This federal contract opportunity notice seeks construction services for a replace dry cooler project. The Veterans Integrated Service Network #04 Contracting Office and Erie Veteran Administration Medical Center will issue an invitation for bid for a single, firm fixed-price construction contract. The contractor shall provide all labor, materials, tools, permits, supervision, and construction specified in the drawings and specifications to replace the dry cooler system for IT at the Erie VA Medical Center. The performance period is 365 calendar days from notice to proceed. This project is set aside as 100% for service-disabled veteran-owned small businesses. The estimated construction cost is between $500,000 to $1 million. Questions regarding this solicitation must be submitted in writing by June 24, 2020, with the solicitation to issue on or around that same date. Respondents must be registered in the System for Award Management and verified in the Department of Veterans Affairs Center for Veterans Enterprise databases at time of proposal submission.

View the file

Other files for this federal contract opportunity

Other files attached to 4120--Replace Dry Cooler System for IT, newest first.
File Type Posted
C01 SAM Award Wording for36C24420C0107 9-23-20.docx DOCX document
S03 SAM Wording for Amend. P00002 to 36C24420B0002 7-23-20.docx DOCX document
S06 Amend. A00002 to 36C24420B0002 7-23-20.docx DOCX document
S03 Contracting Opportunities Amd A00001 36C24420B0002 6-30-20.docx DOCX document
S06 Amend A00001 to 36C24420B0002 6-30-20.docx DOCX document
S02 Solicitation 36C24420B0002 6-22-20.docx DOCX document
P07 Wage Determination 06-19-20.pdf PDF
P03 Sole Source Justification - JCI Metasys.pdf PDF
S02 Specifications - Replace Dry Cooler 01-29-20.pdf PDF
P03 Sole Source Justification - Notifier system.pdf PDF
36C24420B0002_1.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

G001

COVER SHEET

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2019 CJC CJC

100% BID DOCUMENTS

ERIE VA MEDICAL CENTER

REPLACE IT HVAC HEAT EXCHANGER

135 EAST 38TH STREET

ERIE, PA 16504

VICINITY MAP

SITE

LOCATION MAP

SITE

PROJECT DIRECTORY

OWNER:

ERIE VA MEDICAL CENTER

135 EAST 38TH STREET

ERIE, PA 16504

CONTACTS:

COR: PHILIP TSANG - (814) 860-2207

CO: DONALD KALIVODA - (814) 860-2917

ARCHITECT/ENGINEER:

AE WORKS LTD.

209 SANDUSKY ST

PITTSBURGH, PA 15212

(412) 287-7333

CONTACTS:

PROJECT LEAD: CHRIS CHAMPAGNE, PE

PM: TIFFANY HAILE

VA PROJECT: 562-18-401

NORTH

NORTH

DRAWING INDEX

SHEET # SHEET NAME

GENERAL

G001 COVER SHEET

CIVIL

C101 SITE PLAN

MECHANICAL

M001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

MD10B BASEMENT MECHANICAL DEMOLITION PLAN

MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN

M10B BASEMENT MECHANICAL PLAN

M101 FIRST FLOOR MECHANICAL PLAN

M501 HVAC DETAILS

M502 HVAC DETAILS

M601 HVAC CONTROLS DRAFT

M701 HVAC SCHEDULES

ELECTRICAL

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

E101 ELECTRICAL POWER PLAN

E201 ELECTRICAL ONE-LINE DIAGRAM

# Revisions Date

274.49

282.02282.00 282.05282.05

282.00

282.00 282.08

2.

2.

281.43

277.84

277.51

277.59 278.02 278.16

278.03

278.03

278.05

278.07 278.75

278.70

278.23278.06

278.05

278.26

278.22

278.11

278.09

278.04

278.03278.04

278.01

277.99

278.03 278.05

278.03

278.04

278.04 278.04

275.09

275.20275.15

275.12

276.02

278.38

280.12

281.29 281.43 281.47

279.97279.57

276.99

276.89 278.23

275.09 275.38

275.30 275.15 277.66

276.36

REMOVE GRATE, DISPOSE OF INLET SEDIMENT

FILTER AND CLEAN ALL DEBRIS FROM INSIDE OF

INLET. JET AND CLEAN PIPES TO NEXT

DOWNSTREAM STRUCTURE

EX. INLET

TG: 275.14

SAWCUT PAVING SLAB AROUND

EXISTING EQUIPMENT TO REMAIN

AFTER EQUIPMENT IS REMOVED

FROM SLAB, SAWCUT AND

REMOVE ALL EXISTING SLAB

CONCRETE EXCEPT AS NOTED.

277.80

278.20

278.20

278.10

277.90

278.10

EXISTING CURB WALL TO REMAIN.

PROTECT DURING CONSTRUCTION.

276.00

277.00

GRADE AREA BETWEEN SLAB LOW POINT

AND EXISTING INLET TO PROVIDE

POSITIVE DRAINAGE. TOPSOIL AND SEED

DISTURBED AREAS.

1.4%

1.3%

2.0% 1.7%

LEGEND

PROPOSED CURB / DEPRESSED CURB

D.C.

PROPOSED CONCRETE

278.20 PROPOSED ELEVATION

275.15

1319 Sassafras Street, Erie, PA 16501-1720

814.453.5702 (ph) 814.453.2020 (fax)

PROJECT LOCATION

NOTES:

1. THIS PROPERTY LIES WITHIN FLOOD ZONE "X" ("Area of minimal flood hazard") AS

DESIGNATED ON COMMUNITY PANEL No. 42049C0205E OF THE FLOOD INSURANCE RATE

MAPS FOR THE CITY OF ERIE, PENNSYLVANIA, EFFECTIVE DATE: JUNE 7, 2017.

2. LOCATIONS, SIZES, AND MATERIAL TYPES OF ABOVE-GROUND AND BELOW-GROUND

UTILITY LINES, APPURTENANCES AND STRUCTURES AS DEPICTED HEREON ARE PER

OBSERVABLE, ABOVE-GROUND EVIDENCE IN RELATION TO INTERPRETATIONS OF

FURNISHED RECORD UTILITY INFORMATION. THEY ARE PLOTTED AS ACCURATELY AND AS

COMPLETELY AS POSSIBLE FROM SAID EVIDENCE AND FURNISHED INFORMATION, BUT

THEY ARE NOT ENTIRELY FIELD-VERIFIED AND MUST BE CONSIDERED APPROXIMATE. THIS

OFFICE MAKES NO GUARANTEE AS TO THE PRECISE LOCATIONS OR DEPTHS OF

UNDERGROUND UTILITIES. IN ADDITION, THERE MAY BE OTHER ACTIVE OR ABANDONED

UNDERGROUND UTILITY LINES, APPURTENANCES AND STRUCTURES OF WHICH THIS

OFFICE HAS NOT BEEN ADVISED. PRIOR TO ANY EXCAVATION OR DEMOLITION, IT IS

IMPERATIVE THAT SUCH UTILITY LOCATIONS, DEPTHS, SIZES AND MATERIAL TYPES BE

VERIFIED THROUGH THE PA ONE-CALL SYSTEM AND/OR THROUGH THE INDIVIDUAL

UTILITY COMPANY OR AUTHORITY.

3. CONTRACTOR TO VERIFY EXACT LOCATION OF UTILITIES BY CONTACTING PENNSYLVANIA

ONE-CALL SYSTEM AT 1-800-242-1776 A MINIMUM OF THREE (3) WORKING DAYS AND A

MAXIMUM OF TEN (10) WORKING DAYS BEFORE COMMENCING EXCAVATION. PRIOR TO

INSTALLATION, CONSULT WITH UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH

MAY BE CREATED DUE TO THE LOCATION OF THE UTILITIES.

4. VERIFY THE EXACT POSITIONS OF THE TWO EXISTING EQUIPMENT UNITS TO REMAIN IN

SERVICE DURING SLAB REPLACEMENT. NEATLY SAW CUT AROUND THE BASE OF

EQUIPMENT TO REMAIN IN PLACE.

