This document contains questions and answers regarding a solicitation for a construction project to build an addition and renovate an outpatient facility. The project will construct an approximately 8,000 square foot addition to Building 7 of a VA medical center and renovate 9,850 square feet. The addition will be on the first and second floors of the building's A-wing to the north and east. Scope of work includes a new chiller and cooling tower, delivery of new HVAC and electrical utilities via a pipe basement, and asbestos and lead abatement. Questions addressed maintenance contractors for various existing systems and clarified requirements for surveys, modular furniture to be deducted, and the basis of design for an operating room light.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct Spinal Cord Injury Disorder (SCI/D) Outpatient Addition – North Solicitation# 36C24921R0048
1. The solicitation instructions do not say whether or not we need to include Annual Representations & Certifications; Do we need to include this in our proposal? If so, where?
ANSWER: The Bidder/Offeror is advised to read the solicitation in its entirety. Information relative to Representation and Certifications can be found on page 26 of the solicitation.
2. Page 1 of the SF 1442: States “All veteran owned businesses must also provide evidence of VETS 4212 enrollment and they must provide evidence of the company’s Experience Modification Rating (EMR) provided on the letterhead of its insurance company.” Where do we include this on our proposal?
ANSWER: The Successful Bidder/Offeror will be required to provide this information prior to award. The information is stated for the acknowledgement that this will be a requirement in order to determine the contractor responsible for award.
3. Page 5 of Instructions, Conditions & Other Statements to Bidders/Offerors, Factor 3 – Past Performance: Can CPARS be submitted in lieu of PPQs?
ANSWER: CPARS can be submitted in lieu of PPQs, however, it will be the contractor’s responsibility to provide the information with their proposal.
4. Page 6 of Instructions, Conditions & Other Statements to Bidders/Offerors, Factor 4 – Price: There is no S02-Price Worksheet provided with the solicitation, can you please provide this asap?
ANSWER: The S02-Price Worksheet is being provided in Amendment 00001.
5. 5. Page 5 of Instructions, Conditions & Other Statements to Bidders/Offerors, Factor 3 – Past Performance: States “Offeror shall list only 3 prior clients for completed projects of new construction or new additions of VA hospital/healthcare facility, medical clinics where the projects dollar magnitude equal to or greater than $4,000,000 within the last 10 years on the VA Past Performance questionnaire” – No PPQ form was provided with the solicitation.
ANSWER: The Past Performance Questionnaire (PPQ) is being provided in Amendment 00001.
6. Who is the company that services the fire alarm system within the facility?
ANSWER: Johnson Controls Inc (JCI)
7. Who is the company that maintains the existing telecommunications system?
ANSWER: Maintained in-house
8. Who is the company that maintains the HVAC controls for this facility?
ANSWER: Johnson Controls Inc (JCI)
9. Who is the company that maintains the access control or CCTV system for this facility?
ANSWER: Maintained in-house
10. Who is the company that maintains the existing fire suppression system?
ANSWER: Maintained in-house
11. Please provide note description (07.05) located on drawing AE021.
ANSWER: HDG Response: Keynotes 07.05 and 08.06 are missing from drawing AE021 and shall state: "KEYNOTE 07.05: SEISMIC JOINTS AT FLOOR, SEE DETAIL F5 / AE310 FOR INFORMATION. KEYNOTE 08.06: NEW 50% FREE AREA LOUVER (7' - 4" x 2' - 8"), ALIGN WITH BOTTOM OF SOLDIER COURSE, SEE SHEET AE602 FOR INFORMATION."
12. Please confirm that the SSHO may also be the site superintendent.
ANSWER: HDG Response: Negative, spec section 01 35 26 article 1.7 only allows Competant Persons (CP) to have collateral duties. Please note the described differences in spec section 01 35 26 between Site Safety and Health Officer (SSHO) and CP designees.
13. Per spec section 01 00 00, para. 1.12 ‘Survey”, will the contractor be required to provide a new topographic survey or will we use the information provided in the drawings?
ANSWER: HDG Response: Affirmative, contract requires compliance with spec section 01 00 00 article 1.12.
14. Will the contractor be required to provide a geotechnical survey for this project?
ANSWER: HDG Response: Follow spec section 01 00 00 article 1.11.D.
15. Per the bid items schedule, Deductive Alternate 2, states we are to remove the modular furniture and associated work. Per drawing QH601, it states that the majority of the furniture is provided by the VA. Please provide clarification as to what modular furniture is to be deducted by the contractor for this bid item.
ANSWER: HDG: Refer to the modular casework listed under the table titled "Specialty Equipment Schedule-CC."
16. What is the basis of design for the M7490, Dual Head Surgical Light per drawing QH601?
HDG Response: Basis of Design for Operating Room Light (JSN M7490) is Steris HarmonyAIR G5, Dual Head, Non-Camera Ready. GC provides Steris equipment and installation as follows: 1) LG05: HarmonyAIR G5 Dual Package, Non-Camera Ready; 2) LB29: Harmony Single Mount Surgical Lighting Structural Plate; 3) LY01: Control Panel Rough-in Box With Mud Ring; 4) LV00006: Suspension Tube 9 Inch/225mm. Also, refer to spec section 05 50 00 for structural support requirements.