S02 - Attachment_16_Letter of Commitment_(MANDATORY)_(1 page).docx

DOCX document 19 KB Posted

Attached to
Y1LB--Replace AMA Bridge Federal contract opportunity
Solicitation number
36C24823R0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This notice provides details for a pre-solicitation to replace an existing pedestrian bridge at the VA Caribbean Healthcare System in San Juan, Puerto Rico. The Department of Veterans Affairs, through the Veterans Integrated Service Network 8 and VA Caribbean Healthcare System, will issue a solicitation on or about November 25th, 2022 for design-build services to completely replace the Autoridad Metropolitana de Autobuses bridge. Interested service-disabled veteran-owned small businesses should register in the System for Award Management to receive the solicitation numbered 36C24823R0017. Proposals will be due by January 3rd, 2023. The construction magnitude is estimated between $1,000,000 and $2,000,000. In addition to designing and building the new bridge, the selected contractor will remove and dispose of the existing steel pedestrian bridge and provide perimeter fencing during construction.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LB--Replace AMA Bridge, newest first.
File Type Posted
S02 - Attachment_3 SPEC 01_32_16_17_Project Schedules (24 Pages).pdf PDF
S02 - Attachment_9_EMR_(FILL-IN IS MANDATORY)_(1 Page).pdf PDF
S02 - Attachment_10_ Base Offer Price Breakdown_(FILL-IN IS MANDATORY)_(2 Pages).pdf PDF
S02 - Attachment_7 SPEC 01_35_26_Safety Requirements (37 Pages).pdf PDF
S02 - Attachment_4 SPEC 01_33_23_Shop Drawings Product Data and Samples (8 Pages).pdf PDF
S02 - Attachment_2 SPEC 01_00_00_General Requirements (24 Pages).pdf PDF
S03 - Amended Pre-Solicitation Notice 36C24823R0017_1.pdf PDF
S02 - Attachment_15_Experience Info Sheet (MANDATORY)_(4 Pages).docx DOCX document
S02 - Attachment_8_Past Performance_(FILL-IN IS MANDATORY)_(4 Pages).pdf PDF
S02 - Attachment_12_Station_672_Local Protocols for COVID-19_(1 Page).pdf PDF
S02 - Attachment_11_ Release of Claim (ROC) Form_(2 Pages).pdf PDF
S02 - Attachment_6 SPEC 01_57_19_Temporary Environmental Controls (24 Pages).pdf PDF
S02 - 12-12-2022 SOL 36C24823R0017.pdf PDF
S02 - Attachment_13_VA Supplemental Kt Req Combatting COVID-19_(2 Pages).pdf PDF
S02 - Attachment_14_Infection Control Guidelines Construction _ Renovation 11B-17-05 (11 Pages).docx DOCX document
S02 - Attachment_5 SPEC 01_42_19_Reference Standards (9 Pages).pdf PDF
S02 - Attachment_1 SOW_Exhibits A and B (4 Pages).pdf PDF
36C24823R0017_1.docx DOCX document
36C24823R0017 Pre-solicitation (Replace AMA Bridge).docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 16

SOL 36C24823R0017

REPLACE AMA BRIDGE

Letter of Commitment (Sample)

(PRIME CONTRACTOR LETTERHEAD)

Insert Date (MM/DD/YYYY)

Department of Veterans Affairs VA Caribbean Healthcare System San Juan PR 00921 Attn.: Contracting Officer

Subject: Letter of Commitment for Solicitation No. 36C24818R0039, Renovate Chiller Plant at VACHS, San Juan, PR.

In the event that Prime Contractor X is awarded a contract under the subject solicitation, Prime Contractor X commits to using Subcontractor Y as a subcontractor for the services described in this Letter of Commitment and Subcontractor Y agrees to perform as a subcontractor to Prime Contractor X for those services.

Prime Contractor X will perform as the prime contractor while Subcontractor Y will perform the following services as a subcontractor under the resultant contract:

(Describe the work to be performed by the subcontractor, i.e. electrical, mechanical, civil, etc.)

Prime Contractor X may be credited with the experience, expertise and/or past performance of Subcontractor Y as they relate to the services described in this Letter of Commitment.

In the event that Prime Contractor X is awarded the resultant contract, another firm cannot be substituted for Subcontractor Y without prior written approval of the contracting officer. Approval or disapproval of a substitute subcontractor is a matter within the sole discretion of the Contracting Officer, considering such factors as whether the contracting officer considers the proposed substitute to be equally qualified and the substitution to be in the best interests of project execution.

In approving a substitution, the contracting officer may impose such conditions on the substitution as the contracting officer deems appropriate in the exercise of his/her sole discretion.

In the event Prime Contractor X is not awarded a contract under the subject solicitation, this Letter of Commitment is null and void.

NameName
Prime Contractor NameSubcontractor Name
TitleTitle

File details come from the government source that posted it. Updated .