5. IF EXISTING SUBBASE MATERIAL AND DEPTH ARE SUFFICIENT, SUBBASE MAY BE

COMPACTED FOR REUSE. OTHERWISE, REMOVE AND REPLACE EXISTING SUBBASE.

6. PROVIDE BOND BREAKER AT NEW TO EXISTING CONCRETE JOINTS. ONCE CONCRETE HAS

CURED, APPLY A TWO PART POLYSULFIDE BASED JOINT SEALER TO PREVENT WATER

INTRUSION INTO THE JOINTS.

7. GRADE AREA FROM SLAB LOW POINT TO THE EXISTING INLET TO PROVIDE POSITIVE AND

UNIFORM DRAINAGE. MAXIMUM SLOPE SHALL BE 4:1 (H:V).

PROJECT LOCATION MAP

SCALE: 1" = 2000'

REGISTERED

PROFESSIONAL

ENGINEER

TIMOTHY LAWRENCE POLASKI

055636-E

SCALE: 1" = 5'

5' 0' 5'

SUBGRADE

8" FIBER REINFORCED CONCRETE

SLAB PAVEMENT DETAIL (TYP.)

NOT TO SCALE

PENNDOT CLASS AAA (4,000 PSI)

6" SUBBASE (No. 2A)

CEMENT CONCRETE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

C101

SITE PLAN

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2020 TLP DML

100% CONSTRUCTION

DOCUMENTS

# Revisions Date

AutoCAD SHX Text Transformer pad

AutoCAD SHX Text

CURB / DEPRESSED CURB

AutoCAD SHX Text

STORM SEWER LINE

AutoCAD SHX Text

FENCE LINE

AutoCAD SHX Text D.C.

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

CONTOUR LINE

AutoCAD SHX Text

RIGHT-OF-WAY LINE

AutoCAD SHX Text

BOUNDARY LINE

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

AutoCAD SHX Text

TREE / SIZE

AutoCAD SHX Text

MANHOLE

AutoCAD SHX Text

CATCH BASINS/INLETS

AutoCAD SHX Text TG = Top Of Grate Elev. Inv = Invert Elev.

AutoCAD SHX Text Rim = Rim Elev. Inv = Invert Elev.

AutoCAD SHX Text 12"

AutoCAD SHX Text

EDGE OF GRAVEL

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING ELEVATION

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text NOTE: 1. CONSTRUCT SLAB ON NO. 2A COARSE AGGREGATE COMPACTED TO MIN. CONSTRUCT SLAB ON NO. 2A COARSE AGGREGATE COMPACTED TO MIN. 95% STANDARD PROCTOR. 2. PROVIDE 6x6-W4/W4 WELDED WIRE FABRIC MID DEPTH. PROVIDE 6x6-W4/W4 WELDED WIRE FABRIC MID DEPTH. 3. PLACE BOND BREAKER AT EXISTING CONCRETE EDGES. PLACE BOND BREAKER AT EXISTING CONCRETE EDGES. 4. SEAL JOINTS BETWEEN EXISTING AND NEW CONCRETE WITH A TWO SEAL JOINTS BETWEEN EXISTING AND NEW CONCRETE WITH A TWO PART POLYSULFIDE JOINT SEALANT.

CO2

CO

H

HS

NO2

S

TH

TS

T

MS

CHWS

CD

CW

F-CW

H-CW

S-CW

PD

V

SS

SD

OSD

(E)

CHWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSATE DRAINAGE

DOMESTIC COLD WATER

FILTERED COLD WATER

HARD COLD WATER

SOFT COLD WATER

PUMP DISCHARGE

SANITARY VENT

SANITARY SEWER

STORM DRAINAGE

OVERFLOW STORM DRAINAGE

REF-L

REF-S

REFRIGERANT-LIQUID

REFRIGERANT-SUCTION

2"

PLUMBING AND PIPING SYMBOLS

KEYNOTE

CONTINUATION SYMBOL

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

EXISTING PIPE TAG

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

DRAIN SIZE

PIPE RISEPIPE DROP

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN

THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE

USED IN THIS SET OF DRAWINGS.

TYPE (SEE SCHEDULE)

Room

INVERT: -10' - 1"

1/8" / 12" SLOPE

RO REVERSE OSMOSIS WATER

16"x8"

16"/8"

(E)

F

S

M

B

D

C

16"Ø

E/A

O/A

T/A

L/A

R/A

S/A

EXHAUST AIR

OUTSIDE AIR

RELIEF AIR

RETURN AIR

SUPPLY AIR

TRANSFER AIR

GRILLES, REGISTERS & DIFFUSERS TAG

CFM

THROW-150FPM/ 100FPM/ 50FPM

NECK SIZE / MODULE SIZE

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

HVAC SYMBOLS

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR DUCT RISE

MECHANICAL EQUIPMENT TAGS

ROUND DUCT SIZE TAG (DIAMETER)

LINEAR DIFFUSER TAG

CFM

TYPE (SEE SCHEDULE) NUMBER OF SLOTS /

ACTIVE SLOT LENGTH (PLENUM LENGTH) /

NECK SIZE

DUCT BEING DEMOLISHED

ELEVATION (CENTER OF FACE)

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE

ROUND EXHAUST/RELIEF AIR DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP

GE/A GREASE EXHAUST AIR

SE/A SMOKE EXHAUST AIR

EQUIPMENT BY OTHERS

(REFER TO OTHER DISCIPLINE

FOR ADDITIONAL

INFORMATION)

EXISTING EQUIPMENT

TO REMAIN

FLUE EXHAUST GAS FLUE

C/A COMBUSTION AIR

S-O/A CONDITIONED OUTSIDE AIR

VAV-XX

10' - 0"

(E)VAV-XX

VAV-XX

4000 SF

6" SD-1

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

CW COLD WATER

D DEGREE

DB DRY BULB

DIA DIAMETER

DN DOWN

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

E/A EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FD FIRE DAMPER

FDV FIRE DEPARTMENT VALVE

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

O/A OUTSIDE AIR

P&T PRESSURE AND TEMPERATURE

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

R/A RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

S/A SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACE MOUNT

SP STANDPIPE

SP STATIC PRESSURE

STM STEAM

T THERMOSTAT

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

ABBREVIATIONS

AC AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACCU AIR COOLING CONDENSING UNIT

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CH CHILLER

CT COOLING TOWER

CUH CABINET UNIT HEATER

CWP CONDENSER WATER PUMP

CHWP CHILLED WATER PUMP

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

HRU HEAT RECOVERY UNIT

PRV POWER ROOF VENTILATOR

RE RETURN/EXHAUST FAN

RTU ROOFTOP UNIT

SEP SEWAGE EJECTOR PUMP

SF SUPPLY FAN

SP SUMP PUMP

UH UNIT HEATER

WH WATER HEATER

EQUIPMENT ABBREVIATIONS

48"x2 1/2"

400SLB3

8" / 24x24

300SD3

12" / ---

SD9

LINEAR BAR GRILLE

LINEAR SLOT DIFFUSER

PERFORATED DIFFUSER

WITH DEFLECTORS

ROUND DIFFUSER WITH

ADJUSTABLE PATTERNS

LOUVERED DOUBLE

DEFLECTION GRILLE

12"x10" / ---

500SG7

TYPE (SEE SCHEDULE)

10" / 24x24 H-5/7/1422

400SD1

3-CONE DIFFUSER

THROW PATTERN

MAX NC RATING

1 / 4' - 0" / 8"

200LSD1

8' - 0" AFF

1 / 4' - 0" / 8"

200LSD1

18' - 0"

1 / 4' - 0" / 8"

