. The GE Project Manager of Installation (PMI) will work in cooperation with the customer to follow up and ensure that actions in the checklist are complete, and if necessary, will aid in the rescheduling of the delivery and installation date.
Prior to installation, a structrual engineer of record must ensure that the floor and ceiling is designed in such a way that the loads of the installed system can be securely borne and transferred. The layout of additional structural elements, dimensioning and the selection of appropriate installation methods are the sole responsibility of the structural engineer. Execution of load bearing structures supporting equipment on the ceiling, floor or walls are the customer's responsibility.
RADIO-PROTECTION
Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local regulations. GE does not take responsibility for the specification or provision of radio-protection.
DISCLAIMER
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
DATE NAME SIGNATURE
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center C2 - Disclaimer - Site Readiness 02
Any deviation from these drawings must be communicated in writing to and reviewed by your local GE Healthcare Installation project manager prior to making changes.
Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation project manager can supply a reference list of rigging contractors.
New construction requires the following;
1. Secure area for equipment,
2. Power for drills and other test equipment,
3. Capability for image analysis,
4. Restrooms.
Provide for refuse removal and disposal (e.g. crates, cartons, packing)
It is the customer's responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system preinstallation manual for the vibration specification.
CUSTOMER SITE READINESS REQUIREMENTS
IMPORTANT CUSTOMER READINESS ALERT
This equipment involves the use of radioactive isotopes, including those sources necessary for equipment calibration. Appropriate regulatory compliance and licensing must be arranged by the customer early in the planning process and then demonstrated/available for equipment installation.
Note: delivery path down corridors for gantry's and table must be evaluated prior to construction, as 90 degree turns require specific corridor width.
ENVIRONMENT
ALTITUDE
Operating altitude: from -150 m [-492 ft] (below) to 2400 m [7875 ft] (above) sea level.
MAGNETIC FIELD SPECIFICATIONS
Limit the magnetic interference to guarantee specified imaging performance.
GANTRY
Ambient static magnetic fields less than 1 Gauss.
Ambient AC magnetic fields less than 0.01 Gauss.
OPERATOR CONSOLE
Ambient static magnetic fields less than 10 Gauss.
MAXIMUM GANTRY AUDIBLE NOISE LEVEL
The maximum ambient noise level is produced by the gantry during a CT scan acquisition.
It is less than 70 dBA when measured at a distance of one meter from the nearest gantry surface, in any direction.
BACKGROUND RADIATION
It is important that background radiation be kept to a minimum. The coincidence detection used in a PET system allows a moderate amount of external singles events. The PET/CT system has been found to have less than 1% deadtime if the external field is below 1 mR/hr from a single source.
Because area background can be more general than a single source, a lower limit is appropriate. If the area dose rate is maintained to less than 0.2 mR/hr (due to 511 or lower energy gamma rays) at the covers, detector deadtime should not exceed 1%.
Radioactive sources must be stored in approved shielded containers. It is recommended that any radioactive source not specifically designed to be housed in the gantry's lead storage container be stored in a separate room (hot lab) adjacent to, and accessible from, the Scan Room. Doses should be prepared in the same area.
VIBRATION SPECIFICATIONS
Shock Restrictions: The system cannot tolerate shock or vibration. System components cannot be tipped, dropped, or hoisted.
The scanning facility shall be isolated from vibration such as; hospital power plants, pumps, motors, air handling equipment, air conditioning units, nearby rooms with exercise equipment or where exercise occurs, hallway foot traffic, elevators, parking lots, roads, subways, trains, and heliports; otherwise, vibration will affect the image quality of the scanner.
CT systems are sensitive to vibration and may display limited performance if exceeding the vibration limits listed below. The band of frequencies in which systems exhibit the most sensitivity appears at or near the resonant frequencies of the gantry and the patient table, the latter of which varies depending on patient mass and location. These frequencies fall within the following ranges:
• Patient Table: 2 – 10 Hz
• Gantry: 8 – 14 Hz
It is the customer’s responsibility to contract a vibration consultant or qualified engineer to verify that these specifications are met and implement an appropriate solution.
The maximum steady state vibration transmitted through the floor should not exceed 2.5 mm/s² RMS maximum single frequency above ambient baseline from 0.5 to 80 Hz (measured in any 1 hour during a normal operating period).
