S02 - Attachment 2 - Drawings - 596A4 18 102 .pdf
PDF 18 MB Posted
- Attached to
- Z1DA--596A4-18-102 - Replacement elevators Federal contract opportunity
- Solicitation number
- 36C24923R0021
About this file
This document includes a presolicitation notice and related file for an upcoming federal contract opportunity. The Department of Veterans Affairs Network Contracting Office 9 Central Region will issue a solicitation Request for Proposals on or about November 30, 2022 to request construction services for Project #596A4-18-102 to upgrade elevators P1, P2, P3, S4, and S5 at the Troy Bowling VA Medical Center in Lexington, Kentucky. The magnitude of construction is estimated between $1 million and $2 million. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The project aims to upgrade the elevators which have outlived their useful life and are prone to unexpected stoppages and failures. All elevators were rated D or F by the Facility Condition Assessment.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
M
COVER SHEET
JAB JJG
GI001
PROJECT # 596A4-18-102
UPGRADE ELEVATORS P1, P2, P3, S4 AND S5
LEXINGTON VA MEDICAL CENTER
VICINITY MAP CAMPUS MAPVICINITY MAP
1 4
INDEX OF DRAWINGS
ELECTRICAL
ED101
E-001
ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, ABBREVIATIONS AND SCHEDULES
PENTHOUSE ELEVATOR EQUIPMENT ROOM ELECTRICAL DEMOLITION PLAN
PENTHOUSE ELEVATOR EQUIPMENT ROOM AND ROOF MECHANICAL POWER PLANS
E-201
EP101
ELECTRICAL HOISTWAY ELEVATION PLAN
E-501 ELECTRICAL DETAILS
SINGLE-LINE DIAGRAME-601
FIRE ALARM
FIRE ALARM NOTES, LEGEND, ABBREVIATIONS, AND RISER DIAGRAM
FA001
FA100
FA101
OVERALL ROOF FIRE ALARM FLOOR PLAN
PENTHOUSE ELEVATOR EQUIPMENT ROOM FIRE ALARM PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
GENERAL
ARCHITECTURE
COVER SHEETGI001
A-102
A-101
GI002 2 OF 4GENERAL INFORMATION
A-201
A-400
INFECTION CONTROL RISK ASSESSMENT - (ICRA)
GI003 3 OF 4
GI004 4 OF 4ICRA AND CONSTRUCTION PHASING PLANS
A-103
A-202
OVERALL GROUND FLOOR PLAN AND CONSTRUCTION ROUTE
OVERALL ROOF PLAN AND ELECTRICAL ROOM ENLARGED PLAN
OVERALL PENTHOUSE ROOF PLAN AND ELEVATOR EQUIPMENT ROOM ENLARGED PLAN
PASSENGER ELEVATOR CAB INTERIOR ELEVATIONS
SERVICE ELEVATOR CAB INTERIOR ELEVATIONS
ELEVATOR RISER DIAGRAM
LEXINGTON
VA MEDICAL
CENTER CAMPUS
LEXINGTON
VA MEDICAL
CENTER CAMPUS
LOCATION
NOTE:
FOR ALL ELEVATOR MODIFICATIONS - REFERENCE DIVISION 14 SPECIFICATIONS
ELEVATORS INCLUDED IN THIS PROJECT - P1, P2, P3, S4, S5
ELEVATORS ARE LOCATED IN TOWER BUILDING 1.
FIFTH FLOOR FIRE ALARM
FA102
NOTE: FOR ALL ELEVATOR MODIFICATIONS, SEE SPECIFICATIONS
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
T
H
C A
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
N
O
RT
R
O
L
I
N
A
DocuSign Envelope ID: 52967F7C-C185-4DEB-B445-9D1E718C7D97
8/19/2020
ALL ELEVATOR SUBMITTALS TO BE REVIEWED & APPROVED
PRIOR TO MOBILIZATION
COMPLETE ONE ELEVATOR CAB BEFORE STARTING ANOTHER.
FINAL ELEVATOR EQUIPMENT PLANS WILL BE DESIGNED BY
ELEVATOR CONTRACTOR
THE CONTRACTOR AND SUBCONTRACTORS INVOLVED
IN THIS PROJECT SHALL BE RESPONSIBLE FOR
INSTALLING THEIR RESPECTIVE WORK AND
SYSTEMS TO MEET ALL APPLICABLE FEDERAL,
STATE, AND LOCAL CODES, LAWS, SAFETY
REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE
CONTRACTOR SHALL FURNISH ALL NECESSARY
PERMITS.
THE CONTRACTOR SHALL REVIEW THE DRAWINGS,
SPECIFICATIONS AND UNDERSTAND THE SCOPE OF THE
DRAWINGS TO BE THE FOLLOWING:
THESE CONSTRUCTION DOCUMENTS (DRAWINGS,
SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN
TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE
DIMENSIONS OF THE BUILDING, THE MAJOR
ARCHITECTURAL ELEMENTS, AND THE MAJOR
STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA
SYSTEMS. ON THE BASIS OF THE GENERAL SCOPE
INDICATED IN THESE DOCUMENTS, THE TRADE
CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED
FOR THE PROPER EXECUTION AND COMPLETION OF THEIR
WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL
AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR
WARRANTY FOR THEIR WORK UNLESS A LONGER
WARRANTY IS INDICATED IN THE SPECIFICATIONS.
CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE
FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
DO NOT SCALE DRAWINGS. DIMENSIONS SHALL
GOVERN EACH BUILDING COMPONENT LOCATION.
