Asbestos Surveillance Report 06-19-2022.pdf
PDF 487 KB Posted
- Solicitation number
- 36C24623B0011
About this file
This asbestos surveillance report outlines requirements for an asbestos abatement project at a Veterans Affairs facility. The general or prime contractor will be responsible for removing all asbestos-containing materials prior to any renovation or demolition work through a licensed Virginia asbestos abatement contractor. Testing must also be conducted for suspect materials that are behind walls, ceilings or otherwise inaccessible. The related federal contract opportunity is for improvements to patient privacy on the fourth floor of the facility as part of a Phase 2 project under solicitation number 36C24623B0011. The work is to be performed within Veterans Integrated Service Network 6 of the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24623B0011 0004.docx | DOCX document | |
| 17-261_Addendum 01.pdf | ||
| 3655-HH McGuire VAMC Six Month ReInspection.pdf | ||
| RFI 002 Response.pdf | ||
| RFI 003 Response.pdf | ||
| 36C24623B0011 0003.docx | DOCX document | |
| RFI 001 Response.pdf | ||
| S04 Pre-Bid Site Visit Attedance Log 12-15-2022.pdf | ||
| 36C24623B0011 0002.docx | DOCX document | |
| S04 Pre bid Agenda and ATTENDANCE LOG.pdf | ||
| 36C24623B0011 0001.docx | DOCX document | |
| 652-21-106 Improve Patient Privacy 4C - Phase 2 Drawings 11-4-22.pdf | ||
| Attachment B - Contractor EMR Certification Form 2022.docx | DOCX document | |
| 652-21-106 Improve Patient Privacy 4C - Phase 2 - Specs 11-4-22.pdf | ||
| Wage Det. VA20220155 Rev 4 Dated 08192022.pdf | ||
| VAAR 852.219-77 Certification.docx | DOCX document | |
| 36C24623B0011_1.docx | DOCX document | |
| Attachment A - RFI Form B0011.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Surveillance Report
The General Contractor and/or Prime Contractor is fully responsible of the following:
All Asbestos-Containing Materials (ACM) must be removed by a Commonwealth of Virginia Licensed Asbestos Abatement Contractor prior to impact by renovations or demolition activities.
Areas behind solid walls and ceiling were inaccessible and therefore could not be visually surveyed for suspect ACMs. If suspect materials are observed during renovation/demolition, those materials should be sampled by a Commonwealth of Virginia Licensed Asbestos Inspector prior to impact or assumed to contain asbestos. Materials identified as ACM in this plan may be located in other areas of the buildings concealed behind interior finishes or covered by other materials.
Based upon previous work experience at the facility, prior to any renovation project, more extensive asbestos testing is performed in each area planned to renovate prior to the start of work.
Limitations
The conclusions and recommendations presented within this report are based upon a reasonable level of assessment within normal bounds and standards of professional practice for a site in this particular geographic setting. The VA is not responsible or liable for the discovery and elimination of hazards that may potentially cause damage, accidents, or injuries.
The VA does not assume the responsibility of the person(s) in charge of the construction site, the VA assumes no responsibility regarding any response actions initiated as a result of these findings. General compliance with regulations and response actions are the sole responsibility of the General Contractor and/or Prime Contractor and should be conducted in accordance with local, state, and/or federal requirements.
4th Floor Asbestos Re-survey
(specific to section 4C Phase 2)
4th Floor ACM Summary Table I
VHARICAlvarA Line
4th Floor ACM Abatement Summary Table
VHARICAlvarA Line