200LSD1

SECTION TOTAL TRACK LENGTH

12"x10" / 24x12

500RG9

LOUVERED GRILLE

12"x10" / 24x24

500RG2

EGGCRATE RETURN

GRILLE

BOTTOM OF EQUIPMENT

ELEVATION

505 lb

RTU-XX

RTU-XX

3.0 ton

115000 Btu/h

115 CFH

RTU-XX

Htg: 3.7 GPM

VAV-XX

HEATING COIL

FLOW

OPERATING WEIGHT

NOT INCLUDING CURB

FUEL INPUT

GAS PIPE FLOW

NOMINAL COOLING

CAPACITY

4" FD-1FLOOR DRAIN

VAV BOX

ROOFTOP UNIT

4" AD-6 AREA DRAIN

4" FS-4FLOOR SINK

4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN

8 WFU

4" FD-13

HUB DRAIN

DRAIN TAGS

"P" - INDICATES

PRIMER CONNECTION

FIXTURE UNITS

FLOW CONTROL

DRAIN

4" SD-12

COMBINATION

DRAINS

STORM DRAIN4" SD-15

ROOF AREA

SERVED BY DRAIN

PIPE ACCESSORY TAGS

DOMESTIC WATER METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL VALVE

3 WAY MOTORIZED CONTROL

VALVE

PRESSURE REDUCING VALVE

REFRIGERANT SOLENOID VALVE

BUTTERFLY VALVE

DATA DEVICE TAGS

DAMPER TAGS

VAV-XX

RTU-XX

EQUIPMENT ID

SYMBOL

BBB

INLET COLLAR DAMPER

MANUAL BALANCING DAMPER

BACKDRAFT DAMPER

COMBINATION FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

MOTORIZED DAMPER

SENSOR

MANUAL SWITCH

THERMOSTAT

TEMPERATURE SENSOR

TEMPERATURE & HUMIDITY SENSOR

HUMIDITY SENSOR

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT

WATER CLOSET -

WALL HUNG - ADA WC-1

U-1

1 WFU

LAV-1A

1.5 CWFU

1.5 HWFU

LAV-1A

FIXTURE UNITS

4" WCO

PIPE ACCESORY

TAG

PLUMBING FIXTURE TAGS

4" WCO

TYPE (SEE SCHEDULE)

WC-1A

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET-

(40% PROPYLENE GLYCOL)

(40% PROPYLENE GLYCOL)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

M001

HVAC SYMBOLS, ABBREVIATIONS

AND GENERAL NOTES209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2019 CJC CJC

100% BID DOCUMENTS

PROJECT GENERAL NOTES

* REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

* THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL

EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN SPACE.

* THE CONTRACTOR SHALL VISIT THE SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING

SITE CONDITIONS. PROVIDE ALL MATERIAL AND COMPONENTS AS NEEDED TO BRING THE

UNITS TO FULL COMPLIANCE OF THE VA’S REQUIREMENTS.

* WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT

CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO

START OF WORK.

* COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY,

STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.

* THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE

ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE REASONABLY

ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.

* FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO

ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT

LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.

* LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.

* ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.

* LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE

ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.

* FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO

SPECIFICATION.

* PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,

FLOORS, WALLS, AND ROOF.

* ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.

* REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.

* PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS

SHOWN.

* FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS,

REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.

* INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN

INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH

THE SPECIFICATIONS.

* LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE

APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE

COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.

* INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT

CEILINGS.

HVAC PROJECT GENERAL NOTES

1 NOT ALL SYMBOLS ARE NECESSARILY USED.

2 COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED

CEILING PLANS.

3 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND

COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.

4 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

5 DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED

OTHERWISE.

6 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

7 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE

INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE

RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMODATE ACTUAL SITE

CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.

8 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE

AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE UNDERWRITER

REQUIREMENTS.

9 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL,

CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.

10 MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,

SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL

ROOMS.

11 ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY

MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.

12 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS

RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.

13 TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED

AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU

(NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.

PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL

STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S

QUALIFICATIONS.

14 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE

PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.

15 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED

DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED

FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.

16 ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE,

DIVISION 26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE

UNDERWRITER REQUIREMENTS.

17 THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE

SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.

THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND

RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE

APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

18 PLAN DRAWINGS AND SECTIONS CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE

OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC.

ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS EXIST. MECHANICAL

CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL

OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED

AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE

FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH CONDITIONS IN SCOPE OF WORK AT

NO ADDITIONAL COST TO THE OWNER.

19 ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF

MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS

OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR

AT NO ADDITIONAL COST TO THE OWNER.

20 ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND

AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.

21 ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.

22 REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING AND EQUIPMENT INSTALLATION.

23 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT

CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO

START OF WORK.

24 LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, CABINET HEATERS, UNIT HEATERS, ETC.,)

FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO

NOT LOCATE FAN POWERED VAV BOXES ABOVE LIGHTING FIXTURES.

25 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT

LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.

26 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE

ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.

27 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN HYDRONIC WATER PIPING

SYSTEMS. ALL PIPING SHALL SLOPE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE

BOTTOM OF ALL RISERS AND LOW POINTS.

28 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER

APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

29 ALL ISOLATION VALVES SHALL BE IN LOCATION AND ELEVATION WHICH ALLOWS FOR EQUIPMENT

AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE ISOLATION

VALVE.

30 ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE

PROVIDED WITH POSITIONS INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).

31 ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINERS, AND PIPING SPECIALTIES SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND

CONTROLS.

32 MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED

AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL

DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR

ALTERATION AND REPAIRS.

33 MEASURE, CUT AND INSTALL PIPE LENGTH ACCURATELY TO MINIMALIZE MISALIGNMENT.

INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.

34 PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER

EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION (EXCEPT WATER COILS). FLEXIBLE

CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

35 PROVIDE VIBRATION INSULATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION

TRANSMISSION TO BUILDING STRUCTURE.

36 FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO

SPECIFICATION.

37 ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE

COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHEMENTS TO STEEL MEMBERS, BAR

JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER.

WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.

38 MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR

DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL MEMBERS. COORDINATE WITH

STRUCTURAL DRAWINGS.

39 PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,

FLOORS, WALLS, AND ROOF.

40 UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IF OVERHEAD, TIGHT TO UNDERSIDE

OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.

41 PROVIDE CHAINWHEEL OPERATORS FOR ALL EXPOSED VALVES MOUNTED GREATER THAN 8'-0"

ABOVE FINISHED FLOOR LEVEL. CHAIN SHALL EXTEND UNOBSTRUCTED TO 7'-0" ABOVE FLOOR

LEVEL.

42 ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES,

MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION,

INSPECTION AND MAINTENANCE.

43 ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

44 PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS

OTHERWISE INDICATED OR SPECIFIED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS

CONTAINING TURNING VANES.

45 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.

46 ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL

BE APPROVED BY THE ENGINEER PRIOR TO PURCHASE, FABRICATION AND INSTALLATION.

47 ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE

ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE PROTECTED,

INSULATED, OR CONTROLLED TO REMAIN BELOW 120º F.

48 PROVIDE MANUAL VOLUME DAMPERS IN ALL RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS

FROM MAIN SUPPLY DUCT, AND IN ALL OTHER AREAS REQUIRED TO PROVIDE PROPER SYSTEM

AIRFLOW BALANCING.

49 REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.

50 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS

SHOWN.

51 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS,

REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.

52 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN

INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH

THE SPECIFICATIONS.

53 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE

APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE

COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.

PLUMBING GENERAL NOTES

* FIELD VERIFY ALL NEW WATER, WASTE, AND VENT PIPING CONNECTIONS AND PROVIDE NEW

CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.

* PITCH UNDERFLOOR SANITARY WASTE AND STORM PIPING 3" AND GREATER AT 1/8" PER FOOT, UNLESS NOTED OTHERWISE. PITCH ALL OTHER WASTE PIPING AT 1/4" PER FOOT UNLESS

OTHERWISE NOTED.

* FIELD VERIFY LOCATION AND INVERTS OF SITE UTILITIES PRIOR TO INSTALLATION.

