This pre-solicitation notice describes a forthcoming federal contract opportunity to construct a 6,130 square foot single story addition to a Department of Veterans Affairs medical center building.

The project will be awarded as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Interested offerors must be classified as small under NAICS code 236220 with a size standard of $39.5 million. The work includes construction of the addition, along with associated finishes, mechanical, electrical and technology systems. The period of performance is estimated at 780 calendar days.

The solicitation is expected to be posted on SAM.gov on or around February 26, 2020. Proposals will be due approximately 30 days later. Interested parties should register on SAM.gov to receive automatic notifications of any amendments. A site visit will be held and questions must be submitted in writing to the contracting officer. The winning offeror must obtain necessary Ohio licenses and permits. Bid, payment and performance bonds will be required.

36C25020B0005 0002 36C25020B0005 0002.docx

View the file

Other files

File Type Posted
36C25020B0005-0006000.docx DOCX document
36C25020B0005-0005000.docx DOCX document
36C25020B0005-0003002.pdf PDF
36C25020B0005-0003001.pdf PDF
36C25020B0005-0003000.docx DOCX document
36C25020B0005-0001078.pdf PDF
36C25020B0005-0001074.docx DOCX document
36C25020B0005-0001079.pdf PDF
36C25020B0005-0001080.pdf PDF
36C25020B0005-0001076.pdf PDF
36C25020B0005-0001077.pdf PDF
36C25020B0005-0001081.pdf PDF
36C25020B0005-0001075.pdf PDF
36C25020B0005-077.docx DOCX document
36C25020B0005-084.pdf PDF
36C25020B0005-083.docx DOCX document
36C25020B0005-085.pdf PDF
36C25020B0005-078.pdf PDF
36C25020B0005-089.pdf PDF
36C25020B0005-090.pdf PDF
36C25020B0005-087.pdf PDF
36C25020B0005-086.pdf PDF
36C25020B0005-088.pdf PDF
36C25020B0005-080.pdf PDF
36C25020B0005-081.pdf PDF
36C25020B0005-091.pdf PDF
36C25020B0005-079.pdf PDF
36C25020B0005-082.docx DOCX document
36C25020B0005-092.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-02-2020 539-20-2-2001-0010 539-330 539/90C Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati

OH

45219 Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati

OH

45219 To all Offerors/Bidders

36C25020B0005 02-27-2020

X X X

The purpose of this amendment is to:

-Post additional questions and answers.

Bid opening still remains April 17, 2020 @ 1:00PM EST

This information can be found on the continuation page of the amendment.

Ronald T. Heidemann Contract Officer

CONTINUATION PAGE

ADDITONAL QUESTIONS/ANSWERS

Question 1. What specific ductwork on the drawings is required to be 20ga with angle frame companion flanges as there is big difference in cost of this ductwork versus SMACNA standard ductwork?

Answer: The isolation room temporary ductwork between the HEPA filter and fan per sheet MD106NT.

Question 2. What is the HEPA filter sizing schedule shown on M601’s purpose as I cannot find any HEPA filters on this job other than the CD-5’s listed in the air device schedule?

Answer: Refer to sheet MD106NT. HEPA filters are required for the isolation room temporary ductwork.

Question 3. Note 23 on MH106N calls for all the existing outside air ductwork to be Aero sealed once all the phases are complete. Aero seal is completed by blanking off the ends of all ductwork being sealed and blowing sealer through the ductwork to fill the voids. The only way this could be completed would require every FCU/VAV fed with outside air to be capped off. This would mean a great majority of the floor would need the duct disconnected, capped and Aero sealed. This would leave the great majority of these rooms with no outside air until complete. Due to this job being done in phases in order to maintain hospital beds this does not seam feasible. Aero sealing the duct as the phases are completed will not work either because after you would get a phase done you would then connect it back to the duct. You would not be able to disconnect & cap the duct for the next phase without cutting off the air to the now occupied area. I don’t see how it is feasible to Aero seal this ductwork please advise if just duct sealing the outside of the existing duct where accessible is going to be acceptable.

Answer: Just sealing the outside of the ductwork is not acceptable. Lockable position Blastgate dampers shall be installed, in lieu of typical manual balancing dampers, during each construction phase. The initial Blastgate damper balancing positions shall be marked so dampers can be returned to initial positions after AeroSeal. AeroSeal process shall take place over a weekend and all Blastgate dampers shall be fully closed during the process. AeroSeal shall take place prior to the project completion rebalancing as required per the General Notes.

Question 4. Does phase 1A need to be complete before phase 1B can begin and so on for phase 1C & 1D?

Answer: Yes, all phases have to be complete prior to beginning next phase. And phases shall take place in order.