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center A1 - General Notes 03
The GE HPI Technical Support Group is an additional resource that can provide answers for general GE product siting questions and can be reached at (877)-305-9677 or mail to:HPITechCOE@ge.com
For Accessory Sales: (866) 281-7545 Options 1, 2, 1, 2 or mail to: gehcaccessorysales@ge.com
Exam Room Height
Finished Ceiling Height rec. 9'-0"
LEGEND
A GE Supplied C Customer/contractor supplied and installed
B GE Supplied/contractor installed D Available from GE E Existing/Reinstall
BY ITEM DESCRIPTION
MAX
HEAT
OUTPUT
(btu)
WEIGHT
(lbs)
A 1 Discovery MI Gantry 28320 6383
A 2 Patient Table 1023 1808
A 3 Power Distribution Unit 3400 813
A 4 PARC4 6824 540
A 5 Annulus Phantom Safe - 330
A 6 Service Cabinet - 90
A 7 Chiller 13649 320
A 8 Power Distribution Box - 66
A 9 Operators Console 3625 144
B 10 Main Disconnect Panel - 46
D 11 Laser on Ceiling - -
D 12 Laser on Wall - -
A 13 Operators Chair - -
A 14 Advantage workstation 2019 22 D 15 Workspace Table - 154
A 16 Uninterruptible Power Supply (14 kVA) 5122 619
C 17 Counter top for equipment
C 18 Lead glass window
C 19 Minimum door opening for equipment delivery is 55 in. w x 80 in. h [1397mm x 2032mm], contingent on a 96 in. [2438mm] corridor width
POSITION TO BE DEFINED CONTROL ROOM
EXAM ROOM
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center A2 - Equipment Layout 04
7'-4"
14'-8"
19'-2"
4'-1"
1' -3
9' -0
'-9
'-1
1" 8'
-1 1"
12'-3"
7' -1
1"
EX
ST
'-7
5 8"
11 1212
1.32.65.210.410.45.22.61.3
RADIATION PROTECTION LAYOUT
SHIELDING REQUIREMENTS:
Engage a qualified radiological health physicist to review your scan room shielding requirements, taking into consideration:
Scatter radiation levels within the scanning room.
Equipment placement.
Weekly projected work-loads (number of patients/day technique
(kvp*ma)).
Materials used for construction of walls, floors, ceiling, doors, and windows.
Activities in surrounding scan room areas.
Equipment in surrounding scan room areas (e.g., film developer, film storage).
For small and medium filter survey, the 20 cm water phantom should be placed on the phantom headholder inserted into the end of the patient table.
The four scatter surveys depict measured radiation levels within the scanning room at the indicated distanced, while scanning a 16 cm CTDI phantom for the Head Scan mode and 32 cm CTDI phantom for the Body Scan Mode. Use the mAs, kV and aperture scaling factors in the table shown here to adjust exposure levels to the scan technique used at the site.
For example: The exposure level for a 120 kV, 800 mA, 1 sec scan at 50" (127 cm) away from the scan plane is: 10.4 ˃Dȅ Ҏ лΦтм Ҏ уллκмлл Ґ рфΦм ˃Gy
NOTE: Actual measurements can vary. Expected deviations equals ҕмр҈Σ ŜȄLJŜŎǘ ŦƻNJ ǘƘŜ р Ƴ! ŀƴŘ мΦнрƳƳ ǘŜŎƘƴƛljdzŜǎΣ ǿƘŜNJŜ ǾŀNJƛŀǘƛƻƴǎ may be greater (up to a factor of 2), due to the inherent deviation in small values. The maximum deviation anticipated for tube output Ŝljdzŀƭǎ ҕпл҈Φ
SHIELDING REQUIREMENTS SCALING
CHANGED PARAMETER MULTIPLICATION FACTOR
mAs new mAs/100
80 kV 0.24
100 kV 0.45
120 kV 0.71
140 kV 1.00 1 mm aperture 0.20 3 mm aperture 0.22 5 mm aperture 0.27 10 mm aperture 0.38 15 mm aperture 0.48 20 mm aperture 0.59 30 mm aperture 0.79 40 mm aperture 1.00
RADIOACTIVE ISOTOPES
RADIOACTIVE ISOTOPES AND RADIOPROTECTION
Since the system produces X-ray radiation and involves the use of radioactive isotopes, compliance with Nuclear Regulatory Commission regulations (or country similar regulatory requirements), must be adhered to and all permissions obtained well in advance.
It is Customer's responsibility consult a qualified radiological health physicist for radiation protection requirements for the walls, floor, ceiling, doors, window glass, etc.(lead content and thickness) and warning lights and signs, in accordance with local requirements.
It is essential that regulatory compliance and preparations are completed early so that required source materials can be obtained prior to installation, including calibration sources and isotopes. These sources and isotopes may have fairly long delivery lead times and a short half-life, so that it may not be advisable to store them over long periods of time.
RADIOACTIVE SOURCE - ISOTOPE
The PET/CT system uses one radioactive source during calibration and the Daily QA Check.
Isotope Ge-68 Activity level рр a.lj ҕ нл҈
Typical Positron Emitting Isotopes include
Fluorine 18
Carbon 11 Nitrogen 13
Oxygen 15
It is customer's responsibility provide isotopes for system calibration and prepare the required doses.
