S02 Drawings - Replace Dry Cooler 1-29-20.pdf
PDF 25 MB Posted
- Attached to
- 4120--Replace Dry Cooler System for IT Federal contract opportunity
- Solicitation number
- 36C24420B0002
About this file
This federal contract opportunity notice seeks construction services for a replace dry cooler project. The Veterans Integrated Service Network #04 Contracting Office and Erie Veteran Administration Medical Center will issue an invitation for bid for a single, firm fixed-price construction contract. The contractor shall provide all labor, materials, tools, permits, supervision, and construction specified in the drawings and specifications to replace the dry cooler system for IT at the Erie VA Medical Center. The performance period is 365 calendar days from notice to proceed. This project is set aside as 100% for service-disabled veteran-owned small businesses. The estimated construction cost is between $500,000 to $1 million. Questions regarding this solicitation must be submitted in writing by June 24, 2020, with the solicitation to issue on or around that same date. Respondents must be registered in the System for Award Management and verified in the Department of Veterans Affairs Center for Veterans Enterprise databases at time of proposal submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C01 SAM Award Wording for36C24420C0107 9-23-20.docx | DOCX document | |
| S03 SAM Wording for Amend. P00002 to 36C24420B0002 7-23-20.docx | DOCX document | |
| S06 Amend. A00002 to 36C24420B0002 7-23-20.docx | DOCX document | |
| S03 Contracting Opportunities Amd A00001 36C24420B0002 6-30-20.docx | DOCX document | |
| S06 Amend A00001 to 36C24420B0002 6-30-20.docx | DOCX document | |
| S02 Solicitation 36C24420B0002 6-22-20.docx | DOCX document | |
| P07 Wage Determination 06-19-20.pdf | ||
| P03 Sole Source Justification - JCI Metasys.pdf | ||
| S02 Specifications - Replace Dry Cooler 01-29-20.pdf | ||
| P03 Sole Source Justification - Notifier system.pdf | ||
| 36C24420B0002_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
G001
COVER SHEET
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2019 CJC CJC
100% BID DOCUMENTS
ERIE VA MEDICAL CENTER
REPLACE IT HVAC HEAT EXCHANGER
135 EAST 38TH STREET
ERIE, PA 16504
VICINITY MAP
SITE
LOCATION MAP
SITE
PROJECT DIRECTORY
OWNER:
ERIE VA MEDICAL CENTER
135 EAST 38TH STREET
ERIE, PA 16504
CONTACTS:
COR: PHILIP TSANG - (814) 860-2207
CO: DONALD KALIVODA - (814) 860-2917
ARCHITECT/ENGINEER:
AE WORKS LTD.
209 SANDUSKY ST
PITTSBURGH, PA 15212
(412) 287-7333
CONTACTS:
PROJECT LEAD: CHRIS CHAMPAGNE, PE
PM: TIFFANY HAILE
VA PROJECT: 562-18-401
NORTH
NORTH
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
CIVIL
C101 SITE PLAN
MECHANICAL
M001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
MD10B BASEMENT MECHANICAL DEMOLITION PLAN
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
M10B BASEMENT MECHANICAL PLAN
M101 FIRST FLOOR MECHANICAL PLAN
M501 HVAC DETAILS
M502 HVAC DETAILS
M601 HVAC CONTROLS DRAFT
M701 HVAC SCHEDULES
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E101 ELECTRICAL POWER PLAN
E201 ELECTRICAL ONE-LINE DIAGRAM
# Revisions Date
274.49
282.02282.00 282.05282.05
282.00
282.00 282.08
2.
2.
281.43
277.84
277.51
277.59 278.02 278.16
278.03
278.03
278.05
278.07 278.75
278.70
278.23278.06
278.05
278.26
278.22
278.11
278.09
278.04
278.03278.04
278.01
277.99
278.03 278.05
278.03
278.04
278.04 278.04
275.09
275.20275.15
275.12
276.02
278.38
280.12
281.29 281.43 281.47
279.97279.57
276.99
276.89 278.23
275.09 275.38
275.30 275.15 277.66
276.36
REMOVE GRATE, DISPOSE OF INLET SEDIMENT
FILTER AND CLEAN ALL DEBRIS FROM INSIDE OF
INLET. JET AND CLEAN PIPES TO NEXT
DOWNSTREAM STRUCTURE
EX. INLET
TG: 275.14
SAWCUT PAVING SLAB AROUND
EXISTING EQUIPMENT TO REMAIN
AFTER EQUIPMENT IS REMOVED
FROM SLAB, SAWCUT AND
REMOVE ALL EXISTING SLAB
CONCRETE EXCEPT AS NOTED.
277.80
278.20
278.20
278.10
277.90
278.10
EXISTING CURB WALL TO REMAIN.
PROTECT DURING CONSTRUCTION.
276.00
277.00
GRADE AREA BETWEEN SLAB LOW POINT
AND EXISTING INLET TO PROVIDE
POSITIVE DRAINAGE. TOPSOIL AND SEED
DISTURBED AREAS.
1.4%
1.3%
2.0% 1.7%
LEGEND
PROPOSED CURB / DEPRESSED CURB
D.C.
PROPOSED CONCRETE
278.20 PROPOSED ELEVATION
275.15
1319 Sassafras Street, Erie, PA 16501-1720
814.453.5702 (ph) 814.453.2020 (fax)
PROJECT LOCATION
NOTES:
1. THIS PROPERTY LIES WITHIN FLOOD ZONE "X" ("Area of minimal flood hazard") AS
DESIGNATED ON COMMUNITY PANEL No. 42049C0205E OF THE FLOOD INSURANCE RATE
MAPS FOR THE CITY OF ERIE, PENNSYLVANIA, EFFECTIVE DATE: JUNE 7, 2017.
2. LOCATIONS, SIZES, AND MATERIAL TYPES OF ABOVE-GROUND AND BELOW-GROUND
UTILITY LINES, APPURTENANCES AND STRUCTURES AS DEPICTED HEREON ARE PER
OBSERVABLE, ABOVE-GROUND EVIDENCE IN RELATION TO INTERPRETATIONS OF
FURNISHED RECORD UTILITY INFORMATION. THEY ARE PLOTTED AS ACCURATELY AND AS
COMPLETELY AS POSSIBLE FROM SAID EVIDENCE AND FURNISHED INFORMATION, BUT
THEY ARE NOT ENTIRELY FIELD-VERIFIED AND MUST BE CONSIDERED APPROXIMATE. THIS
OFFICE MAKES NO GUARANTEE AS TO THE PRECISE LOCATIONS OR DEPTHS OF
UNDERGROUND UTILITIES. IN ADDITION, THERE MAY BE OTHER ACTIVE OR ABANDONED
UNDERGROUND UTILITY LINES, APPURTENANCES AND STRUCTURES OF WHICH THIS
OFFICE HAS NOT BEEN ADVISED. PRIOR TO ANY EXCAVATION OR DEMOLITION, IT IS
IMPERATIVE THAT SUCH UTILITY LOCATIONS, DEPTHS, SIZES AND MATERIAL TYPES BE
VERIFIED THROUGH THE PA ONE-CALL SYSTEM AND/OR THROUGH THE INDIVIDUAL
UTILITY COMPANY OR AUTHORITY.
3. CONTRACTOR TO VERIFY EXACT LOCATION OF UTILITIES BY CONTACTING PENNSYLVANIA
ONE-CALL SYSTEM AT 1-800-242-1776 A MINIMUM OF THREE (3) WORKING DAYS AND A
MAXIMUM OF TEN (10) WORKING DAYS BEFORE COMMENCING EXCAVATION. PRIOR TO
INSTALLATION, CONSULT WITH UTILITY COMPANIES TO RESOLVE ANY PROBLEMS WHICH
MAY BE CREATED DUE TO THE LOCATION OF THE UTILITIES.
