36C24419Q0974 0003 Triennial Breaker Testing Contract Answers and Clarifications base on Site Visits 19 and 20 August 2019.docx
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Triennial Breaker Testing Contract Answers and Clarifications base on Site Visits UD Site visit 8/19/2019 @ 1:00 PM HZ Site visit 8/20/2019 @9:00 AM
1. No contractor parking on site.
2. No smoking, vaping, or chewing tobacco is allowable on site
3. Testing will occur evenings and weekends to minimize impact to the medical center
4. To meet project schedule, work to be performed at both campuses simultaneously
5. IR Scanning - Contractor is responsible for the removal and reinstallation of covers, doors, etc. as required to allow for IR scanning/testing of equipment
6. All panels and disconnects rated over 100 amps shall be maintained and tested per 3.12.1 of the solicitation’s performance work statement (PWS).
7. The contractor shall provide a temporary generator per section 3.9 of the performance work statement.
8. Per 12.2.21 Fisher House pdf electrical drawing attached.
9. For solicitation 36C24419Q0974, in the attached document, there is section number 12. This lists all the one lines and equipment lists. However, those numbers don’t correlate with the document titles that were available for download.
Additional questions:
1. If you already have our past performance information for another solicitation do we need to resend that past performance information for this solicitation.
Response: Yes.
2. Vendors are advised that the requirements of 13 CFR § 125.6 are applicable to this solicitation and shall respond accordingly. This is an unrestricted requirement, does this still apply?
Response: This line does not apply to this acquisition, please disregard.