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center A3 - Radiation Protection 05
7'-4"
'-9
GANTRY WITH PATIENT TABLE
SIDE VIEW
TOP VIEW
SCALE 1:50
[152 in]
[28 in]
[152 in]
PET primary scan plane CLCT scan plane CL
[28 in]
[113 in]
[74 in]
[74 in]
CT CONSOLE
Center of Gravity
SIDE VIEWFRONT VIEW
TOP VIEW
CONSOLE DIMENSIONS
SCALE 1:20
CUSTOMER SUPPLIED TABLE
[16 in]
[24 in]
[4 in]
[16 in]
[6 in]
PARC4 RECONSTRUCTION CABINET
SCALE 1:20
Minimum air flow clearance
SIDE VIEW FRONT VIEW
Cable inlet at the rear back of the equipment
152.4 [6 in]
152.4 [6 in]
1357.6 [53.4 in]
613.5 [24.2 in]
1315.2 [51.8 in]
312.4 [12.3 in]
368.3 [14.5 in]
Seismic mounting brackets613.5 [24.2 in] Indicates air flow (Convection)Center of Gravity
POWER DISTRIBUTION UNIT (PDU)
Service Area
TOP VIEW FRONT VIEW SIDE VIEW
Indicates air flow (Convection)
Center of Gravity
SCALE 1:20
[35.4 in]
[5.9 in]
[14.2 in]
[13.8 in]
[27.6 in]
[9.2 in]
Minimum air flow clearance
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center A4 - Equipment Dimensions (1) 06
UNINTERRUPTIBLE POWER SUPPLY
[12 in]
[32 in]
[12 in]
[6 in]
TOP VIEW FRONT VIEW SIDE VIEW
Center of GravitySCALE 1:20
CHILLER
TOP VIEW
SCALE 1:20 Indicates air flow (Convection) Center of Gravity
SIDE VIEW FRONT VIEW
[21.4 in]
[6.7 in]363
[14.3 in]
CHILLER PDB
BOTTOM VIEW
SCALE 1:10
SIDE VIEWFRONT VIEW
[19.7 in]
[9.5 in]
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center A5 - Equipment Dimensions (2) 07
SHIPPING DOLLY DIMENSIONS FOR GANTRY
CT GANTRY
Weight with dollies and side rails = 2050 kg [4520 lbs]
[110.6 in]
[110.6 in]
[110]
[110] [82.8]
[44]
[40.9]
[50.8]
Weight with dollies and side rails = 1204 kg [2654.3 lbs]
PET IMAGE RING FOR WELDMENT GANTRY
DELIVERY
THE CUSTOMER/CONTRACTOR SHOULD:
Provide an area adjacent to the installation site for delivery and unloading of the GE equipment.
Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the movement of GE equipment from the delivery area into the definitive installation room.
Ensure that access routes for equipment will accommodate the weights of the equipment and any transportation, lifting and rigging equipment.
Ensure that all necessary arrangements for stopping and unloading on public or private property not belonging to the customer have been made.
DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT
mm in kg lbs
CT GANTRY
LENGTH 2810 111
2050 4520WIDTH 1290 51
HEIGHT 2000 79
PET WELDMENT
GANTRY
LENGTH 2794 110
1204 2654.3WIDTH 1118 44
HEIGHT 1880 74
PATIENT TABLE
LENGTH 3836 151
1241 2736WIDTH 864 34
HEIGHT 1410 55.5
Above dimensions shown with side rails on. The minimum unobstructed hallway width is 1803 mm, the minimum clear doorway openings is 1067 mm to accommodate delivery of the system.
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center A6 - Delivery 08
STRUCTURAL NOTES
Methods of support for the steelwork that will permit attachment to structural steel or through bolts in concrete construction should be favored. Do not use concrete or masonry anchors in direct tension.
All units that are wall mounted or wall supported are to be provided with supports where necessary. Wall supports are to be supplied and installed by the customer or his contractors. See plan and detail sheets for suggested locations and mounting hole locations.
All ceiling mounted fixtures, air vents, sprinklers, etc. To be flush mounted, or shall not extend more than 6,35mm (1/4") below the finished ceiling.
Floor slabs on which equipment is to be installed must be level to 6.00mm (1/4") in 3050mm (10'-0")
Dimensions are to finished surfaces of room.
Customers contractor must provide all penetrations in post tension floors.
Customers contractor must provide and install any non-standard anchoring. Documents for standard anchoring methods are included with GE equipment drawings for geographic areas that require such documentation.
Customers contractor must provide and install hardware for "through the floor" anchoring and/or any bracing under access floors. This contractor must also provide floor drilling that cannot be completed because of an obstruction encountered while drilling by the GE installer such as rebar etc.
It is the customer's responsibility to perform any floor or wall penetrations that may be required. The customer is also responsible for ensuring that no subsurface utilities (e.g., electrical or any other form of wiring, conduits, piping, duct work or structural supports (i.e. post tension cables or rebar)) will interfere or come in contact with subsurface penetration operations (e.g. drilling and installation of anchors/screws) performed during the installation process. To ensure worker safety, GE installers will perform surface penetration operations only after the customer's validation and completion of the "GE surface penetration permit"
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center S1 - Structural Notes 09
ITEM DESCRIPTION
(CONTRACTOR SUPPLIED & INSTALLED)
1 Floor contact area for discovery gantry and patient table. see detail on Structural Detail sheets for more information.