BRING DISCREPANCIES TO THE COR'S
ATTENTION IN WRITING IMMEDIATELY.
ALL WORK SHALL BE PERFORMED IN A SKILLED
WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO
THE COR'S.
PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN
DIFFERENT MATERIALS.
EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR
TO BEGINNING OF WORK. ANY ERRORS OR OMISSIONS
SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IN
WRITING IMMEDIATELY.
ALL CARS TO BE CONSTRUCTED ON THE GROUND FLOOR,
INSIDE THE SHAFT.
CONTRACTOR IS RESPONSIBLE FOR ALL SERVICE CALLS AND
SERVICES FOR ALL 5 ELEVATORS AFTER THE EXECUTION
AND DURING THE DURATION OF THEIR CONTRACT.
FOR OVERHEAD PIPE WORK ABOVE CEILING OUTSIDE THE
ARE OF WORK FOR THIS PROJECT, COORDINATE WITH VA COR
ABOUT OFF-HOUR SCHEDULE AND ICRA PROTECTION
REQUIREMENTS.
CONTRACTOR TO RE-LABEL ALL DOORS WITH SAME SIGNAGE AS EXISTING
FROM 290 SIGN CO COMPANY- (SOLE SOURCE)
A.
GENERAL NOTES:
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
SYMBOL LEGEND
SITE PLAN NORTH ARROW
BUILDING WALL SECTION INDICATION
DETAIL INDICATION
ROOM NAME
ROOM NUMBER
AREA DETAILED
NORTH ARROW
NORTH
LIMIT OF WORK
BREAK LINE
SECTION NUMBER
SHEET WHERE SHOWN
SHEET WHERE SHOWN
DETAIL NUMBER
KEYNOTE INDICATOR
ROOM NAME
A101
SIM
N
ROOM INDICATION
KEYNOTE SYMBOL
A101
X
EXISTING WALL
TEMPORARY BARRIER
CONSTRUCTION ROUTE
GENERAL DEMOLITION NOTES:
A. REMOVE EXISTING CONSTRUCTION AS
DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH
NEW CONSTRUCTION.
B. EXISTING EQUIPMENT REMOVED
SHALL BE PROPERLY DISPOSED OFF
MEDICAL CENTER GROUNDS.
COORDINATE WITH VA COR.
C. NOTIFY CONTRACTING OFFICER'S
REPRESENTATIVE OF ANY AREA
REQUIRING DEMOLITION FOR
INSTALLATION OF MECHANICAL,
PLUMBING, STRUCTURAL, ELECTRICAL,
OR DATA ITEMS (INCLUDING ROOF
PENETRATIONS) NOT SHOWN IN THESE
DRAWINGS. AFTER SUCH DEMOLITION
AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH
EXISTING.
D. THE INFORMATION CONTAINED IN
THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT
RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL
DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
E. REFER TO THE ENGINEER'S
SPECIFICATION & DRAWINGS FOR
FURTHER INFORMATION REGARDING
DEMOLITION OF MECHANICAL,
ELECTRICAL, PLUMBING & ELEVATOR
EQUIPMENT SYSTEMS.
F. ALL DEMOLITION WORK SHALL BE
PERFORMED WITH "CARE AND DILIGENCE"
IN ORDER TO PREVENT ARBITRARY
DAMAGE OR INTERRUPTION OF SERVICE
OR CONCEALED UTILITIES INTENDED TO
REMAIN IN SERVICE. DISCOVERY OF
UTILITIES OR CONDITIONS LOCATED
DIFFERENTLY FROM THAT INDICATED OR
THAT ARE NOT IDENTIFIED. SHALL BE
REPORTED TO THE CONTRACTING
OFFICER.
G. CONTRACTOR IS RESPONSIBLE TO
ENSURE LIGHTING, SMOKE DETECTOR
AND EXIT SIGNS WILL BE AVAILABLE
DURING CONSTRUCTION FOR EACH
PHASE. COORDINATE WITH VA COR AND
SAFETY ABOUT RELOCATION OF THESE
ELEMENTS PRIOR TO ERECTING
TEMPORARY CONSTRUCTION BARRIER.