4. VERIFY THE EXACT POSITIONS OF THE TWO EXISTING EQUIPMENT UNITS TO REMAIN IN
SERVICE DURING SLAB REPLACEMENT. NEATLY SAW CUT AROUND THE BASE OF
EQUIPMENT TO REMAIN IN PLACE.
5. IF EXISTING SUBBASE MATERIAL AND DEPTH ARE SUFFICIENT, SUBBASE MAY BE
COMPACTED FOR REUSE. OTHERWISE, REMOVE AND REPLACE EXISTING SUBBASE.
6. PROVIDE BOND BREAKER AT NEW TO EXISTING CONCRETE JOINTS. ONCE CONCRETE HAS
CURED, APPLY A TWO PART POLYSULFIDE BASED JOINT SEALER TO PREVENT WATER
INTRUSION INTO THE JOINTS.
7. GRADE AREA FROM SLAB LOW POINT TO THE EXISTING INLET TO PROVIDE POSITIVE AND
UNIFORM DRAINAGE. MAXIMUM SLOPE SHALL BE 4:1 (H:V).
PROJECT LOCATION MAP
SCALE: 1" = 2000'
REGISTERED
PROFESSIONAL
ENGINEER
TIMOTHY LAWRENCE POLASKI
055636-E
SCALE: 1" = 5'
5' 0' 5'
SUBGRADE
8" FIBER REINFORCED CONCRETE
SLAB PAVEMENT DETAIL (TYP.)
NOT TO SCALE
PENNDOT CLASS AAA (4,000 PSI)
6" SUBBASE (No. 2A)
CEMENT CONCRETE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
C101
SITE PLAN
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2020 TLP DML
100% CONSTRUCTION
DOCUMENTS
# Revisions Date
AutoCAD SHX Text Transformer pad
AutoCAD SHX Text
CURB / DEPRESSED CURB
AutoCAD SHX Text
STORM SEWER LINE
AutoCAD SHX Text
FENCE LINE
AutoCAD SHX Text D.C.
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
CONTOUR LINE
AutoCAD SHX Text
RIGHT-OF-WAY LINE
AutoCAD SHX Text
BOUNDARY LINE
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
AutoCAD SHX Text
TREE / SIZE
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
CATCH BASINS/INLETS
AutoCAD SHX Text TG = Top Of Grate Elev. Inv = Invert Elev.
AutoCAD SHX Text Rim = Rim Elev. Inv = Invert Elev.
AutoCAD SHX Text 12"
AutoCAD SHX Text
EDGE OF GRAVEL
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING ELEVATION
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text NOTE: 1. CONSTRUCT SLAB ON NO. 2A COARSE AGGREGATE COMPACTED TO MIN. CONSTRUCT SLAB ON NO. 2A COARSE AGGREGATE COMPACTED TO MIN. 95% STANDARD PROCTOR. 2. PROVIDE 6x6-W4/W4 WELDED WIRE FABRIC MID DEPTH. PROVIDE 6x6-W4/W4 WELDED WIRE FABRIC MID DEPTH. 3. PLACE BOND BREAKER AT EXISTING CONCRETE EDGES. PLACE BOND BREAKER AT EXISTING CONCRETE EDGES. 4. SEAL JOINTS BETWEEN EXISTING AND NEW CONCRETE WITH A TWO SEAL JOINTS BETWEEN EXISTING AND NEW CONCRETE WITH A TWO PART POLYSULFIDE JOINT SEALANT.
CO2
CO
H
HS
NO2
S
TH
TS
T
MS
CHWS
CD
CW
F-CW
H-CW
S-CW
PD
V
SS
SD
OSD
(E)
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAINAGE
DOMESTIC COLD WATER
FILTERED COLD WATER
HARD COLD WATER
SOFT COLD WATER
PUMP DISCHARGE
SANITARY VENT
SANITARY SEWER
STORM DRAINAGE
OVERFLOW STORM DRAINAGE
REF-L
REF-S
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
PLUMBING AND PIPING SYMBOLS
KEYNOTE
CONTINUATION SYMBOL
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
DRAIN SIZE
PIPE RISEPIPE DROP
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
TYPE (SEE SCHEDULE)
Room
INVERT: -10' - 1"
1/8" / 12" SLOPE
RO REVERSE OSMOSIS WATER
16"x8"
16"/8"
(E)
F
S
M
B
D
C
16"Ø
E/A
O/A
T/A
L/A
R/A
S/A
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
GRILLES, REGISTERS & DIFFUSERS TAG
CFM
THROW-150FPM/ 100FPM/ 50FPM
NECK SIZE / MODULE SIZE
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG (DIAMETER)
LINEAR DIFFUSER TAG
CFM
TYPE (SEE SCHEDULE) NUMBER OF SLOTS /
ACTIVE SLOT LENGTH (PLENUM LENGTH) /
NECK SIZE
DUCT BEING DEMOLISHED
ELEVATION (CENTER OF FACE)
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
GE/A GREASE EXHAUST AIR
SE/A SMOKE EXHAUST AIR
EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINE
FOR ADDITIONAL
INFORMATION)
EXISTING EQUIPMENT
TO REMAIN
FLUE EXHAUST GAS FLUE
C/A COMBUSTION AIR
S-O/A CONDITIONED OUTSIDE AIR
VAV-XX
10' - 0"
(E)VAV-XX
VAV-XX
4000 SF
6" SD-1
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
P&T PRESSURE AND TEMPERATURE
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
48"x2 1/2"
400SLB3
8" / 24x24
300SD3
12" / ---
SD9
LINEAR BAR GRILLE
LINEAR SLOT DIFFUSER
PERFORATED DIFFUSER
WITH DEFLECTORS
ROUND DIFFUSER WITH
ADJUSTABLE PATTERNS
LOUVERED DOUBLE
DEFLECTION GRILLE
12"x10" / ---
500SG7
TYPE (SEE SCHEDULE)
10" / 24x24 H-5/7/1422
400SD1
3-CONE DIFFUSER
THROW PATTERN
MAX NC RATING
1 / 4' - 0" / 8"
200LSD1
8' - 0" AFF
1 / 4' - 0" / 8"
200LSD1
18' - 0"
1 / 4' - 0" / 8"
200LSD1
SECTION TOTAL TRACK LENGTH
12"x10" / 24x12
500RG9
LOUVERED GRILLE
12"x10" / 24x24
500RG2
EGGCRATE RETURN
GRILLE
BOTTOM OF EQUIPMENT
ELEVATION
505 lb
RTU-XX
RTU-XX
3.0 ton
115000 Btu/h
115 CFH
RTU-XX
Htg: 3.7 GPM
VAV-XX
HEATING COIL
FLOW
OPERATING WEIGHT
NOT INCLUDING CURB
FUEL INPUT
GAS PIPE FLOW
NOMINAL COOLING
CAPACITY
4" FD-1FLOOR DRAIN
VAV BOX
ROOFTOP UNIT
4" AD-6 AREA DRAIN
4" FS-4FLOOR SINK
4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN
8 WFU
4" FD-13
HUB DRAIN
DRAIN TAGS
"P" - INDICATES
PRIMER CONNECTION
FIXTURE UNITS
FLOW CONTROL
DRAIN
4" SD-12
COMBINATION
DRAINS
STORM DRAIN4" SD-15
ROOF AREA
SERVED BY DRAIN
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
DATA DEVICE TAGS
DAMPER TAGS
VAV-XX
RTU-XX
EQUIPMENT ID
SYMBOL
BBB
INLET COLLAR DAMPER
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
SENSOR
MANUAL SWITCH
THERMOSTAT
TEMPERATURE SENSOR
TEMPERATURE & HUMIDITY SENSOR
HUMIDITY SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
HUMIDISTAT
WATER CLOSET -
WALL HUNG - ADA WC-1
U-1
1 WFU
LAV-1A
1.5 CWFU
1.5 HWFU
LAV-1A
FIXTURE UNITS
4" WCO
PIPE ACCESORY
TAG
PLUMBING FIXTURE TAGS
4" WCO
TYPE (SEE SCHEDULE)
WC-1A
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET-
(40% PROPYLENE GLYCOL)
(40% PROPYLENE GLYCOL)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
M001
HVAC SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2019 CJC CJC
100% BID DOCUMENTS
PROJECT GENERAL NOTES
* REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
* THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL
EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN SPACE.