2 Support Backing, locate as shown
CONTROL ROOM
EXAM ROOM
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center S2 - Structural Layout 10
6'-3"
7'-4"
10'-2"
12'-10"
8' -6
'-9
POSITION TO BE DEFINED
ANCHORING/LOADING DISTRIBUTION TO THE FLOOR
SCALE 1:25
PT 1049 kg [2308 lbs] with patient
[15.75]
550.2 [21.66]
[34.98]
[15.75]
5.3 [0.21]
322.5 [12.7]
322.5 [12.7]
878.2 [34.57]
878.2 [34.57]
[0.40]
[34.17]
[8.5]
[8.5]
[0.93]48
[1.89]
G2 (CT) 1787 kg [3940 lbs]
(1) PET primary scan plane axis
(2) CT scan plane axis
(3) Longitudinal axis
(4) Cable and hose access
(5) Cable access only
(6) 5 anchoring points for the Table
(7) 8 anchoring points for the Gantry
(8) Alternative anchoring points
Center of gravity Minimum anchor embedment: 89 mm (2106573)
G1 (PET) 1108 kg [2443 lbs]
ANCHORING AND FLOOR REQUIREMENTS
Ø 63.5 [2.5 in] leveling pad
9.7 [0.38 in] height for short rod
44.5 [1.75 in] height for long rod
Adjuster lock ring Gantry/Table stationary base
Leveling screw Anchor washer
Anchor bolt
GE SUPPLIED GANTRY ANCHORS (2106573)
24 mm [0.94 in] min - 33 mm [1.3 in] max after proper torque
NOT TO SCALE
FINISHED FLOOR REQUIREMENTS
Installation requires a finish floor in the scan and control rooms.
The floor surface in the scan room directly under the gantry and table must be level.
The floor shall be no greater than 6 mm [0.25 in] out of level over a 3048 mm [120 in] range, with level defined as the horizontal surface between the highest and lowest points.
The floor shall have a minimum concrete thickness of 127 mm [5 in].
Shims should not be used to compensate for a floor that does not meet this requirement.
These requirements apply to all installation types.
NOTES:
If the concrete floor has a floor covering installed over it (such as floor tile), 17 or more openings
101.6 mm [4 in] in diameter will be cut into the floor covering to ensure the table and gantry rest on the concrete. (Openings are cut during installation.)
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center S3 - Structural Details (1) 11
TEMPERATURE AND HUMIDITY SPECIFICATIONS
STORAGE CONDITIONS
IN-USE CONDITIONS
Material should not be stored for more than 6 month.
(1) Non-condensing
(2) Actual heat output is site specific and dependent on the specific configuration and customer usage.
AIR RENEWAL
According to local standards. The HVAC system should be designed to provide 5 air changes per hour to maintain adequate air quality and temperature.
NOTE : In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to take measures to protect the equipment from dropping water.
Temperature 0°C to +30°C +32°F to +86°F Relative humidity (1) ≤ 70% RH Temperature gradient ≤ 3°C/h ≤ 5.4°F/h Humidity gradient ≤ 5% RH/h
EXAM ROOM CONTROL ROOM
Temperature Min Recommended Max Min Recommended Max
18°C 22°C 26°C 18°C 22°C 26°C
64°F 72°F 79°F 64°F 72°F 79°F
Temperature gradient ≤ 3°C/h ≤ 3°C/h
≤ 5.4°F/h ≤ 5.4°F/h Relative humidity (1) 30% to 60% 30% to 60%
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center M1 - HVAC 12
ROOM DESCRIPTION Max (kW) Max (btu)
Exam Room
PET Gantry 2.8 9554 CT Gantry 5.5 18766
Patient table 0.3 1024
TOTAL 9 29344
Exam room or Technical room*
Power distribution unit (CT PDU) 1.0 3400 PARC 4 (Reconstruction Cabinet) 2.0 6824
Partial UPS 0.88 3000
Chiller 4.0 13649
TOTAL 8 26873
Control Room or Reporting Room
Operator console 0.84 2860 LCD Monitor (2 units, 170 BTU/50 Watts each) 0.1 340 Peripheral Media Tower (PMT) 0.13 425 Advantage Workstation (computer with 2 monitor - Option) 0.075 256
TOTAL 1 3881
*Technical Room is not mandatory, the placements of these elements are recommended in the Exam Room.
WARNING
This chart contains only the principal components of the PET/CT system and does not include information about non-GE supplied equipment.
HEAT DISSIPATION
CONNECTIVITY REQUIREMENTS
Broadband Connections are necessary between customer's imaging devices and the GE Support Center, starting from the installation process to ensure full support from the Engineering Teams. GE provides remote maintenance and maximum availability for the customer's system, during the equipment's full lifetime. GE guarantees to keep the equipment at a maximum performance level.
Proactive and reactive maintenance are available through utilizing a wide range of digital tools.
You may choose from the connectivity solutions listed below:
Site-to-Site VPN/GE Solution Site-to-Site VPN/Customer Solution Connection through Dedicated Service Network Internet Access - connectivity for InSite 2.0
The requirements for these connectivity solutions are explained in the broadband solutions catalogue (separate document).
ELECTRICAL NOTES
All junction boxes, conduit, duct, duct dividers, switches, circuit breakers, cable tray, etc., are to be supplied and installed by customers electrical contractor.
Conduit and duct runs shall have sweep radius bends Conduits and duct above ceiling or below finished floor must be installed as near to ceiling or floor as possible to reduce run length.
Ceiling mounted junction boxes illustrated on this plan must be installed flush with finished ceiling.
All ductwork must meet the following requirements:
1.Ductwork shall be metal with dividers and have removable, accessible covers.
2.Ductwork shall be certified/rated for electrical power purposes.
3.Ductwork shall be electrically and mechanically bonded together in an approved manner.
4.PVC as a substitute must be used in accordance with all local and national codes.
All openings in access flooring are to be cut out and finished off with grommet material by the customers contractor.
