P03 Sole Source Justification - Pergola(s).pdf

PDF 246 KB Posted

Attached to
Y1DZ--CLC NRM - Construction Federal contract opportunity
Solicitation number
36C24420B0006
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This justification and approval document describes a sole source procurement by the Department of Veterans Affairs for an arched open sky pergola from Forever Redwood for use in the Erie VA Medical Center Community Living Center construction project. The pergola will be installed in the exterior courtyard as part of the project and will cost $4,330. The justification cites that only one responsible source will satisfy the agency's requirement for a pergola that is consistent in shape, construction, and materials with other courtyard amenities to establish a cohesive design.

The related federal contract opportunity notice indicates the Veterans Integrated Service Network #04 intends to issue an invitation for bid for the construction services for the CLC NRM construction project located at the Erie VA Medical Center. The solicitation will be issued on or about June 29, 2020. The contract will be awarded as a 100% service-disabled veteran-owned small business set-aside with a performance period of 365 calendar days from notice to proceed. The estimated value is between $2,000,000 to $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--CLC NRM - Construction, newest first.
File Type Posted
C01 SAM Wording of Award 36C24420C0109 9-21-20.docx DOCX document
S03 SAM Wording for Amend A00003 to 36C24420B0006 7-24-20.docx DOCX document
S06 Amend A00003 to 36C24420B0006 7-24-20.docx DOCX document
S03 SAM Wording for Amend A00002 to 36C24420B0006 7-22-20.docx DOCX document
S06 Amend 00002 to 36C24420B0006 7-22-20.docx DOCX document
S03 Amend A00001 Wording Posting 36C24420B0006 to SAM.beta 6-30-20.docx DOCX document
S06 Amend 00001 to 36C24420B0006 6-30-20.docx DOCX document
S02 File 3 Electrical Dwgs. 4-21-20.zip ZIP file
S02 File 4 Structural Dwgs. 4-21-20.zip ZIP file
P03 Sole Source Justification - Kalwall Panel(s).pdf PDF
P03 Sole Source Justification - Bollard Light(s).pdf PDF
P03 Sole Source Justification - Glass(s).pdf PDF
S02 Wage Determination 06-19-20.pdf PDF
S02 File 2 Civil Dwgs 4-21-20.zip ZIP file
S02 File 5 Landscaping Dwgs. 4-21-20.zip ZIP file
S02 File 1 Architecture Dwgs. 4-21-20.zip ZIP file
P03 Sole Source Justification - Swing(s).pdf PDF
P03 Sole Source Justification - Pole for Site Light(s).pdf PDF
P03 Sole Source Justification - Storm Chamber(s).pdf PDF
S02 Specification 4-21-20.zip ZIP file
S02 Solicitation 36C24420B0006 6-24-20.docx DOCX document
P03 Sole Source Justificaiton - Precast Pavers(s).pdf PDF
P03 Sole Source Justification - Light Site(s).pdf PDF
P03 Sole Source Justification - Shed(s).pdf PDF
36C24420B0006_1.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition (>SAT)

Acquisition Plan Action ID: 36C244-20-AP-3175

1. Contracting Activity: Department of Veterans Affairs, VISN 04, Erie VA Medical Center.

2. Nature and/or Description of the Action Being Processed: Acquisition of proprietary Forever

Redwood “Arched Open Sky Pergola 20’ x 16’ with 9 ‘-6” tall posts” for use in the Erie VA Medical Center Community Living Center NRM Project 562-17-307. As part of this construction project, the pergola will be installed In the exterior courtyard. This sole source will be used in this project.

3. Description of Supplies/Services Required to Meet the Agency’s Needs: The acquisition of the

Forever Redwood Pergola will be consistent in shape, construction and materials with the wheelchair swing and other components of the courtyard amenities, so that all of them together contribute to establishing a cohesive design. The cost of the pergola is $4,330. The pergola will be installed after the courtyard pavers are installed.

4. Statutory Authority Permitting Other than Full and Open Competition:

(X) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1;

( ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2;

( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3;

( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4 ( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR 6.302-5;

( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6;

( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7;.

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority): The acquistition is authorized pursuant to 10 U.S.C. 2304(c)(1), and is implemented by FAR 6.302-1(c). Only one responsible source and no other supplies or services will satisfy agency requirements.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: Any action to increase competition for the supplier of the pergola would affect the overall design aesthetics of the courtyard. It would also affect the coordination of the structural components that were based on the particular dimensions and requirements of this unit.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and

Reasonable: This item is being sole sourced under a larger construction project that will be completed as a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set aside.

Therefore, competition will be provided on the base contract which will lead to a fair and reasonable price.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted: Market research was conducted through the Internet, accessing numerous provider and manufacturer websites, and found this one to be the product that worked better with all other design components of the courtyard.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: N/A

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: N/A

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: N/A

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Mark Poweski Date Acting Chief, FMS Erie VA Medical Center

13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Don Kalivoda Date Contracting Officer, Construction-West Network Contracting Office 4

b. One Level Above the Contracting Officer (Required over SAT but not exceeding $700K): I certify the justification meets requirements for other than full and open competition.

Date

Michelle Y. Lappen Branch Chief, Construction West Network Contracting Office 4

Acting Assistant Chief for Mark Poweski

Robert J. Petrone 1348359

Digitally signed by Robert J. Petrone 1348359 Date: 2020.05.19 11:42:49 -04'00'

Donald J Kalivoda 252427

Digitally signed by Donald J Kalivoda 252427 Date: 2020.05.20 07:50:15 -04'00'

2020-06-11T13:35:01-0400
MICHELLE Y. LAPPEN 1635695