This solicitation is for construction services related to a CLC NRM construction project located at the Erie VA Medical Center. The contractor shall provide all tools, labor, materials, permits, licenses and supervision for construction specified in the drawings and specifications. The period of performance is 365 calendar days from receipt of the notice to proceed. The solicitation will be issued as an invitation for bid conducted in accordance with FAR Subpart 14 and is set aside as 100% for service-disabled veteran-owned small businesses. The NAICS code is 236220 with a size standard of $39.5 million in annual receipts. The estimated value is between $2,000,000 to $5,000,000. The solicitation issue date will be on or about June 29, 2020. All questions must be received in writing by the specified date. Offerors must be verified in CVE and registered in SAM at the time of proposal submission to be eligible for award.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
07-22-2020
562-21-1-5705-0001
562-17-307
00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24420B0006 07-22-2020
X
This Amendment is issued to provide the response to the questions received for this solicitation.
The Bid due date remains unchanged.
All other information remains unchanged.
Questions and Responses CLC NRM - Construction for Proposal 36C2442B0006 Date of Responses – 07/21/2020
Question #1 Specification Section 01 32 16.15 Subparagraph 1.4 (A) Computer Produced Schedules notes that the contractor shall provide monthly time/cost schedules and reports generated from monthly project updates. This paragraph goes on to note that “up to five different reports” are to be provided and that “the COTR shall identify the five different report formats that the contractor shall provide”. Does the VA desire time and cost loaded schedules for this project or will a CPM schedule suffice? If the time and cost loaded schedules is required, please provide specifically which reports (up to five) that the VA will require so that General Contractors can appropriately include the scheduling costs associated with the schedule requirements.
Response:
The Schedule is required to be built utilizing Critical Path Method software. In addition to the logic required to accurately track the relationship between the predecessors and successors of an activity, the schedule shall have all costs associated with an activity linked to it – including all labor, materials, equipment and appropriate overhead. In this way, the schedule can be tracked not only from a time standpoint, but also from a monetary standpoint as compared to the monthly pay application.
Regarding the number of “reports”. The VA Central Office has used the number (5) as reasonable place holder. The intention is to allow the Government to request UP TO five different reports from the Contractor for each schedule update. The term “Report” is not intended as a specific form. Instead, “Reports” could possibly be more accurately described as an iteration of the schedule that is filtered by various inputs – such as Early Start, Cost Expensed, Late Finish, etc.
End of Document