* ROUTE DOMESTIC WATER, FIRE PROTECTION, SANITARY SEWER, AND STORM SEWER

SERVICES TO SITE UTILITIES 5'-0" FROM BUILDING UNLESS NOTED OTHERWISE. REFER TO CIVIL

PLANS.

* WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2" MINIMUM.

* PROVIDE CLEANOUT IN ACCESSIBLE LOCATION AT THE BASE OF ALL PLUMBING RISERS.

# Revisions Date

THE PRIMARY PROJECT SCOPE AREA FOR THIS PROJECT IS CLASS II.

HOWEVER, WORK OUTSIDE THE PRIMARY PROJECT SCOPE AREA MAY

VARY. THE REQUIRED INFECTION CONTROL PRECAUTIONS WITH

EACH CLASS ARE AS OUTLINED IN SPECIFICATION SECTION 01 35 26 -

SAFETY REQUIREMENTS PARAGRAPH 1.12 B.

INFECTION CONTROL - SAFETY REQUIREMENTS

STORAGE

EB-11A

Room

NB-60-6

OFFICE

EB-28A

DINING ROOM

NB-60

ELEV

P-3

OFFICE

EB-28

V-TEL CONFERENCE ROOM

EB-26A

MECH. ROOM

EB-25

STAIRS 'A'

FB-1C

ELEV.

F-5

OFFICE

EB-26

BREAK ROOM

NB-60-8

MENS LOCKER-1

NB-60-9

MENS LOCKER-2

NB-60-10

AIR COND. EQUIP ROOM

NB-60-11

ELECTRICAL SWITCH GEAR

NB-60-12

STORAGE

NB-60-13

MED GAS STORAGE

NB-60-14

MAIL ROOM

NB-60-16

ELEVATOR LOBBY

NB-60-17

Room

NB-60-18

Space

NB-60-19

Space

NB-60-20

TOILET

NB-60-21

TOILET

NB-60-22

IT OFFICE

NB-60-23

TOILET

WB-40E

TRAINING ROOM

NB-60-24

R.O.L.

NB-60-25

OFFICE

B-06

OFFICE

B-11

LIBRARY STORAGE

B-12

IT STORAGE

NB-60-26

IT SERVER ROOM

NB-60-27

SALE STOR.

NB-60-28

Space

NB-60-30

DAV OFFICE

NB-60-31

AMERICAN LEGION

NB-51

CLOSET

NB-51A

HAC

WB-48

TOILET ROOM

NB-49

OFFICE

NB-60-33

OFFICE

B-10

TOILET ROOM

NB-50

OFFICE

B-07

STORAGE-2

EB-7A-2

TOILETS

NB-60-34

ELEV-2

P-2-2

ELEVATOR LOBBY

EB-23

Space

NB-60-35

PHARMACY RESIDENTS

EB-31

Space

NB-60-36

BREAK ROOM

NB-60-37

STAIR C-2

NB-44-2

MACHINE ROOM

NB-60-39 STORAGE

EB-7

STORAGE

EB-6

CANTEEN STORE

NB-46

STORAGE-2

EB-5-2

WORKSHOP-2

EB-09A-2

MECHANICAL ROOM

NB-59

ELEC

NB-59A

FE CLOSET-2

NB-59B-2

ELEV-2

S-4-2

CORRIDOR-2

EB-8-2

STORAGE

EB-3

STORAGE

BB15C

STORAGE

BB15A

STORAGE

NB-60-46

Space

NB-60-47

OFFICE

NB-60-48

PIV OFFICE

B-01

IT OFFICE

NB-60-49

Space

NB-60-50

OFFICE

NB-60-51

MEDICAL RECORDS

NB-60-52

STORAGE

NB-60-53

Space

NB-60-54

STORAGE

NB-60-55

CALL CENTER

NB-60-56

POLICE

NB-60-57

CORRIDOR

WB-36

STORAGE

BA07B

Space

NB-60-59

IT WORK ROOM

BA13A

LIBRARY

NB-60-61

COMPUTER ROOM

BA07A

IT CHIEF

NB-60-63

SHOWER

NB-60-64

WOMENS LOCKER

NB-60-65

SOCIAL WORKER OFFICE

NB-60-66

CHIEF POLICE

NB-60-67

OFFICE

NB-60-68

MECHANICAL ROOM

BA13C

Space

NB-60-69

STORAGE

NB-60-70

SERVER ROOM

BB14

STORAGE

BB15B

SIGN SHOP-2

EB-09B-2

MACHINE ROOM

EB-11

LAUNDRY

EB-22

3" CHWR

3" CHWS

WSHP-5

WSHP-1

FCU-L2B

FCU-L2A

FCU-6

WSHP-2A

WSHP-2

FCU-L1WSHP-11 WSHP-10

WSHP-4

FCU-5

UP TO IT

CLOSET

ABOVE FCU-L6

M10B

M10B

5A

A B CB5

8.5

10.2

D E F G

H J K L M N

ONB

K5

FCU-L3

FCU-L4

1" CW

3" CHWR

M10B

NON-IT LOOP

NON-IT LOOP

IT LOOP

IT LOOP

IT LOOP

IT LOOP

IT LOOP

OA P PA Q QA R RA S SA SB T TA U V

STORAGE

BB15B

STORAGE

BB15C

CHWS CHWR

4" CHWS

4" CHWR4" CHWR

4" CHWS

5 5

M10B

M10B

3" CHWS

3" CHWR

PIPING FOR NON-IT LOOP

PIPING FOR IT LOOP

R RA S SA SB

FCU-L4

FCU-L3

NEW

NEW

IT WORK ROOM

BA13A

STORAGE

BA07B

COMPUTER ROOM

BA07A

2" CHWS

2" CHWR

CHWS

CHWR

2" CHWS

2" CHWR

2" CHWS

2" CHWR

CHWS

CHWR

PA Q QA R RA S SA

5A

8.5

3" CHWR

3" CHWR

CW

1" CW

CHWS

CHWR

CHWR

CHWS

HX-1

1" CD

M10B

M10B

RA S SA SB T

00 - BASEMENT -

OVERALL PLAN

0' - 0"

CHWR

CHWS

CHWR

CHWS

PIPING FOR IT LOOP

PIPING FOR NON-IT LOOP

01 - FIRST FLOOR -

EXIST

13' - 0"

00 - BASEMENT -

OVERALL PLAN

0' - 0"

CHWR

CHWS

CHWS

CHWR

S SA

01 - FIRST FLOOR -

EXIST

13' - 0"

00 - BASEMENT -

OVERALL PLAN

0' - 0"

7 6

HX-1

INCOMING DOMESTIC WATER

DRAIN LINE

3" CHWR

3" CHWR

0'

01 - FIRST FLOOR -

EXIST

13' - 0"

00 - BASEMENT -

OVERALL PLAN

0' - 0"

HX-1

DRAIN LINE

INCOMING DOMESTIC WATER

3" CHWR

3" CHWR

SB

OVERHEAD

DOOR

OVERHEAD

DOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

KEYPLAN

M10B

BASEMENT MECHANICAL PLAN

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2019 CJC CJC

100% BID DOCUMENTS

1/16" = 1'-0"M10B

1 OVERALL BASEMENT MECHANICAL PLAN

1/8" = 1'-0"M10B

2 BASEMENT MECHANICAL PLAN - STORAGE BB15C

1/8" = 1'-0"M10B

3 BASEMENT MECHANICAL PLAN - COMPUTER ROOM BA07A

KEYNOTES

1 SHUT EXISTING VALVES ONCE NEW PIPING FOR NON-IT LOOP IS INSTALLED.

2 NEW, UPSIZED PIPING SERVING FCU-L3 AND FCU-L4 TO BE INSTALLED AT THIS LOCATION.

CONTRACTOR TO REMOVE TEMPORARY COOLING FOR COMPUTER ROOM BA07A ONLY

AFTER NEW PIPING IS INSTALLED AND PRESSURE TESTED.