* THE CONTRACTOR SHALL VISIT THE SITE, PRIOR TO FINAL BIDDING, AND VERIFY ALL EXISTING
SITE CONDITIONS. PROVIDE ALL MATERIAL AND COMPONENTS AS NEEDED TO BRING THE
UNITS TO FULL COMPLIANCE OF THE VA’S REQUIREMENTS.
* WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK.
* COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY,
STRUCTURE, AND EQUIPMENT TO PREVENT CONFLICTS.
* THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE
ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE REASONABLY
ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.
* FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO
ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT
LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.
* LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
* ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.
* LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
* FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO
SPECIFICATION.
* PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
* ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.
* REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.
* PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS
SHOWN.
* FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS,
REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
* INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN
INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH
THE SPECIFICATIONS.
* LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE
APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE
COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
* INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT
CEILINGS.
HVAC PROJECT GENERAL NOTES
1 NOT ALL SYMBOLS ARE NECESSARILY USED.
2 COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED
CEILING PLANS.
3 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND
COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.
4 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
5 DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED
OTHERWISE.
6 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
7 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR SHALL BE
RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMODATE ACTUAL SITE
CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.
8 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE
AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE UNDERWRITER
REQUIREMENTS.
9 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL,
CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
10 MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL
ROOMS.
11 ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY
MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
12 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS
RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
13 TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED
AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU
(NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS.
PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL
STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S
QUALIFICATIONS.
14 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.
15 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS BEFORE FABRICATION.
16 ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE,
DIVISION 26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE
UNDERWRITER REQUIREMENTS.
17 THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.
THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
18 PLAN DRAWINGS AND SECTIONS CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE
OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC.
ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS EXIST. MECHANICAL
CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL
OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED
AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE
FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH CONDITIONS IN SCOPE OF WORK AT
NO ADDITIONAL COST TO THE OWNER.
19 ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF
MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR
AT NO ADDITIONAL COST TO THE OWNER.
20 ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND
AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
21 ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.
22 REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING AND EQUIPMENT INSTALLATION.
23 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK.
24 LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, CABINET HEATERS, UNIT HEATERS, ETC.,)
FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO
NOT LOCATE FAN POWERED VAV BOXES ABOVE LIGHTING FIXTURES.
25 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT
LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.
26 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS. TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
27 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN HYDRONIC WATER PIPING
SYSTEMS. ALL PIPING SHALL SLOPE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE
BOTTOM OF ALL RISERS AND LOW POINTS.
28 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
29 ALL ISOLATION VALVES SHALL BE IN LOCATION AND ELEVATION WHICH ALLOWS FOR EQUIPMENT
AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE ISOLATION
VALVE.
30 ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE
PROVIDED WITH POSITIONS INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
31 ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINERS, AND PIPING SPECIALTIES SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND
CONTROLS.
32 MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED
AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL
DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
33 MEASURE, CUT AND INSTALL PIPE LENGTH ACCURATELY TO MINIMALIZE MISALIGNMENT.
INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
34 PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER
EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION (EXCEPT WATER COILS). FLEXIBLE
CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
35 PROVIDE VIBRATION INSULATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION
TRANSMISSION TO BUILDING STRUCTURE.
36 FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. REFER TO
SPECIFICATION.
37 ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE
COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHEMENTS TO STEEL MEMBERS, BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER.
WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.
38 MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR
DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL MEMBERS. COORDINATE WITH
STRUCTURAL DRAWINGS.
39 PROVIDE SLEEVES AND/OR OPENINGS TO RUN PIPES AND DUCTS THROUGH FOUNDATIONS,
FLOORS, WALLS, AND ROOF.
40 UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IF OVERHEAD, TIGHT TO UNDERSIDE
OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
41 PROVIDE CHAINWHEEL OPERATORS FOR ALL EXPOSED VALVES MOUNTED GREATER THAN 8'-0"
ABOVE FINISHED FLOOR LEVEL. CHAIN SHALL EXTEND UNOBSTRUCTED TO 7'-0" ABOVE FLOOR
LEVEL.
42 ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES,
MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION,
INSPECTION AND MAINTENANCE.
43 ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
44 PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED OR SPECIFIED. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS
CONTAINING TURNING VANES.
45 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.
46 ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL
BE APPROVED BY THE ENGINEER PRIOR TO PURCHASE, FABRICATION AND INSTALLATION.
47 ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE
ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE PROTECTED,
INSULATED, OR CONTROLLED TO REMAIN BELOW 120º F.
48 PROVIDE MANUAL VOLUME DAMPERS IN ALL RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS
FROM MAIN SUPPLY DUCT, AND IN ALL OTHER AREAS REQUIRED TO PROVIDE PROPER SYSTEM
AIRFLOW BALANCING.
49 REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.
50 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS
SHOWN.
51 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS,
REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
52 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN
INSTALLATION INSTRUCTIONS, AT A LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH
THE SPECIFICATIONS.
53 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE
APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE
COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
PLUMBING GENERAL NOTES
* FIELD VERIFY ALL NEW WATER, WASTE, AND VENT PIPING CONNECTIONS AND PROVIDE NEW
CONNECTIONS AS REQUIRED FOR PROPERLY OPERATING SYSTEMS.
* PITCH UNDERFLOOR SANITARY WASTE AND STORM PIPING 3" AND GREATER AT 1/8" PER FOOT, UNLESS NOTED OTHERWISE. PITCH ALL OTHER WASTE PIPING AT 1/4" PER FOOT UNLESS
OTHERWISE NOTED.
* FIELD VERIFY LOCATION AND INVERTS OF SITE UTILITIES PRIOR TO INSTALLATION.
* ROUTE DOMESTIC WATER, FIRE PROTECTION, SANITARY SEWER, AND STORM SEWER
SERVICES TO SITE UTILITIES 5'-0" FROM BUILDING UNLESS NOTED OTHERWISE. REFER TO CIVIL
PLANS.
* WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL BE 2" MINIMUM.
* PROVIDE CLEANOUT IN ACCESSIBLE LOCATION AT THE BASE OF ALL PLUMBING RISERS.
# Revisions Date
THE PRIMARY PROJECT SCOPE AREA FOR THIS PROJECT IS CLASS II.
HOWEVER, WORK OUTSIDE THE PRIMARY PROJECT SCOPE AREA MAY
VARY. THE REQUIRED INFECTION CONTROL PRECAUTIONS WITH
EACH CLASS ARE AS OUTLINED IN SPECIFICATION SECTION 01 35 26 -
SAFETY REQUIREMENTS PARAGRAPH 1.12 B.