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE TRANSPORTATION
ALUM ALMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOD BASIS OF DESIGN
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH
CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT COTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CR CRASH RAIL
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EFTR EXISTING FINISH TO REMAIN
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
ETR EXISTING TO REMAIN
ETS EXPOSED TO STRUCTURE
ARCHITECTURAL ABBREVIATIONS
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE FIXTURES & EQUIPMENT
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLR FLOOR
FLUOR FLUORESCENT
FO FINISH OPENING
FOS FACE OF STUD
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
FURR FURRING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GF CMU GROUND FACE CMU
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLACK
GLU LAM GLUE LAMINATED WOOD
GND GROUND
GT GROUT
GYP BD GYPSUM BOARD
GYP GYPSUM
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG INSULATING GLASS
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
L LONG
LAV LAVATORY
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
M & BH MOP AND BROOM HOLDER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEPF MECHANICAL, ELECTRICAL,
PLUMBING,
FIRE PROTECTION (CONDUIT)
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
N
NORTH
NA NOT APPLICABLE
NECY NECESSARY
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER,
OVERFLOW DRAIN
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PAINT
PARTN PARTITION
PBD PARTICLE BOARD
PBSW PATIENT BED SERVICE WALL
PCC PRECAST CONCRETE
PI PSYCHIATRIC INPATIENT
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PMU PSYCHIATRIC MEDICAL UNIT
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONCPOST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QT QUARRY TILE
R-VALUE (INSULATION),
RADIUS, RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RFT RESILIENT FLOOR TILE
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RT RUBBER STAIR TREAD
S
SOUTH
SAF SEAMLESS ACRYLIC FLOORING
SAP SUSPENDED ACOUSTICAL PANELS
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SEAL SEALER
SECT SECTION
SECT SECTION
SF SQUARE FOOT
SF CMU SPLIT-FACE CMU
SHR SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SL SLOPE
SLV SHORT LEG VERTICAL
SND SANITARY NAPKIN DISPOSER
SNV SANITARY NAPKIN VENDOR
SPECS SPECIFICATIONS
SQ SQUARE
SS SOLID SURFACE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TD TUBULAR DAYLIGHTING DEVICE
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS,
TONGUE & GROOVE,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
URN URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDP WOOD PANELING
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
INV INVERT
ITG INSULATED TEMPERED GLASS
TT TERRAZZO TILE
· SIMPLEX FIRE ALARM
· TK ELEVATOR
· ASCO TRANSFER SWITCHES
· 290 SIGNS
BASIS OF DESIGN
P
M
GENERAL INFORMATION
JAB JJG
GI002
2 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
11296
R E G
I
S
T
E
R
E D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V I F
V
I F
V.I.F.
V I F
E X
I S
T I N
G
W
A L L
V I F
E X
I S
T I N
G
W
A L L
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
I G
H T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
UPGRADE ELEVATORS PROJECT
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
A P
P R
O X
A
F
F
HARD BARRIER
WITH DOOR & HINGES.
SEE 5/GI003
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X
D
U C
T
HARD BARRIER & DOOR
WITH HINGES
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
P
M
INFECTION CONTROL RISK
ASSESSMENT - (ICRA)
A.
B.
C.
D.
E.
GENERAL
SEE SHEET GI004 FOR PRE-CONSTRUCTION RISK
ASSESSMENT FORMS AND INFECTION CONTROL
PRECAUTIONS.
SEE SHEET GI004 FOR PHASING PLANS AND
DESCRIPTION.
ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK FOR EACH PHASE. PERMITS INCLUDE: ICRA,
ILSM, ABOVE CEILING FIRE/SMOKE WALL, UTILITY,
FIRE ALARM SYSTEM, MEDICAL GASES, AND
CONFINED SPACES.
WORK REQUIRED BY INFECTION CONTROL SHALL
BE PERFORMED FOR EACH PHASE OF THE
PROJECT.
CONTRACTOR SHALL EXHAUST ALL AIR FROM
SPACES WHERE WORK IS BEING PREFORMED
DIRECTLY TO THE EXTERIOR OF THE BUILDING.
ENSURE EXHAUST POINTS ARE LOCATED AWAY
FROM INTAKE POINTS FOR THE BUILDING. EXHAUST
LOCATIONS TO BE APPROVED BY COR.
Scale: 1/2" = 1'-0"
CROSS SECTION 'A'
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT CART
Scale: 6" = 1'-0"
ILSM SIGNAGE
ILSM TEMPORARY BARRIER TAG
Scale: 1/2" = 1'-0"
ROOM ELEVATION
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
JAB
GI003
JJG 3 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
KEY PLAN
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
SHEET NOTES:
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
DocuSign Envelope ID: 52967F7C-C185-4DEB-B445-9D1E718C7D97
8/19/2020
AutoCAD SHX Text X
AutoCAD SHX Text X
ICRA GENERAL NOTES:
1.
2.
NO MAJOR EQUIPMENT ACCESS THROUGH THE BUILDING BETWEEN 7AM TO
5PM. CONTRACTOR TO COORDINATE WITH VA COR.
LOBBY WORK CAN BE COMPLETED DURING REGULAR BUSINESS HOURS IF A
CONSTRUCTION BARRIER IS INSTALLED PRIOR TO PERFORMING WORK.
ELECTRICAL
ROOM
A700A
ELEVATOR
MACHINE
ROOM
A-700
ELEVATOR
LOBBY
A000
ELEVATOR LOBBY
A001
BREAK RM
A021
ELEV ELEV
ELEV
P3
ELEV
P2
ELEV
P1
S4 S5
ICRA AND CONSTRUCTION PHASING
PLANS
JAB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
SEE SHEET A-101 FOR CONSTRUCTION ACCESS
FROM BASEMENT TO LOADING DOCK
SPECIFICATION REQUIRES CLASS II ICRA
REQUIREMENTS. SEE SPECIFICATION SECTION
01 35 26 FOR MORE INFORMATION.