3 SCOPE OF WORK SHOWN IN THIS VIEW IS PART OF “DEDUCT ALTERNATE NO. 1”.

4 1” DRAIN PIPE FROM NEW HEAT EXCHANGER HX-1 TO DISCHARGE INTO EXISTING FLOOR

DRAIN. TERMINATE PIPE DIRECTLY ABOVE FLOOR DRAIN, 6” ABOVE FINISHED FLOOR.

5 NEW PIPING FOR NON-IT LOOP INSTALLED BELOW EXISTING PIPING. THE EXISTING PIPING

WILL BECOME THE IT LOOP. THE NON-IT AND IT LOOP PIPING ARE ROUTED DOWN FROM

FIRST FLOOR TO BASEMENT LEVEL IN SAME CHASE.

6 CONTRACTOR TO REMOVE PORTION OF EXISTING SHELVING TO ALLOW FOR FLOOR SPACE

FOR HX-1. COORDINATE REMOVAL OF SHELFING AND RELOCATION OF ANY EQUIPMENT

STORED ON THAT SHELF WITH COR.

7 1” DOMESTIC WATER PIPING TO HX-1 TO BE COPPER TUBE, ASTM B88, TYPE K OR L,

DRAWN. FITTINGS FOR COPPER TUBE TO BE WROUGHT COPPER OR BRONZE CASTINGS

CONFORMING TO ASME B16.18 AND B16.22. INSTALLATION TO COMPLY WITH THE

INTERNATIONAL PLUMBING CODE. PIPE SHALL BE ROUND AND STRAIGHT. CUTTING SHALL

BE DONE WITH PROPER TOOLS. PIPE SHALL BE REAMED TO REMOVE BURRS AND A CLEAN

SMOOTH FINISH RESTORED TO FULL PIPE INSIDE DIAMETER. INSULATE PIPING.

8 CONTRACTOR TO PROVIDE NEW HONEYWELL NOTIFIER DUCT SMOKE DETECTOR FOR

UNIT. NAME BRAND ONLY. NO OTHER MANUFACTURER TO BE ACCEPTED.

HVAC GENERAL NOTES

* REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND SPEC SECTION 01 35 26 FOR ADDITIONAL REQUIREMENTS. THE PRIMARY ICRA CLASSIFICATION FOR THIS PROJECT

SCOPE AREA IS CLASS II, HOWEVER THIS MAY VARY OUTSIDE THE PRIMARY PROJECT SCOPE

AREA.

* ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH ERIE VAMC. A DETAILED JOB

TIMELINE SHALL BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO

CONTRACTOR STARTING WORK ON-SITE.

* EXISTING SYSTEMS TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED.

* REFER TO DRAWINGS M10B AND M101 FOR INFORMATION FOR NEW EQUIPMENT.

* ALL ISOLATION AND SHUT OFF VALVES FOR EQUIPMENT ARE SHOWN ON M601. REFER TO M601 FOR SCHEMATIC LOCATION. INSTALL VALVES IN BRANCH PIPING AS CLOSE TO EQUIPMENT TO BE

ISOLATED AS POSSIBLE FOR EASE OF USE DURING EQUIPMENT MAINTENANCE.

* ANY NEW DDC EQUIPMENT TO BE JOHNSON CONTROL METASYS SYSTEM. NAME BRAND ONLY. NO

OTHER MANUFACTURER TO BE ACCEPTED.

M10B

BASEMENT MECHANICAL PLAN - MECH ROOM

BA13C - SHELF TO REMOVE

NOT TO SCALE

M10B

BASEMENT MECHANICAL PLAN - MECH ROOM

BA13C - EXISTING FLOOR DRAIN

NOT TO SCALE

M10B

BASEMENT MECHANICAL PLAN - MECH ROOM

BA13C - EXISTING FLOOR DRAIN

NOT TO SCALE

6 4

1/8" = 1'-0"M10B

4 BASEMENT MECHANICAL PLAN - MECH ROOM BA13C

NORTH

TRUE NORTH=

PLAN

150.0°

# Revisions Date

1/8" = 1'-0"M10B

5 STORAGE BB15C - FACING PLAN WEST

1/8" = 1'-0"M10B

6 STORAGE BB15C - FACING PLAN NORTH

1/8" = 1'-0"M10B

7 MECHANICAL ROOM BA13C - FACING PLAN WEST

1/8" = 1'-0"M10B

8 MECHANICAL ROOM BA13C - FACING PLAN NORTH

TELEPHONE

CLOSET

1C58

FCU-L6

H J K L M N

ONB

K5

M101

OA P PA Q QA R RA S SA SB T TA U V

M101

EXISTING

GRAVEL

FRENCH

DRAIN

DC-2

DC-1

PP-1

PP-2

EXISTING TRANSFORMERS

TO REMAIN

EXISTING

CONDENSING

UNIT TO

REMAIN)

ET-2

ET-1

EXISTING CWS PIPING STACKED

ON TOP OF EXISTING CWR,

SUPPORTS HUNG TO WALL

M101

PIPING FOR NON-IT LOOP DRY

COOLER (DC-2) TO FEED IT

LOOP WHEN DC-1 IS OFFLINE.

REFER TO DRAWING M601 FOR

ADDITIONAL INFORMATION.

5 5

4" CHWS

4" CHWR

4" CHWR

4" CHWS

4" CHWS 4" CHWR

S SA SB T TA U V

01 - FIRST FLOOR -

EXIST

13' - 0"

01 - FIRST FLOOR -

EXIST

13' - 0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

KEYPLAN

M101

FIRST FLOOR MECHANICAL PLAN

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2019 CJC CJC

100% BID DOCUMENTS

KEYNOTES

1 INSTALL TWO 4” PIPING TEES FOR EMERGENCY CHILLED WATER CONNECTIONS WITH

SHUT-OFF VALVES AND CAPS AT END. ON STRAIGHT PORTION OF PIPING AFTER TEE

CONTRACTOR TO ADD VALVES WITH DRAIN LINES OFF THE BOTTOM OF THE PIPE FOR BOTH

THE SUPPLY AND RETURN PIPES.

DURING CONSTRUCTION WHILE THE EXISTING EQUIPMENT IS BEING DEMOLISHED (DRY

COOLERS, PUMPS, EXPANSION TANK, ETC.) CONTRACTOR PROVIDED TEMPORARY EQUIPMENT

WILL UTILIZE THESE TAPS TO COOL THE LOOP. ONCE THE NEW EQUIPMENT IS OPERATIONAL

THE TAPS WILL REMAIN FOR EMERGENCY USE.

2 NEW LOCATION FOR RELOCATED EXISTING CONDENSING UNIT FOR THE ASC’s AIR HANDLING

UNIT. MODIFY EXISTING REFRIGERANT PIPING AS NEEDED TO CONNECT REFRIGERANT PIPING

BETWEEN ASC AHU AND ASC CONDENSING UNIT. PROVIDE EQUIPMENT PAD UNDERNEATH

CONDENSING UNIT PER DETAIL 5 ON DRAWING M501.

3 NEW OUTDOOR CONTROL ENCLOSURE TO CONTROL DC-1’S FANS AND PUMP PACKAGES PP-1.

4 NEW OUTDOOR CONTROL ENCLOSURE TO CONTROL DC-2’S FANS AND PUMP PACKAGES PP-2.

5 THE DRY COOLER BASE HAS MOUNTING HOLES FOR SECURING THE DRY COOLER ONCE

INSTALLED DIRECTLY TO CONCRETE BASE PER MANUFACTURER'S INSTALLATION MANUAL.