General contractor to insert pull cords for all cable run conduits between the equipment room and the operators control room.
10 foot pigtails at all junction points.
Grounding is critical to equipment function and patient safety. Site must conform to wiring specifications shown on this plan.
1. All wires specified shall be copper stranded, flexible, thermo-plastic, color coded, cut 10 foot long at outlet boxes, duct termination points or stubbed conduit ends. All conductors, power, signal and ground, must be run in a conduit or duct system. Electrical contractor shall ring out and tag all wires at both ends. Wire runs must be continuous copper stranded and free from splices.
1.1. Aluminum or solid wires are not allowed.
2. Wire sizes given are for use of equipment. Larger sizes may be required by local codes.
3. It is recommended that all wires be color coded, as required in accordance with national and local electrical codes.
4. Conduit sizes shall be verified by the architect, electrical engineer or contractor, in accordance with local or national codes.
5. Convenience outlets are not illustrated. Their number and location are to be specified by others. Locate at least one convenience outlet close to the system control, the power distritbution unit and one on each wall of the procedure room. Use hospital approved outlet or equivalent.
6. General room illumination is not illustrated. Caution should be taken to avoid excessive heat from overhead spotlights. Damage can occur to ceiling mounting components and wiring if high wattage bulbs are used.
Recommend low wattage bulbs no higher than 75 watts and use dimmer controls (except mr). Do not mount lights directly above areas where ceiling mounted accessories will be parked.
7. Routing of cable ductwork, conduits, etc., must run direct as possible otherwise may result in the need for greater than standard cable lengths (refer to the interconnection diagram for maximum usable lengths point to point).
8. Conduit turns to have large, sweeping bends with minimum radius in accordance with national and local electrical codes.
9. A special grounding system is required in all procedure rooms by some national and local codes. It is recommended in areas where patients might be examined or treated under present, future, or emergency conditions. Consult the governing electrical code and confer with appropriate customer administrative personnel to determine the areas requiring this type of grounding system.
10. The maximum point to point distances illustrated on this drawing must not be exceeded.
11. Physical connection of primary power to GE equipment is to be made by customers electrical contractor with the supervision of a GE representative. The GE representative would be required to identify the physical connection location, and insure proper handling of GE equipment.
12. GEHC conducts power audits to verify quality of power being delivered to the system. The customer's electrical contractor is required to be available to support this activity.
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center E1 - Electrical Notes 13
B C
D
A
ITEM DESCRIPTION
FLOOR
1 Main disconnect panel (recommended 1 1/2m [60 in] floor to middle of panel)
2 75 [3"] conduit below floor for water lines
3 38 [1 1/2"] conduit below floor
4 64 [2 1/2"] conduit below floor
5 89 [3 1/2"] conduit below floor
6 300 x 400 x 100 [12" x 16" x 4"] box for power distribution unit
7 300 x 400 x 150 [12" x 16" x 6"] box for power distribution unit
8 100 x 100 x 100 [4" x 4" x 4"] box for UPS
9 250 x 100 [10" x 3 1/2"] surface wall duct with minimum 2 dividers
10 450 x 100 [18" x 3 1/2"] surface wall duct with minimum 2 dividers
11 25 [1"] conduit below floor
CONTROL ROOM
EXAM ROOM
POSITION TO BE DEFINED
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center E2 - Electrical Layout 14
ITEM QTY Outlet Legend for GE Equipment
Dedicated telephone line(s)
Network outlet Duplex hospital grade, dedicated wall outlet 120-v, single phase power
System emergency off (SEO), (recommended height 1.2m [48"] above floor) X-Ray room warning light control panel
X-Ray ON lamp (L1) - 24V
Door interlock switch (needed only if required by state/local codes)
0'-7" 1'-11"
3'-1" 3'-8"
10'-2" 12'-10"
7'-4"
0' -5
0' -1
1"
1' -4
6' -3
6' -7
3'-1" 3'-6"
'-9
0' -6
2'-6"
2' -7
1 10 9 8 7 6
2 3
Additional Conduit Runs (Contractor Supplied and Installed)
From To Qty Size
In. mm 3 phase power Main disconnect 1 AS REQ'D AS REQ'D
Main disconnect Emergency off 1 1/2 13
Power Distribution Unit 1 AS REQ'D AS REQ'D
Power Distribution Unit Door Switch 1 1/2 13
Warning light control 1 1/2 13
Warning light 1 1/2 13 1 phase power 1 1/2 13
Main Disconnect Panel
UPS
1 1 1/4 30
Power Distribution Unit 1 2 50
A
B
C
0' -9
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center E3 - Electrical Elevations 15
± 0'-0"
+ 9'-6"
± 0'-0"
+ 9'-6"
± 0'-0"
+ 9'-6"
D
5' -0
3' -1
1"
1' -6
1' -0
0' -8
± 0'-0"
+ 9'-6"
5 4 2 4 11
9 8 7 6
POWER DISTRIBUTION
Main supply 3 phases
Cable SUPPLIED BY CUSTOMER
Equipment CAN BE ORDERED FROM GE
Equipment SUPPLIED BY CUSTOMER Equipment SUPPLIED BY GE
1-NO.14 BLACK
1-NO.14 WHITE
1-NO.14 GREEN
MDP Main Disconnect Panel SEO 1-2-3 Emergency OFF located near to the access door.