GC TO INCLUDE ALL ICRA BARRIER DOOR
HARDWARE
CONTRACTOR TO ENSURE ACCESS TO EXISTING
FIRE EXTINGUISHERS OR FIRE ALARM PULL
STATIONS ARE MAINTAINED. RELOCATE SAID
EXTINGUISHERS OR PULL STATIONS UNTIL SUCH
TIME THAT THEY CAN BE RETURNED TO THEIR
ORIGINAL LOCATIONS. COORDINATE LOCATION WITH
VA COR AND SAFETY IN ADVANCE
DO NOT REMOVE TEMPORARY BARRIERS FOR EACH
PHASE AND ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA INFECTIONS DISEASE CONTROL HAS INSPECTED
AND APPROVED THE CLEANING
VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK. PERMITS INCLUDE ICRA, ILSM, ABOVE
CEILING, FIRE ALARM SYSTEM
CONTRACTOR SHALL PROTECT AREA ADJACENT TO
THE DEMOLITION AND NEW CONSTRUCTION WORK
TO PREVENT DAMAGES. (IF DAMAGED, REPAIR,
PATCH, SAND AND REFINISH TO MATCH EXISTING
COORDINATE CONSTRUCTION SCHEDULE WITH VA
COR TO ENSURE STAFF ACCESS FROM ELEVATOR
LOBBIES TO THEIR OFFICES OR OTHER ROOMS
DURING CONSTRUCTION
SEE ARCHITECTURAL PLANS AND DETAILS FOR
DEMOLITION AND RENOVATION WORK
ALL LIGHTING, SMOKE DETECTOR AND EXIT SIGN IN
THE ELEVATOR LOBBY AREAS SHALL REMAIN
AVAILABLE DURING CONSTRUCTION.
SHEET NOTES
1.
SHEET KEY NOTES
PROVIDE TEMPORARY PROTECTIVE HARD BARRIER WITH
DOOR & HINGES, TO BOTTOM OF CEILING
PROVIDE 1-HR RATED TEMPORARY CONSTRUCTION
BARRIER CONSISTING OF SEALED 5/8" GYPSUM BOARD ON
BOTH SIDES OF 3-5/8" METAL STUD PARTITION EXTEND TO
BOTTOM OF FLOOR OR ROOF DECK ABOVE. SEAL TOP AND
BOTTOM OF PARTITION. PARTITION SHALL BE INSPECTED
BY VA ICRA STAFF PRIOR TO START OF CONSTRUCTION IN
SPACE. SEE TEMPORARY PARTITION TYPE "T" ON SHEET
GI003.
PROVIDE RATED 3' WIDE BY 7' TALL HARD DOOR WITH
ASSOCIATED HARDWARE FOR TEMPORARY PARTITION.
COORDINATE WITH VA COR ON SECURING
EGRESS DOOR DURING THIS CONSTRUCTION
PHASE(S).
CONSTRUCTION ROUTE THRU THE BASEMENT
LEVEL TO LOADING DOCK AS INDICATED ON
SHEET GI003
PROVIDE TEMPORARY CONSTRUCTION SIGN FOR
PHASE 9 CONSTRUCTION WORK IN THE
STAIRWELL AND LOBBY AREA. TEMPORARY
CONSTRUCTION SIGN SHALL INCLUDE
ALTERNATE EGRESS MAP TO DIRECT STAFF AND
VISITORS TO THE NEAREST STAIRS 1, 2 AND 4.
COORDINATE WITH VA COR PRIOR TO ERECTING
SIGN.
PROVIDE CONSTRUCTION SIGN FOR PHASE 8
CONSTRUCTION WORK IN the RESTROOM AND
THE LOBBY AREA TO INDICATE NO ACCESS TO
THE LOBBY.
PROVIDE STICKY MAT AT CONSTRUCTION
ACCESS POINT. (MAT SHALL BE INSPECTED AND
CHANGED FREQUENTLY TO ENSURE
EFFECTIVENESS)
USE PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM
COORDINATE WITH VA COR ABOUT OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING
ACCESS FOR HOSPITAL STAFF/VISTORS PRIOR
TO ERECTING TEMPORARY BARRIER
CONSULT WITH THE VA SAFETY DEPARTMENT TO
MAINTAIN A MINIMUM CLEARANCE IN HALLWAY
REFER TO SHEETS A-101 AND A-102 FOR
CONSTRUCTION ROUTE FOR EACH PHASE
OF CONSTRUCTION
1.
1A.
1B
2.
3.
3A
3B
4.
5.
6.
7.
8.
GI004
JJG 4 4
ICRA ELECTRICAL PHASING PLAN
SCALE:3/16" = 1'-0"
ELEVATOR EQUIPMENT ROOM PHASING PLAN
SCALE:3/16" = 1'-0"
P1, P2, P3, S4 AND S5 PHASING PLAN
SCALE:3/16" = 1'-0"
PHASE 5
(OFF-HOUR)
PHASE 4
(OFF-HOUR)
(OFF-HOUR)
PHASE 3
(OFF-HOUR)
PHASE 1
PHASE 2
(OFF-HOUR)
1A
ICRA ELEVATORS
GROUND FLOOR
KEY PLAN
(NEW TRANSFER SWITCH LOCATION)
2.
3.
4.
5.
6.
7.
8.
9.
10.
GENERAL CONTRACTOR TO
THOROUGHLY CLEAN FLOOR IN
ELEVATOR MECHANICAL ROOM
BEFORE NEW EQUIPMENT IS PLACED.
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
UP
UP DN
GARAGE GATE
UP
MOTOR
CYCLE PARKING
WHEEL
CHAIR PARKING
DN
ATM
DN
RAISED FLOOR
GAS CYL
STORAGE
B005D
HAC
A006F
ELEC.
