S02 - Attachment_9_EMR_(FILL-IN IS MANDATORY)_(1 Page).pdf

PDF 196 KB Posted

Attached to
Y1LB--Replace AMA Bridge
Solicitation number
36C24823R0017
Issued by

About this file

This document contains a pre-solicitation notice for design-build services to replace a pedestrian bridge at the VA Caribbean Healthcare System in San Juan, Puerto Rico. The Department of Veterans Affairs is seeking to completely replace an existing pedestrian bridge between an AMA parking lot and VA facilities with a new structure. The contractor will be responsible for design, construction, fencing around the work area during construction, and removal and disposal of the existing bridge. The project value is estimated between $1,000,000 to $2,000,000. The solicitation is scheduled for issuance on November 25, 2022. The pre-solicitation notice provides a point of contact and states the requirement is set aside for Service-Disabled Veteran-Owned Small Businesses. Interested SDVOSBs must be registered in SAM.gov and verified in the VIP database by the response date of January 3, 2023 to be eligible to compete.

View the file

Other files

File Type Posted
S02 - Attachment_16_Letter of Commitment_(MANDATORY)_(1 page).docx DOCX document
S02 - Attachment_3 SPEC 01_32_16_17_Project Schedules (24 Pages).pdf PDF
S02 - Attachment_15_Experience Info Sheet (MANDATORY)_(4 Pages).docx DOCX document
S02 - Attachment_8_Past Performance_(FILL-IN IS MANDATORY)_(4 Pages).pdf PDF
S02 - Attachment_12_Station_672_Local Protocols for COVID-19_(1 Page).pdf PDF
S02 - Attachment_11_ Release of Claim (ROC) Form_(2 Pages).pdf PDF
S02 - Attachment_6 SPEC 01_57_19_Temporary Environmental Controls (24 Pages).pdf PDF
S02 - 12-12-2022 SOL 36C24823R0017.pdf PDF
S02 - Attachment_13_VA Supplemental Kt Req Combatting COVID-19_(2 Pages).pdf PDF
S02 - Attachment_14_Infection Control Guidelines Construction _ Renovation 11B-17-05 (11 Pages).docx DOCX document
S02 - Attachment_5 SPEC 01_42_19_Reference Standards (9 Pages).pdf PDF
S02 - Attachment_1 SOW_Exhibits A and B (4 Pages).pdf PDF
S02 - Attachment_10_ Base Offer Price Breakdown_(FILL-IN IS MANDATORY)_(2 Pages).pdf PDF
S02 - Attachment_7 SPEC 01_35_26_Safety Requirements (37 Pages).pdf PDF
S02 - Attachment_4 SPEC 01_33_23_Shop Drawings Product Data and Samples (8 Pages).pdf PDF
S02 - Attachment_2 SPEC 01_00_00_General Requirements (24 Pages).pdf PDF
S03 - Amended Pre-Solicitation Notice 36C24823R0017_1.pdf PDF
36C24823R0017_1.docx DOCX document
36C24823R0017 Pre-solicitation (Replace AMA Bridge).docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT: 9

EMR FORM FOR BIDDER/OFFEROR TO COMPLETE & SUBMIT WITH PROPOSAL

Pre-Award Contractor Evaluation Form Company Name:

Address: _____________________________________________________

Telephone: ______________________ Fax: ________________________

Email: _______________________________________________________

Contact: ______________________________________________________

1. Utilizing your OSHA 300 Forms, please complete the following information:

Category 2019 2020 2021 Number of man hours (jobsite and office) Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)

Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page:

http://www.osha.gov/pls/publications/publication.html.

2. Provide your six-digit North American Industrial Classification System (NAICS) Code for this acquisition: __________________________________

3. Who administers your company’s Safety and Health Program?

4. Company’s Insurance Experience Modification Rate (EMR) for the past 3 years (an EMR of greater than 1.0 disqualifies the contractor): _____________

File details come from the government source that posted it. Updated .