DS Door Switch PDU Power Distribution Unit L Warning Light Control Box L1 X-Ray ON light - 24V Located near access doors
5 x 1.5mm²
3 x 1.5mm²
3 x 1.5mm²
Ground (Min 55 mm² [1/0 awg])
MAIN
DISCONNECT
(MDP)
4 x 50mm² 4 x 1.5mm²
480V = 90A
380V = 110ASEO1
L
L1
PDU
1 phase power
DS
3 - BLACK
1 - WHITE
1 - GREEN
3 - BLACK
1 - GREEN
1-NO.14 BLACK
1-NO.14 WHITE
1-NO.14 GREEN
2-NO.14 BLACK
1-NO.14 WHITE
1-NO.14 RED
1-NO.14 BLACK
1-NO.14 WHITE
1-NO.14 GREEN
1-NO.14 BLACK
1-NO.14 WHITE
1-NO.14 GREEN
3 x 1.5mm²
3 x 1.5mm²
POWER REQUIREMENTS
POWER SUPPLY 3 PHASES+G 380V/400V/420V/440V/460V/480V ±10%
FREQUENCIES 50/60Hz ± 3Hz MAXIMUM POWER DEMAND 100 kVA AVERAGE POWER 30 kVA
POWER FACTOR 0.85
Power supply should come into a System PDB (MDP) containing the protective units and controls.
The section of the supply cable should be calculated in accordance with its length and the maximum permissible voltage drops, equal to 3.4% max. of regulation for feeder size.
There must be discrimination between supply cable protective material at the beginning of the installation
(main low-voltage transformer side) and the protective devices in the A1 Main Disconnect.
TNC neutral point connection must not be used.
SUPPLY CHARACTERISTICS
Power input must be separate from any others which may generate transients (elevators, air conditioning, radiology rooms equipped with high speed film changers...).
All equipment (lighting, power outlets, etc...) installed with GE system components must be powered separately.
Phase imbalance 2% maximum.
Maximum voltage variation at full load 6% (Including line impedance).
Transients must be less than 1500V peak. (on a 380V line) A record of power input disturbances over a continuous two-weeks period (prior to delivery) enables determination of the frequency and degree of these disturbances and can be used to ascertain the need to provide line conditioning equipment.
GROUND SYSTEM
System of equipotential grounding.
Equipotential: The equipotential link will be by means of an equipotential bar. This equipotential bar should be connected to the protective earth conductors in the ducts of the non GE cableways and to additional equipotential connections linking up all the conducting units in the rooms where GE system units are located.
The impedance of the earth bar should be less than or equal to 2 Ω (ohm).
CABLES
Power and cable installation must comply with the distribution diagram.
All cables must be isolated and flexible of HO7RNF type, cable color codes must comply with standards for electrical installation.
The cables from signaling and remote control (Y,SEO,L...) will go to A1 Main Disconnect with a pigtail length of
1.5m, and will be connected during installation. Each conductor will be identified and isolated (screw connector).
CABLEWAYS
The general rules for laying cableways should meet the conditions laid down in current standards and regulations, with regard to:
Protecting cables against water (cableways should be waterproof).
Protecting cables against abnormal temperatures (proximity to heating pipes or ducts).
Protecting cables against temperature shocks.
Replacing cables (cableways should be large enough for cables to be replaced).
Metal cableways should be grounded.
DateRev /17PET-M146472-FIN-00-A.DWG A 29/OCT/2019DISCOVERY MI PET/CTCincinnati VA Medical Center E4 - Power Requirements 16
FEEDER TABLE
MIN. FEEDER WIRE SIZE, AWG OR MCM
(sq. mm)/VAC MINIMUM FEEDER WIRE LENGTH - ft (m)
50 (15) 100 (30) 150 (46) 200 (61) 250 (76) 300 (91) 350 (107) 400 (122)
480 VAC 3 (30) 3 (30) 3 (30) 3 (30) 3 (30) 2 (35) 1 (45) 1 (45)
GENERAL NOTES
In all cases qualified personnel must verify that the feeder (at the point of take-off) and the run to the CT-PET system meet all the requirements stated in the PIM For a single unit installation, the minimum transformer size is 125kVA, with 2.4% rated regulation at unity power factor. Resultant maximum allowable feeder regulation is 3.4% Grounding conductor will be a 1/0 minimum. this ground will run from the equipment back to the power source/main grounding point and always travel in the same conduit with the feeders
CONDUIT IN THE FLOOR
CABLE MANAGEMENT
Removable coverplate
WALL DUCT
NOT TO SCALE
PET-M14647DISCOVERY MI PET/CTCincinnati VA Medical Center
INTERCONNECTIONS
TECHNICAL ROOM / EXAM ROOM
EXAM ROOM
CONTROL ROOM
17.10 m [56.1 ft]
PDU
16.60 m [54 ft]
21.20 m [69 ft]
4.30 m [14 ft]
15.10 m [50 ft]
18.80 m [61.7 ft]
12.40 m [40.7 ft]
PARC4
6.80 m [22.3 ft]
21.80 m [71.5 ft]
SYSTEM
PDB (MDP)
PARTIAL
UPS
(OPTION)
Operator's Console
CHILLER
PDB
7.62 m [25 ft]
30.48 m [100 ft]9.30 m
[30.5 ft]
LIQUID LINES
29.80 m [97.8 ft]
12.80 m [42 ft]
CHILLER
CUSTOMER
SUPPLIED
13.70 m [45 ft]
5.00 m [16.4 ft]
PET Gantry CT Gantry
26.30 m [86.3 ft]
5.00 m [16.4 ft]
21.50 m [70.7 ft]
15.24 m [50 ft]
DateRev /1746472-FIN-00-A.DWG A 29/OCT/2019 E5 - Details - Interconnections 17
M001
INDEX, LEGEND, AND GENERAL
NOTES 01
INDEX OF DRAWINGS
SHEET DESCRIPTION
PARTIAL FIRST FLOOR AND ROOF PLAN - REMOVALS AND NEW WORK
1-M104
SECOND FLOOR PLAN - REMOVALS AND NEW WORK1-M102
DETAILS, SCHEDULES, CONTROLS AND AUTOMATION
M601
JAC MNT
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
CLEAN OUT
CEILING GRILLE
CEILING DIFFUSER
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
SHEET NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP STATION
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CW
CR
CO
CG
CD
BIW
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S
F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MAX
O.A.