B009
ELECTRICAL
AU003
ELECTRICAL
AU002ELECTRICAL
AU001
SIGNAL CLOSET
D008
TOILET
FEMALE
B019
PREPARATION STERILIZATION
WORK RM
A005C
STORAGE
A008
FOOD
SERVICING
A006D
CLERK
TYPIST
A011
ASST
CHIEF
A012
CHIEF
A010
PARKING LEVEL A
PA01
MECH RM
D-B038
CORRIDOR
BH005
STORAGE
PA08
OTHER SPACE
PAM03
STORAGE
PA07
ELEVATOR
LOBBY
PA02
ELEVATOR
PAE05
ELEVATOR
PAE04
STAIRWELL
PAS05
EMERGENCY
GENERATOR
D003
TRANSFORMERS &
SWITCHGEAR
D003A
STORAGE
D006STORAGE
D005A
EMS
D005
MECH RM
D004
CORRIDOR
DH001
CORRIDOR
DH002
CORRIDOR
DH004
CORRIDOR
DH003
CORRIDOR
DH003
COMM EQUIP
RM
D007D
TD
D002
ELECTRICAL
D001
STAIR
PAS06 STAIR
PAS07
ELEVATOR
S7
ELEVATOR
S6
STORAGE AREA
PA06
PAINT SHOP
D007C
CARPENTER SHOP
D007
LOCKSMITH
D007B
CHIEF
D007A
CORRIDOR
DH005
STAIR
PAS08
CORRIDOR
BH002
M&O
FORMAN
B013
CHIEF
ELECTRICIAN
B014B
ELECTRIC SHOP
B014C
ELECTRONIC
B014
CORRIDOR
BH003
CORRIDOR
BH003
STORAGE
FLAMMABLE
B016
OFFICE
B017
STAFF
TOILET
B015A
WARE HOUSE
B015
STORAGE
GENERAL
B020
MAIL RM
B015B
EMS EQUIP
B021
TOILET
MALE
B018
SOILED
UTILITY
B022A
CORRIDOR
BH004
OFFICE
B022D
OFFICE
B022E
LOGISTICS SVC
INVENTORY MGMT
B022
OFFICE
B022C
OFFICE
B022B
OFFICE
B022A
EMERGENCY GENERATOR
RM
B037
TRANSFORMER RM
B037A
A/C REFRIGERATION
EQUIP RM
B038
CORRIDOR
BH004
ELECTRICAL DISTRIBUTION
RM
B037B
SVC RM
B039
CORRIDOR
BH006
CORRIDOR
BH006
HAS
B044
HAS
B044C
HAS
B044B
EMS OFFICE
B042A
EMS CHECK IN
B042B
SECY/
RECEPTIONIST
B-042
OFFICE
ASST CHIEF
WORK RM
B-042C
TOILET
B044A
IT
B046
EMS
B043
ELECTRIC
CLOSET
B043A
CHARTING
A032E
HALL
A032
CONFERENCE RM
A032D
RESIDENTS
OFFICE
A032C
SECY
OFFICE
A032B
PM&RS CHIEF'S
OFFICE
A032A
MAIN KITCHEN
B036
DISH
WASHING
A020
CONFERENCE M
A029
BREAK RM
B045A
SUPV OFFICE
B045
SURGICAL PACK
B045C
ENVIRONMENTAL
MGMT SUPPLY
B045D
STORAGE
B045B
MAIN KITCHEN
B036
LINEN
B036D
EMS
B036C
MENS
TOILET
B041
FEMALE
TOILET
B040
CANTEEN STORAGE
B036B
OFFICE
B035
STORAGE
B035A
DAIRY & EGG
REFRIG
B036G
OFFICE SUPVS
B036F
CORRIDOR
AH005
CORRIDOR
AH004
CORRIDOR
AH006
CORRIDOR
AH004
SECY
A028
DIETICIANS
OFFICE
A025A
ASST CHIEF
A027
DIETICIANS
OFFICE
A025EMS
A023
ELECTRIC
CLOSET
AU004
ELEVATOR
LOBBY
A000
ELEVATOR LOBBY
A001
BREAK RM
A021
EQUIP
STORAGE AREA
B001
STORAGE
& ISSUE
B034
OFFICE
A019
ELECTRIC
CLOSET
BU003
EMS
A001B
DUMB
ELEVATOR
SOILED RECEIVING
DECONTAMINATION AREA
B005
MANUAL
CART WASH
B005B
STAIRWELL
BS003HALL
B004
EMS
B005A
WOMENS TOILET
B002
MENS TOILET
B003
STORAGE
B009A
HALL
B006A
CORRIDOR
OX101
BULK
STORAGE
B010
LOGISTICS
STORAGE
B011
ELECTRIC
CLOSET
BU002
UNION OFFICE
B011A
FF: VCT
AC PLUMBING
MACH
B012
OFFICE
B012A
CORRIDOR
BH001
CORRIDOR
AH003
CLEAN RECEIVING
B007
CORRIDOR
AH002
STERILE AND NON-STERILE
STORAGE
A001A
RETAIL STORE
A009
STAIRWELL
PAS04
CORRIDOR
AH001
ELECTRIC
CLOSET
AU005
OFFICE
ASST CHIEF
A003
KITCHEN
A006
OFFICE
CANTEEN
A007
REFR WALK IN
A006B
PREFAB
REFRIG
A006C
FOOD
STORAGE
A006A
SERVING LINE
A005
AU008 AU007 AU006
STAIR
AS002
CAFETERIA
A004A
VCS OFFICE
A004E
VCS OFFICE CHIEF
A004A
STORAGE
A004
STORAGE
A004A
EMS
A004B LOUNGE
A002
LOCKERS
FEMALE
A002A
TOILET &
SHOWERS
A002B
IT CLOSET
A002C
TOILET
A024TELEPHONE EQUIP RM
A022
LOCKERS
A026B
EMS
A026
PHYSICAL
THERAPY
A035
STORAGE
A033
HYDROTHERAPY
A034
RECEPTION
A030
CORRIDOR
AH007
PHYSICAL THERAPY
OUTPATIENT
A036
CORRIDOR
A030A
WAITING AREA
A042
EXAM/EMG
A037
PROVIDER
A038
EXAM
A041
EXAM
A040 PROVIDER
A039
STAIRWELL
AS001
TOILET & SHOWERS
A046
A026A TOILET
FEMALE
A045
OT CLINIC
A044
OT OFFICE
A043
OT OFFICE
A043A
RECEPTION AREA
A050
CORRIDOR
AH009
OFFICE
A070RECEIVING
A071
SVC MGR
A072
CORRIDOR
AH008PGM MGR
A068
OFFICE
A069
COMPUTER RM
A073
CORRIDOR
AH010
SOFTWARE APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR SYST &
NETWORKING
A063
ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
OFFICE
A051
PGM
SPECIALISTS
A052
PGMMING &
INFO
A053
PGMMING &
INFO
A054
CONFERENCE
RM
A055
ELECTRICAL
A056
MECHANICAL
B015F
FF: CONC.