6 PROVIDE EQUIPMENT PAD UNDERNEATH PUMP PACKAGE PER DETAIL 5 ON DRAWING M501.

1/16" = 1'-0"M101

1 OVERALL FIRST FLOOR MECHANICAL PLAN

HVAC GENERAL NOTES

* REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND SPEC SECTION 01 35 26 FOR ADDITIONAL REQUIREMENTS. THE PRIMARY ICRA CLASSIFICATION FOR THIS PROJECT

SCOPE AREA IS CLASS II, HOWEVER THIS MAY VARY OUTSIDE THE PRIMARY PROJECT SCOPE

AREA.

* ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH ERIE VAMC. A DETAILED JOB

TIMELINE SHALL BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO

CONTRACTOR STARTING WORK ON-SITE.

* EXISTING SYSTEMS TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED.

* REFER TO DRAWINGS M10B AND M101 FOR INFORMATION FOR NEW EQUIPMENT.

* ALL ISOLATION AND SHUT OFF VALVES FOR EQUIPMENT ARE SHOWN ON M601. REFER TO M601 FOR SCHEMATIC LOCATION. INSTALL VALVES IN BRANCH PIPING AS CLOSE TO EQUIPMENT TO BE

ISOLATED AS POSSIBLE FOR EASE OF USE DURING EQUIPMENT MAINTENANCE.

* ANY NEW DDC EQUIPMENT TO BE JOHNSON CONTROL METASYS SYSTEM. NAME BRAND ONLY. NO

OTHER MANUFACTURER TO BE ACCEPTED.

1/4" = 1'-0"M101

2 FIRST FLOOR MECHANICAL PLAN - EQUIPMENT PAD AND CRAWLSPACE

NORTH

TRUE NORTH=

PLAN

150.0°

# Revisions Date

1/8" = 1'-0"M101

3 CRAWL SPACE - FACING PLAN EAST

1/8" = 1'-0"M101

4 CRAWL SPACE - FACING PLAN SOUTH

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

MAXIMUM PIPE/TUBING SUPPORT SPACING

TUBING 5 FT

NOM. SIZE

PIPE

THRU (20)

6 8 10

(32)(25) (40)

(65)

(50)

(75)

-1312 14 -16 -

(125)(100)

(150)

(250)

(200)

(300)

(400)

(350)

(450)

(600)

(500)

20 241814 16128 1064 532 2 1/21 1/21 1 1/4IN.

(MM)

(M)

FT.

FT.

(M)

(9.1) (9.6)(8.5)(7.6) (8.2)(7.0)(5.8) (6.7)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)

--- --(4.9) -(4.1)(3.7) (4.0) -(3.0)(2.4)(1.8)5 FT

THRU 3/4

(2.1) (2.1)

(2.1)

(2.7)

(2.4)

HANGER ROD

INSULATION

(VAPOR BARRIER TYPE IS REQUIRED

FOR LOW TEMPERATURE PIPE)

ADJUSTABLE CLEVIS HANGER

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9 PCF MIN.

DENSITY) UNDER INSULATION SHIELD

INSULATION SHIELD AT

HANGER WELD

SADDLE

1/2" DIA. HANGER RODS WITH 36"

MAX. SPACING ON EACH

CHANNEL

BAND

PROVIDE INSULATION SHIELD

AND INSERT FOR ALL PIPING (8" MIN.)

1" MAX. 1-5/8" 12 GAUGE CHANNEL OR

2"x2"x1/4" ANGLE

SIDE VIEW

TRAPEZE HANGER FOR UP TO 1000 LB.

UNIFORM LOAD

PIPE

BOLT

FIRE-STOPPING

MATERIAL

PLAN VIEW

RISER

CLAMP

PIPE SLEEVE

WHERE SPECIFIED

RISER

INSULATION

BOLT

(TYPICAL)

RISER CLAMP

PIPE SLEEVE

WHERE SPECIFIED

FIRE-STOPPING

MATERIAL

1" M

IN

PIPE SLEEVE ANCHOR

ELEVATION

FLOOR SLAB

BOLT (TYP.)

INSULATION

RISER CLAMP, BOTTOM CLAMP

REQUIRED AT ANCHOR POINTS

ONLY

NOTES:

1. PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS.

2. EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.

STRUCTURAL STEEL BEAM

HEAVY DUTY BEAM

CLAMP

EYE SOCKET

CLEVIS HANGER

INSULATION WHERE

SPECIFIED SHALL

COVER HANGER

HANGER ROD

LOCKING NUT

INSERT NUT HEAVY DUTY CONCRETE STEEL

INSERT WITH ELONGATED SLOT

(OR EXPANSION SHIELD)

HANGER ROD

LOCKING NUT

VAPOR BARRIER INSULATION

PIPE

PIPE BRACKET SADDLE AND CLAMP,

1/4" THICK GALVANIZED OR

ELECTROPLATED STEEL, SIZE

BRACKET TO SUIT INSULATION

INSULATION WITH HIGH

DENSITY INSERT AT

SUPPORT

NEW INSULATION PROTECTION

SHIELD, FED. SPEC. WW-H-171E

TYPE 41 AND MSS SP-69 TYPE

40, WHEN USED IN HORIZONTAL

POSITION

1/2" DIA. WEDGE TYPE CONCRETE EXPANSION

ANCHORS, STAINLESS STEEL MINIMUM 2 1/2"

EMBEDMENT

L

A

A

B BW

CONCRETE BASE

DCONCRETE BASE

5D

2D

ANCHOR BOLT

(TYP)

PIPE SLEEVE (5D,

3" MIN)

WELD HEAD TO PLATE OR

BEND OVER END5D

FLOOR

PLAN SECTION B-B

1"

PROVIDE DOUBLE SLAB

REINFORCING IN BASE AREA

L/10, 5" MIN

EQUIPMENT BASE

PLATE

TYPICAL ANCHOR

BOLT NUT & WASHER

16"

SECTION A-A (BASE POURED WITH FLOOR SLAB)

TYPICAL ANCHOR

BOLT NUT & WASHER

SECTION A-A (BASE POURED WITH FLOOR SLAB)

L/10, 5" MIN

EQUIPMENT BASE

PLATE

PROVIDE #3 BARS 12" O.C. EACH WAY

IN THE BASE & DOWEL BASE TO

FLOOR

NOTES:

1) THIS DETAIL APPLIES TO EQUIPMENT NOT SPECIFIED TO BE MOUNTED ON SPRING

ISOLATED BASES.

2) LENGTH & WIDTH (L&W) DIMENSIONS SHALL BE 6" GREATER THAN THE EQUIPMENT

BASE PLATE.

CONCRETE EQUIPMENT BASES

STEEL EXPANSION SHIELD FOR EXISTING

CONSTRUCTION AND INSERTS FOR NEW CONSTRICTION

THIS TYPE SHALL BE USED ONLY IN SLABS OR BEAMS

OF 4" [100mm] MIN DEPTH

3/8" [10mm] MIN DIA EXPANSION BOLTS FOR

EXISTING CONSTRUCTION AND INSERTS FOR NEW

CONSTRUCTION

CONCRETE

FLOOR SLAB

3/8" [10mm] MIN DIA INSERTS

NEW CONSTRUCTION ONLY.CLIP

ANGLE

FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1

1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] &

LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE

NUTS & WASHERS

3/8" [10mm] MIN DIA

HANGER RODS 3/8" [10mm] MIN DIA

HANGER RODS

TURNBUCKLE

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

TYPICAL MANUAL AIR VENT

ELEVATION

CIRCULATING WATER PIPING

1/2" [15mm] x 4" [100mm]

NIPPLE

1/4" [8mm]

COPPER TUBING

MV

OR

AV

AIR VENT

1/2" [15mm]

BALL VALVE

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR PLANS LOCATE DRAIN AT BOTTOM OF

SCALE POCKET.

TYPICAL CHILLED AND HOT WATER

PIPING DRAIN VALVE CONNECTIONS

ELEVATION THREADED

PIPING

ELEVATION WELDED

PIPING

ADAPTER TO 3/4" [20mm] HOSE

THREAD-PROVIDE HOSE CAP NUT

3/4" [20mm] BALL VALVE

REDUCER (IF REQUIRED)

TYPICAL WATER PIPING

HORIZONTAL

VERTICAL

ABOVE 2" DIA PIPE 2" DIA & SMALLER PIPE

2-1/2" DIA.