INFECTION CONTROL - SAFETY REQUIREMENTS
STORAGE
EB-11A
Room
NB-60-6
OFFICE
EB-28A
DINING ROOM
NB-60
ELEV
P-3
OFFICE
EB-28
V-TEL CONFERENCE ROOM
EB-26A
MECH. ROOM
EB-25
STAIRS 'A'
FB-1C
ELEV.
F-5
OFFICE
EB-26
BREAK ROOM
NB-60-8
MENS LOCKER-1
NB-60-9
MENS LOCKER-2
NB-60-10
AIR COND. EQUIP ROOM
NB-60-11
ELECTRICAL SWITCH GEAR
NB-60-12
STORAGE
NB-60-13
MED GAS STORAGE
NB-60-14
MAIL ROOM
NB-60-16
ELEVATOR LOBBY
NB-60-17
Room
NB-60-18
Space
NB-60-19
Space
NB-60-20
TOILET
NB-60-21
TOILET
NB-60-22
IT OFFICE
NB-60-23
TOILET
WB-40E
TRAINING ROOM
NB-60-24
R.O.L.
NB-60-25
OFFICE
B-06
OFFICE
B-11
LIBRARY STORAGE
B-12
IT STORAGE
NB-60-26
IT SERVER ROOM
NB-60-27
SALE STOR.
NB-60-28
Space
NB-60-30
DAV OFFICE
NB-60-31
AMERICAN LEGION
NB-51
CLOSET
NB-51A
HAC
WB-48
TOILET ROOM
NB-49
OFFICE
NB-60-33
OFFICE
B-10
TOILET ROOM
NB-50
OFFICE
B-07
STORAGE-2
EB-7A-2
TOILETS
NB-60-34
ELEV-2
P-2-2
ELEVATOR LOBBY
EB-23
Space
NB-60-35
PHARMACY RESIDENTS
EB-31
Space
NB-60-36
BREAK ROOM
NB-60-37
STAIR C-2
NB-44-2
MACHINE ROOM
NB-60-39 STORAGE
EB-7
STORAGE
EB-6
CANTEEN STORE
NB-46
STORAGE-2
EB-5-2
WORKSHOP-2
EB-09A-2
MECHANICAL ROOM
NB-59
ELEC
NB-59A
FE CLOSET-2
NB-59B-2
ELEV-2
S-4-2
CORRIDOR-2
EB-8-2
STORAGE
EB-3
STORAGE
BB15C
STORAGE
BB15A
STORAGE
NB-60-46
Space
NB-60-47
OFFICE
NB-60-48
PIV OFFICE
B-01
IT OFFICE
NB-60-49
Space
NB-60-50
OFFICE
NB-60-51
MEDICAL RECORDS
NB-60-52
STORAGE
NB-60-53
Space
NB-60-54
STORAGE
NB-60-55
CALL CENTER
NB-60-56
POLICE
NB-60-57
CORRIDOR
WB-36
STORAGE
BA07B
Space
NB-60-59
IT WORK ROOM
BA13A
LIBRARY
NB-60-61
COMPUTER ROOM
BA07A
IT CHIEF
NB-60-63
SHOWER
NB-60-64
WOMENS LOCKER
NB-60-65
SOCIAL WORKER OFFICE
NB-60-66
CHIEF POLICE
NB-60-67
OFFICE
NB-60-68
MECHANICAL ROOM
BA13C
Space
NB-60-69
STORAGE
NB-60-70
SERVER ROOM
BB14
STORAGE
BB15B
SIGN SHOP-2
EB-09B-2
MACHINE ROOM
EB-11
LAUNDRY
EB-22
3" CHWR
3" CHWS
WSHP-5
WSHP-1
FCU-L2B
FCU-L2A
FCU-6
WSHP-2A
WSHP-2
FCU-L1WSHP-11 WSHP-10
WSHP-4
FCU-5
UP TO IT
CLOSET
ABOVE FCU-L6
M10B
M10B
5A
A B CB5
8.5
10.2
D E F G
H J K L M N
ONB
K5
FCU-L3
FCU-L4
1" CW
3" CHWR
M10B
NON-IT LOOP
NON-IT LOOP
IT LOOP
IT LOOP
IT LOOP
IT LOOP
IT LOOP
OA P PA Q QA R RA S SA SB T TA U V
STORAGE
BB15B
STORAGE
BB15C
CHWS CHWR
4" CHWS
4" CHWR4" CHWR
4" CHWS
5 5
M10B
M10B
3" CHWS
3" CHWR
PIPING FOR NON-IT LOOP
PIPING FOR IT LOOP
R RA S SA SB
FCU-L4
FCU-L3
NEW
NEW
IT WORK ROOM
BA13A
STORAGE
BA07B
COMPUTER ROOM
BA07A
2" CHWS
2" CHWR
CHWS
CHWR
2" CHWS
2" CHWR
2" CHWS
2" CHWR
CHWS
CHWR
PA Q QA R RA S SA
5A
8.5
3" CHWR
3" CHWR
CW
1" CW
CHWS
CHWR
CHWR
CHWS
HX-1
1" CD
M10B
M10B
RA S SA SB T
00 - BASEMENT -
OVERALL PLAN
0' - 0"
CHWR
CHWS
CHWR
CHWS
PIPING FOR IT LOOP
PIPING FOR NON-IT LOOP
01 - FIRST FLOOR -
EXIST
13' - 0"
00 - BASEMENT -
OVERALL PLAN
0' - 0"
CHWR
CHWS
CHWS
CHWR
S SA
01 - FIRST FLOOR -
EXIST
13' - 0"
00 - BASEMENT -
OVERALL PLAN
0' - 0"
7 6
HX-1
INCOMING DOMESTIC WATER
DRAIN LINE
3" CHWR
3" CHWR
0'
01 - FIRST FLOOR -
EXIST
13' - 0"
00 - BASEMENT -
OVERALL PLAN
0' - 0"
HX-1
DRAIN LINE
INCOMING DOMESTIC WATER
3" CHWR
3" CHWR
SB
OVERHEAD
DOOR
OVERHEAD
DOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
KEYPLAN
M10B
BASEMENT MECHANICAL PLAN
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2019 CJC CJC
100% BID DOCUMENTS
1/16" = 1'-0"M10B
1 OVERALL BASEMENT MECHANICAL PLAN
1/8" = 1'-0"M10B
2 BASEMENT MECHANICAL PLAN - STORAGE BB15C
1/8" = 1'-0"M10B
3 BASEMENT MECHANICAL PLAN - COMPUTER ROOM BA07A
KEYNOTES
1 SHUT EXISTING VALVES ONCE NEW PIPING FOR NON-IT LOOP IS INSTALLED.
2 NEW, UPSIZED PIPING SERVING FCU-L3 AND FCU-L4 TO BE INSTALLED AT THIS LOCATION.
CONTRACTOR TO REMOVE TEMPORARY COOLING FOR COMPUTER ROOM BA07A ONLY
AFTER NEW PIPING IS INSTALLED AND PRESSURE TESTED.
3 SCOPE OF WORK SHOWN IN THIS VIEW IS PART OF “DEDUCT ALTERNATE NO. 1”.
4 1” DRAIN PIPE FROM NEW HEAT EXCHANGER HX-1 TO DISCHARGE INTO EXISTING FLOOR
DRAIN. TERMINATE PIPE DIRECTLY ABOVE FLOOR DRAIN, 6” ABOVE FINISHED FLOOR.