PROSTHETICS STORAGE
B015C
FF: VCT
MORGUE
B015A
FF: VCT
LOGISTICS BREAKDOWN
B006B
FF: VCT
LOADING DOCK
AREA
LIMIT OF
WORK
LIMIT OF
WORK
PROPOSED
CONTRACTOR
LAY DOWN AREA
VERIFY FINAL
LOCATION W/ COR
PROVIDE 8'-0" TALL
SECURITY FENCE ON
THREE SIDES.
EXISTING DOCK
"TOWER" BUILDING #1NO SCOPE IN MAIN
BUILDING #1A
P
M
OVERALL GROUND FLOOR PLAN AND
CONSTRUCTION ROUTE
JAB JJG
A-101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
KEY PLAN
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
OVERALL GROUND PLAN AND CONSTRUCTION ROUTE
SCALE:1/16" = 1'-0"
SHEET KEY NOTES - NEW
GROUND FLOOR CONSTRUCTION ROUTE
1 6
ELEV ELEV
ELEV
P3
ELEV
P2
ELEV
P1
S4 S5
INDICATES PROPOSED
CONSTRUCTION PATHWAY
PIT ACCESS TO ELEVATORS IS IN CRAWL SPACE
BELOW - ACCESS THROUGH THIS STAIRWELL
11296
R E
G
I
S
T
E
R
E D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
DocuSign Envelope ID: 52967F7C-C185-4DEB-B445-9D1E718C7D97
8/19/2020
NORTH
(CANOPY BELOW)
NEW TRANSFER
SWITCHGEAR
LOCATION - SEE
GI004 AND ELEC
DWGS
ELEC ROOM
STAIRS UP TO
ELEVATOR
MACHINE ROOM
BOILER RM
B702B
LOUVER
LOUVER
EQUIP RM
B702
STORAGE
B702C
STORAGE
CONTROL RM
B702A
STAIR HALL
B700
TOILET &
SHOWER
B701
STAIR
BS703
AHU
AHU
AHU
CONFINED
SPACE
CONFINED
SPACE
EQUIP RM
A700
LOUVER
TRANSMITTER
A700B
6NORTH OPER RMS
MECH RM
A702
PLATFORM
FOR AHU
ROOF OF
SECOND
FLOOR
L O
U V
E R
S T
O R
A G
E
ROOF OF
THIRD FLOOR
ROOF OF
FOURTH
FLOOR
ROOF OF
SECOND
FLOOR
(ROOF OF
FIFTH FLOOR)
STAIR AND ELEVATOR
PENTHOUSE ROOF
ROOF OF
GROUND ROOF
ROOF OF
FIRST ROOF
ROOF OF
SECOND
ROOF
ROOF OF
THIRD ROOF
BELOW
ROOF OF
THIRD ROOF
BELOW
ROOF OF
SECOND ROOF
BELOW
ROOF OF
FOURTH ROOF
ROOF OF
SECOND ROOF
(ROOF OF
FIFTH ROOF)
(ROOF OF
FIFTH ROOF)
ROOF OF
FOURTH ROOF
0700A
"TOWER" BUILDING #1NO SCOPE IN MAIN
BUILDING #1A
MAIN TOWER
ROOF
PENTHOUSE
P
M
OVERALL ROOF PLAN AND
ELECTRICAL ROOM ENLARGED PLAN
JAB JJG
A-102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
KEY PLAN
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
OVERALL ROOF PLAN
SCALE:1/16" = 1'-0"
SHEET KEY NOTES - NEW
2 6
1 GOVERNOR LOCATED HERE
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
DocuSign Envelope ID: 52967F7C-C185-4DEB-B445-9D1E718C7D97
8/19/2020
PENTHOUSE ROOF
(ABOVE)
TOWER ROOF TOWER ROOF
"TOWER" BUILDING #1
P
M
OVERALL PENTHOUSE ROOF PLAN
AND ELEVATOR EQUIPMENT ROOM
ENLARGED PLAN
JAB
A-103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
KEY PLAN
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
OVERALL PENTHOUSE ROOF PLAN
SCALE:1/16" = 1'-0"
SHEET KEY NOTES - NEW
3 6
ELEVATOR EQUIPMENT ROOM ENLARGED PLAN
SCALE:1/16" = 1'-0"
ELEVATOR
MECH
ROOM
A-103
JJG
GENERAL CONTRACTOR TO THOROUGHLY CLEAN
FLOOR IN ELEVATOR MECHANICAL ROOM BEFORE NEW
EQUIPMENT IS PLACED
EXISTING MONORAIL
S5 S4
P3 P2 P1
RELOCATE EXISTING WALL MOUNTED FIRE
EXTINGUISHER FOR NEW ELECTRIC PANEL.