2-1/2" DIA.

ABOVE 2" DIA PIPE 2" DIA & SMALLER PIPE

NOTES:

1. PROVIDE IN CHILLED WATER MAIN AND IN CONDENSER WATER MAIN.

2. LOCATE PILOT TUBE TAPS 20 PIPE DIAMETERS DOWNSTREAM AND 10 PIPE

DIAMETERS UPSTREAM FROM THE NEAREST PIPE FITTING.

3. EITHER TOP OR SIDE LOCATION. BOTH ARE NOT REQUIRED AT SAME LOCATION.

WELD (TYP)

PLUG

1-1/2" [40mm]

FULL PORT BALL

VALVE

PLUG

1 1/2" [40mm] FULL PORT

BALL VALVE

1-1/2" Ø x 2" LONG

[40x50mm] PIPE

90°

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

M501

HVAC DETAILS

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2019 CJC CJC

100% BID DOCUMENTS

NOT TO SCALEM501

1 PIPE HANGERS

NOT TO SCALEM501

2 (VA) SUPPORT/ANCHOR FOR PIPE RISERS

NOT TO SCALEM501

3 PIPE HANGER SUPPORTS

NOT TO SCALEM501

4 WALL HUNG PIPE SUPPORT FOR INSULATED PIPE

NOT TO SCALEM501

5 CONCRETE EQUIPMENT BASES

NOT TO SCALEM501

6 SECURING HANGER RODS IN CONCRETE

NOT TO SCALEM501

7 DRAIN VALVE & AIR VENT CONNECTIONS (HYDRONIC SYSTEMS)

NOT TO SCALEM501

8 INSTALLATION OF THERMOMETER WELLS

NOT TO SCALEM501

9 PITOT TEST CONNECTIONS

D

D

1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR COMPONENT SIZES.

2. RELIEF VALVE FOR CHILLED WATER SYSTEM IS SHOWN. OMIT WHEN

RELIEF VALVE IS SHOWN ON HEAT EXCHANGER DETAIL & SYSTEM IS

USED ONLY FOR HOT WATER HEATING.

3. PROVIDE STRAINER IN AIR SEPARATOR WHEN INDICATED IN EXPANSION

TANK SCHEDULE.

4. FOR HOT WATER SYSTEMS 2" [50mm] AND SMALLER AND CHILLED

WATER SYSTEMS USE IN-LINE AIR PURGER IN LIEU OF AIR SEPARATOR.

5 SET PRESSURE REDUCING VALVE SO PRESSURE AT HIGHEST POINT IN

SYSTEM HAS A MINIMUM OF 4 PSIG. [28kPa]

NOTES

DIAPHRAGM

EXPANSION TANK

TANK SADDLE

TO PUMP

SUCTION

PITCH UP

1.6% SLOPE

(MIN.)

HANGER ROD

SUPPORTS (TYPICAL)

CONNECTOR PIPE

NORMALLY OPEN

GATE VALVE IN

VERTICAL (REMOVE

HANDLE)

RUN DRAIN LINE

TO NEAREST

F.D. UNLESS

INDICATED

OTHERWISE

FROM SYSTEM

AIR

SEPARATOR

SEE NOTES

NO. 3 & 4

DRAIN

COLD WATER FILL

LINE. SEE EXPANSION

TANK SCHEDULE FOR

SIZE

NC

RUN DRAIN

LINE TO

NEAREST FD

REDUCED PRESSURE

BACKFLOW PREVENTER

BUTTERFLY

OR BALL

ISOLATION

VALVE

HANGER

RODS

(TYP)

AV

AUTOMATIC AIR VENT

PI

NOTE:

TOP OF CHEMICAL POT

FEEDER TANK SHALL NOT

BE MORE THAN 4'-0"

[1200mm] ABOVE FINISHED

FLOOR.

1" [25mm]

CHEMICAL POT

FEEDER-

MINIMUM CAPACITY

5 GALLONS [19L]

1" [25mm]

FUNNEL

3/4" [20mm]

TO

DRAIN

F R

O M

P U

M P

D

IS

C H

A R

G E

T O

P U

M P

S U

C T

IO

N

AUTOMATIC

FLOW CONTROL

AND BALANCE

DEVICE

PROVIDE ESCUTCHEONS FOR

EXPOSED PIPING.

OMIT INSIDE MECH ROOM

SECURE JACKET WITH METAL

BAND NO MORE THAN 1" FROM

END

BACKUP

MATERIAL

SEALANT

ALUMINUM JACKET WITH

FACTORY APPLIED MOISTURE

BARRIER. EXTEND FROM BELOW

BACKUP MATERIAL TO 10" ABOVE

FLOOR.

METAL BAND NEAR FLOOR

MASONRY FLOOR

SCHEDULE 40 STEEL OR

CAST-IRON PIPE SLEEVE

CUT FLUSH WITH FLOOR

INSULATION (WHERE

REQUIRED)

OMIT ALUMINUM JACKET IF

PIPING IS UNINSULATED

BACK STOP MATERIAL

SEALANT

CONTINUOUS INSULATION

THRU SLEEVE. PROVIDE

ALUMINUM JACKET 2"

BEYOND CAULKING OR

ESCUTCHEON.

PIPE SLEEVE PER

SPECS

UNFINISHED AREA

INTERIOR WALL

ESCUTCHEON TO BE PROVIDED IN FINISHED

AREAS

1/4" MIN. SPACE ALL

AROUND

FINISHED AREA

CRAC

FLOOR

3-WAY WATER REGULATING

VALVE (350 PSI) PROVIDED

WITH UNIT

MANUAL AIR VENT

STRAINER

D

ISOLATION VALVES

CALIBRATED BALANCE VALVE W/ P&T

TAPS. BALANCE VALVE SHALL BE SIZED

AT A PRESSURE DROP OF 3 PSI MAX AT

FULL FLOW.

TRAPPED CONDENSATE DRAIN

UNION

DRAIN

PIPE ANCHOR SCHEDULE

D P C N S BOLT PATTERN

IN MM IN MM IN MM IN MM IN MM

4" 102 5/8" 16 3/4" 19 4" 102 3/4" 19

3" 76 1/2" 13 1/2" 13 4" 102 5/8" 16

2-1/2" 64 3/8" 10 3/8" 10 4" 102 5/8" 16

2" 51 3/8" 10 3/8" 10 4" 102 5/8" 16

1-1/2" 38 3/8" 10 1/4" 6 4" 102 1/2" 13

D+[25]

D+1"

INSULATE AS INDICATED FOR ALL

CHILLED WATER. INSULATE PIPE

ONLY FOR STEAM & CONDENSATE.

STEEL PIPE OR

COPPER TUBE

D = PIPE O.D.