5 NEW PIPING FOR NON-IT LOOP INSTALLED BELOW EXISTING PIPING. THE EXISTING PIPING
WILL BECOME THE IT LOOP. THE NON-IT AND IT LOOP PIPING ARE ROUTED DOWN FROM
FIRST FLOOR TO BASEMENT LEVEL IN SAME CHASE.
6 CONTRACTOR TO REMOVE PORTION OF EXISTING SHELVING TO ALLOW FOR FLOOR SPACE
FOR HX-1. COORDINATE REMOVAL OF SHELFING AND RELOCATION OF ANY EQUIPMENT
STORED ON THAT SHELF WITH COR.
7 1” DOMESTIC WATER PIPING TO HX-1 TO BE COPPER TUBE, ASTM B88, TYPE K OR L,
DRAWN. FITTINGS FOR COPPER TUBE TO BE WROUGHT COPPER OR BRONZE CASTINGS
CONFORMING TO ASME B16.18 AND B16.22. INSTALLATION TO COMPLY WITH THE
INTERNATIONAL PLUMBING CODE. PIPE SHALL BE ROUND AND STRAIGHT. CUTTING SHALL
BE DONE WITH PROPER TOOLS. PIPE SHALL BE REAMED TO REMOVE BURRS AND A CLEAN
SMOOTH FINISH RESTORED TO FULL PIPE INSIDE DIAMETER. INSULATE PIPING.
8 CONTRACTOR TO PROVIDE NEW HONEYWELL NOTIFIER DUCT SMOKE DETECTOR FOR
UNIT. NAME BRAND ONLY. NO OTHER MANUFACTURER TO BE ACCEPTED.
HVAC GENERAL NOTES
* REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND SPEC SECTION 01 35 26 FOR ADDITIONAL REQUIREMENTS. THE PRIMARY ICRA CLASSIFICATION FOR THIS PROJECT
SCOPE AREA IS CLASS II, HOWEVER THIS MAY VARY OUTSIDE THE PRIMARY PROJECT SCOPE
AREA.
* ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH ERIE VAMC. A DETAILED JOB
TIMELINE SHALL BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO
CONTRACTOR STARTING WORK ON-SITE.
* EXISTING SYSTEMS TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED.
* REFER TO DRAWINGS M10B AND M101 FOR INFORMATION FOR NEW EQUIPMENT.
* ALL ISOLATION AND SHUT OFF VALVES FOR EQUIPMENT ARE SHOWN ON M601. REFER TO M601 FOR SCHEMATIC LOCATION. INSTALL VALVES IN BRANCH PIPING AS CLOSE TO EQUIPMENT TO BE
ISOLATED AS POSSIBLE FOR EASE OF USE DURING EQUIPMENT MAINTENANCE.
* ANY NEW DDC EQUIPMENT TO BE JOHNSON CONTROL METASYS SYSTEM. NAME BRAND ONLY. NO
OTHER MANUFACTURER TO BE ACCEPTED.
M10B
BASEMENT MECHANICAL PLAN - MECH ROOM
BA13C - SHELF TO REMOVE
NOT TO SCALE
M10B
BASEMENT MECHANICAL PLAN - MECH ROOM
BA13C - EXISTING FLOOR DRAIN
NOT TO SCALE
M10B
BASEMENT MECHANICAL PLAN - MECH ROOM
BA13C - EXISTING FLOOR DRAIN
NOT TO SCALE
6 4
1/8" = 1'-0"M10B
4 BASEMENT MECHANICAL PLAN - MECH ROOM BA13C
NORTH
TRUE NORTH=
PLAN
150.0°
# Revisions Date
1/8" = 1'-0"M10B
5 STORAGE BB15C - FACING PLAN WEST
1/8" = 1'-0"M10B
6 STORAGE BB15C - FACING PLAN NORTH
1/8" = 1'-0"M10B
7 MECHANICAL ROOM BA13C - FACING PLAN WEST
1/8" = 1'-0"M10B
8 MECHANICAL ROOM BA13C - FACING PLAN NORTH
TELEPHONE
CLOSET
1C58
FCU-L6
H J K L M N
ONB
K5
M101
OA P PA Q QA R RA S SA SB T TA U V
M101
EXISTING
GRAVEL
FRENCH
DRAIN
DC-2
DC-1
PP-1
PP-2
EXISTING TRANSFORMERS
TO REMAIN
EXISTING
CONDENSING
UNIT TO
REMAIN)
ET-2
ET-1
EXISTING CWS PIPING STACKED
ON TOP OF EXISTING CWR,
SUPPORTS HUNG TO WALL
M101
PIPING FOR NON-IT LOOP DRY
COOLER (DC-2) TO FEED IT
LOOP WHEN DC-1 IS OFFLINE.
REFER TO DRAWING M601 FOR
ADDITIONAL INFORMATION.
5 5
4" CHWS
4" CHWR
4" CHWR
4" CHWS
4" CHWS 4" CHWR
S SA SB T TA U V
01 - FIRST FLOOR -
EXIST
13' - 0"
01 - FIRST FLOOR -
EXIST
13' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
KEYPLAN
M101
FIRST FLOOR MECHANICAL PLAN
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2019 CJC CJC
100% BID DOCUMENTS
KEYNOTES
1 INSTALL TWO 4” PIPING TEES FOR EMERGENCY CHILLED WATER CONNECTIONS WITH
SHUT-OFF VALVES AND CAPS AT END. ON STRAIGHT PORTION OF PIPING AFTER TEE
CONTRACTOR TO ADD VALVES WITH DRAIN LINES OFF THE BOTTOM OF THE PIPE FOR BOTH
THE SUPPLY AND RETURN PIPES.
DURING CONSTRUCTION WHILE THE EXISTING EQUIPMENT IS BEING DEMOLISHED (DRY
COOLERS, PUMPS, EXPANSION TANK, ETC.) CONTRACTOR PROVIDED TEMPORARY EQUIPMENT
WILL UTILIZE THESE TAPS TO COOL THE LOOP. ONCE THE NEW EQUIPMENT IS OPERATIONAL
THE TAPS WILL REMAIN FOR EMERGENCY USE.
2 NEW LOCATION FOR RELOCATED EXISTING CONDENSING UNIT FOR THE ASC’s AIR HANDLING
UNIT. MODIFY EXISTING REFRIGERANT PIPING AS NEEDED TO CONNECT REFRIGERANT PIPING
BETWEEN ASC AHU AND ASC CONDENSING UNIT. PROVIDE EQUIPMENT PAD UNDERNEATH
CONDENSING UNIT PER DETAIL 5 ON DRAWING M501.
3 NEW OUTDOOR CONTROL ENCLOSURE TO CONTROL DC-1’S FANS AND PUMP PACKAGES PP-1.
4 NEW OUTDOOR CONTROL ENCLOSURE TO CONTROL DC-2’S FANS AND PUMP PACKAGES PP-2.
5 THE DRY COOLER BASE HAS MOUNTING HOLES FOR SECURING THE DRY COOLER ONCE
INSTALLED DIRECTLY TO CONCRETE BASE PER MANUFACTURER'S INSTALLATION MANUAL.
6 PROVIDE EQUIPMENT PAD UNDERNEATH PUMP PACKAGE PER DETAIL 5 ON DRAWING M501.
1/16" = 1'-0"M101
1 OVERALL FIRST FLOOR MECHANICAL PLAN
HVAC GENERAL NOTES
* REFER TO FACILITY'S INFECTION CONTROL AND RISK ASSESSMENT (ICRA) AND SPEC SECTION 01 35 26 FOR ADDITIONAL REQUIREMENTS. THE PRIMARY ICRA CLASSIFICATION FOR THIS PROJECT
SCOPE AREA IS CLASS II, HOWEVER THIS MAY VARY OUTSIDE THE PRIMARY PROJECT SCOPE
AREA.
