S02-Price Schedule (Minor Project 614-321) FY2021.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- 36C24921R0048
About this file
This price schedule template and related federal contract opportunity are for Minor Project 614-321 to construct an approximately 8,000 gross square foot addition and renovate 9,850 gross square feet of Building 7 at the Memphis VA Medical Center.
The price schedule template divides the project into divisions and subdivisions for finishes, conveyance equipment, fire suppression, HVAC, electrical, communications, electronic safety and security. It requires contractors to provide itemized pricing for labor, materials, equipment, taxes, overhead and profit for each category. The related federal contract opportunity provides additional details on the project scope including construction of a 1st and 2nd floor addition, new chiller and cooling tower, and delivery of new utilities. It also lists the solicitation and project numbers, type as a pre-solicitation, and the contracting agency as the Department of Veterans Affairs VHA VISN 9. The document includes four deductive alternates removing scopes such as skylights, modular furniture, and administrative spaces.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Item 1
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $0.00 | ||||
| 10 14 00 | Signage | $0.00 | $0.00 | 0.00 | $0.00 | |
| 10 26 00 | Wall and Door Protection | $0.00 | $0.00 | 0.00 | $0.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | Electric Traction Passenger Elevators P1-P4 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 20 | Electric Traction Passenger Elevators P7-P9 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 30 | Electric Traction Service Elevators S5-S6 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 14 21 90 | Passenger Elevators Data Connection P10-P12 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $0.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $0.00
TOTAL MATERIALS $0.00
TAX FOR MATERIALS 6% $0.00
| TOTAL EQUIPMENT | $0.00 | |
| $0.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $0 |
| TAX FOR MATERIALS | $0 |
SUBTOTAL $0
| OVERHEAD | 0% | $0 |
| PROFIT | 0% | $0 |
SUBTOTAL $0
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $0
| Base Offer Item 1 | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation and expert supervision necessary for Minor Project#614-321, Construct Building 7 SCI/D Outpatient Addition-North. |
The period of performance for the work in the base offer 540 calendar days from receipt of notice to proceed.
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"Minor Project 614-321 &"-,Bold"Construct Building 7 Spinal Cord Injury/Disorder (SCI/D) Outpatient-Addition &"-,Bold"MEMPHIS VA MEDICAL CENTER
Deduct Alternates
| Deduct Alternate 1: |
| Perform all work as stated in the Base Offer Item 1, except delete skylight and associated work. |
| Price: _______________________________________________ |
| Deduct Alternate 2: |
| Perform all work as stated in the Deduct Alternate 1, except remove modular furniture and associated work. |
| Price: _______________________________________________ |
| Deduct Alternate 3: |
| Perform all work as stated in the Deduct Alternate 2, except remove SCI Admin and associated spaces. See Drawing Sheet AE020 for details. |
| Price: _______________________________________________ |
| Deduct Alternate 4: |
| Perform all work as stated in Deduct Alternate 3, except remove SIM Lab and associated spaces. See Drawing Sheet AE021 for details. |
Price: _______________________________________________
File details come from the government source that posted it. Updated .