D+3-3/4"

D+1-1/2"

D+[38]

D+[95]

5/16"

[8"]

ANCHOR BOLTS

N=NUMBER

S=SIZE

DRILL Ø = S+1/16"

DRILL Ø = S+[2]

D

P

D+4-3/4"

D+2-1/2"

C

D+[64]

D+[121]

NOTE:

WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseArchitect/Engineer of Record StampConsultant

321 4 5 6 7 8 9 10

Sprinkler Status

M502

HVAC DETAILS

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

WWW.AE-WORKS.COM

AE WORKS PROJECT #: 18017

REPLACE IT HVAC HEAT

EXCHANGER

135 East 38th Street, Erie, PA 16504

562-18-401

01/29/2019 CJC CJC

100% BID DOCUMENTS

NOT TO SCALEM502

1 HORIZONTAL EXPANSION TANK - PIPING CONNECTIONS

NOT TO SCALEM502

2 (VA) WATER TREATMENT - CLOSED SYSTEMS

NOT TO SCALEM502

3 FLOOR PIPE PENETRATION DETAIL

NOT TO SCALEM502

4 TYPICAL WALL PIPE SLEEVE DETAIL

NOT TO SCALEM502

5 CRAC UNIT DETAIL

NOT TO SCALEM502

6 SMALL PIPE ANCHOR 1-1/2" - 4"

DRYCOOLER NO. 2 (DC-2)

(NON-IT LOOP (MISC SPACES))

DRYCOOLER NO. 1 (DC-1)

(IT LOOP)

LEGEND

GATE VALVE

CHECK VALVE

BUTTERFLY VALVE

RELIEF VALVE

UNION

BALL OR FLOW CONTROL VALVE

FLOW SWITCH

PRESSURE DROP SENSOR

STRAINER/FILTER

NOTES:

1. PRESSURE AND TEMPERATURE GAUGES (OR PORTS FOR

SAME) REQUIRED TO MONITOR COMPONENT PRESSURE

DROPS AND PERFORMANCE.

FS

P

FS

ET

EXPANSION TANKET

ET

EQPT ID: FCU-L2A

LOCATION: WB-39

AREA SERVED: PHONE ROOM

TYPE: CRAC

PUMP

EQPT ID: FCU-L2B

LOCATION: WB-39

AREA SERVED: PHONE ROOM

TYPE: CRAC

EQPT ID: FCU-L3

LOCATION: B-20

AREA SERVED: SERVER ROOM

TYPE: CRAC

EQPT ID: FCU-L4

LOCATION: B-20

AREA SERVED: SERVER ROOM

TYPE: CRAC

EQPT ID: FCU-5

LOCATION: B-13A

AREA SERVED: IT CLOSET

TYPE: CRAC

EQPT ID: FCU-6

LOCATION: 1E-011 (FIRST FLOOR)

AREA SERVED: IT CLOSET

TYPE: CRAC

EQPT ID: WSHP-2

LOCATION: BN058

AREA SERVED: BASEMENT ROOMS BN051, BN052, BN053

TYPE: WSHP

EQPT ID: WSHP-2A

LOCATION: CANTEEN

AREA SERVED: STORE CLOSET

TYPE: WSHP

EQPT ID: WSHP-4

LOCATION: BE026A

AREA SERVED: BASEMENT

ROOMS BE026, BE026A

TYPE: WSHP

EQPT ID: WSHP-5

LOCATION: BE031

AREA SERVED: PHARMACY

RESIDENTS

TYPE: WSHP

EQPT ID: WSHP-10

LOCATION: BREAK ROOM

AREA SERVED: WOMENS

LOCKER ROOM EF-29A

TYPE: WSHP

EQPT ID: WSHP-11

LOCATION: BREAK ROOM

AREA SERVED: MENS LOCKER

ROOM EF-27A

TYPE: WSHP

EQPT ID: FCU-L1

LOCATION: BW033

AREA SERVED: MAIL ROOM

TYPE: CRAC

EQPT ID: WSHP-1

LOCATION: BW035

AREA SERVED: CHIEFS OFFICE

TYPE: WSHP

EXTERIOR EQUIPMENT

OUTSIDE THE HOSPITAL

LEVEL 1

CRAWL SPACE

BELOW

AMBULATORY CARE

ADDITION

BUILDING 1

BASEMENT LEVEL

BUTTERFLY

VALVE V-1

BUTTERFLY

VALVE V-2

BUTTERFLY

VALVE V-5

BUTTERFLY

VALVE V-6

BUTTERFLY

VALVE V-3

BUTTERFLY

VALVE V-4

DOMESTIC WATER

HEAT EXCHANGER

HX-1

DRAIN PIPE

DOMESTIC

WATER SUPPLY

BUTTERFLY VALVE V-9

BUTTERFLY

VALVE V-8

BUTTERFLY

VALVE V-7

IT LOOP TERMINAL EQUIPMENT

NON-IT LOOP TERMINAL EQUIPMENT

PACKAGED

PUMPING UNIT

PP-2 FOR DC-2

PACKAGED

PUMPING UNIT

PP-1 FOR DC-1

PUMP P-1

PUMP P-2

PUMP P-3

PUMP P-4

CONTINUATION SYMBOL

BUTTERFLY VALVE V-10

TEMPERATURE SENSORT

T

T

T

T P

FSP

BUTTERFLY VALVE V-11

EMERGENCY CONNECTIONS

PRESSURE/TEMPERATURE WELL

PT

DRAIN (FOR TESTING OF

GLYCOL LEVELS/PERCENTAGE)DR

PT

PT

PT

PT PT

PT

PT

PT

DR

DR

GENERAL

THE PURPOSE OF THIS PROJECT IS TO REPLACE EXISTING OUTDOOR DRY COOLERS WITH EQUIPMENT THAT PROPERLY COOLS THE GLYCOL LOOP SERVING BOTH IT AND NON-IT HVAC EQUIPMENT INSIDE THE FACILITY. THE HVAC EQUIPMENT CONNECTED TO THE LOOP IS SET UP TO REJECT HEAT FROM THE SPACES INTO A COOLED 40% PROPYLENE GLYCOL WATER LOOP, ALLOWING THE ROOMS TO MAINTAIN PROPER TEMPERATURE.

THE EXISTING LOOP WILL BE SEPARATED INTO TWO LOOPS –

- IT EQUIPMENT LOOP – IT SPACES SUCH AS SERVER ROOMS. THE UNITS SERVING THE IT ROOMS (VERTIV/LIEBERT UNITS) HAVE INTERNAL COMPRESSORS WHICH ALLOW THEM TO HANDLE TEMPORARY, OCCASIONAL HIGHER LOOP TEMPERATURES.

- NON-IT EQUIPMENT LOOP - THE “NON-IT LOOP” CONSISTS OF MISCELLANEOUS NON-IT COOLING LOADS. LOCKER ROOMS, STORAGE SPACES, OFFICES. THE MISCELLANEOUS ROOMS HAVE EXISTING GEOTHERMAL HEAT PUMPS WHICH CANNOT HANDLE LOOP TEMPERATURE

DRIFTING HIGHER.

DRY COOLERS WILL PROVIDE NECESSARY COOLING IN OFF-PEAK SUMMER CLIMATE CONDITIONS. HEAT SHED FROM THE LOOP MUST BE TRANSFERRED TO THE AIR THROUGH A WATER-TO-AIR COIL. THIS HEAT MUST BE TRANSFERRED FROM A HIGHER TEMPERATURE TO A LOWER TEMPERATURE. DURING THE SUMMER MONTHS AT EXTREME TEMPERATURES IT WILL NOT BE POSSIBLE TO COOL THE WATER LOOP LOWER THAN THE OUTSIDE AMBIENT TEMPERATURE. THIS COULD RESULT, ON THE HOTTEST DAYS, IN A COOLING LOOP TEMPERATURE ABOVE 95°.

EXISTING CONTROL POINTS FOR THE LIEBERT UNITS FOR FCU-L3 AND FCU-L4 CAN BE RE-USED FOR THE UPSIZED INDOOR UNITS.

ANY NEW DDC EQUIPMENT TO BE JOHNSON CONTROL METASYS SYSTEM. NAME BRAND ONLY. NO OTHER MANUFACTURER TO BE ACCEPTED.

VALVE FUNCTIONS

THE FOLLOWING PARAGRAPH SUMMARIZES THE VARIOUS VALVES ADDED AS PART OF THIS PROJECT, LISTING THEIR FUNCTION AND DIFFERENTIATING BETWEEN MOTORIZED AND MANUAL VALVES.

• V-1 & V-2 = MOTORIZED VALVES FOR SUPPLY AND RETURN PIPING FOR DC-1

• V-3 & V-4 = MOTORIZED VALVES FOR SUPPLY AND RETURN PIPING FOR DC-2

• V-5 & V-6 = MOTORIZED VALVES FOR BYPASS…