* ALL WORK SHALL BE SCHEDULED AND COORDINATED JOINTLY WITH ERIE VAMC. A DETAILED JOB
TIMELINE SHALL BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO
CONTRACTOR STARTING WORK ON-SITE.
* EXISTING SYSTEMS TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED.
* REFER TO DRAWINGS M10B AND M101 FOR INFORMATION FOR NEW EQUIPMENT.
* ALL ISOLATION AND SHUT OFF VALVES FOR EQUIPMENT ARE SHOWN ON M601. REFER TO M601 FOR SCHEMATIC LOCATION. INSTALL VALVES IN BRANCH PIPING AS CLOSE TO EQUIPMENT TO BE
ISOLATED AS POSSIBLE FOR EASE OF USE DURING EQUIPMENT MAINTENANCE.
* ANY NEW DDC EQUIPMENT TO BE JOHNSON CONTROL METASYS SYSTEM. NAME BRAND ONLY. NO
OTHER MANUFACTURER TO BE ACCEPTED.
1/4" = 1'-0"M101
2 FIRST FLOOR MECHANICAL PLAN - EQUIPMENT PAD AND CRAWLSPACE
NORTH
TRUE NORTH=
PLAN
150.0°
# Revisions Date
1/8" = 1'-0"M101
3 CRAWL SPACE - FACING PLAN EAST
1/8" = 1'-0"M101
4 CRAWL SPACE - FACING PLAN SOUTH
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE
THRU (20)
6 8 10
(32)(25) (40)
(65)
(50)
(75)
-1312 14 -16 -
(125)(100)
(150)
(250)
(200)
(300)
(400)
(350)
(450)
(600)
(500)
20 241814 16128 1064 532 2 1/21 1/21 1 1/4IN.
(MM)
(M)
FT.
FT.
(M)
(9.1) (9.6)(8.5)(7.6) (8.2)(7.0)(5.8) (6.7)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)
--- --(4.9) -(4.1)(3.7) (4.0) -(3.0)(2.4)(1.8)5 FT
THRU 3/4
(2.1) (2.1)
(2.1)
(2.7)
(2.4)
HANGER ROD
INSULATION
(VAPOR BARRIER TYPE IS REQUIRED
FOR LOW TEMPERATURE PIPE)
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PCF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION SHIELD AT
HANGER WELD
SADDLE
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH
CHANNEL
BAND
PROVIDE INSULATION SHIELD
AND INSERT FOR ALL PIPING (8" MIN.)
1" MAX. 1-5/8" 12 GAUGE CHANNEL OR
2"x2"x1/4" ANGLE
SIDE VIEW
TRAPEZE HANGER FOR UP TO 1000 LB.
UNIFORM LOAD
PIPE
BOLT
FIRE-STOPPING
MATERIAL
PLAN VIEW
RISER
CLAMP
PIPE SLEEVE
WHERE SPECIFIED
RISER
INSULATION
BOLT
(TYPICAL)
RISER CLAMP
PIPE SLEEVE
WHERE SPECIFIED
FIRE-STOPPING
MATERIAL
1" M
IN
PIPE SLEEVE ANCHOR
ELEVATION
FLOOR SLAB
BOLT (TYP.)
INSULATION
RISER CLAMP, BOTTOM CLAMP
REQUIRED AT ANCHOR POINTS
ONLY
NOTES:
1. PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS.
2. EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.
STRUCTURAL STEEL BEAM
HEAVY DUTY BEAM
CLAMP
EYE SOCKET
CLEVIS HANGER
INSULATION WHERE
SPECIFIED SHALL
COVER HANGER
HANGER ROD
LOCKING NUT
INSERT NUT HEAVY DUTY CONCRETE STEEL
INSERT WITH ELONGATED SLOT
(OR EXPANSION SHIELD)
HANGER ROD
LOCKING NUT
VAPOR BARRIER INSULATION
PIPE
PIPE BRACKET SADDLE AND CLAMP,
1/4" THICK GALVANIZED OR
ELECTROPLATED STEEL, SIZE
BRACKET TO SUIT INSULATION
INSULATION WITH HIGH
DENSITY INSERT AT
SUPPORT
NEW INSULATION PROTECTION
SHIELD, FED. SPEC. WW-H-171E
TYPE 41 AND MSS SP-69 TYPE
40, WHEN USED IN HORIZONTAL
POSITION
1/2" DIA. WEDGE TYPE CONCRETE EXPANSION
ANCHORS, STAINLESS STEEL MINIMUM 2 1/2"
EMBEDMENT
L
A
A
B BW
CONCRETE BASE
DCONCRETE BASE
5D
2D
ANCHOR BOLT
(TYP)
PIPE SLEEVE (5D,
3" MIN)
WELD HEAD TO PLATE OR
BEND OVER END5D
FLOOR
PLAN SECTION B-B
1"
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
L/10, 5" MIN
EQUIPMENT BASE
PLATE
TYPICAL ANCHOR
BOLT NUT & WASHER
16"
SECTION A-A (BASE POURED WITH FLOOR SLAB)
TYPICAL ANCHOR
BOLT NUT & WASHER
SECTION A-A (BASE POURED WITH FLOOR SLAB)
L/10, 5" MIN
EQUIPMENT BASE
PLATE
PROVIDE #3 BARS 12" O.C. EACH WAY
IN THE BASE & DOWEL BASE TO
FLOOR
NOTES:
1) THIS DETAIL APPLIES TO EQUIPMENT NOT SPECIFIED TO BE MOUNTED ON SPRING
ISOLATED BASES.
2) LENGTH & WIDTH (L&W) DIMENSIONS SHALL BE 6" GREATER THAN THE EQUIPMENT
BASE PLATE.
CONCRETE EQUIPMENT BASES
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW CONSTRICTION
THIS TYPE SHALL BE USED ONLY IN SLABS OR BEAMS
OF 4" [100mm] MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS FOR NEW
CONSTRUCTION
CONCRETE
FLOOR SLAB
3/8" [10mm] MIN DIA INSERTS
NEW CONSTRUCTION ONLY.CLIP
ANGLE
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1
1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] &
LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS 3/8" [10mm] MIN DIA
HANGER RODS
TURNBUCKLE
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
TYPICAL MANUAL AIR VENT
ELEVATION
CIRCULATING WATER PIPING
1/2" [15mm] x 4" [100mm]
NIPPLE
1/4" [8mm]
COPPER TUBING
MV
OR
AV
AIR VENT
1/2" [15mm]
BALL VALVE
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR PLANS LOCATE DRAIN AT BOTTOM OF
SCALE POCKET.
TYPICAL CHILLED AND HOT WATER
PIPING DRAIN VALVE CONNECTIONS
ELEVATION THREADED
PIPING
ELEVATION WELDED
PIPING
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
3/4" [20mm] BALL VALVE
REDUCER (IF REQUIRED)
TYPICAL WATER PIPING
HORIZONTAL
VERTICAL
ABOVE 2" DIA PIPE 2" DIA & SMALLER PIPE
2-1/2" DIA.
2-1/2" DIA.
ABOVE 2" DIA PIPE 2" DIA & SMALLER PIPE
NOTES:
1. PROVIDE IN CHILLED WATER MAIN AND IN CONDENSER WATER MAIN.
2. LOCATE PILOT TUBE TAPS 20 PIPE DIAMETERS DOWNSTREAM AND 10 PIPE
DIAMETERS UPSTREAM FROM THE NEAREST PIPE FITTING.