NEW LOCATION OF WALL MOUNTED FIRE
EXTINGUISHER.
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
DocuSign Envelope ID: 52967F7C-C185-4DEB-B445-9D1E718C7D97
8/19/2020
SUSPENDED
METAL CEILING
LED LIGHTS
- CENTER IN PANELS
AS INDICATED
Q
E
Q
2' 0"EQ. 2 EQ 2
TYPICAL PASSENGER CAB
EQ 1 EQ 1
(F.V.)
SEE NOTE 1
F
V
S E
E
N
O T
E
COORDINATE FUTURE
SECURITY CAMERA
LOCATION WITH VA
COR AND SAFETY FOR
ROUGH-IN CABLING DARK CHERRY WOOD
PANELS - PER
SPECIFICATIONS
ALL CONTROLS TO BE MFR
STANDARD AS SPECIFIED
AND REQUIRE ADA
STAINLESS
STEEL BASE
6'-1 1/2"
NEW COMPLETE
DOORS & ACTUATORS
- SEE SPECS.
CAB AT OPPOSITE DOOR SIDE ELEVATION
FIELD VERIFY CAB DIMENSIONS
EQ EQEQ
DARK CHERRY PANELS -
MATCH EXISTING
MIRROR POLISHED
STAINLESS STEEL
REVEALS - 16 GAUGE
SATIN FINISH
STAINLESS STEEL 3"
HANDRAILS
1 1/2" MIRROR FINISH
STAINLESS STEEL
REVEALS AT CORNERS
STAINLESS
STEEL BASE
STAINLESS STEEL
BUMPER RAIL AT
BASE
CAB AT DOOR SIDE ELEVATION
FIELD VERIFY CAB DIMENSIONS
EQ EQEQ
ELEVATOR
DOOR
SIDE
VA INTERIOR
DEPARTMENT TO
PROVIDE
DIRECTORY SIGN
ALL CONTROLS TO
BE MFR STANDARD
AS SPECIFIED AND
REQUIRE ADA
DARK CHERRY PANELS -
MATCH EXISTING
PROVIDE
RAILING
RETURNS
DOOR
SIDE
8'-1 1/2"8'-1 1/2"
DARK CHERRY PANELS -
MATCH EXISTING
EQ EQ
STAINLESS STEEL 3"
HANDRAILS
1 1/2" MIRROR FINISH
STAINLESS STEEL
REVEALS AT CORNERS
DARK CHERRY PANELS -
MATCH EXISTING
STAINLESS STEEL BASE
STAINLESS STEEL
BUMPER RAIL AT BASE
5'-8"
6'-0 7/16"
DARK CHERRY WOOD
PANELS - MATCH EXISTING
EXISTING
FLOORING
TO REMAIN
STAINLESS STEEL
3" HANDRAILS
STAINLESS
STEEL BUMPER
RAIL AT BASE
1 1/2"
PASSENGER ELEVATORS CAB FINISH SCHEDULE:
SIX LED DOWNLIGHTS WITH STAINLESS PANELS AND CONCEALED ACCESS PANEL. (BASIS
OF DESIGN FOR CEILING PANELS - FORMS+SURFACES, PATTERN: "MIST."
DARK CHERRY WOOD PANELS - MATCH EXISTING.
EXISTING FLOORING TO REMAIN.
ALL DOORS TO BE SS ON BOTH SIDES. RE-LABEL ALL DOORS WITH SAME SIGNAGE AS
EXISTING FROM 290 SIGN COMPANY
STAINLESS STEEL RAIL TYPE BASE SLOPED 6" FROM WALL TO FLOOR.
3" WIDE S.S. HANDRAIL AND GUARDRAILS. SEE ELEVATIONS.
