S06 Amend A00003 to 36C24420B0006 7-24-20.docx

DOCX document 99 KB Posted

Attached to
Y1DZ--CLC NRM - Construction
Solicitation number
36C24420B0006
Issued by

About this file

This document provides information on a federal contract opportunity for construction services related to a CLC NRM construction project located at the Erie VA Medical Center. The contract will be awarded as a 100% service-disabled veteran-owned small business set-aside between $2 million to $5 million. The period of performance is 365 calendar days from receipt of the notice to proceed. Interested parties must register in SAM and be verified in CVE. The solicitation will be issued as an IFB in accordance with FAR Subpart 14 and posted on beta.SAM.gov with a pre-bid conference approximately one week after. Questions regarding this opportunity must be submitted in writing to the identified point of contact by the specified due date.

View the file

Other files

File Type Posted
C01 SAM Wording of Award 36C24420C0109 9-21-20.docx DOCX document
S03 SAM Wording for Amend A00003 to 36C24420B0006 7-24-20.docx DOCX document
S03 SAM Wording for Amend A00002 to 36C24420B0006 7-22-20.docx DOCX document
S06 Amend 00002 to 36C24420B0006 7-22-20.docx DOCX document
S03 Amend A00001 Wording Posting 36C24420B0006 to SAM.beta 6-30-20.docx DOCX document
S06 Amend 00001 to 36C24420B0006 6-30-20.docx DOCX document
S02 Specification 4-21-20.zip ZIP file
S02 Solicitation 36C24420B0006 6-24-20.docx DOCX document
S02 Wage Determination 06-19-20.pdf PDF
P03 Sole Source Justification - Swing(s).pdf PDF
P03 Sole Source Justificaiton - Precast Pavers(s).pdf PDF
S02 File 3 Electrical Dwgs. 4-21-20.zip ZIP file
P03 Sole Source Justification - Pole for Site Light(s).pdf PDF
P03 Sole Source Justification - Light Site(s).pdf PDF
P03 Sole Source Justification - Storm Chamber(s).pdf PDF
S02 File 4 Structural Dwgs. 4-21-20.zip ZIP file
P03 Sole Source Justification - Kalwall Panel(s).pdf PDF
P03 Sole Source Justification - Pergola(s).pdf PDF
S02 File 5 Landscaping Dwgs. 4-21-20.zip ZIP file
S02 File 1 Architecture Dwgs. 4-21-20.zip ZIP file
P03 Sole Source Justification - Shed(s).pdf PDF
P03 Sole Source Justification - Bollard Light(s).pdf PDF
S02 File 2 Civil Dwgs 4-21-20.zip ZIP file
P03 Sole Source Justification - Glass(s).pdf PDF
36C24420B0006_1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

07-24-2020

562-21-1-5705-0001

562-17-307

00244 Department of Veterans Affairs Network Contracting Office 4

00244 Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

36C24420B0006

X

This amendment is issued to provide responses to questions recieved on this solicitation.

The Bid Due Date remains unchanged.

All other information remains unchanged.

Questions and Responses CLC NRM - Construction for Proposal 36C2442B0006 Date of Responses – 07/24/2020

Question #1 Specification Section 01 32 16.15 Subparagraph 1.4 (A) Computer Produced Schedules notes that the contractor shall provide monthly time/cost schedules and reports generated from monthly project updates. This paragraph goes on to note that “up to five different reports” are to be provided and that “the COTR shall identify the five different report formats that the contractor shall provide”. Does the VA desire time and cost loaded schedules for this project, or will a CPM schedule suffice? If the time and cost loaded schedules is required, please provide specifically which reports (up to five) that the VA will require so that General Contractors can appropriately include the scheduling costs associated with the schedule requirements.

Response: The Schedule is required to be built utilizing Critical Path Method software. In addition to the logic required to accurately track the relationship between the predecessors and successors of an activity, the schedule shall have all costs associated with an activity linked to it – including all labor, materials, equipment and appropriate overhead. In this way, the schedule can be tracked not only from a time standpoint, but also from a monetary standpoint as compared to the monthly pay application.

Regarding the number of “reports”. The VA Central Office has used the number (5) as reasonable place holder. The intention is to allow the Government to request UP TO five different reports from the Contractor for each schedule update. The term “Report” is not intended as a specific form. Instead, “Reports” could possibly be more accurately described as an iteration of the schedule that is filtered by various inputs – such as Early Start, Cost Expensed, Late Finish, etc.

Question #2 Specification Section 05 12 00 Part 1.5 requires AISC certification. Is it possible to utilize a steel contractor without this certification?

Response: As per Specifications, AISC Certification is required.

Questions #3A and #3B Related to steel fabrication, AESS Category and galvanizing.

3A. Can you please confirm which AESS Category this project is?

3B. Can you confirm if we can bypass the galvanizing and simply blast and prime the steel, with GC to carry the finish paint afterwards?

Responses:

3A. Using the keynote designations on Drawing A101, provide the following:

▪ Category AESS 2:

◦ Keynote 2, Vehicular Canopy

◦ Keynote 5, Truck Port Loading Dock Canopy

▪ Category AESS 3:

◦ Keynote 4, Covered Walkway 3B. Include galvanizing as specified in the documents. Weep holes for the galvanizing process can be placed at connection points as to not require plugs.

End of Document