3. EITHER TOP OR SIDE LOCATION. BOTH ARE NOT REQUIRED AT SAME LOCATION.
WELD (TYP)
PLUG
1-1/2" [40mm]
FULL PORT BALL
VALVE
PLUG
1 1/2" [40mm] FULL PORT
BALL VALVE
1-1/2" Ø x 2" LONG
[40x50mm] PIPE
90°
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
M501
HVAC DETAILS
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2019 CJC CJC
100% BID DOCUMENTS
NOT TO SCALEM501
1 PIPE HANGERS
NOT TO SCALEM501
2 (VA) SUPPORT/ANCHOR FOR PIPE RISERS
NOT TO SCALEM501
3 PIPE HANGER SUPPORTS
NOT TO SCALEM501
4 WALL HUNG PIPE SUPPORT FOR INSULATED PIPE
NOT TO SCALEM501
5 CONCRETE EQUIPMENT BASES
NOT TO SCALEM501
6 SECURING HANGER RODS IN CONCRETE
NOT TO SCALEM501
7 DRAIN VALVE & AIR VENT CONNECTIONS (HYDRONIC SYSTEMS)
NOT TO SCALEM501
8 INSTALLATION OF THERMOMETER WELLS
NOT TO SCALEM501
9 PITOT TEST CONNECTIONS
D
D
1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR COMPONENT SIZES.
2. RELIEF VALVE FOR CHILLED WATER SYSTEM IS SHOWN. OMIT WHEN
RELIEF VALVE IS SHOWN ON HEAT EXCHANGER DETAIL & SYSTEM IS
USED ONLY FOR HOT WATER HEATING.
3. PROVIDE STRAINER IN AIR SEPARATOR WHEN INDICATED IN EXPANSION
TANK SCHEDULE.
4. FOR HOT WATER SYSTEMS 2" [50mm] AND SMALLER AND CHILLED
WATER SYSTEMS USE IN-LINE AIR PURGER IN LIEU OF AIR SEPARATOR.
5 SET PRESSURE REDUCING VALVE SO PRESSURE AT HIGHEST POINT IN
SYSTEM HAS A MINIMUM OF 4 PSIG. [28kPa]
NOTES
DIAPHRAGM
EXPANSION TANK
TANK SADDLE
TO PUMP
SUCTION
PITCH UP
1.6% SLOPE
(MIN.)
HANGER ROD
SUPPORTS (TYPICAL)
CONNECTOR PIPE
NORMALLY OPEN
GATE VALVE IN
VERTICAL (REMOVE
HANDLE)
RUN DRAIN LINE
TO NEAREST
F.D. UNLESS
INDICATED
OTHERWISE
FROM SYSTEM
AIR
SEPARATOR
SEE NOTES
NO. 3 & 4
DRAIN
COLD WATER FILL
LINE. SEE EXPANSION
TANK SCHEDULE FOR
SIZE
NC
RUN DRAIN
LINE TO
NEAREST FD
REDUCED PRESSURE
BACKFLOW PREVENTER
BUTTERFLY
OR BALL
ISOLATION
VALVE
HANGER
RODS
(TYP)
AV
AUTOMATIC AIR VENT
PI
NOTE:
TOP OF CHEMICAL POT
FEEDER TANK SHALL NOT
BE MORE THAN 4'-0"
[1200mm] ABOVE FINISHED
FLOOR.
1" [25mm]
CHEMICAL POT
FEEDER-
MINIMUM CAPACITY
5 GALLONS [19L]
1" [25mm]
FUNNEL
3/4" [20mm]
TO
DRAIN
F R
O M
P U
M P
D
IS
C H
A R
G E
T O
P U
M P
S U
C T
IO
N
AUTOMATIC
FLOW CONTROL
AND BALANCE
DEVICE
PROVIDE ESCUTCHEONS FOR
EXPOSED PIPING.
OMIT INSIDE MECH ROOM
SECURE JACKET WITH METAL
BAND NO MORE THAN 1" FROM
END
BACKUP
MATERIAL
SEALANT
ALUMINUM JACKET WITH
FACTORY APPLIED MOISTURE
BARRIER. EXTEND FROM BELOW
BACKUP MATERIAL TO 10" ABOVE
FLOOR.
METAL BAND NEAR FLOOR
MASONRY FLOOR
SCHEDULE 40 STEEL OR
CAST-IRON PIPE SLEEVE
CUT FLUSH WITH FLOOR
INSULATION (WHERE
REQUIRED)
OMIT ALUMINUM JACKET IF
PIPING IS UNINSULATED
BACK STOP MATERIAL
SEALANT
CONTINUOUS INSULATION
THRU SLEEVE. PROVIDE
ALUMINUM JACKET 2"
BEYOND CAULKING OR
ESCUTCHEON.
PIPE SLEEVE PER
SPECS
UNFINISHED AREA
INTERIOR WALL
ESCUTCHEON TO BE PROVIDED IN FINISHED
AREAS
1/4" MIN. SPACE ALL
AROUND
FINISHED AREA
CRAC
FLOOR
3-WAY WATER REGULATING
VALVE (350 PSI) PROVIDED
WITH UNIT
MANUAL AIR VENT
STRAINER
D
ISOLATION VALVES
CALIBRATED BALANCE VALVE W/ P&T
TAPS. BALANCE VALVE SHALL BE SIZED
AT A PRESSURE DROP OF 3 PSI MAX AT
FULL FLOW.
TRAPPED CONDENSATE DRAIN
UNION
DRAIN
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
IN MM IN MM IN MM IN MM IN MM
4" 102 5/8" 16 3/4" 19 4" 102 3/4" 19
3" 76 1/2" 13 1/2" 13 4" 102 5/8" 16
2-1/2" 64 3/8" 10 3/8" 10 4" 102 5/8" 16
2" 51 3/8" 10 3/8" 10 4" 102 5/8" 16
1-1/2" 38 3/8" 10 1/4" 6 4" 102 1/2" 13
D+[25]
D+1"
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE
ONLY FOR STEAM & CONDENSATE.
STEEL PIPE OR
COPPER TUBE
D = PIPE O.D.
D+3-3/4"
D+1-1/2"
D+[38]
D+[95]
5/16"
[8"]
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL Ø = S+1/16"
DRILL Ø = S+[2]
D
P
D+4-3/4"
D+2-1/2"
C
D+[64]
D+[121]
NOTE:
WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL ANCHOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseArchitect/Engineer of Record StampConsultant
321 4 5 6 7 8 9 10
Sprinkler Status
M502
HVAC DETAILS
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
WWW.AE-WORKS.COM
AE WORKS PROJECT #: 18017
REPLACE IT HVAC HEAT
EXCHANGER
135 East 38th Street, Erie, PA 16504
562-18-401
01/29/2019 CJC CJC
100% BID DOCUMENTS
NOT TO SCALEM502
1 HORIZONTAL EXPANSION TANK - PIPING CONNECTIONS
NOT TO SCALEM502
2 (VA) WATER TREATMENT - CLOSED SYSTEMS
NOT TO SCALEM502
3 FLOOR PIPE PENETRATION DETAIL
NOT TO SCALEM502
4 TYPICAL WALL PIPE SLEEVE DETAIL
NOT TO SCALEM502
5 CRAC UNIT DETAIL
NOT TO SCALEM502
6 SMALL PIPE ANCHOR 1-1/2" - 4"
DRYCOOLER NO. 2 (DC-2)
(NON-IT LOOP (MISC SPACES))
DRYCOOLER NO. 1 (DC-1)
(IT LOOP)
LEGEND
GATE VALVE
CHECK VALVE
BUTTERFLY VALVE
RELIEF VALVE
UNION
BALL OR FLOW CONTROL VALVE
FLOW SWITCH
PRESSURE DROP SENSOR
STRAINER/FILTER
NOTES:
1. PRESSURE AND TEMPERATURE GAUGES (OR PORTS FOR
SAME) REQUIRED TO MONITOR COMPONENT PRESSURE
DROPS AND PERFORMANCE.