CEILING:
WALLS:
FLOOR:
DOORS:
BASE:
HANDRAILS:
P
M
PASSENGER ELEVATOR CAB INTERIOR
ELEVATIONS
JAB JJG
A-201
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
KEY PLAN
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
CAR REAR ELEVATIONS
SCALE: 3/4" = 1'-0"
CAR CEILING PLAN
SCALE: 3/4" = 1'-0"
CAR FRONT ELEVATION
SCALE: 3/4" = 1'-0"
LEFT SIDE ELEVATIONS
SCALE: 3/4" = 1'-0"
CAR FLOOR FINISH PLAN
SCALE: 3/4" = 1'-0"
TYPICAL CAR WALL SECTION
SCALE: 3/4" = 1'-0"
4 6
CAR RIGHT SIDE ELEVATIONS - P1, P2, P3
SCALE: 3/4" = 1'-0"
ELEVATOR
TOWER - 102
P1, P2, & P3
Replace Ceiling
(1)
Replace Walls
(2)
YES: WOOD REQ'D HERE
Replace Flooring
(3)
NO
Replace Doors
(4)
YES
Replace Handrails
(5)
YES
1. CEILING- REPLACE AS REQUIRED
2. WALLS- WHEREVER THE EXISTING HANDRAILS ARE REMOVED AND REPLACED WILL TYPICALLY REQUIRE NEW WALL PANELS - UNLESS EXISTING HOLES CAN BE
REUSED FOR HANDRAIL ATTACHMENT
- VERIFY WHETHER EXISTING HOLES CAN BE REUSED WITH C.O.R. -
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
DocuSign Envelope ID: 52967F7C-C185-4DEB-B445-9D1E718C7D97
8/19/2020
AutoCAD SHX Text A-201
CAB RIGHT AND LEFT SIDE
ELEVATION
NEW STAINLESS
STEEL CAB LINING
NEW STAINLESS STEEL
3" HANDRAILS
NEW STAINLESS STEEL
WALL PANEL
CAB REAR ELEVATION CAB FRONT ELEVATION
NEW STAINLESS
STEEL CAB LINING
NEW STAINLESS STEEL
3" HANDRAILS
NEW STAINLESS STEEL
WALL PANEL
ALL CONTROLS TO BE
MFR STANDARD AS
SPECIFIED AND
REQUIRED BY ADA
NEW STAINLESS
STEEL BASE
NEW STAINLESS
STEEL BASE
" 7
7'-10 1/2" 0"6'-5 1/2" 0" 7'-7 1/2" 0"
NOTE: DIMENSIONS ARE APPROXIMATE - GC TO VERIFY
NEW COMPLETE
DOORS & ACTUATORS
- SEE SPECS.
LED LIGHTS
-CENTER IN PANELS
AS INDICATED
TYPICAL SERVICE CAB
SUSPENDED METAL
CEILING
FIELD VERIFY HIGH
CEILING & CEILING
ACCESS DOOR
EQ
1'-4 1/4"
EQ
1'-4 1/4"
1'-4 1/4"
EQ 2' 0" EQ2' 0" 2' 0"
EXISTING
FLOORING
TO REMAIN
SIX LED DOWNLIGHTS WITH STAINLESS PANELS AND CONCEALED ACCESS PANEL. BASIS
OF DESIGN FOR CEILING PANELS - FORMS+SURFACES, PATTERN: "MIST."
STAINLESS STEEL - MATCH EXISTING.
EXISTING FLOORING TO REMAIN.
ALL DOORS TO BE SS ON BOTH SIDES. RE-LABEL ALL DOORS WITH SAME SIGNAGE AS
EXISTING FROM 290 SIGN COMPANY
STAINLESS STEEL RAIL TYPE BASE SLOPED 3" FROM WALL TO FLOOR.
3" WIDE S.S. HANDRAIL AND GUARDRAILS. SEE ELEVATIONS.
CEILING:
WALLS:
FLOOR:
DOORS:
BASE:
HANDRAILS:
SERVICE ELEVATORS CAB FINISH SCHEDULE:
P
M
SERVICE ELEVATOR CAB INTERIOR
ELEVATIONS
JAB JJG
A-202
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
5 6
INTERIOR ELEVATIONS - S4, S5
SCALE: 3/4" = 1'-0"
CEILING PLAN
SCALE: NTS
FLOOR PLAN
SCALE: NTS
ELEVATOR
TOWER - 102
S4 & S5
Replace Ceiling
(1)
Replace Walls
(2)
YES: SS
Replace Flooring
(3)
NO
Replace Doors
(4)
YES
Replace Handrails
(5)
YES
1. CEILING- REPLACE AS REQUIRED
2. WALLS- WHEREVER THE EXISTING HANDRAILS ARE REMOVED AND REPLACED WILL TYPICALLY REQUIRE NEW WALL PANELS - UNLESS EXISTING HOLES CAN BE
REUSED FOR HANDRAIL ATTACHMENT
- VERIFY WHETHER EXISTING HOLES CAN BE REUSED WITH C.O.R. -
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
1ST FLOOR
GROUND LEVEL
2ND FLOOR
3RD FLOOR
4TH FLOOR
5TH FLOOR
6TH FLOOR
1 2
TOWER
PASSENGER ELEV. 7 FLOORS (3)
P-1, P-2, P-3
TOWER
SERVICE ELEV. 7 FLOORS (2)
S-4, S-5
MACH.
RM. FL.
7TH FLOOR
PIT PIT
P M
JJG
JAB
ELEVATOR RISER DIAGRAM
N.T.S.
A-400
ELEVATOR RISER DIAGRAM
6 6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date: Dwg. of
17-297
ACG Project Number
FULLY SPRINKLERED
Engineers Architects
BID DOCUMENTS
BID DOCUMENTS
08/21/2020
TOWER BLDG
UPGRADE ELEVATORS P1, P2,
P3, S4 AND S5
596A4-18-102
LEXINGTON, KY 40502
Apogee Consulting Group 1151 Kildaire Farm Rd., Suite 120 Cary, NC 27511 919-858-7420
Elevator Consultant:
KEY PLAN
P1, P2, P3
S4, S5
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
AREA OF WORK
WITHIN BUILDING #1
NNN
11296
R E G
I
S
T
E
R
E
D A
R
C
H
I
T
E
C
T
N
O
R
R
O
L
I
N
A
J
E
F
F
R
E
Y
A
B
R
O
O
K
S
R
A
L
E
I
G
R
O
L
I
N
A
A-400
DocuSign Envelope ID: 79E8F1BD-752B-4158-9B52-7E78772AB89B
| 01-General |
| Sheets and Views |
| GI001 |
| 02-Architectural |
| Sheets and Views |
| A-101 |