NOM
MIN
PC
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FLR.
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.
H1 N
ETCHED CLEAR LACQUER
E.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWER
BHP
BRITISH THERMAL UNIT
BTU
BRITISH THERMAL UNIT PER HOUR
BTUH
CUBIC FEET PER MINUTE
CFM
DEGREE
DEG
DIAMETER
DIA
DIFFERENTIAL PRESSURE SENSOR
DPS
ENTERING
ENT
F
FAHRENHEIT
FPM
FEET PER MINUTE
FT
FEET
GALLONS PER MINUTE
GPM
HEAD
HD
CHILLED WATER RETURN
CHR
CHILLED WATER SUPPLY
CHS
INCHES
IN
INCHES WATER COLUMN
IN WC
INCHES WATER GAUGE
IN WG
LEAVING AIR TEMPERATURE
LAT
LEAVING
LVG
MBH
1000 BTUH
MERV
MINIMUM EFFICIENCY REPORTING VALUE
NC
NOISE CRITERIA
REVOLUTIONS PER MINUTE
RPM
SMOKE DAMPER (SUPPLY)
SDS
SMOKE DAMPER (RETURN)
SDR
STEAM PRESSURE REDUCING VALVE
SPRV
VOLUME DAMPERVD
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FAN
ICF
T
T
T
T
H dP
CS
DP SP
1-MS4
A
H7
9'-6"
MV
MANUAL AIR VENT
ABBREVIATIONS
CONTROLSPIPING SYMBOLS
DRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
EXHAUST DUCT (UP & DOWN)
UP DN
PUMPED CONDENSATE RETURNPC
EXPANSION TANK PIPE
ET
FCU
FAN COIL UNIT
PUMP
P
PROPELLER UNIT HEATER
PUH
RETURN FAN
RF
WATER FILTERWF
POWER TYPE ROOF VENTILATOR
RV
POWER TYPE WALL VENTILATORWV
COR
PROPELLER TYPE EXHAUST FAN
PEF
RETURN AIR
R.A.
SUPPLY AIR
S.A.
SINGLE WIDTH SINGLE INLET (FAN)
SWSI
SPECIFIC GRAVITY
SP. GR.
ACCESS DOOR
AD
FCW
FOWARD CURVED WHEEL (FAN)
FC
FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIO
EER
EXHAUST AIR
E.A.
CONTRACTING OFFICER'S REPRESENTATIVE
AIR SEPARATOR
AS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
STAINLESS STEEL DUCT
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
COMBINATION AXIAL/BACKWARD CURVED WHEEL
A/BCW
UTILITY SET FANUSF
T
GENERAL
DOMESTIC COLD WATER
W
FLOW METER
PIPE MOUNTED DDC TEMPERATURE SENSOR
TOP GRILLE (WALL TYPE)TG
WATER GAUGEWG
WATTSW
VARIABLE AIR VOLUMEVAV
THERMOSTATTSTAT
TOTAL STATIC PRESSURETSP
SMOKE DETECTOR
SD
SUPPLY AIR TEMPERATURE
SAT
OUTSIDE DIAMETER
OD
N.C.
NORMALLY CLOSED
N.O.
NORMALLY OPEN
MCA
MINIMUM BRANCH CIRCUIT AMPACITY
LEAVING WATER TEMPERATURE
LWT
ENTERING WATER TEMPERATURE
EWT
EXTERNAL STATIC PRESSURE
ESP
DIRECT EXPANSION
DX
ENTERING AIR TEMPERATURE
EAT
1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING
MEDIUM AND AIR.
5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH
EXISTING WHERE OPENING IS NOT RE-USED.
6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS WORK TO MATCH EXISTING.
8 COORDINATE ABOVE CEILING WORK WITH CEILING REPLACEMENT. REFER TO ARCHITECTURAL DRAWINGS.
9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
10 UNLESS NOTED OTHERWISE, ALL WORK IN CORRIDOR OUTSIDE OF PET-CT SUITE, OR WORK THAT REQUIRES SHUTDOWN OF
SYSTEMS SERVING AREAS OUTSIDE OF PET-CT SUITE, SHALL TAKE PLACE AT NIGHT (GENERALLY BETWEEN 7PM AND 5AM) OR ON
WEEKENDS - COORDINATE WITH COR.
11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE
PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY
TO INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY
ANTICIPATED INSTALLATION ISSUES.
14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING WORK.
15 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK
TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE
ASSOCIATED WITH THE REMOVAL WORK.
16 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF
WORK IN THIS PROJECT.
17 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING
FACILITY.
18 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.
THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT
DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING
OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
19 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS
SHALL BE COORDINATED WITH THE COR.
20. ALL NEW EQUIPMENT INCLUDING SPLIT-SYSTEM AC UNITS, CONDENSING UNITS, VAV BOXES, HUMIDIFIERS, ETC. SHALL BE
PROVIDED WITH AN EQUIPMENT LABEL. OUTDOOR EQUIPMENT LABELS SHALL BE WEATHER RESISTANT. COORDINATE ALL
EQUIPMENT NUMBERS WITH THE VA PRIOR TO ORDERING LABELS.
21. EQUIPMENT VA TAGS FOR ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE COR PRIOR TO REMOVING THE EQUIPMENT
FROM THE SITE.
22. SELF-ADHESIVE MARKERS SHALL BE INSTALLED ON CEILING GRID TO IDENTIFY SHUTOFF VALVES.
DOMESTIC HOT WATER SUPPLY
DHW
DOMESTIC HOT WATER RECIRCULATION
DHWR
FREE STEAM (LOW PRESSURE STEAM)
FS(5)
M
VALVE ON RISE/DROP (LOCATED IN VERTICAL PIPE)
(REFER TO DETAIL FOR ADDITIONAL SPECIALTIES)
SST
CS
PT
SP
AFMS
AIRFLOW MEASURING STATION
CURRENT SWITCH (FAN STATUS INDICATION)
START-STOP RELAY FOR FAN
FAN SPEED CONTROL SIGNAL
PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER
OS ROOM OCCUPANCY SENSOR(S)
DPT DIFFERENTIAL PRESSURE TRANSMITTER
PS PRESSURE SWITCH
DETAILS
M501
INDEX, LEGEND, AND GENERAL NOTESM001
DUPLEX PLUME EXHAUST FAN PACKAGE
DPF
CONSTANT VOLUME REHEAT TERMINAL UNIT
CVR
VARIABLE VOLUME REHEAT TERMINAL UNITVVR
SIMPLEX PLUME EXHAUST FANSPF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PREPARE SITE FOR PET-CT
CINCINNATI, OH
539-CSI-204
Project Director
1/27/2020Revisions: Date:
Cincinnati V.A.
Medical Center
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PREPARE SITE FOR PET-CT
CINCINNATI, OH
539-CSI-204
Project Director
1/27/2020Revisions: Date:
Cincinnati V.A.
Medical Center
1-M102
SECOND FLOOR PLAN - REMOVALS
& NEW WORK 01
SCALE: 1/4" = 1'-0"
PARTIAL SECOND FLOOR PLAN - REMOVALS
JAC MNT
SCALE: 1/4" = 1'-0"
PARTIAL SECOND FLOOR PLAN - NEW WORK
SECOND FLOOR KEY PLAN
NO SCALE
SECOND FLOOR KEY PLAN
NO SCALE
1. EXISTING DUCTWORK TO REMAIN.
2. REMOVE EXISTING SPLIT SYSTEM AC INDOOR UNIT, ASSOCIATED
REFRIGERANT PIPING, CONTROLS, SUPPORTS, ACCESSORIES,
ETC.
3. REMOVE ALL EXISTING SPLIT SYSTEM AC SUPPLY DUCTWORK.
4. REMOVE EXISTING SPLIT SYSTEM AC RETURN DUCTWORK TO
EXTENTS INDICATED.
5. REMOVE EXISTING SPLIT SYSTEM AC RETURN DUCTWORK BACK
TO THIS POINT AND CAP.
6. REMOVE EXISTING HOT WATER SUPPLY AND RETURN PIPING
BACK TO THIS POINT FOR RECONNECTION TO NEW WORK.
7. REMOVE EXISTING AIR DEVICE. EXISTING DUCTWORK AND
BALANCE DAMPER TO REMAIN.
8. REMOVE EXISTING AIR TERMINAL UNIT, ASSOCIATED DUCTWORK,
CONTROLS, SUPPORTS, ACCESSORIES, ETC.
9. EXISTING HEATING HOT WATER SUPPLY AND RETURN PIPING TO
REMAIN.
10. REMOVE EXISTING CONDENSATE PIPING BACK TO THIS POINT FOR
RECONNECTION TO NEW WORK.
11. REMOVE EXISTING DOMESTIC WATER SUPPLY PIPING BACK TO
MAIN AND CAP.
12. PROVIDE NEW HORIZONTAL MOUNTED ABOVE CEILING, DIRECT
DRIVE SPLIT SYSTEM AC INDOOR UNIT…
This is the start of the file's text. The full file is on GovTribe.