FS
P
FS
ET
EXPANSION TANKET
ET
EQPT ID: FCU-L2A
LOCATION: WB-39
AREA SERVED: PHONE ROOM
TYPE: CRAC
PUMP
EQPT ID: FCU-L2B
LOCATION: WB-39
AREA SERVED: PHONE ROOM
TYPE: CRAC
EQPT ID: FCU-L3
LOCATION: B-20
AREA SERVED: SERVER ROOM
TYPE: CRAC
EQPT ID: FCU-L4
LOCATION: B-20
AREA SERVED: SERVER ROOM
TYPE: CRAC
EQPT ID: FCU-5
LOCATION: B-13A
AREA SERVED: IT CLOSET
TYPE: CRAC
EQPT ID: FCU-6
LOCATION: 1E-011 (FIRST FLOOR)
AREA SERVED: IT CLOSET
TYPE: CRAC
EQPT ID: WSHP-2
LOCATION: BN058
AREA SERVED: BASEMENT ROOMS BN051, BN052, BN053
TYPE: WSHP
EQPT ID: WSHP-2A
LOCATION: CANTEEN
AREA SERVED: STORE CLOSET
TYPE: WSHP
EQPT ID: WSHP-4
LOCATION: BE026A
AREA SERVED: BASEMENT
ROOMS BE026, BE026A
TYPE: WSHP
EQPT ID: WSHP-5
LOCATION: BE031
AREA SERVED: PHARMACY
RESIDENTS
TYPE: WSHP
EQPT ID: WSHP-10
LOCATION: BREAK ROOM
AREA SERVED: WOMENS
LOCKER ROOM EF-29A
TYPE: WSHP
EQPT ID: WSHP-11
LOCATION: BREAK ROOM
AREA SERVED: MENS LOCKER
ROOM EF-27A
TYPE: WSHP
EQPT ID: FCU-L1
LOCATION: BW033
AREA SERVED: MAIL ROOM
TYPE: CRAC
EQPT ID: WSHP-1
LOCATION: BW035
AREA SERVED: CHIEFS OFFICE
TYPE: WSHP
EXTERIOR EQUIPMENT
OUTSIDE THE HOSPITAL
LEVEL 1
CRAWL SPACE
BELOW
AMBULATORY CARE
ADDITION
BUILDING 1
BASEMENT LEVEL
BUTTERFLY
VALVE V-1
BUTTERFLY
VALVE V-2
BUTTERFLY
VALVE V-5
BUTTERFLY
VALVE V-6
BUTTERFLY
VALVE V-3
BUTTERFLY
VALVE V-4
DOMESTIC WATER
HEAT EXCHANGER
HX-1
DRAIN PIPE
DOMESTIC
WATER SUPPLY
BUTTERFLY VALVE V-9
BUTTERFLY
VALVE V-8
BUTTERFLY
VALVE V-7
IT LOOP TERMINAL EQUIPMENT
NON-IT LOOP TERMINAL EQUIPMENT
PACKAGED
PUMPING UNIT
PP-2 FOR DC-2
PACKAGED
PUMPING UNIT
PP-1 FOR DC-1
PUMP P-1
PUMP P-2
PUMP P-3
PUMP P-4
CONTINUATION SYMBOL
BUTTERFLY VALVE V-10
TEMPERATURE SENSORT
T
T
T
T P
FSP
BUTTERFLY VALVE V-11
EMERGENCY CONNECTIONS
PRESSURE/TEMPERATURE WELL
PT
DRAIN (FOR TESTING OF
GLYCOL LEVELS/PERCENTAGE)DR
PT
PT
PT
PT PT
PT
PT
PT
DR
DR
GENERAL
THE PURPOSE OF THIS PROJECT IS TO REPLACE EXISTING OUTDOOR DRY COOLERS WITH EQUIPMENT THAT PROPERLY COOLS THE GLYCOL LOOP SERVING BOTH IT AND NON-IT HVAC EQUIPMENT INSIDE THE FACILITY. THE HVAC EQUIPMENT CONNECTED TO THE LOOP IS SET UP TO REJECT HEAT FROM THE SPACES INTO A COOLED 40% PROPYLENE GLYCOL WATER LOOP, ALLOWING THE ROOMS TO MAINTAIN PROPER TEMPERATURE.
THE EXISTING LOOP WILL BE SEPARATED INTO TWO LOOPS –
- IT EQUIPMENT LOOP – IT SPACES SUCH AS SERVER ROOMS. THE UNITS SERVING THE IT ROOMS (VERTIV/LIEBERT UNITS) HAVE INTERNAL COMPRESSORS WHICH ALLOW THEM TO HANDLE TEMPORARY, OCCASIONAL HIGHER LOOP TEMPERATURES.
- NON-IT EQUIPMENT LOOP - THE “NON-IT LOOP” CONSISTS OF MISCELLANEOUS NON-IT COOLING LOADS. LOCKER ROOMS, STORAGE SPACES, OFFICES. THE MISCELLANEOUS ROOMS HAVE EXISTING GEOTHERMAL HEAT PUMPS WHICH CANNOT HANDLE LOOP TEMPERATURE
DRIFTING HIGHER.
DRY COOLERS WILL PROVIDE NECESSARY COOLING IN OFF-PEAK SUMMER CLIMATE CONDITIONS. HEAT SHED FROM THE LOOP MUST BE TRANSFERRED TO THE AIR THROUGH A WATER-TO-AIR COIL. THIS HEAT MUST BE TRANSFERRED FROM A HIGHER TEMPERATURE TO A LOWER TEMPERATURE. DURING THE SUMMER MONTHS AT EXTREME TEMPERATURES IT WILL NOT BE POSSIBLE TO COOL THE WATER LOOP LOWER THAN THE OUTSIDE AMBIENT TEMPERATURE. THIS COULD RESULT, ON THE HOTTEST DAYS, IN A COOLING LOOP TEMPERATURE ABOVE 95°.
EXISTING CONTROL POINTS FOR THE LIEBERT UNITS FOR FCU-L3 AND FCU-L4 CAN BE RE-USED FOR THE UPSIZED INDOOR UNITS.
ANY NEW DDC EQUIPMENT TO BE JOHNSON CONTROL METASYS SYSTEM. NAME BRAND ONLY. NO OTHER MANUFACTURER TO BE ACCEPTED.
VALVE FUNCTIONS
THE FOLLOWING PARAGRAPH SUMMARIZES THE VARIOUS VALVES ADDED AS PART OF THIS PROJECT, LISTING THEIR FUNCTION AND DIFFERENTIATING BETWEEN MOTORIZED AND MANUAL VALVES.
• V-1 & V-2 = MOTORIZED VALVES FOR SUPPLY AND RETURN PIPING FOR DC-1
• V-3 & V-4 = MOTORIZED VALVES FOR SUPPLY AND RETURN PIPING FOR DC-2
• V-5 & V-6 = MOTORIZED VALVES FOR BYPASS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .